RELEVANT INFORMATION AND DECISION MAKING: PRODUCTION DECISION
Making AV Production Work for You
-
Upload
heidi-brumbach -
Category
Technology
-
view
187 -
download
0
description
Transcript of Making AV Production Work for You
Making AV Production Work for You!
Heidi Brumbach, CMP, CTA, Technisch
Creative
Andy DiRaddo, Staging Solutions, Inc.
Heidi Brumbach, CMP, CTATechnisch Creative
Andy DiRaddo Staging Solutions, Inc.
What’s in store for us today?
First things first
When?
Where?
How?(Much?)
Who?
Why?
The Lingo
Microphones
Speakers
What the rider specified
What the sound guy wanted
What the band thought was cool
What the accountant approved
What the sound company provided
What the venue actually needed
Components
Lighting
Projection
Staging/Scenic
Riders
The Crew•Production Manager•Technical Director•Department Heads•Stagehands, Loaders, Other
The Crew•Production Manager•Technical Director•Department Heads•Stagehands, Loaders, Other
QuickTime™ and a decompressor
are needed to see this picture.
Why is it so EXPENSIVE?
Production Schedule
He who controls the timeline controls the
event.
Event Manager: Heidi Brumbach 517-908-0013 cell: 702-813-8222Production Manager: Greg Poulos cell: 617-293-5630Technical Director: Jim Brumbach 517-908-0013 cell: 702-610-6845MISBTDC: Jennifer Deamud 616-331-7480 cell: 616-295-6232Edward Lowe: Joy Kitamori 312-726-4532 cell: 312-726-4532Emcee: Chris Holman cell: 517-243-9611SBA: Cathy Gase 313-226-6075 x.223Teleprompter: Julie Dyer 517-712-2025Photographer: Dave Trumpie 517-290-5101Head Sound: Jose Mora 312-243-8215 cell: 773-802-3498Lansing Center: Donna Roy 517-483-7400x241Lansing Center: Don Fischer 517-483-7400x215
5/1/13
Time Activity Person/s involved Contact Phone Location
8:00 AM Load in drape, linens, decor Heidi Brumbach 702-813-8222 Lansing Center
9:00 AM Begin rigging floor to ceiling drape 4 riggers Don Fisher Hall A
9:00 AM 12:00 PM Set up VIP reception Event staff Heidi Brumbach 702-813-8222 Governor’s Residence
12:00 PM 1:00 PM Load- In Sound, Lights, Video AV crew, truck loaders, 1 electrician, 5 stagehands
Greg Poulos 617-293-5630 Hall A
12:00 PM 1:00 PM Lunch break Riggers Don Fisher
1:00 PM 5:00 PM Set up Sound, Lights, Video AV crew, truck loaders, 1 electrician, 5 stagehands
Greg Poulos 617-293-5630 Hall A
5:00 PM 6:00 PM Dinner break All
6:00 PM 8:00 PM VIP Reception Heidi Brumbach 702-813-8222 Governor’s Residence
6:00 PM 11:00 PM Continue production set up AV crew Greg Poulos 617-293-5630 Hall A
8:00 PM 9:00 PM Strike VIP Reception Event staff Heidi Brumbach 702-813-8222 Governor’s Residence
11:00 PM 7:00 AM Place tables Lansing Center staff Donna Hall A
MONDAY, JANUARY 7, 2002
LD CREW DEPART FROM HOBBY AIRPORT AT 7:40 AM FLIGHT 149M BOUND FOR PHOENIX LD CREW ARRIVES AT PHOENIX AIRPORT 9:30 AM ET TRUCK #1 ARRIVES AT PHOENIX SCIENCE CENTER 12:00 PM RS CREW ARRIVES AT SCIENCE CENTER AT 1:00 PM (6 HANDS @ 6 HOURS) LD BEGINS LOAD IN OF PHOENIX SCIENCE CENTER AT 1:00 PM ALL MEETING: FINAL ONSITE EQUIPMENT PLACEMENT PHOENIX SCIENCE CENTER AT 1:00 PM KP BEGINS LOAD IN OF GENERATOR FOR THE PHOENIX SCIENCE CENTER AT 2:00 PM (8 HOUR RUN)
TUESDAY JANUARY 8, 2002
