Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor...

47
Maharashtra Industry Trade Investment Facilitation Cell S.No Name of the Company Department Name of the Service Application Date Issue description and chronology Action to be taken by MAITRI Issue Status 1 4sight Energy Systems Private Limited, MSEDCL Power The department has approved load of 5hp, but the unit requires a minimum load of 35Hp to run all the machines. 09.05.2016: Investor Update: The issue is resolved and do not want MAITRI's intervention in this matter to be closed in the next investor meeting The issue was closed on 20.05.2016 CLOSED 2 A R Industries Revenue Department NA Permission 18.02.2016 Investor has submitted the application for NA permission with collector-Raigad, which is pending for grant of approval. 03.05.2016- Investor update: Investor is meeting Tehsildar on 05.04.2016 11.04.2016- Investor and Department update: All NOC, except UDD, are received for the process. Investor has complied to UDD's queries. The NOC of UDD is pending. 03.05.2016- Investor update: All NOCs are received at Collector's office. Now the file is under process at Collector's desk. 07.05.2016- Investor update: Investor has obtained the NA Permission and the issue to be closed in the next investor meeting The issue was closed on 20.05.2016 CLOSED 3 ACG Pharma technologies Pvt ltd MSEDCL Electricity duty refund 01.09.2015 As the unit had already obtained Eligibility Certificate, the investor has made an application for the refund of electricity duty exemption from the date of commencement of production as per provisions of PSI 2007 01.12.2015- Department update: MSEDCL has approved the proposal of Electricity Duty exemption and conveyed that it will be availed the exemption from November 2015 billing onward. The refund will be sent to investor after it is duly audited as per Commercial Circular No.241/18.05.2015. 4.12.2015- investor update- Investor has received November 2015 electricity bill in which, the said effect of exemption is given. The issue to be closed in December 2015 Investor meeting 27.01.2016- Investor update: Investor has not received refund for the amount paid as electricity duty( INR 56 Lakh) for period of Sept 2011- Oct 2015 and requested MAITRI to take it up for resolution. 09.02.2016- Department update: SE circle office has not put up the proposal for the matter. Department to expedite the matter. The proposal is sent to Hon'ble Minister (energy) on 03.02.2016 for approval 29.02.2016- Department update: All proposals related to electricity duty refund are under process with Hon'ble Minister (energy) 11.03.2016- IM Decision: All issues related to electricity duty exemption/refund to be reviewed after 2 months (May 2016) MAITRI to share the list of all Electricity duty refund cases with PS(I) for further action. OPEN MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI) Page 1 of 47

Transcript of Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor...

Page 1: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

1 4sight Energy SystemsPrivate Limited, MSEDCL Power

The department has approved load of 5hp, but the unit requires a minimum load of 35Hp to run all themachines.09.05.2016: Investor Update: The issue is resolved and do not want MAITRI's intervention in this matterto be closed in the next investor meeting

The issue was closed on20.05.2016 CLOSED

2 A R Industries RevenueDepartment NA Permission 18.02.2016

Investor has submitted the application for NA permission with collector-Raigad, which is pending forgrant of approval.03.05.2016- Investor update: Investor is meeting Tehsildar on 05.04.201611.04.2016- Investor and Department update: All NOC, except UDD, are received for the process.Investor has complied to UDD's queries. The NOC of UDD is pending.03.05.2016- Investor update: All NOCs are received at Collector's office. Now the file is under processat Collector's desk.07.05.2016- Investor update: Investor has obtained the NA Permission and the issue to be closed in thenext investor meeting

