RESUME Of MAKBUL A BANDIYA Personal Data Name : Makbul Abdul Bandiya Fathers Name : Abdul Ahmed Bandiya Nickname : Makbul Civil Status : Single Date of Birth : December 30, 1984 Nationality : Indian Address : 2-163 Makkan plot At-Post Ikhar 392230 Ta-Amod, Dist- Bharuch, Gujarat, India Mobile No. : UAE (+971502638483) INDIA (+919328518406) E-Mail Add : [email protected] [email protected] Passport Details : Passport No. G-1410186 Place of issue- Surat, India. Date of Expiry-30/05/2017 Summary of Skills & Qualifications More than Three (6) years of hands-on experience on NDE/NDT, Welding Inspection, Material Inspection, Coating Painting inspection & other fabrication related inspection being a QA/QC Inspector, NDT Inspector, QA/QC Welding Inspector, ASNT Level II Personnel for, Radiographic Test, Magnetic Particle Inspection & Dye Penetrant Test, and related assignments for Oil & Gas Projects, In-Plant and Off-Plant, both onshore & offshore Middle East & India. Familiar with International codes & standards such as ASME, AWS, BSEN, API, ASTM, ISO etc. Computer Literate, Proficient in MS Office. Educational Qualification & Background Diploma In Mechanical Engineering Passed in Summer-2003 form Shree Mahaveer Education Societies Institute of Polytechnic NASHIK. Conducted by Maharashtra State Board of Technical Education. INDIA. Four Semesters completed in Bachelor of Mechanical Engineering From Institute of Mechanical Engineers (IME) INDIA Professional Qualification Makbul Bandiya Resume Page 1 of 12

description

 

Transcript of Makbul Cv

Page 1: Makbul Cv

RESUMEOf

MAKBUL A BANDIYA

Personal DataName : Makbul Abdul BandiyaFathers Name : Abdul Ahmed BandiyaNickname : MakbulCivil Status : SingleDate of Birth : December 30, 1984Nationality : IndianAddress : 2-163 Makkan plot

At-Post Ikhar 392230Ta-Amod, Dist- Bharuch,Gujarat, India

Mobile No. : UAE (+971502638483) INDIA (+919328518406)

E-Mail Add : [email protected]@gmail.com

Passport Details: Passport No. G-1410186Place of issue- Surat, India.Date of Expiry-30/05/2017

Summary of Skills & Qualifications

More than Three (6) years of hands-on experience on NDE/NDT, Welding Inspection, Material Inspection, Coating Painting inspection & other fabrication related inspection being a QA/QC Inspector, NDT Inspector, QA/QC Welding Inspector, ASNT Level II Personnel for, Radiographic Test, Magnetic Particle Inspection & Dye Penetrant Test, and related assignments for Oil & Gas Projects, In-Plant and Off-Plant, both onshore & offshore Middle East & India.

Familiar with International codes & standards such as ASME, AWS, BSEN, API, ASTM, ISO etc. Computer Literate, Proficient in MS Office.

Educational Qualification & Background

Diploma In Mechanical Engineering Passed in Summer-2003 form Shree Mahaveer Education Societies Institute of Polytechnic NASHIK. Conducted by Maharashtra State Board of Technical Education. INDIA.

Four Semesters completed in Bachelor of Mechanical Engineering From Institute of Mechanical Engineers (IME) INDIA

Professional Qualification

ASNT LEVEL II Magnetic Particle Testing Certificate No. MPT/II/5007 ASNT LEVEL II Liquid Penetrant Testing Certificate No.LPT/II/5807 ASNT LEVEL II Radiographic Testing (Interpretation) Certificate No, RT

(INT)/II/5007 CSWIP 3.1 Welding Inspector, UKAS

TWI Cambridge, London Certificate No. 41519 Valid up to May 22, 2014.

Courses & Trainings Attended

Offshore Permit to Work (PTW), ADMA-OPCO, Abu Dhabi, UAE

Makbul Bandiya Resume Page 1 of 8

Page 2: Makbul Cv

OFFSHORE SURVIVAL COURSE form Gulf Technical & Safety Training Center (GTSC) Abu Dhabi, UAE.

HSE INDUCTION COURSE done from ADMA OPCO, Abu Dhabi.

Professional Work History

Present Employer Bureau Veritas, Abu Dhabi, UAEInclusive Date April 2008 up to presentAddress 1st Floor, Al-Zubara Towers

Al-Salam Street, Abu DhabiP.O.Box- 26264, UAE.