ET TRUCK #2 ARRIVES AT PHOENIX CONVENTION CENTER AT 8:30 AM ALL EQUIPMENT TO BE RIGGED FOR GALA ONSITE AT 9:00 AM LD CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00 AM TO BEGIN LOAD IN RS CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00 AM TO BEGIN LOAD IN (6 HANDS @ 10 HOURS) IA CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00 AM TO BEGIN LOAD IN (4 RIGGERS @ 10 HOURS) RS CREW ARRIVES AT SCIENCE CENTER AT 10:00 AM TO CONTINUE LOAD IN (4 HANDS @ 8 HOURS)
LD CREW ARRIVES AT SCIENCE CENTER AT 10:00 AM TO CONTINUE LOAD IN KP GENERATOR FOR THE PHOENIX SCIENCE CENTER (12 HOUR RUN 11:59AM-11:59 PM)
WEDNESDAY JANUARY 9, 2002
LD CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00 AM TO CONTINUE LOAD IN RS CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00 AM TO CONTINUE LOAD IN (4 HANDS @ 10 HOURS)
IA CREW ARRIVES AT PHOENIX CONVENTION CENTER AT 9:00AM (2 RIGGERS @ 5 HOURS)
LD CREW ARRIVES AT PHOENIX SCIENCE CENTER TO CONTINUE SETUP AT 11:59 AM FM ARRIVES AT PHOENIX SCIENCE CENTER AT 11:59 AM FOR INSPECTION LD REHEARSAL OF LIGHTING CUES FOR PHOENIX SCIENCE CENTER BEGIN AT 4:00 PM KP GENERATOR FOR THE PHOENIX SCIENCE CENTER (12 HOUR RUN 11:59AM-11:59 PM)
Audio Lighting/EFX Video Presentation Notes3:50pmDJ/House VRC WC Logo Center Screen
Thank you slides Side ScreenSponsor Logos LED Screens
round robin completed, getting all alliances set start of ceremony and introductions
all VIPs should be seated, speakers prepped and ready, Division alliances prepped and ready
Light Force and UCLA Band are all prepped and ready to go
3:55pmDJ - Harlem Shake VRC WC Logo Center ScreenAudience energy/dance shots Side ScreensSponsor Logos LED Screens
Marc Leon and Mascots around fields and ready to start dancing
Everything should be staged, AV should start showing kids energy, dancing on Side Screens/feed
4:00pm dim VRC WC Logo Center ScreenVIDEO montage of event Side ScreensFX LED screens
video to transition to Light Force
have alliances setup so they can see show also?
4:02pmLightforce Lightforce TBD VOG - To Kickoff the finals, please welcome….Lightforce! Lightforce performance
4:06pmstinger VRC WC Logo Center ScreenKarthik lower third Side ScreensFX LED screens
VOG: Ladies and Gentlemen, PLEASE Welcome to the stage, your Master of Ceremonies for the 2013 VEX Robotics Competition World Championship…Karthik Kanagasabapathy
VOG introduces Karthik, enters through LED curtain - Stage Right
LED and lighting effects when Karthik enters
4:07pm VRC WC Logo Center ScreenKarthik Side ScreensVEX Logo LED Screen
Karthik : Wow, what an event, very quick summary of what got us here. 702 teams have blown us away for three days, and after over XXX qualifying rounds and playoff matches, 9 alliances have been crowned Division Champions and X teams have been crowned World Skills Champions. They've earned their way here to the VEX Dome for the Finals of the 2013 VEX Robotics Competition WORLD CHAMPIONSHIP. I know we're all here to see these amazing alliances in the finals do their thing..... so let's meet them!!!
Karthik welcome to event
Floorplans&
Renderings
In Housevs.
Outside Production
Safety•Everybody wins•Working with safety centric clients•What is PPE and/or JSA
Latest Buzz•Webcasting/ Virtual Events•Digital Apps•Image Mapping/ 3D
QuickTime™ and a decompressor
are needed to see this picture.
QuickTime™ and a decompressor
are needed to see this picture.
Heidi Brumbach, CMP, CTA www.technischcreative.com
facebook.com/technischcreativeTwitter @hbrumbach
Andy DiRaddowww.stagingsolutions.com
facebook.com/stagingsolutionsincTwitter @andyssi