The issue was closed on20.05.2016 CLOSED

3 ACG Pharmatechnologies Pvt ltd MSEDCL Electricity duty

refund 01.09.2015

As the unit had already obtained Eligibility Certificate, the investor has made an application for the refundof electricity duty exemption from the date of commencement of production as per provisions of PSI 200701.12.2015- Department update: MSEDCL has approved the proposal of Electricity Duty exemption andconveyed that it will be availed the exemption from November 2015 billing onward. The refund will besent to investor after it is duly audited as per Commercial Circular No.241/18.05.2015.4.12.2015- investor update- Investor has received November 2015 electricity bill in which, the saideffect of exemption is given.The issue to be closed in December 2015 Investor meeting27.01.2016- Investor update: Investor has not received refund for the amount paid as electricity duty(INR 56 Lakh) for period of Sept 2011- Oct 2015 and requested MAITRI to take it up for resolution.09.02.2016- Department update: SE circle office has not put up the proposal for the matter. Departmentto expedite the matter. The proposal is sent to Hon'ble Minister (energy) on 03.02.2016 for approval29.02.2016- Department update: All proposals related to electricity duty refund are under process withHon'ble Minister (energy)11.03.2016- IM Decision: All issues related to electricity duty exemption/refund to be reviewed after 2months (May 2016)

MAITRI to share the list of allElectricity duty refund caseswith PS(I) for further action.

OPEN

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

Page 1 of 47

Page 2: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

4 Agarson Electronics MIDC

Possession ofland & BCC

time limitextension

22.04.2013

With reference letter dated 14.07.2014 from MIDC , the allotment of the plot has been cancelled due nodevelopment on the plot. But according to the investor development of the plot was not possible as thepossession of the plot was not obtained by him (till date) even after continuous follow ups. The investorhas paid the service tax as well before obtaining the possession of the plot. Investor is now requestingMIDC to revoke the plot cancellation order, give possession of the plot and time limit extension to set upthe unit.18.05.2016- MIDC update- MIDC cannot give possession of land. The refund letter is issued.

MAITRI to close the case, onobtaining the documents fromMIDC.The issue was closed on20.05.2016

CLOSED

5 Aheri Tubes India Pvt.Ltd.

MSEDCL/MSETCL Power 27.02.2013

Investor applied to MSEDCL for 33 KV electricity supply and 4 MW power for their stainless steel plant inAheri MIDC area. MSEDCL informed that investor that , MSETCL need to made an arrangement for 66KV/33 KV and 25 KVA power transformers so that the power can be supplied. Nothing has been doneyet.

MAITRI to intimate the investorthe investor to apply for 11KVpower supply and close thecase at MAITRIThe issue was closed on20.05.2016

CLOSED

6 Alfa Laval India Ltd. RevenueDepartment

Original K Pratand Kajapa of

previousdemarcation

Investor applied to TILR office to obtain original K-Prat of Atitatadi Mojani Mo. Ra. No. 1789/10 butreceived only 1/2 copy. The rest 2/2 copy is not yet received. Investor also require the KaJaPa forprevious demarcation (Demarcation dates- 08/07/2011, 11/07/2011, 13/07/2011 for Mo. Ra No. 1783,1781, 1779, 1782, 1778, 1789, 1789/10) as these documents will be needed for every future approval.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

Open

Page 2 of 47

Page 3: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

7 Badve Engineeringlimited MIDC Local Issues 05.11.2015

Unit has taken the possession in July 2012. and they are required to obtain BCC by 15.07.2016. (4 yeardevelopment period). The original occupant of land are not allowing construction activities claiming thattheir issue with MIDC should be resolved first. As guided by DI, Investor has also filed a police case andstarted construction activities with police protection.However, the said occupants/ previous owners resisted the activities. In a joint meeting betweeninvestor, villagers and Police, the villagers agreed to allow the development works with conditions - likeraw material, water, labour to be procured from them / villagers only and upon completion, theemployment should be provided to them. these conditions are not acceptable to the investor.Due the issue, investor is not able to start construction works. Investor has requested MIDC to resolvethe matter and extension of development period till 15.07.2017 without any cost1.12.2015- Investor update: MIDC has approved extension for BCC till 15.07.2016. Encroachment issueto be resolved by RO, MIDC and SP.11.01.2016- MIDC update- RO report in the case is awaited11.01.2016- Investor update- Investor is seeking free extension up to July 2018.14.01.2016- Investor meeting update- MIDC to resolve the issue in 8 days or else the investor toconnect with DC(I)09.03.2016- Investor update: Investor had a meeting with RO, MIDC who has assured to resolve theencroachment issue by 16.03.201628.03.2016- MIDC update: Dy CEO will take a field visit with committee to resolve the issueThe local committee consist of RO, SP and Dy CEO, MIDC13.04.2016- IM decision: Dy CEO, MIDC to look into matter and resolve the case12.05.2016- Investor update: The field visit is completed by Dy. CEO