Multi-Discipline 3rd Party Inspector Project Name: Modification And Installation of US 251 and associated Pipe laying and Riser

Installation, EU01E ADMA-OPCO (Umm shaif Field) Contractor- National Petroleum Construction Company (NPCC) Site Name: NPCC Yard. 07th April 2010 to 27th May 2010. Offshore for Pipe laying Barge NPCC DLB 750 28th May 2010 to 22nd July 2010. Offshore for Riser Installation Barge NPCC DLB 1000. 23rd July 2010 to Present.

Work Description:

Check Inspection & Test Plans, witness PQT/WQT, and other start-up requirements as part of the contractual undertakings of the Contractor for 3LPP coatings, Concrete Weight coating, Anode Installation and connectivity checks, Fabrication of spool, pipe laying and riser installation.

Review & check all related procedures and specifications. Arrange and update all consumable material certificates, and equipment calibration

certificates as well as all physical inventory requirements. In-charge of disseminating the criteria and other quality requirements of the project scope

for shift foreman and line personnel concerned. Monitor and check all site activities within the scope of works and make necessary

documentation, including coating & painting jobs, and material testing of cement samples undertaken by the Sub-Contractor used for jacket leg grouting of offshore structures.

Supervise QA/QC Personnel tasked to monitor all mechanical, welding, coating, painting and Anode installation works in accordance with ADMA-OPCO Standards and relative requirements.

Interpretation of Radiographs & witnessing other Non Destructive Testing. Performs other duties and responsibilities as may be assigned by the client QA/QC Manager

or his authorized representative.

Multi-Discipline 3rd Party Inspector Project Name: Fabrication of Water Treatment Package (Skid).

Client – Iran Offshore. Contractor – Global Process System, Mafarq, Abudhabi 2nd March 2010 to 6th April 2010

Responsibility / Duties:

In-Process Inspection, Final inspection of structures (fit-up, welding, painting). Fabrication Spec / Code : AWS D1.1 / ANSI B31.8 / ASME Sec IX / ASME B 31.3. Witness of NDT Magnetic Particle Testing / Liquid Penetrant Testing & Review of RT( after

PWHT) Films. Witness Review PWHT / PMI and hardness test reports.

Makbul Bandiya Resume Page 2 of 8

Page 3: Makbul Cv

Review of Procedures and Inspection and Test Plan. Carried out the Material inspection and Review of Material Test Certificates (Specification :

RSH-00-ME-MR-0021). Review of Welder Qualification Certificates and test records. Monitoring / Inspection of Welding activity (checking Amps / Volts travel speed etc., as per the

WPS requirements). Review of radio graphs and reports. Witness of MPI activity and review of reports for the same. Monitoring / Inspection of Painting activity (checking of blasting profile, surface preparation

and measuring of wet film thickness and dry film thickness) as per Inspection& Test Plan stages.

Witness of hydro test of pressure vessel and piping spools Inspection of completed skids as per the drawings. Review of Manufacture Record Book (MRB).

QA/QC 3rd Party Inspector. 16th February 2010 to 1st March 2010 Working on the local Inspection, The Company visited in the local inspection is as below.

French Technology Industrial Services, ( For ADMA-OPCO) AL Raha Industrial Equipment Services, ( For ADMA-OPCO) AL Sagar Engineering, SSP. (For ADMA-OPCO) Future Pipe Industry, Mussaffah, Abudhabi. Advance Pipe Industry, Mussaffah, Abudhabi. Al Manssorri Industrial Services, Mussaffah, Abudhabi. Valentine Maritimes, Mussaffah, Abudhabi. Sigma Engineering, Mussaffah, Abudhabi. Costain Abudhabi Company LLC, Mussaffah, Abudhabi. Adyard Abudhabi Co.LLC, Mussaffah, Abudhabi.

Work Description: Overall and spot Inspection Carried out of Pressure Vessels, Piping, Pipeline, Structure work, Both welding coating and Painting. Also inspection of valves, Pumps and Materials like Pipes, Plates, and fittings the inspection activities is mention as below:-

Raw material visual inspection and Review the material test certificates. Witness mechanical and chemical testing at the labs. Witness and visual inspection of PQR and WQT, Review the supporting document. Various stages of inspection for Pressure vessel, Heat exchanger, Process plant and

Equipment and Boiler fabrication. Witness and review the NDT like MPI, LPI and UT and review the report. Review the Radiographic Films as per client acceptance criteria. Witness of Hydrostatics and Leak tightness test. Inspection of pipes & pipe fittings received from the vender, and review the

Certificates as per client specification. Surface preparation and corrosion protection inspection for painting. Co-ordinations with client to set up to quality specification and implementation. Recommend the quality suggestion to client and vender to achieve the requirement.

