MALDIVES PROFILE
Transcript of MALDIVES PROFILE
MMAALLDDIIVVEESS PPRROOFFIILLEEKURIHARA KOGYO CO., LTD
Mechanical & Electrical Services
1 | P a g e
2 | P a g e
A. Our Company Profile………………………………………………………………………..3
B. Main Office / Branch Office / Sales Office…………………………….………….4
C. Our Mission, Policy and Achievements…………………………………………….5
D. Kurihara Kogyo Co. Ltd in Maldives…………………………………………………6
E. Hulhule Island Hotel, Male, Maldives………………………………………………7
F. Bandos Island Resort…………………………………………………………………………10
G. Four Seasons Resort (Maldives at Kuda Huraa…………………………………10
H. Kandooma Tourist and Rhivelli Beach Resort…………………………………..10
I. Four Seasons Resort, Maldives at Landaa Giraavaru…………………………12
J. Hulhule Island Hotel Maldives, New Guestrooms Extension…………..18
K. Holiday Inn Hotel Male, Maldives……………………………………………………24
L. White Sands Resort and Spa – Phase 2…………………………………………….32
M. Second Girls’ Secondary Girl School at Maldives……………………………..38
N. Proposed Island Resort at Falhumaafushi………………………………………..43
O. Konotta Island Resort at Maldives……………………………………………………47
P. Maldives Project Reference……………………………………………………………….50
TABLE OF CONTENTS
3 | P a g e
KURIHARA KOGYO CO., LTD was
Founded in Osaka, Japan since 1919
and is listed as top ten (10) leading
Company in Mechanical & Electrical
Engineering Industrial and Social
Fields according to the Japan
Construction Data Research Institute.
With more than 80 years history in
the industrial, prominent position,
abundant experience and extensive
engineering resources in advance
technology application in the
industrial and building sectors,
Kurihara is fully equipped and
prepared to face any challenge.
Kurihara’s lines of business include
engineering material supply, project
management, construction and
maintenance.
The company offers total engineering
solutions throughout the world from
Planning, designing, material supply, erection, supervision to testing and commissioning.
Kurihara Kogyo has, over the decades, participated in plant and equipment exports since
inception. Thus, far it has rendered technical cooperation in the construction of numerous
projects in various countries such as Asia and elsewhere worldwide.
The company’s policy of providing advanced quality engineering and technologies that
meet the local conditions of the respective countries, at its disposal, an enormous
manpower resource of licensed and experienced engineers to meet this end.
In the unique position, Kurihara Kogyo has handled all kinds of project including mega-
projects that require sophisticated and specialized technolologies, through its well-
organized task forces and project teams at anytime and anywhere.
The company is driven to provide reliable and complete engineering and construction
solution with worldwide reputation. It has endeavoured and will continue its endeavours
to meet the requirements of plant manufacturers and users all over the world in
contributing towards the development of the international community.
OUR COMPANY AND PRODUCT OVERVIEW
4 | P a g e
JAPAN / SINGAPORE / MALAYSIA / CAMBODIA / VIETNAM / THAILAND / SHANGHAI
Vietnam : Hanoi Head Office3rd & 4th Floor, 73 Tran DuyHung Street Cau Giay District 1Hanoi – Vietnam
Ho Chi Minh Branch Office4th & 5th Floor 185 DienBien Ohu Street District 1Ho Chi Minh City- Vietnam
Japan : Kurihara Kogyo Co., LtdHeadquartersHigashi-Hankyu Bldg1-1 Kakuda-Cho, Kita-KuOsaka Japan 530-0017
Singapore : Kurihara Kogyo Co., Ltd168 Jalan Bukit MerahConnection One BuildingTower 3 #05 – 07, Singapore
Malaysia : Kurihara(Malaysia)Sdh BhdNo 16 Lorong 1/137CBedford Business Park,Batu 5, Jln Kelang Lama58200 Kuala Lumpur,Malaysia
Cambodia : Kurihara Kogyo Co., LtdNo 85 Str 214Sangkat Boeung Pralit7 Makara DistricePhnom Penh Cambodia
Thailand : Kurihara(Thailand) Co Ltd19th Floor Unit C-D SSPTower 555/50-51 SolSukhumvit 63 (Ekamai),Sukhumvit Road Klongton-Nua, Wattana District,Bangkok 10110 Thailand
Shanghai : Kurihara Kogyo Co., LtdCentral Place Room No 211No 16 Henan Road SouthShanghai, china
MAIN OFFICE / BRANCH OFFICE / SALES OFFICE
5 | P a g e
Many countries of the world, particularly developing countries are actively promoting
industrialization. With the company decades of foundation, technology, resources and
management, Kurihara Kogyo has expanded its organization and operation with highly
advanced technologies and quality in various countries such as Asia and elsewhere
worldwide.