The 7/12 extract of theencroached plot is in the nameof MIDC, hence the unit canstart the work with policeprotection.

OPEN

8 Balaji Formalin Pvt. Ltd RevenueDepartment

NOC (to storeMethanol) 29.02.2016

Investor visited Collector office, Raigad on 29.02.2016 to apply for permission to operate the Methanoltank at the factory premises. They have already obtained permission from District Explosivesdepartment. However, Collector officer informed the investor to obtain a NOC from Gram Panchayat first.When investor approached the Gram Panchayat, they informed that, no such NOC exists with GramPanchayat and hence no such NOC will be given by them. Investor is asking for assistance.29.03.2016-Investor update: Collector agreed to obtain MIDC NOC instead of gram panchayat NOC.MIDC has issued NOC and further, Collector has asked for NOC of SP and Tehsildar by writing to them13.05.2016 - Department update: The site visit is completed by the officer from Tehsildar office , thereport on the same will be forwarded to the Tehsildar by the end of this week.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

9 Balaji Formalin Pvt. Ltd. EnvironmentDepartment

EnvironmentClearance 25.08.2015

Investor has subsequently applied for Environment Clearance on 25.08.2015. EIA report has also beensubmitted to the department however, Environment Clearance has not yet been granted.09.10.2015- Investor meeting update: The case to be taken in the next SEIAA meeting.07.11.2015- Department update: The department has not obtained an online application from investor,MAITRI to inform the investor about the same. Investor' application is forwarded to the department.14.01.2016- Department update-The proposal was recommended by SEAC-1 in its 115th meeting heldon 03.12.2015. The proposal will be considered in ensuing meeting of SEIAA on 15.03.2016.27.04.2016- Investor update: Compliance is requested from investor as per the minutes. Investor hasmade compliance too on 30.04.2016

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(Env) forfurther action.

OPEN

Page 3 of 47

Page 4: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

10 Bekaert Industries PvtLtd MSEDCL Electricity duty

refund 15.06.2015

Investor has made an application with MSEDCL requesting to refundthe electricity duty amounting to Rs. 4,72,22,211/- which they have paid for the period from March-2014to May-2015 to MSEDCL under PSI 2007. Which is still pending for grant of approval.04.03.2016- MSEDCL - The file is under process and is sent to HO for approval.10.03.2016- MSEDLC update: The proposal for "Exemption in Electricity Duty" has forwarded withrecommendation vide T.O.L No. 3235 dated 15.07.2015 and 30050 dated 03.08.2015.11.03.2016- IM decision: All issues related to electricity duty exemption/refund to be reviewed after 2months (May 2016)

MAITRI to share the list of allElectricity duty refund caseswith PS(I) for further action.

OPEN

11 Bhagyalaxmi RollingMills

Directorate OfIndustries

EligibilityCertificate 02.11.2015

Due to delayed power supply received from MSEDCL - unit started production from 01.02.2008 (onemonth after inaugural function of 01.01.2008). Accordingly Directorate of Industries granted EC for period01.02.2008 - 31.01.2015.In July 2010, DI issued addenda to the original EC with change in effective period as 01.01.2008-31.12.2014. The investor has availed IPS claims from 01.08.2008 only and has submitted that they havestarted the production from 01.02.2008 only.Investor is seeking for approval of IPC period as 01.02.2008- 31.01.2015 as mentioned in original EC.

