Management Presentation May 2018 Houston, Texas

Transcript of Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of...

Page 1: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

Management Presentation

May 2018Houston, Texas

Page 2: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

2Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Cautionary Statement

Safe Harbor Language

This presentation contains, and oral statements made in connection with this presentation may contain, forward-looking statements. Forward-lookingstatements are all statements other than statements of historical facts, such as projections or expectations relating to such topics as oil and gas prices,operating cash flows, capital expenditures, liquidity and tax rates. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,”“projects,” “targets,” “intends,” “likely,” “will,” “should,” “to be,” “potential” and any similar expressions are intended to identify those assertions asforward-looking statements.

We caution readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from thoseanticipated, projected or assumed in the forward-looking statements. Important factors that can cause our actual results to differ materially from thoseanticipated in the forward-looking statements include the cyclical nature of the oil and gas industry, changes in backlog estimates, suspension ortermination of projects, timing and award of new contracts, financial ability and creditworthiness of our customers, consolidation of our customers,competitive pricing and cost overruns, entry into new lines of business, ability to raise additional capital, ability to sell certain assets, receipt of additionalinsurance proceeds, advancement of the SeaOne Project, ability to resolve disputes with a customer relating to certain contracts to build two multi-purpose service vessels, ability to remain in compliance with the covenants contained in our credit agreement, ability to employ skilled workers,operating dangers and limits on insurance coverage, weather conditions, competition, customer disputes, adjustments to previously reported profitsunder the percentage-of-completion method, loss of key personnel, compliance with regulatory and environmental laws, ability to utilize navigationcanals, performance of subcontractors, systems and information technology interruption or failure and data security breaches and other factorsdescribed in more detail in “Risk Factors” in Item 1A of our annual report on Form 10-K for the year ended December 31, 2017, as updated by oursubsequent filing with the U.S. Securities and Exchange Commission (SEC).

Investors are cautioned that many of the assumptions upon which our forward-looking statements are based are likely to change after the forward-looking statements are made, which we cannot control. Further, we may make changes to our business plans that could affect our results. We cautioninvestors that we do not intend to update forward-looking statements more frequently than quarterly notwithstanding any changes in our assumptions,changes in business plans, actual experience or other changes, and we undertake no obligation to update any forward-looking statements.

This presentation also includes certain financial measures such as backlog and options which are not recognized under U.S. Generally AcceptedAccounting Principles (GAAP). The required reconciliation of these non‐GAAP financial measures to the most directly comparable GAAP financialmeasures are included in our SEC filings or otherwise footnoted in this report.

Page 3: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

3Copyright © Gulf Island Fabrication, Inc. All rights reserved.

A Company founded on ingenuity and integrity

Company Overview

• A leading fabrication, shipbuilding, construction services and EPC provider

• Founded in Louisiana in 1985 with an initial public offering in 1997 (NASDAQ:GIFI)

• Diversified international customer base – delivered complex steel structures worldwide

• Market Capitalization: ~$150 million (as of 5/1/18)

Page 4: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

4Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Enhanced liquidity and expanding backlog in diversified markets

Recent Progress in Strategic Repositioning

Rationalizing Underutilized Assets: Successful disposition of our South Yard in Ingleside, Texas, for $55 million in cash (April 20, 2018) Sale of Corporate Aircraft for $2.1 million (expected to close May ‘18) North Yard, cranes and related equipment marketed for sale Insurance proceeds from Hurricane Harvey damage pending ~$5-8 million (expected resolution in Q2 ‘18)

Backlog ~$292 Million Plus Options1 of ~$626 Million: Since early 2017, new orders in excess of $280 million for our Shipyard Division plus $626 million in options with new

customers beyond oil & gas Build Fabrication, EPC and Services backlog

New EPC Division Formed: Named by SeaOne as EPCIC/S Prime Contractor for their project to export compressed gas liquids from Gulfport,

