Manage Goods Issue & Transfer Posting
Click here to load reader
-
Upload
olet-malla -
Category
Documents
-
view
47 -
download
6
description
Transcript of Manage Goods Issue & Transfer Posting
BHP BILLITON Manganese Gabon
Manage Goods Issue
And Transfer Posting Course Curriculum
James Asante
10/28/2010
(See revision listing on back page)
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 2 of 10
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 3 of 10
Version: 1.0 Module: Materials Management (MM) Developer: James Asante Reviewers: Change & Training Tony Botes Deloitte MM Team Lead Bronwen Watson BHP Billiton SME Berinda Joubert Other Course Title / ID: Manage Goods Issue and Transfer Posting Target Audience: Business Unit Supply Personnel:
� Mn Administrator � Mn Supply - Co-ordinator � Mn Supply - Practitioner � Mn Supply - Supervisor � Operator Stores � Overseer Supply � Secretary Departmental � Specialist Financial Systems � Superintendent Supply
Course Duration (Estimate): 1 day Delivery Method(s): Facilitated Session, Practical Exercises
Prerequisites: SAP Basic Navigation Course Course Purpose and Objectives: This course is intended to cover the business processes and the management of Goods Issuing and Transfer Postings as applicable to BHP Billiton. The course will also cover the associated Reports.
Upon completing this course, participants will be able to:
� Describe the of Goods Issue processes � Review stock � Issue Goods direct for consumption � Issue Consignment stock � Perform Transfer Posting � Perform Inventory disposal � Determine disposal method � Goods Issue to scrap � Replenish Consignment stock � Settle Consignment � Describe Stock Transfer processes and methods � Perform stock transfer via Transport Orders � Perform stock transfer via Material Movement � Perform stock transfer via Multiple Movements � Perform stock transfer Transfers between sites � Execute Reports
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 4 of 10
Content Outline:
Course Overview – Process Flow
Process Flow: Procurement Process
Manually Generated
Maintenance Work Order.
MRPex Inventory
Requisition
Requisition Approval
Purchase Order Goods Receipt Payment
Material MasterDetails
Vendor Master Details
StockStock Issue Requester
Asset Management
Process Flow: Goods Issue Direct Process Flow
End UserRequirement
Itemsselected from
warehouse
ActivityReference
Goods Issue
ActivityReference
BU
End UserReceives
Goods
ActivityReference
HazardousSubstanceDatabase
ObtainHazardousSubstance
MSDS
ActivityReference
PrintHazardousSubstance
MSDS
ActivityReference
Request toprint MSDS
ActivityReference
HazardousSubstanceDatabase
PrintHazardousSubstance
MSDS
ActivityReference
Non-HazardousGoods
Hazardous Materials
Automatic Process Manual Process
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 5 of 10
Content Outline:
Course Overview – Process Flow
Process Flow: Stock Transfer Direct Movement
Process Flow
Requirement to Transfermaterial from one Storage
Location to another StorageLocation
BU
TransferMaterials
ActivityReference
Enter TransferPosting
ActivityReference
Print TransferSlip
ActivityReference
Process Flow: Multiple Movement Transfers
Process Flow
Requirement to Transfermaterial from another Plant
BU
TransferMaterials
ActivityReference
Enter TransferRemovalPosting at
Issuing Plant
ActivityReference
Enter TransferPlacementPosting at
Receiving Plant
ActivityReference
Transfer SlipPrinted
ActivityReference
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 6 of 10
Content Outline:
Transaction Name Transaction Code QRG
Goods Issue for Consumption MB1A Yes
Issue Consignment stock MB1A Yes
Goods Issue to Scrap MB1A Yes
Issue Material to Sub-Contractor Order ME2O Yes
Post Goods Issue for Purchase Order MIGO Yes
Change Material Document MB02 Yes
Reprint Material Document MB02 Yes
Cancel Material Document MBST Yes
Picking list (Stock Determination) MB26 Yes
Reports
Display Material Documents MB03 Yes
Display Consignment Stocks MB54 Yes
Stock Reconciliation Report (by Material) MB5B Yes
List of Stock Values by General Ledger Account MB5L Yes
MM Inventory Analysis & Ratios MC.1 Yes
Slow Moving Stock MC46 Yes
Inventory Report with Storage Bin Location ZMIM_INV_WITH_BIN Yes
Manage Goods Issuing.