According to the department,changes in the EligibilityCertificate will not beconsidered, hence thedepartment to intimate theinvestor and after that, MAITRIto close the case.

OPEN

12 BHEL RevenueDepartment Land allottment 22.01.2014

A land parcel with area 3.94 hectare, belongs to revenue department, which is allotted to BHEL by MIDC.The same is yet to be handed over to BHEL by Revenue dept.August 2015- Update from department:The said application is being scrutinized and processed by Revenue Department.17.08.2015- MAITRI has shared draft letter with DC (Industries) written to PS (Revenue) and DYSecy(Revenue) in order to expedite process-as decided in Investor meeting dated 13.08.201511.09.2015- Investor meeting decision: The file is put up for scrutiny. The issue to be resolved within amonth.13.01.2015- MIDC update- MIDC has written to SDO revenue for transfer of said land. The proposal issent for an approval of government14.01.2016- Investor meeting decision: The department to take up the issue on priority and resolve thecase at the earliest.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

Page 4 of 47

Page 5: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

13 BHELRevenue

Department/MIDC

Land dispute/encroachment 6.01.2014

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

Amongst the land allotted to BHEL, a land parcel (survey no 58- area 0.15 hectare) at village Mundipar,Sakoli, could not be acquired till date despite of several attempts of Revenue Dept. Hence, SDO, Sakolirequested MIDC to give permission for acquiring it under 33(3) on 09.07.2014 (letter ref. 326/2014).MIDC, Nagpur has written a letter to MIDC, Mumbai (Ref. 400/2014, dtd. 9.7.2014).August 2015-Update from MIDC:MIDC has submitted the proposal for compulsory acquisition to Industries Department.24.08.2015- update from MIDC:Govt has issued notification for compulsory acquisition. File is under progress at MIDC for acquisition.11.09.2015- Investor meeting update: MIDC to expedite the process26.10.2015- MIDC update: SDO,Sakoli is instructed to process compulsory acquisition of said land videletter dated 10.08.201529.10.2015- SDO update-(verbal): SDO requires order from collector office to process further. Investorwill submit the letter from SDO to MIDC for further process07.11.2015- Investor meeting (VC) decision: SDO Sakoli to rectify the land records and do thenecessary changes in 7/12 extract.02.11.2015- Investor update: SDO Sakoli has replied to RO, MIDC for compulsory acquisition thatMIDC should make proposal for compulsory acquisition to Collector. on 26.11.2015 Investor hasrequested MIDC to acquire land as directed by GoM saying that re-measurement is not required as perthe records of Tehsil Land Record office.08.12.2015- Department update-MIDC has written letter to Collector to issue compulsory acquisitionorders. Further, RO MIDC to be followed up by MAITRI for revised measurement on site.13.01.2016- MIDC update- Existing 7/12 extract showing the said land is 0.15 hectare. According toowner of land, his land is measuring 0.42 Hecate and hence he should be paid amount of entire land(0.42). Hence, RO Nagpur has sent his comments to HO, MIDC saying that BHEL needs to take revisedmeasurement in consultation with SDO and to rectify land records accordingly. Thereafter, MIDC canpurchase the land.14.01.2016- Investor meeting decision: The department to take up the issue on priority and resolve thecase at the earliest.22.01.2016- SDO update: A joint meeting between collector, SDO, RO, SLR (Superintendent of Landrecords) on 15.01.2016 concluded that SLR's record shows the survey no. 58 as 0.42 hectare while, 7/12shows it as 0.15 hectare. Collector concluded that in case of such clerical mistake, SDO needs to amend7/12. hence, SDO has requested SLR to issue report and necessary order so that 7/12 extract can bemodified.10.02.2016- Department update: SLR has issued the letter to SDO to rectify 7/12 extract16.03.2016- SLR Update: He will forward the correction instruction file to SDO within 2-3 days.12.04.2016- Update: The SLR has forwarded the correction instruction to SDO already but there is noupdate from SDO on this yet.27.04.2016- SDO update: SDO has issued an order to SLR office to make correction in landdocumentation - 7/12 extract16.05.2016- Department update: The matter has been forwarded to Tehsildar, Sakoli to make thechanges in 7/12 extract.

