Managing Information Systems Projects
Feasibility, Risks, and Methods
Eric Santanen, Ph.D.ILTM 2006
![Page 2: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/2.jpg)
Overview
Information systems projects can be extremely beneficial to organizations; however,
Poorly managed projects can kill an organization…
Look at how IS and management practices fit together.
![Page 3: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/3.jpg)
Agenda for Today
The changing business environmentIS project feasibility analysisManaging ExpectationsIS design methodologies – time permitting
But first, an illustration…
![Page 4: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/4.jpg)
![Page 5: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/5.jpg)
Organization
![Page 6: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/6.jpg)
Organization
Organizational Objective
![Page 7: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/7.jpg)
Organization
Organizational Objective
Organizational Use of
Technology
![Page 8: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/8.jpg)
Information Systems
Collects, processes, stores, analyzes, & disseminates information– Automatically or with human intervention
What are some business functions performed by IS?
What benefits are offered by IS?– How might they be classified?
![Page 9: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/9.jpg)
Understanding Your Organization
Think of a typical large organizationWhat are its characteristics?
– Think of: longevity, structure, mergers, reward structure, culture, attitudes of upper management, propensity for risk,
– What are implicit assumptions of above?
Are the above advantages or disadvantages when it comes to new projects?
![Page 10: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/10.jpg)
Understanding Your Environment
What has changed since many of these large companies have begun?– In the marketplace?– With technology?– In society?
![Page 11: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/11.jpg)
Market Pressures
Globalization & Competition– NAFTA, EU– What special requirements do these create?
Real-Time Operations– Today’s business doesn’t wait for old data
Changes in the workforce– Telecommuters, flexible hours, etc
Powerful customers– Know more than ever before (how?)– Want customized products (like what?)
![Page 12: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/12.jpg)
Technology Pressures
Obsolescence of today’s products– Moore’s Law– Gateway commercial for the G5– Fairchild Semiconductor: replace a $1.05
television vacuum tube with $100 transistor
Substitute products and services– If you don’t jump on today’s technology…
![Page 13: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/13.jpg)
Moore’s Law Illustrated
![Page 14: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/14.jpg)
Societal Pressures
Major areas of Societal Pressure– Social Responsibility– Government De/Regulations– Homeland Security– Information Ethics
![Page 15: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/15.jpg)
Social Responsibility…
![Page 16: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/16.jpg)
Lets Look at the Cases:
Sports-for-All– What is the current business situation?– Why won’t advertising work here?– Why doesn’t Jim like David’s proposal?
Quantas Airlines– What is their business situation?– Which pressures are evident?– What are the benefits of e-commerce?
![Page 17: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/17.jpg)
The Technology Playground
“Business as Usual” No Longer Exists!
Those that think so will ultimately Fail…
![Page 18: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/18.jpg)
Categories of IS Projects
Problems OpportunitiesDirectives
Which categories get funding first?Which categories have the greatest
potential to return value?Any problems here?
![Page 19: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/19.jpg)
IS Project Management
1995 survey, 352 orgs, 8000 IS projects– What percentage were on-time & on-budget?
– What percentage simply failed?
– The remainder • Are over budget by 189%
• Behind schedule by 222%
Why do these problems occur? What can be done to turn failures into successes?
![Page 20: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/20.jpg)
Why Software Development Fails
![Page 21: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/21.jpg)
Another Illustrated Example…
![Page 22: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/22.jpg)
![Page 23: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/23.jpg)
![Page 24: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/24.jpg)
![Page 25: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/25.jpg)
![Page 26: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/26.jpg)
![Page 27: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/27.jpg)
![Page 28: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/28.jpg)
Analysis of the Swing
Why does this problem happen so often?What can be done to prevent this sequence
of events?
![Page 29: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/29.jpg)
How about a break?!?
![Page 30: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/30.jpg)
![Page 31: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/31.jpg)
Preventing the Failures
Feasibility AnalysisThreats to Feasibility
![Page 32: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/32.jpg)
IS Project Feasibility:
How do you determine if an IS project is feasible?– What does “feasible” really mean?