Worked as a Welding Inspector.Project: Qarn Alam Steam Project,Client: Galfar Engineering & Contracting SAOG

Contractor- FTV Proclad, Esnaad Premises, Mussaffah, Abudhabi. 14th January 2010 to 15th February 2010.

Work Description:

Carried out the Internal Cladding of Pipes and Pipe Fitting (Elbows, Reducers, Tees etc) and Flanges.

Check ITP WPS/ PQR /WQT and NDT procedure, PMI procedure review.

Makbul Bandiya Resume Page 3 of 8

Page 4: Makbul Cv

Procurement of Fittings and Flanges from a supplier and visual and Dimensional checking and procumbent of welding consumables.

Witness PMI of welding consumable, and verification of welding gases % of mixture, Purity per batch review of gas manufacturer certificate.

Checks inside surface prier to Cladding its blasted or not. Clad consumable as per approved WPS Alloy 625, and after cladding checks thickness in

two layers from the both end. Dimensional Checking like Internal Diameter, Rise face. DPI on weld metal overlay area,

UT scanning from the outer surface of pipe, PMI on weld overlay surface from the both end. Carried out Hardness test, Cladding thickness and Identification of pipe for traceability,

steam cleaning and drying of Fittings and Flanges before packing.

Multi-Discipline 3rd Party InspectorOffshore Umm Shaif Gas Injection Facilities Project, EU01E ADMA-OPCOContractor- Hyundai Heavy Industry. (Hook Up and Commissioning)Barge Name-KWAWA-4304 (Jack up Barge)12th June 2009 to 22nd July 2009.

Barge Name- AL Hyleh (Jack up Barge) ADMA-OPCO25th July 2009 to 31st December 2009.

Work Description:

Modification on going of the platform on the based ASME B31.3 process piping. Inspected consumable handling, storage and distribution in accordance with

procedures. Random consumable inspection at stores. Inspecting fit-up, alignment; tack welding and welding of spools as per ISO Drawing being

fabricated in the barge. Inspection/Ensuring that welders are working as per approved welding procedures

(WPS).Verify preheats and inter-pass temperatures during welding. Check approved welders are deployed and they are working in their qualification range.

Inspect to ensure correct consumables are used, welding parameters as specified on the WPS.

Inspect quality of welding as per specification requirements, identification marking of welds etc.

Review / witness Radiography films and MPI tests on completed welds as per ITP. Review of NDT, Dimensional Control & Release reports. Spool Dimension to be checked against ISO Drawing and Dimension tolerance for the

assemblies recorded on the ISO Drawing. Inspect working condition and safety of all equipment / tools and calibration status. Perform visual inspection of welds and ensure compliance to specification / procedure. Monitor Bolt tightening are carried out as per procedure. Checked calibration certificates for Pressure Gauges and Recorder prior to Hydro test.

Worked as a Welding Inspector.Project: Qarn Alam Steam Project,Client: Galfar Engineering & Contracting SAOG

Contractor- FTV Proclad, Esnaad Premises, Mussaffah, Abudhabi. 16th May 2009 to 11th June 2009.

Work Description: Carried out the internal Cladding of Pipes.

Check ITP WPS/ PQR /WQT and NDT procedure, PMI procedure review. Procurement of pipe from a supplier and visual and Dimensional checking and procurement

of welding consumables.

Makbul Bandiya Resume Page 4 of 8

Page 5: Makbul Cv

Witness PMI of welding consumable, and verification of welding gases % mixture, Purity per batch review of gas manufacturer certificate.

Checks inside surface prier to Cladding its blasted or not. Clad consumable as per approved WPS Alloy 625, and after cladding checks thickness in

two layers from the both end. Dimensional Checking at end. DPI on weld metal overlay area, UT scanning from the outer

surface of pipe, PMI on weld overlay surface from the both end. Carried out Hardness test, Cladding Thickness and Identification of pipe for traceability,

steam cleaning and drying of pipes before packing.

Multi-Discipline 3rd Party InspectorOffshore Umm Shaif Gas Injection Facilities Project, EU01E ADMA-OPCO

Contractor- Hyundai Heavy Industry (2nd Phase - Installation) Barge Name: HD-1000. 05th April 2009 to 15th May 2009.

Work Description:

Check Inspection & Test Plans, witness WQT, and other start-up requirements as part of the contractual undertakings of the Contractor for Spool and riser Installation.