ISO ACHIEVEMENTS
Our Mission:“PROMOTE A QUALITY-IN-ALL-WE-DO PHILOSOPHY WITH A TOTAL COMPANY DEDICATED
EFFORT AND COMMITMENT TO CONTINUOUS IMPROVEMENT.”
Our Policy:“FOCUS ON ‘CUSTOMER FIRST’ BY PROVIDING SERVICES THAT MEET OR EXCEED
CUSTOMER NEEDS AND EXPECTATIONS.”
Monitor Customer Satisfaction Reduce Quality Cost And Maintain Improvement Through Innovation
OUR MISSION, OUR POLICY, OUR ACHIEVEMENTS
6 | P a g e
Kurihara Kogyo has venture into Maldives more than a decade ago.
Maldives is scattered like exotic pearls on a vast aquamarine canvas painted by the Indian
Ocean. A Chain of 1190 little coral islands that forms the archipelago of the Maldives in
80- 120km wide, stretching 860 km from latitude 7o6"N to 0o41"S and lying between
72o32" and 73o45" E.
With the local survey and study of Maldives Geography, History & Culture, the company is
well equipped with the close communication network between the operation team in
Maldives and Singapore Head Office. Kurihara Kogyo has maintained its technologies and
logistic link-up to meet the local conditions and requirement and not discounting on the
company MISSION & POLICY of delivering it’s quality and standard.
The company is expanding its operation and services in Maldives from Project
Management, Construction to Engineering Materials Supply and After Sales Maintenance.
KURIHARA KOGYO CO., LTD IN MALDIVES
7 | P a g e
Far before year 2000, Kurihara Kogyo was invited to manage and construct the Mechanical
and Electrical systems for the Airport Island Hotel, Hulhule, Maldives.
With the foundation and solid planning, the company mobilized a management team to
the island for site survey and preparation work.
Kurihara Kogyo has participated in the preliminary project management, with the
strategic local alliances formed over the years, in plant and equipment exports in order to
meet the hotel completion schedule.
HULHULE ISLAND HOTEL, MALE, MALDIVES
8 | P a g e
Hulhule Island Hotel
Couple with the complete engineering and technologies solution, the company has
successfully delivered a timely schedule and completion of the project with no comprising
on the services and quality through its well-organized task forces and project management
team.
9 | P a g e
Hulhule Island Hotel
Kurihara Kogyo has serve the clients as a reliable business partner, providing the clients
with the loyalty of a trusted business ally with unfaltering cost effectiveness. The
company has thrived on the success of the clients business; ensure the clients what it
takes to run the business efficiently and effectively time after time.
10 | P a g e
BANDOS ISLAND RESORT, FOUR SEASONS RESORT (MALDIVES AT KUDA HURAA)
KANDOOMA TOURIST RESORT AND RIHIVELI BEACH RESORT
After the Tsunami occurrence,
Kurihara Kogyo was assigned by
Hotel Properties Leisure Group
(owner of Hilton Hotel Singapore and
the Famous Hard Rock Café and
Hotels in Asia) for the survey and
investigation on the damages of
Mechanical and Electrical system
including the plant generators, RO
plants, sewerage plants caused by
the tidal wave
Due to the emergency needs for
refurbishment of the resorts
damages; with very short notice, the
company mobilized a competent
team of engineers and supervisors to
conduct Due Diligence sites survey,
testing and report.
All necessary tools, testing sets and
equipments were pre-prepared and
hand carried by the team with the
understanding of the limited
resources of the country.
The survey and all necessary testing
of the plants and systems report plus
the proposed budgetary costing for
the refurbishment works were well
carried out and conduct as per
schedule.