![Page 33: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/33.jpg)
IS Project Feasibility:
OperationalTechnicalScheduleEconomic
![Page 34: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/34.jpg)
Operational Feasibility, I
Does management support this system?– Attitude of executive management
• Overall budget rule-of-thumb…
• ‘Enabler’ budget…
• ‘Inhibitor’ budget…
• Sports-for-All vs. Quantas…
– Location of IS on the org chart…– What is the organization’s primary business…
![Page 35: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/35.jpg)
Operational Feasibility, II
How do users feel about their new and changing role?
Is resistance a real threat?Will the working environment change?
– For the better? For the worse? Influences on resistance
![Page 36: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/36.jpg)
Technical Feasibility
Is the proposed technology practical?– Is the technology available? To us…– Is it mature enough to apply?– Will it work with our current technology?
And the often forgotten ones:– Do our people have necessary skills? (mouse)
– What are Training / Hiring needs?– Both Tech staff and “regular” employees
![Page 37: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/37.jpg)
Schedule Feasibility
Are the project deadlines reasonable?– Are they mandatory or simply desired?– What is the penalty for missing a deadline?– Watch out for Parkinson’s Law!
Useful Methods:– (Optimisitic + 4 * Likely + Pessimistic) / 6– Function Points Analysis
![Page 38: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/38.jpg)
Function Points Analysis
Application Item Count Simple Average Complex
# Inputs 3 4 6
# Outputs 4 5 7
# Programmed Inquiries 3 4 8
# Files / Relations 7 10 15
# Application Interfaces 5 7 10
![Page 39: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/39.jpg)
Function Points Questions
Complexity Adjustments (Scale from 0 to 5)– Is backup/recovery required?– Is data communication required?– Are any functions distributed?– Is performance critical… (there are 10 more criteria)
Function Points = total weighted count * (0.65 + (0.1*Σ (complexity adjustments)))
Roger Pressman, Software Engineering: A practitioners approach, 3rd ed, McGraw-Hill, 1992, p50.
![Page 40: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/40.jpg)
![Page 41: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/41.jpg)
Schedule Feasibility
An “old” saying:– It is better to deliver a correctly functioning
system late than to deliver garbage on time!
![Page 42: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/42.jpg)
Economic Feasibility
How can you measure economics of IS?– There are several techniques...
What is wrong with these approaches to feasibility analysis?– How well do they work? – Consider our cases…– Think in terms of information availability
![Page 43: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/43.jpg)
Economic Feasibility
Intangible Benefits: difficult to quantify– Still important to identify
– Without these, many projects would be infeasible...
Examples on intangible benefits– Improved employee morale
– Increased customer loyalty
– Better decision making capability
– Any others?
![Page 44: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/44.jpg)
The Intangible: Cust Loyalty
There is a chance (.50) that a customer may send a few orders (.10) to competitors
There is a chance (.20) that a customer will send more orders (.50) to competitors, especially if orders are slow
There is a chance (.10) that a cust will send an order to competitor only as a last resort, reducing business by (.90)
There is a chance (.05) that a cust will not do business with us at all, 100% loss
![Page 45: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/45.jpg)
Customer Loyalty
Calculate the estimated business loss Loss = .50 * (.10 loss of business) + .20 * (.50 loss of business) + .10 * (.90 loss of business) + .05 * (1.00 loss of business) Loss = 0.29 or 29% estimated loss of business
If avg customer places $100K in annual orders we will lose $29K for each customer
If we have 100 customers, we will lose $2.9M each year!
![Page 46: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/46.jpg)
![Page 47: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/47.jpg)
Economic Feasibility
Another “old saying”– It is better to count gold imprecisely than to
count pennies precisely
![Page 48: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/48.jpg)
Feasibility Dangers
A project that was once feasible may not remain so - why not?
Feasibilities can often conflict!– Best solution can often be the most expensive– good operational feasibility– poor economic feasibility
What can you do if the project is not feasible on all levels?
![Page 49: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/49.jpg)
Managing Expectations
Often most difficult aspect of a projectTool for balancing priorities Rows in matrix are project dimensions:
– Cost– Schedule– Scope / Quality
![Page 50: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/50.jpg)
Managing Expectations
Columns in matrix are the priorities:– Max or Min: most important– Constrain: median importance– Accept: lowest importance
Impossible to optimize all simultaneously!Rule: 1 check per row & column
![Page 51: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/51.jpg)
Expectation Management
Priorities Max or Min Constrain Accept
Cost: $20B
Schedule: Deadline 12/1969
Scope / Quality:Man on the moon,return safely
X
X
X
![Page 52: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/52.jpg)
Making Development a Success
Primarily focused on SW developmentMost hardware has a significant SW
componentThree primary methodologies
– Waterfall, Prototype, None– Which do you think is most common?