Page 5 of 47

Page 6: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

14

Cadbury India Limited(MondelezIndia Foods PrivateLimited -MIFPL)

UDD Zoneconversion 13.12.12 The issue was closed on

20.05.2016 CLOSED

Induri Farms Limited, a wholly owned subsidiary of MIFPL owns about 86 acres of land in Induri, only 12acres of which was converted for Industrial use on which the Plant is already constructed. Anapplication has been made by the investor requesting for conversion of use of the balance land forIndustrial purpose from the current land status viz. Agriculture/Afforestation land.11.09.2015-Investor meeting decision: MAITRI to share a draft DO letter with DC (I), written toDirector Town Planning for the final notification to be issued for zone conversion. UDD to look into thematter09.10.2015- Update from Investor- The file is pending at the desk of Joint Director Town Planning forscrutiny.09.10.2015- Update in the Investor meeting: After approval of under Secretary, it will get resolved.Time frame required would be 2 months. 09.10.2015- Update in the Investor meeting: After approval ofunder Secretary, it will get resolved. Time frame required would be 2 months.29.10.2015- Investor update: The file is sent back to ADTP for want of ownership of one gut number,out of total 3 guts.Investor has provided the relevant details for ownership.27.11.2015- Investor update: final publication is awaited for want of regional plan to be issued from U/SUDD03.12.2015- Department update: The regional plan is received by ADTP from U/S UDD. Publication anddemand draft awaited to be issued22.12.2015- Investor update- the department is in process of deciding the conversion rates, post which,demand note will be issued to the investor07.01.2016- Investor update-Investor has shared new notification of state government in regards toZone conversion and revised rates. Investor has requested for early resolution of his case based on this14.01.2016- Investor meeting update: The issue to be resolved on priority by the department. Weeklyupdate on the issue to be shared with DC(I). The case to be referred to CM meeting.25.01.2016- field visit update- the file is being referred to CM.29.02.2016- Department update: The file is under process with Hon'ble CM10.03.2016- field visit update: The file is received by U/S and the investor has received the letterregarding the same. ADTP will issue demand note based on the letter obtained (revised rate of 30% )after seeking clarification from U/S UDD22.03.2016- Investor update: Investor has received the demand note and he will make the paymentsoon.23.03.2016- UDD update: Investor has made the payment, ADTP has confirmed the same. ADTP isawaiting final notification from u/s.22.04.2016- Investor update : The zone conversion to industrial zone - final notification is issued andhence, the case to be closed.

Page 6 of 47

Page 7: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

15

Cadbury India Limited(MondelezIndia Foods PrivateLimited -MIFPL)

MPCBConsent toOperate-renewal

16.02.2016

The investor has made an online application for renewal of Consent to Operate approval.30.03.2016- MPCB update: It is yet to come at Head office, MPCB13.04.2016- Department update: the file is received at HO, MPCB. It will be placed in upcomingmeeting as per seniority list of consent applications.

MAITRI to share the list of allconsent related cases withPS(I) to be sent to MS (MPCB)requesting a meeting to be heldin PS(I) office.

OPEN

16

Cadbury India Limited(MondelezIndia Foods PrivateLimited -MIFPL)(Expansion)

MPCB Consent toEstablish 16.02.2016

The investor has made an online application for Consent to Establish for the existing factory in Dist.Pune.The application was filed throughonline at MPCB which is under process with the department30.03.2016- MPCB update: It is yet to come at Head office, MPCB13.04.2016- Department update: the file is received at HO, MPCB. It will be placed in upcomingmeeting as per seniority list of consent applications.02.05.2016- MPCB update: The case was discussed in CAC meeting of 27.04.2016. Minutes areawaited17.05.2016 - The Consent has been accorded the case to be closed in the upcoming investor meeting

