Maintenance score cards Checkpoint 2011 Keynote 2

31
Maintenance Scorecards Measure What You Manage

description

 

Transcript of Maintenance score cards Checkpoint 2011 Keynote 2

Page 1: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance ScorecardsMeasure What You Manage

Page 2: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance Scorecards

Define Maintenance ScorecardsDiscuss Required PrerequisitesExplain 10 Common Maintenance ScorecardsReview Your Return on Investment

Page 3: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance ScorecardsWhat are they?

Organized Logical Method To Measure and Communicate Your Past, Current, and Future Maintenance Performance

Against Established Goals

Page 4: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance ScorecardsWhat are they?

• Simple and Easily Understood Charts, Graphs, and Tables

• Used to Display Your Maintenance History• Demonstrate Your Current maintenance

Performance• Communicate Your Maintenance Goals for

the Future

Page 5: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance Scorecard

Measurement Goal ActualBacklog Weeks 4-6 weeks 5.5 weeksOvertime Hours <8% 5%Downtime <5% 4.3%PM Man-hours >40% 45.6%Late PM’s <1% 0.5%Scheduled Man-hours >55% 58%Schedule Compliance >95% 88%Planned Man-hours >80% 86%Breakdown Man-hours <10% 12.5%

Page 6: Maintenance score cards Checkpoint 2011 Keynote 2

Backlog Weeks

0

1

2

3

4

5

6

7

8

9

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Millwright

Electrical

Combined

Page 7: Maintenance score cards Checkpoint 2011 Keynote 2

Backlog Weeks

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

0

1

2

3

4

5

6

7

8

Mill-wright

ElectricalBacklo

g W

eeks

Page 8: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisites

• Vision for Maintenance Excellence and Continuous Improvement

• Short and Long Range Master Plan• Computerized Maintenance

Management System (CMMS)• Maintenance Control Function• Communication Strategy and

Techniques

Page 9: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisite:Vision for Maintenance Excellence and Continuous Improvement

• Culture for Training and Knowledge Growth• Proactive versus Reactive Maintenance• Maintenance of Equipment and Facilities,

not Repair• Maintain Assets in A Like New Condition• Strive for Steady Continuous Improvement

Page 10: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisite :Short and Long Range Master Plan• Develop Long range Plan First – 5 Year– What Do You Want Your Maintenance to Look

Like in 5 Years

• Plan Backwards to Develop your Short Range Plan of Action– Where Do I Start First?

• Develop Long Term Scorecards and Matrices– Proactive vs. Reactive Maintenance– Maintenance of Equipment vs. Repair

Page 11: Maintenance score cards Checkpoint 2011 Keynote 2

If You Don’t Know Where You Are Going, Any Road Will Take You

There

Author - Lewis Carroll

Scorecard Prerequisite :Short and Long Range Master Plan

Page 12: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisite: Computerized

Maintenance Management System (CMMS)

• CMMS is Required for Maintenance Scorecards and Tracking Progress

• Installed Properly• Populated Completely with Data• Maintained with Discipline–Work Order for All Jobs– Properly and Completely Filled Out–Minimum or No Standing Work Orders

Page 13: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisite: Maintenance Control Function• Maintenance Functions Needed– CMMS Administrator– Planner/Scheduler–Maintenance Clerk–Work Order History– Asset Management–Maintenance Engineering– Scorecard and Matrix Development

Page 14: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Prerequisite: Communication Strategy and Techniques

• Daily, Weekly, and Monthly Communication–Memos, Emails, Charts, and Graphs– Intranet Postings– Communication and Information Centers• Bulletin Boards• Visible for All to See

Page 15: Maintenance score cards Checkpoint 2011 Keynote 2

10 Common Scorecards

1. Backlog Weeks

2. Machine Downtime or Uptime

3. Craft Work Distribution

4. Interrupts, Emergencies, or

Breakdowns

5. Schedule Compliance/Effectiveness

Page 16: Maintenance score cards Checkpoint 2011 Keynote 2

10 Common Scorecards

6. Preventive Maintenance Man-hours

7. % Planned vs. Unplanned

8. Maintenance Cost Savings

9. Total Cost of Maintenance

10. Maintenance Stores Management

Page 17: Maintenance score cards Checkpoint 2011 Keynote 2

Backlog• Estimated W.O. Time• Total Backlog Weeks• Listed By Dept.,

Craft, Machine, etc..• List of Older Than

90 Days

9-Ju

l

12-Ju

l

15-Ju

l

18-Ju

l

21-Ju

l

24-Ju

l

27-Ju

l

30-Ju

l

2-Aug

5-Aug

8-Aug

11-A

ug

14-A

ug

17-A

ug

20-A

ug

23-A

ug

26-A

ug

29-A

ug

1-Se

p

4-Se

p

7-Se

p

10-S

ep

13-S

ep0

1

2

3

4

5

6

Weeks o

f B

acklo

g

Page 18: Maintenance score cards Checkpoint 2011 Keynote 2

Machine Downtime for Maintenance• Recorded by

Production or Industrial Engineering

• Optionally Recorded By Maintenance

Department• Only Downtime

Related to Maintenance Problems or Breakdowns

2001 2002 2003 2004 2005 20060%

1%

2%

3%

4%

5%

6%

7%

8%7.1%

5.0%

3.0% 3.0%

1.4% 1.4%

Asset Downtime

% M

ach

ine

Op

era

tio

n

Page 19: Maintenance score cards Checkpoint 2011 Keynote 2

Craft Work Distribution• Electrical, Mechanical, Construction, Millwright• Listed by: Shift, Department, Area, Machine, or Building• Listed by Backlog Weeks

Dec Jan Feb Mar0

1

2

3

4

5

6

7

ElectricalMillwrightConst.

