St Clair Station (at Yonge)The streetcar loading platform will be re-constructed and the station roof will be replaced.
St Clair West Station (at Bathurst)Tracks and overhead wires on the on-ramps leading out of the station will be replaced and upgraded.
St Clair Streetcar Right-of-WayWhile the station projects take place, the TTC will be working along the streetcar dedicated right-of-way on St. Clair Ave. Construction involves retrofi tting a four-metre section of each passenger platform to ensure people using mobility devices can easily board the new, low-fl oor streetcars. Full platform replacement – such as that required on the Spadina streetcar route in 2014 – is not required for the platforms on St. Clair Ave.
Transit Service Changes In order to minimize the use of buses in place of streetcars, the projects are being done together. The priority is to return streetcar service on St. Clair Ave. as quickly as possible.
• From mid-June to September, buses are scheduled to replace streetcars along the entire 512 St Clair route. Streetcars are scheduled to resume service between Gunns Loop (Keele Street) and St Clair West Station (Bathurst Street) in September.
• From mid-June to December, work at St Clair Station will necessitate the use of buses between St Clair West Station (Bathurst Street) and St Clair Station (Yonge Street).
Station Accessibility & PRESTOConstruction is well underway to make St Clair West Station fully accessible with new elevators. The TTC will also be installing new PRESTO-enabled accessible fare gates in late April (St Clair Station) and throughout May (both St Clair and St Clair West stations). Signs will be posted throughout both stations during construction and TTCambassadors will be available to direct you to the closest entrance.
PRESTO card readers will not be available on all buses during this project.To learn more about PRESTO please visit ttc.ca/presto.
For more information about the various projects please visit projects.ttc.ca.
Community Liaison: Denise Jayawardene, 416-393-6937 | [email protected]: 416-393-4636 or TTY 416-481-2523(For translation services, press 0 and ask the operator for the language of your choice)Customer Service: 416-393-3030 or TTY 416-338-0357 @TTCnotices @TTChelps
Beginning in mid-June, the TTC will be co-ordinating various accessibility and infrastructure improvement projects along the St Clair streetcar route and inside both St Clair and St Clair West stations.
Construction is required to prepare for the new, accessible streetcars, which are scheduled to begin operating on St. Clair Ave. in 2018.
The following is an overview of the projects. Due to construction at St Clair and St Clair West stations, streetcars will be replaced with buses. Details on this and other changes to transit during construction can be found in the diagram on the back of this page.
Spring 2016
Making St Clair accessible for TTC customers
Using cash, tickets
or tokens?
Get a tim
e-based transfer from
an operator on the 512 St C
lair route during construction. The tim
e-based transfer is valid until the expiry tim
e shown.
The transfer allows you to stop
along St. C
lair Ave. for two
hours to shop.
(Time-based transfer not
available on PRESTO
.)
Shop on S
t. Clair
St C
lair Ave
WS
t Clair A
veW
Gunns
Loo
p(K
eele)
St C
lair West
St C
lair
Bathurst St
Vaughan Rd
Yonge St
90
• Streetcar P
latform
Ad
justments
M
id-June – Decem
ber
Bath
urst
90
Legend
Bus service
Streetcar service
(resumes in S
eptember)
Bus service change
Route extension
to Bathurst S
tation
Service to
St C
lair West
Station resum
esin S
eptember
90
St C
lair Co
-ord
inated P
rojects &
Transit Service C
hang
es
• PR
ES
TO
May – June
• Rep
lacement o
fO
verhead
Wires
Insid
e Statio
n
Mid-June – S
eptember
• On-R
amp
Track
Rep
lacement
M
id-June – Septem
ber• E
asier Access
St C
lair West
Statio
n Pro
jects
Wh
at to exp
ect:•
During construction, board 512 buses along S
t.Clair A
ve. (curbside).
• If travelling past S
t Clair W
est Station on 512 S
t Clair betw
een Septem
ber and
Decem
ber, you will be required to transfer betw
een streetcars and shuttle buses.
• B
oard 33 Forest Hill and 126 C
hristie buses at street level on St. C
lair Ave. W
est
(in front of St C
lair West S
tation’s main entrances).
• B
oard 74 Mt P
leasant and 88 South Leaside on P
leasant Blvd. (S
t Clair S
tation).
St C
lair Statio
n P
rojects
• PR
ES
TO
April – M
ay• R
oo
f
Rep
lacement
M
id-June – Decem
ber• S
treetcar
Passeng
er
Load
ing P
latform
Co
nstruction
M
id-June – Decem
berD
avisville
97
Turns back north atD
avisville Station
Mid-June
– Decem
ber
97B
us serviceM
id-June– D
ecember
512
Bus service
Mid-June
– Septem
ber
Streetcar service
returns in Septem
ber
512
512
512512
• Vaug
han R
d. C
oncrete
W
ork in Track A
rea
date TBD
Please visit your local
Business Im
provement
Area’s w
ebsite for the latest deals and updates:
• St. C
lair Gardens
• C
orso Italia•
Regal H
eights Village•
Hillcrest Village
• W
ychwood H
eights
Access to paid parking lots along St. C
lair Ave. w
ill remain available.