The issue was closed on20.05.2016 CLOSED

17 Classic GypsumIndustries Pvt. Ltd. MPCB Consent to

Establish 14.07.2015

The investor has made an application for Consent to Establish which is still under process with yourdepartment.30.03.2016- MPCB update: Investor has submitted fresh DD in Jan 2016. Yet to be received at HO11.04.2016- RO, MPCB update: The file is forwarded along with DD at Head office.13.04.2016- IM decision: Once the file reaches HO, it will be taken up in meeting as per seniority level ofapplications. MAITRI to follow up the case after 8 days - 20.04.2016.22.04.2016- MPCB update: The status is same as earlier.

MAITRI to share the list of allconsent related cases withPS(I) to be sent to MS (MPCB)requesting a meeting to be heldin PS(I) office.

OPEN

Page 7 of 47

Page 8: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

18 Cummins MSEDCL/MIDC

Shifting of Substation 11.08.2011

Letter from MIDC with regardsto compliance was received on16.05.2016 by MSEDCL and thesame will be complied byExecutive Engineer, Civil in nextweek.

OPEN

A sub-station of MSEDCL is located at Plot no A-1 an A-2 of investor's land. The unit applied to MSEDCLfor shifting the sub-station to MIDC layout in 2011with undertaking to bear the entire cost of shifting it.13.09.2012 - Joint meeting between MIDC, MSEDCL and unit update: MIDC and MSEDCL agreed toshift the sub-station. Joint visits held on 2.11.2013 and 12.11.2014. Further, MSEDCL accordedadministrative approval by its letter dated 30.09.2014 for shifting of Sub-Station. The shifting cost will beborne by the investor.MSEDCL had requested MIDC to give land on free hold/ 999 years lease since the land of existingsubstation was given on freehold. The investor has agreed to give free land (of equivalent area 10,000Sq. mtr) to MIDC for the said purpose vide letter dated 24.07.2015. Hence, the request to transfercummin's land to MSEDCL and MSEDCL existing land in name of Cummins is pending. MIDC hasinformed MSEDCL on 9.12.2015 about policy of lease for 95 years only.11.12.2015- Investor meeting decision: MIDC to write a letter to MSEDCL that MIDC will give land toMSEDCL on lease for 95 years, as per their prevailing policy, but will renew the same lease till 999 yearswithout any additional payment or conditions. MSEDCL to issue letter to investor that they can start thework for shifting the sub station. MAITRI to follow up with MSEDCL in next 8 days.11.12.2015- The issue of encroached land of the unit was earlier closed in MAITRI. However, MIDC wasasked to initiate compulsory acquisition for the encroached land.11.12.2015-MIDC update: MIDC has informed MSEDCL that it will renew lease tenure for 95 years eachtime without any financial implications till 999 years. Issue pending with MSEDCL.13.01.2016- MSEDCL update: the matter is under process for decision by competent authority. The fileis with SE Satara.21.01.2016- MSEDCL update- SE has requested remarks from CE, MSEDCL on 95 years lease. Legaldivision of MSEDLC is processing the same10.03.2016- MSEDCL Update: MSEDCL has approved the proposal by MIDC for renewable 95 yearlease11.03.2016 - IM decision: MSEDCL to communicate the same with MIDC and MAITRI to follow up withboth department to resolve the issue17.03.2016- MSEDCL update: MSEDCL has issued instruction to SE Satara to carry out the shiftingwork, at cost of unit.29.03.2016- MSEDCL update: SE has written to Exe. Engg, MSEDCL , Pune to process for land, wheresubstation can be shifted to01.04.2016- MSEDCL update: Cummins to give the land parcel for shifting of substation in coordinationwith MESDCL and MIDC.07.04.2016- MSEDCL update: SE, Baramati MSEDCL is meeting CE, Civil, MSEDCL to understand nextcourse of action.25.04.2016- Joint site survey to find suitable location for substation is planned on 03.05.2016 betweenMIDC, MSEDCL and investor.05.05.2016- Department Update-SE Civil, Baramati has send a report to CE Civil, HO for furtherproceedings.