Backlo

g W

eeks

Page 20: Maintenance score cards Checkpoint 2011 Keynote 2

Interrupts/Emergencies/Breakdowns• Listed by Department, Machine, Craft• By Priority E-1-2-3-4• Tracked in Work Order Man-hours

2000 2001 2002 2003 2004 20050.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0% 37% 37%

25%

15%10% 10%

Emergency Man-hours

Page 21: Maintenance score cards Checkpoint 2011 Keynote 2

Scheduled Compliance/Effectiveness• Weekly Maintenance Work Schedule• Work Order Percent Scheduled• Work Order Percent Completed Against

Scheduled

9-Ju

l

12-Ju

l

15-Ju

l

18-Ju

l

21-Ju

l

24-Ju

l

27-Ju

l

30-Ju

l

2-Au

g

5-Au

g

8-Au

g

11-A

ug

14-A

ug

17-A

ug

20-A

ug

23-A

ug

26-A

ug

29-A

ug

1-Se

p86%

88%

90%

92%

94%

96%

98%

Scheduled

Page 22: Maintenance score cards Checkpoint 2011 Keynote 2

Preventive Maintenance• PM - Inspections and Lubrication• PdM - Infrared - Ultrasonic – Vibration Analysis• Listed in % of Total Maintenance Man-hours Available

1998 1999 2000 2001 2002 20030%

5%

10%

15%

20%

25%

30%

35%

7%

12%15%

18%

25%

29%

Page 23: Maintenance score cards Checkpoint 2011 Keynote 2

Planned Packages• Planned Work Orders• Work Orders Kitted with All

Parts

• Scorecard Tracked by Planner• Tracked as a Percent of Total

Man-hours per Planner

Aug Sep Oct Nov Dec Jan Feb Mar0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

60%65% 68%

61% 64% 63% 67% 63%

Percentage of Planned Work Orders

Page 24: Maintenance score cards Checkpoint 2011 Keynote 2

Cost Savings• Due To Downtime

Reduction• From Preventive and

Predictive Maintenance Programs

• Due To Interrupt Reduction

• Related to Maintenance Scheduling Improvements

2000 2001 2002 2003 2004 2005 $-

$50,000.00

$100,000.00

$150,000.00

$200,000.00

$250,000.00

$300,000.00

Cost Savings

Page 25: Maintenance score cards Checkpoint 2011 Keynote 2

Total Cost of Maintenance• Total Cost of Work

Order• Tracked by Machine,

Department, Production

Line, or Area• Supplies and Labor• Contractor Costs

2000 2001 2002 2003 2004 2005 $-

$1,000

$2,000

$3,000

$4,000

$5,000

$6,000

Yearly Maintenance Costs

Page 26: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance Stores Management• Turns Per Year, Stock-outs, Service levels• Slow moving, Obsolete parts, Cost of inventory• Satellite Storage

Jan Feb Mar Apr May Jun Jul0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Service ...

Page 27: Maintenance score cards Checkpoint 2011 Keynote 2

Maintenance Scorecard

Measurement Goal ActualBacklog Weeks 4-6 weeks 5.5 weeksOvertime Hours <8% 5%Downtime <5% 4.3%PM Man-hours >40% 45.6%Late PM’s <1% 0.5%Scheduled Man-hours >55% 58%Schedule Compliance >95% 88%Planned Man-hours >80% 86%Breakdown Man-hours <10% 12.5%

Page 28: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Return on Investment• Manpower Adjustments– Increases or Decreases in Staffing– Assignment Adjustments

• Capital Improvements– Justify Equipment Replacements– Equipment Overhauls

• Program Justifications– PM, PdM, Planning/Scheduling

Page 29: Maintenance score cards Checkpoint 2011 Keynote 2

Scorecard Review:What are they and why Use Them?• Simple and Easily Understood Charts,

Graphs, and Tables• Used to Display Your Maintenance

History• Demonstrate Your Current maintenance

Performance• Communicate Your Maintenance Goals

for the Future

Page 30: Maintenance score cards Checkpoint 2011 Keynote 2

You Cannot Manage What You Cannot Control and Cannot Control What You Cannot Measure

W. Edwards Deming

Page 31: Maintenance score cards Checkpoint 2011 Keynote 2

Pitstop: 15 Minute Break

Time to refuel?