Review & check all related procedures and specifications. Arrange and update all consumable material certificates, and equipment calibration

certificates as well as all physical inventory requirements. In-charge of disseminating the criteria and other quality requirements of the project scope

for shift foreman and line personnel concerned. Monitor and check all site activities within the scope of works and make necessary

documentation, including coating & painting jobs, and material testing of cement samples undertaken by the Sub-Contractor used for jacket leg grouting of offshore structures.

Supervise QA/QC Personnel tasked to monitor any/all civil, mechanical, welding, coating, painting and Anode installation works in accordance with ADMA-OPCO Standards and relative requirements.

Interpretation of Radiographs & witnessing other Non Destructive Testing. Performs other duties and responsibilities as may be assigned by the client QA/QC Manager

or his authorized representative.

QA/QC 3rd Party Inspector. 5th January to 31st March. Working on local inspection project as below Project name- Al Shaheen Field Development Project, 6048.

Client – MOQ.Contractor- NPCC.

Project name- Gas Processing Facility Project, Client- ADMA-OPCO.

Contractor- Technip and NPCC. Project name – Borouge 2 project.

Client – Tecnicas ReunidasContractor-Al Jaber Energy services LLC.

Future pipe industry, Mussaffah, ABUDHABI. Bodycoat Material Testing, Airport road, ABUDHABI. Lonestar Technical & industrial Services, ICAD city, ABUDHABI. Al Jaber Precision Engineering Est, Mussaffah, ABUDHABI. Insulco Emirretes, Mussaffah, Abudhabi. Target Engg and Contractor, Mussaffah, Abudhabi.

Work description:

Raw material visual inspection and Review the material test certificates. Witness mechanical and chemical testing at the labs. Witness and visual inspection of PQR and WQT, Review the supporting document.

Makbul Bandiya Resume Page 5 of 8

Page 6: Makbul Cv

Various stages of inspection for Pressure vessel, Heat exchanger, Process plant and Equipment and Boiler fabrication.

Witness and review the NDT like MPI, LPI and UT and review the report. Review the Radiographic Films as per client acceptance criteria. Witness of Hydrostatics and Leak tightness test. Inspection of pipes & pipe fittings received from the vender, and review the

certificates as per client specification. Surface preparation and corrosion protection inspection for painting. Co-ordinations with client to set up to quality specification and implementation. Recommend the quality suggestion to client and vender to achieve the requirement.

Multi-Discipline 3rd Party InspectorOffshore Umm Shaif Gas Injection Facilities Project

Contractor- Hyundai Heavy Industry Barge Name: HD-1000. (Installation) 14th November2008 to 4th January 2009.

Work Description:

Check Inspection & Test Plans, witness WQT, and other start-up requirements as part of the contractual undertakings of the Contractor Jacket installation.

Monitor all welding activities after installation of jacket before drilling and after piling of jacket legs like CSP, CP and UAP.

Monitor and witness all NDT activity before and after welding activity on the jacket. Review the hole survey carried out after drilling the leg. Witness the grout density during the grouting activity on a mixer m/c and on the legs over

flow. Monitor and witness the Cathodic Protection survey carried out by dibber of CSP jacket. Witness the cube crush test as per schedule. Witness grout bags installation and witness the density of grout.

Multi-Discipline 3rd Party InspectorOffshore Umm Shaif Gas Injection Facilities Project, EU01E ADMA-OPCOContractor- Hyundai Heavy Industry.Barge Name-HD-2500 (Deric pipe laying Barge)May 2008 to October 2008

Work Description:

Check Inspection & Test Plans, witness WQT, and other start-up requirements as part of the contractual undertakings of the Contractor for pipe laying.

Review & check all related procedures and specifications. Arrange and update all consumable material certificates, and equipment calibration

certificates as well as all physical inventory requirements. In-charge of disseminating the criteria and other quality requirements of the project scope

for shift foreman and line personnel concerned. Supervise QA/QC Personnel tasked to monitor any/all civil, mechanical, welding, coating,

painting and Anode installation works in accordance with ADMA-OPCO Standards and relative requirements.

Interpretation of Radiographs & witnessing other Non Destructive Testing. Performs other duties and responsibilities as may be assigned by the client QA/QC Manager

or his authorized representative.

Immediate Past Emp. AARVI ENCON Pvt. Ltd.Inclusive Date October 2007 to April 2008Address Sardar Stetas, Lower Parel, Mumbai,

Maharashtra. INDIA.

QA/QC Inspection Engineer (Contractor Representative)

Makbul Bandiya Resume Page 6 of 8

Page 7: Makbul Cv

Contractor. Larsons & Turbo Limited (ECCD)Project. Jamnagar Export Refinery Project (JARP)Reliance Petroleum Limited, Jamnagar.October 2007 to April 2008

Work Description:

Coordinate in a daily basis with the client Inspectors concerning the NDT schedule of activities, and related requirements.