11 | P a g e
Bandos Island, Four Seasons, Kandooma Tourist and Rihivelli Beach Resort
The Due Diligence reports with all
the test results, endorsed by the
company Professional Engineer, and
photos attached were delivered
timely to the clients in less than a
week. Meetings and presentations on
the report were conducted together
with the clients and representative
of Insurance Professional Engineer.
Kurihara Kogyo was awarded for the
repair and refurbishment works for
Rihiveli Beach Resort. With the
company social field and readiness
of all resources including tools,
materials, the people and know
how, it form a team of Engineer,
supervisors with hands on
experience, close logistic network
and personnel for the repair works
Electrical engineering work was
calculated and all damage panels
were rectified and face-lift. Sub-
main cables with leakage were
track and repair with quality resin
compound. All outlets and circuitry
were tested and replaced.
The assigned task force complete
the M&E repair work of the resort in
less than a month with the resort re-
launch and back in operation at
minimum down time and minimum
lost of income.
12 | P a g e
FOUR SEASONS RESORT, MALDIVES AT LANDAA GIRAAVARU
With an enormous manpower resource
from licensed and competent managers,
engineers to workers, the company
carefully selected a project team with
the knowledge of details components of
each and every system.
The personnel know how and hands on
knowledge make the big difference in
the execution and schedule of the
project requirements
All proper tools and machineries, from
excavator, cable hoist, compressors to
hand tools were bought and delivered.
All bracketing and supports were
tailored to site requirements.
With the experience and knowledge of
Maldives condition and nature of the
water tide and water table for
underground work, Kurihara Kogyo
adopted Vacuum system for the
Sanitary System.
The system eliminates the need for
flow gradient in the waste discharge.
13 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru
Landaa Giraavaru is sited in the BAA Atoll
North of the Main Capital, Male. The distance
between Male, in North Male Atoll to the
project site is 121km which takes 3 hrs
traveling with speed launch or 9 hrs with the
local boats, or dhonis.
Studies and understanding that logistic is the
one of the main feature for the execution of
the project, the company set up and
maintain a close communication network
both in Singapore and Maldives, not
excluding the close co-operation with its
associated forwarders and suppliers.
The main mode of transportation and
delivery of equipments and materials is by
the sea. With the knowledge on the climate
and the transportation mode of Maldives,
the company engages 100% check on proper
packing and labelling of every material
delivered with the forwarders and suppliers.
Due to Maldives geographical isolation, all
materials from equipments to bolts and nuts
are controlled and accountable with a stock
list monitoring system.
14 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru
With a systematic documentation and
handing over, the resort maintenance
team was given one week of former
training on all the systems by our
engineers and two months of operation
interfacing period.
The fire Hydrant pipe works were pre
erected in Singapore work shop with all
brackets and supports, simulation of the
calculated pump room area, and re-
assembled on site. This methodology
eliminates any missing out of parts.
All systems were tested with proper
record and endorsement through the
company licensed and competent
engineers, witnessed by the client’s
representative engineers.
15 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru
The whole execution work from planning, designing, materials supply, delivery,
supervision, testing and commissioning, training, documentation and submission
was completed in 2 years. The resort was officially launched and operated on Oct
2006.
16 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru
Diving Centre, Four Seasons Resort at Landaa Giraavaru
Linear Villa, Four Seasons Resort at Landaa Giraavaru
17 | P a g e
Four Seasons Resort, Maldives at Landaa Giraavaru
Kurihara Kogyo has drawn the trust from the developer and received numerous
compliments from the Resort management on its organization, operation and
technologies.
The company has successfully completed the execution works for the entire M&E
system.
Aerial View of Four Seasons Resort at Landaa Giraavaru
18 | P a g e
HULHULE, ISLAND HOTEL MALDIVES, NEW GUESTROOMS EXTENSION
Being a reliable and trustworthy business partner couple with its past records and
active participation in plants and equipment exports, Kurihara Kogyo was invited
and awarded for the M&E construction work for New Guestroom Extension for
Hulhule, Island Hotel Maldives on June 2006.
With the engineering details established, the company set up the site in two weeks.
19 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension
A site survey and co-ordination was
planned and executed.
With the site mark-up and pipes
length requirement measure to site,
all necessary materials are shipped
and delivered in the shortest time.
ACMV, Data/Tel, Fire Protection,
Electrical services support are colour
coded as per the consultant
requirement couple with the
specified quality, engineered
calculated gauging and salty
environmental coating.
