    OAL MANAGEMENTOAL MANAGEMENTYSTEM ATYSTEM AT

    RAICHUR THERMAL POWER

    STATION

    : .GUIDE Mrs GAUTHAMI ALVA

    : . .EVALUATOR PROF SUDHIR M

    : .SPEAKER PRIYANKA R

  • 8/14/2019 Management System At

    3/23

  • 8/14/2019 Management System At

    4/23

    INTRODUCTION

    RaichurThermal Power Station (RTPS) is a project

    sponsored by the Karnataka Power CorporationLimited . KPCL is a fully owned by the Government

    of Karnataka.

    Karnataka Power Corporation LTD exclusively for

    power generation through hydel & thermal .

    RaichurThermal Power Station is first of its kind in

    Karnataka State.

  • 8/14/2019 Management System At

    5/23

    OBJECTIVES

    To generate the electricity & supply to the people

    in the Karnataka State.

  • 8/14/2019 Management System At

    6/23

    ESTABLISHMENT

    Raichur Thermal Power Plant is situated atShaktinagar near Deosugur village of Raichur District(on Raichur Hyderbad Highway).

    The Project to construct the Thermal Power Station was

    finalized in 1978 after an MOU was signed betweenKarnataka Power Corpration Limited & the Karnataka

    State Electricity Board. Tata Group Company wasappointed as the consultants for the project.

    Aquired area of RTPS, is 536 acres for colony.1600 acresfor power station. 1000 acres for ash handling . 128

    acres for Rehabilitation centre.

  • 8/14/2019 Management System At

    7/23

    The Power station at present consists of seven

    units each of 210 MW generationcapacities.Each unit generating 5 million units

    per day .

  • 8/14/2019 Management System At

    8/23

    Major Sources Of Coal Supply To Raichur

    Thermal Power Plant Are:

    M/s. Singareni Collieries Company Limited ,

    Andhra Pradesh -550

    KMs.M/s.Wstern Coalfields Limited ,Maharashtra -

    660KMs.

    M/s.Mahanadi Coal Fields Limited , Orissa - 1850KMsM/s.Karnataka EMTA Coal Mines Limited (KECML)

    ,Maharashtra - 660KMs.

    Imported Coal from Indonesia, Thailand & China.

  • 8/14/2019 Management System At

    9/23

    CHITTAPUR

    KRISNA

    RAICHUR

    MCI

    MADRAS

    ARAKONAM

    GUDUR

    ANDRA PRADESH

    RTPS

    BYSHIP

    WCL CUTTCK

    BPARDM

    SYIMMZ

    SSCL

    SAST1

    PRPI

    VISHAKAPATNAM

    PENAKODA

    BHUBANESWAR

    BILASPUR

    ORISSA

    MCLTALCHER

  • 8/14/2019 Management System At

    10/23

    The coal supplied is sampled using a

    computerized system and sent to the laboratory

    for testing. This ensures that a properly graded

    coal is being used.

    Coal Management System At

    RTPS / Computerized Unit ControlSystem:

  • 8/14/2019 Management System At

    11/23

    RAW MATERIALS

    RTPS uses coal for generation of electricity.

    Types of Coal Used

    Raw Coal Washed coal

  • 8/14/2019 Management System At

    12/23

    AVERAGE LANDED COST OF:

    A) WASHED COAL 1728.91

    B) RAW COAL 1103.08

    THEREFORE, WASHING, HANDLING &

    SERVICE CHARGES TO WASHERIES

    (A - B)

    625.83

    ADD: 20% LOSS OF RAW COAL DUE TO

    WASHING AT WASHERIES

    220.62

    ON THE TOTAL QUANTITY OF WASHED

    COAL, THE FINANCIAL IMPLICATION IS

    (Rs. In Crores)

    271.21

    TOTAL COST FOR THE COAL PROCURED DURING THE YEAR 2008-2009

  • 8/14/2019 Management System At

    13/23

    Unloading of Coal at RTPS

  • 8/14/2019 Management System At

    14/23

  • 8/14/2019 Management System At

    15/23

    Problems faced by KPCL inprocurement of coal

  • 8/14/2019 Management System At

    16/23

    Actions initiated by KPCL:

    To bring down the transit losss a liaison agent was

    appointed.

    KPCL entered into Fuel Supply agreement (FSA) with coal

    companies during the year2000

    .

  • 8/14/2019 Management System At

    17/23

    KPCL initiative to own its coalmines block:

  • 8/14/2019 Management System At

    18/23

    ISSUES

  • 8/14/2019 Management System At

    19/23

    ENVIRONMENT MANAGEMENTGREENARY AT RTPS

  • 8/14/2019 Management System At

    20/23

    AWARDS

    2003-04 GOLD SHIELD & CERTIFICATE FOR OUTSTANDING

    PERFORMANCE - 88.23% PLF

    2002-03 GOLD SHIELD & CERTIFICATE FOR OUTSTANDINGPERFORMANCE -90.39% PLF

    2000-01 and 2001-02 - CERTIFICATE & SILVER SHIELD FOR GOOD

  • 8/14/2019 Management System At

    21/23

  • 8/14/2019 Management System At

    22/23

    CONCLUSION