In-charge primarily on the review of the Welding Procedures & Specifications Interpretation & generation of reports using requirements as acceptance criteria set forth by the client, and as required by the project.

Review & check all related procedures and specifications. Witness and monitor PQR, monitor welding variable log sheet. Witness qualification test of welders during the conduct of WQT. Check records on welding consumable log, RT interpretation, material certificates,

calibration certificates, and other relative documents used by the Contractor for the scheduled activities.

Checking pre welding variables edge preparations, checking of drawing fit up, pre heat application and monitor during welding.

Carrying out Inspection of final welds. Conducting / witnessing NDT such as visual inspection, MPI, PT, RT of final welds as per ASME standard.& client specification

Witness other activities like, line drying, abrasive blasting and coating, holiday testing, and other start-up requirements.

Witness final Inspection of line and make ready for HT with Hydro test pack details files as per Clint procedure.

Performs other duties and responsibilities as may be assigned by the Area Manager QA/QC manager or his authorized representative and Coordinating with Client Inspectors.

Past Employer SUNSIL FABRICATION WORKInclusive Date October 2005 to September 2007Address GIDC States, Ankleshwar,

Gujarat, INDIA

QC Engineer NDT Supervisor

Company Details:

The Company is engaged in fabrication of Transformer Tanks, Pressure Vessels, Air Receivers, Chemical Tanks, S.S. Reactors, Forming Dish ends, Coils, Cones. Fabrication of Structural work such as Girders, Trusses, Purling etc

Work Description:

Inspection of raw material including review and co relation of certificates. Witnessing destructive tests such as Tensile Tests, Bend Tests, and Impact Test. Review & check all related procedures and specifications. Conduct & supervise procedure qualification and welder qualification tests. Checking pre welding variables edge reparations, fit ups, pre heating etc Monitoring

variables during welding. Carrying out Inspection of final welds. Conducting / witnessing NDT such as visual

inspection, MPI, PT, RT of final welds. Coordinate in a daily basis with the client concerning the NDT schedule of activities,

supervise NDT crew, and prepare all necessary NDT documents and related requirements. Update records especially on revisions introduced during the project execution, or any

invocations of deviations pointed out by the clients. In-charge of disseminating the criteria and other quality requirements of the project scope

for subordinates and other personnel concerned.

Makbul Bandiya Resume Page 7 of 8

Page 8: Makbul Cv

Conducting and Witnessing Hydro testing, pneumatic testing of tanks, pressure vessels, air receivers,. Dimensional check up during and after fabrication.

Carried-out all NDE/NDT activities within the scope of works and make necessary documentation, and/or representation to client.

Supervise of NDE/NDT equipments on site, and other contingency activities. Preparation of Inspection records and Coordinating with client / TPI inspectors.

Past Employer GENERAL ENGINEERING WORKInclusive Date August 2003 TO September 2005Address Near Kasak Fuwara, Bharuch,

Gujarat, INDIA.

MAINTANENCE SUPERVISOR

Company Details:

Company is engaged in carrying out key maintenance, Shut down jobs & overhauling of process plants & equipments of fertilizer, chemical plants such as Gujarat Narmada Valley Fertilizers Company (GNFC), Narmada Chemicals & Petrochemicals Limited (NCPL), Alembic ltd, and United Phosphorous Ltd. (UPL).

Work Description:

I was engaged in maintenance and overhauling and during shut down of process equipments and process piping of Gujarat Narmada Valley Fertilizers Company (GNFC), Narmada Chemicals & Petrochemicals Limited (NCPL), Alembic ltd, and United Phosphorous Ltd. (UPL). The list of equipments include pressure vessels, tanks, heat exchangers, pumps, all types of valves such as Ball Valves, Gate Valves, Butterfly Valves Safety valves etc. I was actively engaged during preparation of maintenance schedule, procurement of spares and other allied pre maintenance activities. Implementation of procedures during maintenance, monitoring progress to achieve target dates. Guiding work force technically. Witnessing of Testing of Plants and equipments. Also maintain the work sheet, daily progress report and co-ordinate with the client Engineer.

I hereby acknowledge that I have fully caused the preparation of this document, and do hereby certify the correctness of each and every entry hereto of my professional work experience consisting of Seven pages, and signed in each and every page hereto at the left bottom portion except on this page where my signature appears directly above my printed full name.

MAKBUL A. BANDIYA

July 29, 2010.