Mississippi to Carribean and South & Central American countries (which is subject to conditions such as agreement on terms of engagement and SeaOne seeking financing)

Received approval for $1 million purchase order from SeaOne for continuing “Early Works” estimating support services Execute Definitive Contract for EPCIC/S Project and commence project

Continued Expansion into Offshore Wind Power Projects in USA: Another offshore Wind Power Project award in March 2018 Partnering agreement in place with EEW and pursuing other opportunities in Wind Secure more substantial awards starting in 2019 and beyond to build backlog

1 Options include unexercised options on contracts.

Page 5: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

5Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Delivering Quality Products April 2018: Fabrication successful delivery

of ~10,000 tons of petrochemical modules for Ethylene Plant in Lake Charles

February 2017: Shipyard successful delivery of 300’ Diesel Electric OSV (a 2nd

vessel delivery scheduled in June 2018)

Page 6: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

6Copyright © Gulf Island Fabrication, Inc. All rights reserved.

>>> 2016 Harvest• Project management focus• Income statement focused• Profitability• Diminishing upstream oil &

gas wave of investment• Shipyard acquisition /

expansion

2017/18 The “Pivot”• “Price taker” on bids• Backlog exhaustion / trough• Balance sheet management• Cash preservation focus• Divestitures• Protect/expand capabilities• Market diversification• Rebuilding backlog• ERM – Enterprise Risk

Management

2019 Growth >>>>• Return to growth• Diversification / new markets• Income statement focused• Profitability• Capacity constraints• Pricing leverage / margin

expansion• Shareholder returns• Capital investments

2017/2018 – A Season of Transition…

Page 7: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

7Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Integrating our experience with best practices and risk management

A Path to More Consistent Performance

• Enhancing our compliance efforts to integrate ERM (“Enterprise Risk Management”) across the Company:

• Rationalize/modernize controls and target compliance effort• Engage business unit managers to identify key operational

risks• Educate, communicate and integrate ERM into organization

• Embed Best Practices:• Enhance estimating capabilities across divisions• Standardize pre-engineering and full-scale mockups / 3D

modeling prior to cutting steel (“keel-laying”)

• Organizational Re-Alignment:• Hired EPC Division Senior Vice President and other

professionals• Enhance marketing capabilities• Evaluate and implement operational position changes to

maximize effectiveness

Experience

Best Practices

ERM

Page 8: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

8Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Embed best practices w/corporate and operational risk management

Converting Challenges into Advantage

• Utilize best practice pre-engineering to mitigate construction risks

• Utilizing pre-build engineering practices to de-risk future ship newbuild projects

MPSV Ship Project Losses

in 2017

• Implementing Enterprise Risk Management (ERM)• Embedding ERM practices in all major projects

Project Inconsistency

• Hired experienced EPC leadership from outside and staffing team of EPC professionals

• De-risking project by adding a trusted partner with EPC, electrical, and international experience

• Utilizing best practices regarding contract structure

SeaOne EPC Project

Advantage Gulf Island

Going Forward

Page 9: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

9Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Capacity along the Gulf Coast to service onshore and offshore clients

Gulf Coast Facilities

Houston, TXEPC Division &

Corporate Office

*Aransas Pass, Texas, location currently held for sale.

Page 10: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

10Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Fabrication of complex steel structures for over 33 years

Our Capabilities

Page 11: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

11Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Many “Firsts” in the industry

A Leader in Offshore Fabrication

Page 12: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

12Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Business Segment Drivers

• Chemical renaissance driving new plant construction/expansion along Gulf Coast

• Modular construction techniques similar to offshore• US Offshore Wind emergence

Fabrication

• “Plant-the-Flag” Strategy on Fabrication’s coattails of new projects• >80% of spending occurs post-construction in petrochemical plants• Enter/acquire new marketing channels for land-based services

Services

• U.S. Jones Act enforcement• Strong shipping demand• Naval fleet reconstruction; military/government• Petrochemical marine demand; product carriers• Offshore wind power service vessels

Shipyards

• SeaOne Project• Expansion to capture project management opportunities below current

EPC players’ radarEPC

1“US Downstream Engineering, Construction & Maintenance Market Outlook 2017,” by Martina Asbury, Petrochemical Update, December 2016.