All services are co-ordinate in
details.
Standard installation practice is
carried out and witness by the
clients representative.
20 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension
ELV and MV services lines are segregated, duct work are insulated with standard
insulation materials as according to British Standard of practice.
Two different Guestroom type were mocked up as per schedule.
All M&E fittings and outlets are delivered and installed as per architectural and
designer details.
21 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension
The Re-Trolifted Reception Lobby of the Existing Hotel
22 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension
The Sky Restaurant of the New Wing Extension
Inner View of the Sky Restaurant
23 | P a g e
Hulhule, Island Hotel Maldives, New Guestrooms Extension
Kurihara Kogyo has drawn the trust from the developer and received numerous
compliments from the Hotel management on its organization, operation and
technologies.
The company has successfully completed the execution works for the entire M&E
system. The Hotel Extension was opened in October 2007.
External View of the New Hotel Extension
24 | P a g e
HOLIDAY INN HOTEL MALE, MALDIVES
Mobilisation and Site Set-up for the Holiday Inn Hotel, Male – December 2007
25 | P a g e
Holiday Inn Hotel Male, Maldives
Basement Site Work of the Holiday Inn Hotel, Male – June 2008
26 | P a g e
Holiday Inn Hotel Male, Maldives
Basement Site Work (Night Lifting) of the Holiday Inn Hotel, Male – June 2008
27 | P a g e
Holiday Inn Hotel Male, Maldives
28 | P a g e
Holiday Inn Hotel Male, Maldives
29 | P a g e
Holiday Inn Hotel Male, Maldives
30 | P a g e
Holiday Inn Hotel Male, Maldives
31 | P a g e
Holiday Inn Hotel Male, Maldives
32 | P a g e
WHITE SANDS RESORT AND SPA – PHASE 2
M&E Works at White Sands Resort & Spa – March 2008
Delivery of Materials Site Costing Work
Work at Disco Work at Disco
33 | P a g e
White Sands Resort and Spa – Phase 2
34 | P a g e
White Sands Resort and Spa – Phase 2
35 | P a g e
White Sands Resort and Spa – Phase 2
36 | P a g e
White Sands Resort and Spa – Phase 2
37 | P a g e
White Sands Resort and Spa – Phase 2
38 | P a g e
SECOND GIRLS’ SECONDARY GIRL SCHOOL AT MALDIVES
Basement Site Work of the Second Girls’ Secondary School, Male – June 2008
39 | P a g e
Second Girls’ Secondary Girl School at Maldives
Basement Site Work of the Second Girls’ Secondary School, Male – June 2008
40 | P a g e
Second Girls’ Secondary Girl School at Maldives
41 | P a g e
Second Girls’ Secondary Girl School at Maldives
42 | P a g e
Second Girls’ Secondary Girl School at Maldives
43 | P a g e
Falhumaafushi Island Resort – Top Island View
PROPOSED ISLAND RESROT AT FALHUMAAFUSHI, MALDIVES
44 | P a g e
Island Resort at Falhumaafushi, Maldives
45 | P a g e
Island Resort at Falhumaafushi, Maldives
46 | P a g e
Island Resort at Falhumaafushi, Maldives
47 | P a g e
PROPOSED KONOTTA ISLAND RESORT, MALDIVES
48 | P a g e
Konotta Island Resort, Maldives
49 | P a g e
Konotta Island Resort, Maldives
44 | P a g e
Particulars of Contract ServicesProject
Completion
Value of Works
(US$)Name of Client Name Of Consultant
Vadoo Diving Paradise
Resort, South Male Atoll,
Maldives
Electrical Installation October 1988 500,000.00Sun Maldives
International Ltd.Tak Institute of Architect
Hulhule Island Hotel, Male,
MaldivesM&E Installation September 2000 2,812,500.00 SIA Properties Meinhardt(S) Pte Ltd
Hulhule Island Hotel, Male,
Maldives – Maintenance and
Upgrading Work
M&E Installation March 2001 113,750.00 HIH Hotel N/A
Rihiveli Resort, South Male
Atoll, Maldives
Rehabilitation of M&E
