Maintanence

2

Click here to load reader

Transcript of Maintanence

Page 1: Maintanence

Lighting

Firstly carry out a visual check. You must make ensure that:

That there are ten CCT Fresnels in the rig. CCT Fresnels are found in the

back of the hall to the right under the lighting shelf. That all lights a gel frame if required. Gel frames are found in the back of

hall, hung on the wall to the right. Gels are found in the back of the hall in a draw to the right. Gels must be cut to fit light and slotted in at the top.

All are lights are assembled correctly. For example the lamp tray must be attached to the bottom of the light correctly.

That the safety chain must be attached the rig by going under the arm and clipped over the top of the arm.

That the G clamp must be attached with the light going under.

That all plugs are fully placed in the plug.

Sound

When setting up the sound desk you must ensure this is all in place:

That all cables are plugged into where they are needed. For example:

That the kettle leads must be plugged into the speakers and desk. That the output of the speakers must be plugged into input of the desk.

That the laptop must be plugged into the mains. That the mini jack must plugged into the laptop from the sound desk.

(All cables can be found in the technician’s office at the back of the hall

in labeled boxes.)

Projection

For the projection ensure all appropriate cables are plugged in. For

example the VGA must be plugged into the laptop.

Signature:

Print:

Date:

Page 2: Maintanence