![Page 53: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/53.jpg)
Software Development
Sequential Methodologies “Waterfall”
Survey, Study, Define, Target, Design, Construct, Deliver
n-1
2
1
n
…
![Page 54: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/54.jpg)
Software Development
Iterative Methodologies “Prototyping”
Require, Design, Code, Test, Feedback
1
2
3
4
5
![Page 55: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/55.jpg)
SW Development Tools
What is the value of dev methodologies?How can you coordinate team efforts?
– Who works on what? – At what times?– From what locations?
What is the single difference between:– IBM vs. Apple, DVD vs. DivX, Windows vs.
Linuix
![Page 56: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/56.jpg)
Frequent Causes of Failures
Taking shortcuts with methodology– when/why do these occur?
Cost of fixing errors, finding an error in:– Requirements: $1,000– Design: $2,500– Coding: $6,000– Testing: $25,000– Implementation: $75,000
![Page 57: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/57.jpg)
Frequent Causes of Failures
Scope & Feature Creep– can be both good and bad, how?– are mgmt intentions clear?
![Page 58: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/58.jpg)
Brief Summary
IS Projects present new challengesNeed to carefully consider new criteriaNew methodologies exist to helpLets reduce % of failed projects!!
![Page 59: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/59.jpg)
![Page 60: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/60.jpg)
And the stuff that we didn’t get to…
![Page 61: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/61.jpg)
Investment Strategy Analysis
General IS application areas– Institutional, professional, physical
automation, external, infrastructureMap these against functional components
or user groups– R&D, QA, manufacturing, marketing, finance
What do we learn from this? What comparisons can we make?
![Page 62: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/62.jpg)
Waves of Tech Adoption
of 100 Million US households…1/2 million are the actual Innovators5 million are the Early Adopters30-35 million are Early Majority40-50 million are Late Majority10-15 million are Technology Averse
![Page 63: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/63.jpg)
Waves of Adoption, I
The Innovators– On the cutting edge of technology– Most people don’t understand anything about
these folksManagement’s Approach
– Support them with funding & learn from them– What are advantages? Drawbacks?– How much funding should they get?
![Page 64: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/64.jpg)
Waves of Adoption, II
Early Adopters: The First Consumers– Risk Takers: Owned BetaMax, 8-tracks, DivX– Wait at midnight for releases on Win95, etc.– “Gotta Have It!!!!” mentality
Management’s Approach– Significant opportunities can be missed if these people
are ignored– Need guidance of IS dept to prevent overwhelming
resources– How do we manage this group?
![Page 65: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/65.jpg)
Waves of Adoption, III
The Early Majority: First Big Wave– Open to new technology but need help– Confused by terminology, new standards, no time to
learn– Hold important positions in organizations, can make
or break technology use: must see direct benefits
Management’s Approach– Lots of training! If needs are unmet, will be rejected– IS must know the business, non-tech products &
services
![Page 66: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/66.jpg)
Waves of Adoption, IV
Late Majority: Technology Skeptics– Not afraid of technology, have concerns about
cost, risk, security, compatibility, time, learning curves for decision making
– Face severe budget pressures– Will my client really benefit from this?
Management’s Perspective– Address risks, costs as well as opportunities– Address technology concerns (security) at level of
the audience
![Page 67: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/67.jpg)
Waves of Adoption, V
Technologically Averse– Not even considering a computer
– Concerned about privacy, security, control
– Real estate & Publishing: web pages bypass sunk costs in infrastructure
Management’s Perspective– Need to be aware of justifiable business fears
– These people need the most time & education
![Page 68: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/68.jpg)
Summary
Range of organizational problems– Many have happened inadvertently– Many can be addressed by IS
IS alone is not a sufficient solution to any problem
Proper management is essential
![Page 69: Managing Information Systems Projects Feasibility, Risks, and Methods Eric Santanen, Ph.D. ILTM 2006.](https://reader030.fdocuments.net/reader030/viewer/2022032523/56649d805503460f94a63a97/html5/thumbnails/69.jpg)
Questions??