Page 8 of 47

Page 9: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

19 Digichem IndustriesRevenue

Department/MIDC

Royalty 13.01.2016

Tehsildar office has issued royalty notice to the unit. Investor replied to Tehsildar, Ambernath office on13.01.2016 that they have used soil for levelling purpose of the same plot and as per the GR no. GKN –10/0307/P. No 57/KH dated 07.01.2011, Royalty is not applicable in MIDC area if the same soil is utilizedfor levelling purpose. Hence Investor has requested to cancel the said notice.11.03.2016- IM decision- MAITRI to draft a DO letter in name of DC (I) written to the Collector (Thane) -with Cc marked to the investor. Tehsildar to verify the facts and Deputy CEO to intervene in order toresolve the issue. The case to be presented for the CM meeting.09.03.2016: MIDC update: MIDC has written to Tehsildar about non applicability of royalty in this case.20.03.2016- Investor update: Investor met Tehsildar as instructed by DC sir but Tehsildar is asking toapproach HO, Ulhasnagar. Investor is requesting for resolution. DC Industry has written a letter toCollector for the issue13.04.2016- IM decision: MAITRI to follow up the case with Dy CEO, MIDC and Tehsildar office.02.05.2016- Investor update: Investor has appealed at SDO office.

MAITRI to draft a DO letter forPS (I) addressed to Secretary(Revenue) for setting an inquiryover Tehsildar forinappropriately charging theroyalty.

Open

20 Eco Recycling Limited RevenueDepartment Infrastructure 27.11.2015

This project of e-waste recycling is financially and technologically supported by (NEDO) a department ofGovernment of Japan. The developer has left the project site without completing the basic infrastructurelike road, electricity, water supply, drainage system at the complex undertaken by him. Hence theinvestor is seeking intervention from the department to complete the approach road and other basicinfrastructure so that the project can be started at the earliest.09.10.2015- Investor meeting update: MAITRI to share the DO letter in name of DC(I) along with thecopy of the FIR to be sent to collector(Thane) and Commissioner Police Thane.07.11.2015 update from department- DC(I) has talked to collector thane about providing support.Department to look into the matter and update MAITRI on the same.20.01.2016- Investor update; Collector has written letter to Tehsildar to issue permission in favour ofinvestor to construct the internal road (by investor). Investor will make application to Tehsildaraccordingly05.02.2016- Investor update: Collector has instructed office of land records on 30.11.2015 to demarcateinternal road layout as per plan approved at time of NA permission sanction and once the demarcation isdone, the land to be transferred to gram panchayat and investor to be permitted to carry outinfrastructure works / approach road development at his own cost. Once investor develops the road, itwill be handed over to gram panchayat. Investor has made application for demarcation of land on02.02.2016.07.03.2016- Investor update: The investor has obtained demand note for demarcation survey. He hasmade the payment02.05.2016- Investor update: The demarcation survey is scheduled on 19.05.2016

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

Page 9 of 47

Page 10: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

21 Escon Elevators MIDC Land allottment NA

Investor has attended LAC meeting held on 18.03.2016 at Andheri MIDC office, in which it was decidedto offer him a land admeasuring 4000 mtr in additional Patalganga industrial area, Mahape. Althoughinvestor claims that till date he has not received any further communication from MIDC on the same.10.05.2016: MIDC Update: Land has been allotted to the unit. The investor has confirmed the same.Hence, the issue to be closed.