Work due to Tsunami
Damage
March 2005 196,346.00Hotel Properties
LimitedHotel Properties Limited
Proposed Landaa Giraavaru
Resort, Baa Atoll, Maldives
Mechanical & Electrical
Services InstallationAugust 2006 6,561,875.00
Landaa Giraavaru Pte
Ltd/Hotel Properties
Limited
J.P.R Sdn Bhd
Hulhule Island Hotel New
Guest Wing, Maldives
Mechanical & Electrical
Services Installation
Completed
October 20072,070,000.00
Maldives Inflight
Catering Pte Ltd / SIA
Properties
Bescon Consulting
Engineers Pte
15 Storey Holiday Inn Hotel,
Male, Maldives
Mechanical & Electrical
Services Installation
Expected Completion
July 20093,577,450.00
Male Hotel Associates /
Holiday InnPCR Consulting Pte Ltd
KURIHARA PROJECT LISTS (MALDIVES PROJECT REFERENCE)
45 | P a g e
Particulars of Contract Services Project
Completion
Value of Works
(US$)
Name of Client Name Of Consultant
White Sands Resort & Spa
Pvt Ltd (Phase 2)
Mechanical & Electrical
Services Installation
Completed October
2008
2,883,473.00 White Sands Resort &
Spa Pvt Ltd
GMF International Ltd
The Second Girls Secondary
School, Male, Maldives
Mechanical & Electrical
Services Installation
Completed
March 2009
885,000.00 Japan Aid Fund Mohri, Architect &
Associates, Inc.
Proposed Island Resort at
Falhumaafushi, Maldives
Mechanical & Electrical
Services Installation
Feb’10 – Mar’12 S$16,000,000.00 Keong Hong
Construction Pte Ltd
Ace Tech Design Pte Ltd
Konotta Island Resort Mechanical & Electrical
Services Installation
March 2010 1,000,000.00 AIMA Construction AIMA Construction
44 | P a g e
Particulars of Contract ServicesProject
Completion
Value of Works
(US$)Name of Client Name Of Consultant
Vadoo Diving Paradise
Resort, South Male Atoll,
Maldives
Electrical Installation October 1988 500,000.00Sun Maldives
International Ltd.Tak Institute of Architect
Hulhule Island Hotel, Male,
MaldivesM&E Installation September 2000 2,812,500.00 SIA Properties Meinhardt(S) Pte Ltd
Hulhule Island Hotel, Male,
Maldives – Maintenance and
Upgrading Work
M&E Installation March 2001 113,750.00 HIH Hotel N/A
Rihiveli Resort, South Male
Atoll, Maldives
Rehabilitation of M&E
Work due to Tsunami
Damage
March 2005 196,346.00Hotel Properties
LimitedHotel Properties Limited
Proposed Landaa Giraavaru
Resort, Baa Atoll, Maldives
Mechanical & Electrical
Services InstallationAugust 2006 6,561,875.00
Landaa Giraavaru Pte
Ltd/Hotel Properties
Limited
J.P.R Sdn Bhd
Hulhule Island Hotel New
Guest Wing, Maldives
Mechanical & Electrical
Services Installation
Completed
October 20072,070,000.00
Maldives Inflight
Catering Pte Ltd / SIA
Properties
Bescon Consulting
Engineers Pte
15 Storey Holiday Inn Hotel,
Male, Maldives
Mechanical & Electrical
Services Installation
Expected Completion
July 20093,577,450.00
Male Hotel Associates /
Holiday InnPCR Consulting Pte Ltd
KURIHARA PROJECT LISTS (MALDIVES PROJECT REFERENCE)
45 | P a g e
Particulars of Contract Services Project
Completion
Value of Works
(US$)
Name of Client Name Of Consultant
White Sands Resort & Spa
Pvt Ltd (Phase 2)
Mechanical & Electrical
Services Installation
Completed October
2008
2,883,473.00 White Sands Resort &
Spa Pvt Ltd
GMF International Ltd
The Second Girls Secondary
School, Male, Maldives
Mechanical & Electrical
Services Installation
Completed
March 2009
885,000.00 Japan Aid Fund Mohri, Architect &
Associates, Inc.
Proposed Island Resort at
Falhumaafushi, Maldives
Mechanical & Electrical
Services Installation
Feb’10 – Mar’12 S$16,000,000.00 Keong Hong
Construction Pte Ltd
Ace Tech Design Pte Ltd
Konotta Island Resort Mechanical & Electrical
Services Installation
March 2010 1,000,000.00 AIMA Construction AIMA Construction