Page 13: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

13Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Successfully delivered four modules nearing 10,000 tons of steel for a new Ethylene Plant being constructed in Lake Charles, Louisiana.

Recent Fabrication Success

Page 14: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

14Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Over $275 million in new orders since early 2017 plus $626 million in new options.

Recent Shipyard Success

Page 15: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

15Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Successful execution of profitable projects in 2018 and poised for growth as industry conditions improve.

Recent Services Success

Yard Fabrication:• Ongoing fabrication and pipe

shop work for maintenance and upgrades at various offshore and onshore locations

• Heater module fabrication continues

Inshore Operations:• Marine terminal upgrades;

manifold and tank farm expansion projects completing

• Supporting miscellaneous maintenance projects with labor and equipment

Offshore Operations:• Three major tiebacks being

performed for GOM operator• Ongoing offshore

maintenance at various offshore locations

Offshore Tieback SkidHeat Medium Skid

42” Pipeline Construction Frames Treatment Skid

Page 16: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

16Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Export of compressed gas liquids (dry gas/methane and solvent/propane) to developing countries in the Caribbean and Central & South Americas.

EPC Division - SeaOne Project Highlights

Gulf Island named EPCIC/S by

SeaOne in 2017

Page 17: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

17Copyright © Gulf Island Fabrication, Inc. All rights reserved.

EPC Project would include opportunities to fill backlog for Fabrication Division (with some opportunities for Services and Shipyard Divisions as well).

EPC Division - SeaOne Project Summary

• EPC with trusted Joint Venture partner

• ~$3-4 billion total project scope (subject to final design and contracting)

• 240,000 tons of modules and steel (fabrication ~10-15% of total project cost)

• Export facility in Gulfport, Mississippi, w/import facilities in Colombia and Dominican Republic

• Additional import facilities in later phases could include another Colombia site, Puerto Rico, and Mexico among others

• Another ~$1.5 billion for each new set of import facilities (again, subject to final design and contracting)

Page 18: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

18Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Gulf Island fabricated the foundations for the first offshore wind farm in U.S. waters.

Deepwater Wind in Rhode Island

Page 19: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

19Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Gulf Island is leading in offshore wind foundation fabrication in the USA and is partnering with global leaders in offshore wind products.

USA Offshore Wind Power Gaining Momentum

Source: “Wind Power Takes to the Seas,” by Brian Dumaine, Fortune, March 24, 2017 .

050

100150200250300350

2015 2016 2017 2018 2019 2020 2021 2022

Offshore USA Wind Turbine Installations and Foundations Required

Sources: Statoil Hywind company information, management estimates.

Page 20: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

20Copyright © Gulf Island Fabrication, Inc. All rights reserved.

*Options include unexercised options under existing contracts and include deliveries through 2025; options may be dependent on government funding, competitor protests and ability to perform among other factors.

Backlog plus Options ~ $0.9 Billion

Backlog$292

Options$626

Total Company Backlog and Options(in millions)

Backlog and options with deliveries through 2025, subject to customer and other contingencies.

Page 21: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

21Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Actual hours worked will be based on project management schedules and are subject to change due to weather, material availability, subcontractors, availability of labor, customers’ decision/approval to exercise options, funding of projects, and a variety of other factors.