Upon completion of this module, participants will be able to:
� Issue Goods direct for consumption � Issue Consignment stock � Post Goods Issue for Purchase Order � Goods Issue to scrap � Create Picking list (Stock Determination) � Change Material Document � Execute Reports
This course will cover the following concepts, terms, and procedures:
� Movement Type � Issuing Plant � Receiving Plant
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 7 of 10
Content Outline:
Transaction Name Transaction Code QRG
Transfer Posting Materials to a Stock Transport Order MB1B Yes
Transfer Posting Materials MB1B Yes
Reports
Display Material Documents MB03 Yes
Display Consignment Stocks MB54 Yes
Stock Reconciliation Report (by Material) MB5B Yes
List of Stock Values by General Ledger Account MB5L Yes
MM Inventory Analysis & Ratios MC.1 Yes
Slow Moving Stock MC46 Yes
Inventory Report with Storage Bin Location ZMIM_INV_WITH_BIN Yes
Course Review:
After completing this course, participants will be expected to be able to:
� Describe the of Goods Issue processes � Review stock � Issue Goods direct for consumption � Issue Consignment stock � Perform Transfer Posting � Perform Inventory disposal � Determine disposal method � Goods Issue to scrap � Replenish Consignment stock � Settle Consignment � Describe Stock Transfer processes and methods � Perform stock transfer via Transport Orders � Perform stock transfer via Material Movement � Perform stock transfer via Multiple Movements � Perform stock transfer Transfers between sites � Execute Reports
Manage Transfer Posting
Upon completion of this module, participants will be able to:
� Perform stock transfer via Transport Orders � Perform stock transfer via Material Movement � Perform stock transfer via Multiple Movements � Execute Reports
This course will cover the following concepts, terms, and procedures:
� Movement Type � Issuing Plant � Receiving Plant
Goods Issue and Transfer Posting 2010
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 8 of 10
Learning Assessments:
The following mechanisms will be used to reinforce and evaluate the learning:
� Practical exercises in the SAP R/3 training environment. Support Material:
The following mechanisms will be used to support the learning:
� Manage Goods Issue and Transfer Posting Quick Reference Guide � PowerPoint presentation � Activity Flow Posters � Student Guide � Exercise Guide � Data Sheet
Source Documentation This section lists all source materials (supplementary to the ARIS LPDD Report) that should be used to build the Module (e.g. product documentation, peripherals, CDs, white papers, product specific software, hardware requirements, etc.). Source materials should be stable at commencement of development activity and also identify exactly what and how they should be used.
Doc Ref
Document Title Version Location Document Usage: Identify What, Where and how to use this source document
1 Release 1 1SAP Project Overview eLearning
Published As a source where referenced. http://elearning.bhpb.internal/Modules/Basics/I1_1SAP_Project_Overview/
2 1SAP Overview Images Zip File
- Module Design DB
As specified.
3 PPT source doc INT001 L&PS Approach
- Module Design DB As specified.
4
5
6
7
8
9
10
11
12
BHP Billiton 1SAP Project
1SAP L&PS Module Design – eLearning – Introductory Learning
Date of Issue: 28/10/2010 2009 BHP Billiton Commercial in Confidence Page 10 of 10
Document History
Approvals Record
Document Owner Title / Role Signature Date
James Asante MM Trainer
Approvers
Tony Botes Technical Project Manager
Bronwen Watson Deloitte MM Team Lead
Berinda Joubert BHP Billiton SME
Change History
Version No. Date Changed Modified By Nature of Amendment
1.0 2010-10-28 James Asante Issue for comment