4.8.2.P Piping Engineering Company
Man Hours
Index
Drawings/Documents List P R200 50000
Line Index/Piping Line list P R 150 37500
Tie-in Schedule F A 250 62500Specification
F A120 30000
F A120 30000
P A60 15000
F A60 15000
Data Sheet
P R
60 15000
P R
60 15000
Procurement Related Documents
P R
160 40000
Calculations
F R
400 100000
P I400 100000
p R
300 75000
Engineering Dwg & 3-D Model
Overall Plot Plan F A100 25000
Contractor’s Deliverables
Phase 5Cost $ 250/Hr
Piping Material Selection Specification/Line class index
Piping Material Specification (Pipe Class)
Heat Tracing/Jacketing Specifications (If applicable)
Insulation specification & Thickness Table (Job Specification)
Special Piping Item Schedule & Data Sheets (Strainers, Traps, etc..) (if applicable)
Spring Support Schedule and Data sheets (If applicable)
Long Lead Item List & Material Requisitions, TBE, POR/PO (if applicable)
Piping Wall thickness Calculation Sheets (All Line Classes)
Material Take Off (1st , 2nd, 3rd or final)
Stress Reports along with Stress isometrics for critical lines including executable CAESAR-II input (If applicable)
![Page 2: Man Hour Estimate](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8fbc550346703b9f4109/html5/thumbnails/2.jpg)
F A
100 25000
P R
250 62500
Underground piping layout Plan P A300 75000
P A300 75000
P A300 75000
TOTAL 3690 922500
Unit Area Plot Plan/Equipment Layout plan, elevation and sectional elevation
Piping Study Drawings (Critical Piping only)
Eye wash/ Safety shower location Drawings
Tie-in Location Plan & Detailed Drawings
![Page 3: Man Hour Estimate](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8fbc550346703b9f4109/html5/thumbnails/3.jpg)
4.8.2.G Machinery Company Man Hours
Critical and Long lead equipment List F A 200
Drawings/Document List F A 500
F(LLE) A
500
General/ Project Specifications F A 250
Equipment Data Sheets F A 700
F(LLE) A200
F(LLE) A500
Requisitions for Packaged Units F A 500
Vendor Deviations / Exceptions F(LLE) A 125
F(LLE) A600
Machinery Painting Specification F I 150
Machinery Insulation Specification F R 150
P A0
Machine Monitoring System Scope F A 300
F(LLE) R300
F(LLE) A300
List of Special Tools F(LLE) A 300
F(LLE) A300
TOTAL 5875
Contractor’s Deliverables
Phase 5
Complete List of Vendor Data and Drawings in accordance with the Vendor Data section of all applicable Standards / SES.
Rotating Machinery Final Selection Document
Rotating Equipment Requisitions including completed Data Sheets
Technical Bid Tabulation/ Evaluation & Recommendations
Rotating Machinery Protective Instrumentation (Instrumentation)
Electrical Motors/ Generators Mechanical Details
List of Capital, Pre-commissioning, Commissioning & Start-up and Operational Spare parts.
Inspection and Testing surveillance plan, procedures and third party inspection scope
![Page 4: Man Hour Estimate](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8fbc550346703b9f4109/html5/thumbnails/4.jpg)
50000125000
12500062500
175000
50000
12500012500031250
1500003750037500
075000
75000
7500075000
750001468750
Cost $ 250/Hr
![Page 5: Man Hour Estimate](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8fbc550346703b9f4109/html5/thumbnails/5.jpg)
4.8.2.Q Stationary Company
General
Equipment List F R 200
F A
600
F R
500
F A400
Identification of two-year operational spare parts P R100
Specification
Mechanical Data Sheets (for Critical items / LLE) F A700
Mechanical Data Sheets (for other equipment) P A 200
Project Specifications (for Critical items / LLE) F R 400
Project Specifications (for all other equipment) P R 200
Equipment Internals specifications (for Critical items / LLE) F R800
P R
300
P R300
Fireproofing Specification P R150
Rust Prevention Specification P R150
P R150
Technical specification for equipment modification F R
500
F R
500
TOTAL 7200
Contractor’s Deliverables
Phase 5
Man Hours
Technical bid evaluation & tabulation for Critical items (based on service and MOC) & LLE 1
Purchase Inquiry Specifications (RFQ/ MR for equipment vendors) - for Critical items / LLE 1
Purchase Specification – “Ready for order” stage for Critical items / LLE 1
Refractory Specifications (including MOC and types of anchors with spacing details)
Painting Specifications (for special applications not covered by SES, if any)
Internal lining specification (ex. elastomers/GRP/FRP/glass etc.)
A complete Inspection Report addressing the current condition of the pressure components and attachments
![Page 6: Man Hour Estimate](https://reader036.fdocuments.net/reader036/viewer/2022072008/55cf8fbc550346703b9f4109/html5/thumbnails/6.jpg)
General
50000
150000
125000
100000
25000Specification
175000
50000
10000050000
200000
75000
75000
37500
37500
37500
125000
1250001800000
Cost $ 250/Hr