Histogram – Booked Work & Possible Options

0

50

100

150

200

250

300

350

400

450

May

'18

June

'18

July

'18

Aug

'18

Sept

'18

Oct

'18

Nov

'18

Dec

'18

Jan

'19

Feb

'19

Mar

'19

Apr

'19

May

'19

June

'19

July

'19

Aug

'19

Sept

'19

Oct

'19

Nov

'19

Dec

'19

Jan

'20

Feb

'20

Mar

'20

Apr

'20

May

'20

June

'20

July

'20

Aug

'20

Sept

'20

Oct

'20

Nov

'20

Dec

'20

Jan

'21

Feb

'21

Mar

'21

Apr

'21

May

'21

June

'21

July

'21

Aug

'21

Sept

'21

Oct

'21

Nov

'21

Dec

'21

Man

hour

s in

thou

sand

s

Booked Work & Possible Option Manhours for CompanyMay 2018 through Dec 2021

Booked Work Options Possible Traditional Availability Current Availability

Current Availability =250,000 MH/month

Traditional Availability = 360,000 MH/month

*Availabilities based on 55 hours per week.

Actual financial results will be based on actual contractual work preformed and approved by the customer and may differ materially from information presented in this presentation.

Page 22: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

22Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Commercial$120 Government

$160

Backlog by Market(in millions)

New customer orders (with options) in commercial transportation and government including marine research institutions, defense and others. Follow-on orders for additional Z-tech tugs recently signed.

NEW Shipyard Orders in 2017/2018

Options include unexercised options under existing contracts and include deliveries through 2025; options may be dependent on government funding, competitor protests and ability to perform among other factors

Commercial$24

Government$602

Options by Market(in millions)

Page 23: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

23Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Continued challenging results due to unabsorbed overhead in Fabrication and Shipyard Divisions along with EPC Division startup.

Recent Performance

• Strong Services Division performance with improving oil prices.

• Fabrication Division driven by completion of CB&I modules for ethylene plant during 1Q18; depletion of backlog in coming periods.

• New Shipyard Division orders – Terminal/Escort Tugs – beginning to flow through financials; curtailment of challenged MPSV construction projects; pursuing level loading of yards to improve operating margins.

• EPC Division with unabsorbed overhead but continuing to pursue more material backlog opportunities.

• 1Q18 Income Summary:(in millions)

• Revenues $57.3• Gross profit 0.7• SG&A 4.7• Asset impairment 0.7• Operating income (loss) (4.8)• Other income (expense) (0.5)• Net income (loss) (5.3)

Page 24: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

24Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Improved liquidity from sale of South Yard which closed April 20, 2018.

Balance Sheet Highlights & Liquidity

~$82 Million in Liquidity1

$48 Million Cash Balance1

~$5-8 Million in Additional Hurricane

Harvey Insurance Proceeds3 Pending Claim Resolution

$48 Million Remaining in Assets

Held for Sale4

$200 Million S-3 Shelf Registration

Statement Available for Supplemental

Capital

$40 Million Revolving-

Line-of-Credit2

$0 Drawn1 with $5.5 Million of LC’s

Outstanding1

1 Balances as of May 7, 2018.2 Availability on revolver is $40 million less outstanding letters of credit of $5.5 for a total of $34.5 million available to draw; balances will vary per working capital requirements and timing.3 Management estimate and subject to final settlement.4 Balance at quarter end March 31, 2018.Other tax attributes: $63 Million of Tax Net Operating Losses with no material Federal tax cash payments .

Page 25: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

25Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Balance portfolio of projects across service lines and prepare for a period of sustained growth.

Corporate Objectives in 2018

Capital Discipline:• Rationalize assets• Enhance contract structure to offset working capital investments

Protect Liquidity:• Preserve cash position• Capital expenditures enhanced by MARAD grant

Enhance Organization:• Recruiting top talent to enhance team across the organization• Implement Enterprise Risk Management and Embed Best Practices

Build Backlog in EPC, Fabrication and Grow Services:• Continue to develop new marketing channels (renewables/offshore wind,

petrochemical, transportation, government, onshore services)

Page 26: Management Presentation - d1io3yog0oux5.cloudfront.net€¦ · canals, performance of subcontractors, systems and information technology interruption or failure and data security

26Copyright © Gulf Island Fabrication, Inc. All rights reserved.

Thank you!