Making the right decisions for your project Tony Kirby PE, ENV SP, LEED GA, QSD Civil...

13
Making the right decisions for your project Tony Kirby PE, ENV SP, LEED GA, QSD Civil Engineer/Associate Principal, Arup

Transcript of Making the right decisions for your project Tony Kirby PE, ENV SP, LEED GA, QSD Civil...

Making the right decisions for your project

Tony Kirby PE, ENV SP, LEED GA, QSD

Civil Engineer/Associate Principal, Arup

2

Presentation overview

Arup in Los Angeles The issues facing us…

Population Growth Transport Water Energy

When does sustainable design make sense? Three case studies

Questions

3

Arup in Los Angeles

LAX Central Utility Plant Replacement project

Gerald Desmond Bridge Replacement

MTA Crenshaw Corridor – Expo Station

California HST

The issues facing us…

5

Population Growth in California

39,000,000 people in 2014est. 54,000,000 people in 2040 (Source: ASCE Report Card 2012)

6

Transportation

Roads~6,000,000 cars in County of Los Angeles

In Los Angeles, 78% of all trips Are taken by private car (2009)

Need to shift to alternate modes -MTA are making the investmentin rail, bus & roads

AirportsGreater LA area capacity = 142.6 MAP

Forecast for 2030 is ~200 MAP

LAWA has a $7Bn CIP in progress at LAX

PortsThe Ports of Los Angeles and Long Beach will invest $7.3Bn in their ports over the next 10 years. These ports handle 40% of all US imports from Asia.

7

Water

“For the first time in its 54-year history, the State Water Project may not allot any water to the 25 million people and 1 million acres of farmland that it usually services in 2014” (CA DWR)

8

Energy

Source: UCI Advanced Power & Energy Program / Southern California Edison

When does sustainable design make sense?

Three Case Studies

10

LAX CUP – Cogeneration & Thermal Energy Storage

calculated energy savings of $7M per year against old plant

11

Woodbury University Masterplan – Recycled Water

30% potable water reduction for a ~$50k investment

12

Wastewater re-use feasibility

Block Level Strategy Hybrid Strategy Centralized Strategy0

5

10

15

20

25

30Wastewater Treatment Systems – Payback (years)

Optimized strategy has a simple payback of less than 12 years

13