The issue was closed on20.05.2016 CLOSED

22 Fine Finish OrganicsPvt. Ltd. MIDC Transfer of Plot 11.11.2012

Investor has purchased the plot numbers bearing E2 & E3 in Mahad MIDC through auction process fromofficial liquidator, Bombay high court in February 2012.Earlier, MIDC sought pending dues of previous owner form Fine finish (INR 8 lakh), which investor hasnot agreed to pay. Later, MIDC received the claimed the amount from DRT and received the same. Soold dues were cleared. Till this time, the plot was not transferred in name of Fine finish.To obtain No dues certificate, investor has approached exe. Engg, MIDC. Investor is claiming that Exe.Engg is asking for service charge of INR 1.80 Lakh (for duration of 2012 till date for infrastructure serviceof MIDC- but in verbal). Investor is seeking interventions to resolve the case.18.05.2016- MIDC update- The file is under process with RO Panvel for his remarks

MIDC has waived off the olddue amount and has resolvedthe actual possession issue.With regards to service chargesapplicability, MIDC to look intothe matter and update MAITRI.

Open

23 Finolex J PowerSystems Pvt. Ltd MPCB Zero discharge

certificate 28.01.2015

The unit lifts water for its daily usage from 'Nira Right Bank Canal', Phaltan office. This agency requires acertificate from Maharashtra Pollution Control Board to be submitted to confirm the 'zero discharge'status of the unit. Investor has written to SRO MPCB, Satara on 28.01.2015 but no reply received tilldate.12.04.2016- SRO update: the certificate is issued. The investor has to collect the same. MAITRI hasinformed the investor .Investor has collected the same and requested MAITRI to close the case

The issue was closed on20.05.2016 CLOSED

24 Finolex J PowerSystems Pvt. Ltd MPCB

Consent toOperate-renewal

28.12.2015

investor has applied for "Renewal of consent to operate" on 28.12.2015 for five years (i.e. 31.01.2016 to31.01.2021) to SRO, Satara. The matter is pending.15.01.2016- Investor update: MPCB SRO Satara has processed the file and now it is under process atMPCB, SIon office30.03.2016- MPCB update: It will be taken up in next CC/CAC meeting

MAITRI to share the list of allconsent related cases withPS(I) to be sent to MS (MPCB)requesting a meeting to be heldin PS(I) office.

Open

Page 10 of 47

Page 11: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

25 Finolex J PowerSystems Pvt. Ltd

RevenueDepartment

NOC (to storepetroleum) 27.11.2012

The investor made an application on 27th November 2012 to obtain NOC to store petroleum class B atGat no 1142 to 1149 to Hon'ble District Collector.Collector office has requested four departments namely- (1) Superintendent of Police, Satara (2) ZillaParishad, (3) District Rehabilitation officer and (4) Town Planning, Satara (5) Dy Director, DISH (6)District Health Department and (7) MSEDCL to submit a report on the same (videDC/MAG/3/Explo/NOC/SR-16/12 dated 30th November 2012.) However, no reply has been received byCollectorate from these department till date. NOC is yet to be received by the investor.The 3 NOC out of 7 are received - namely DISH, .District Health Department and MSEDCL.25.02.2016- Investor update: Investor has shared application written to remaining 4 departments03.03.2016- ZP update: Exe. Engg, ZP has requested for compliance from the investor. , which investorhas submitted.23.03.2016- Investor update: Investor has received, till date, 6 NOC from above including SP NOC.Only NOC from ZP is pending.04.04.2016- Investor update: Investor has complied for ZP NOC. Further, Collector has requested forTehsildar, Khandala's NOC. Hence, 2 NOC are pending as on date - ZP and Tehsildar.03.05.2016- Investor update: The investor had complied to the Tehsildar request.16.05.2016- Investor update: ZP has asked the investor to submit the details of the unit in a particularformat obtained from the PWD office.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

26 Finolex J PowerSystems Pvt. Ltd.

RevenueDepartment Royalty

Investor was served a demand notice of 2.58 Crores by Tehsildar, Satara for excavating minor mineralsfor construction of boundary walls and internal roads at the factory premise. Since the minor mineralsand excavated soil was not transported out of the factory premise, investor is seeking exemption fromthe royalty charges.13.04.2016- IM decision: MAITRI to share GR copy- which says no royalty required for this process-with the investor and Sicom to inform Tehsildar02.05.2016- Department update: The file is under process at Prant officer. MAITRI has shared thedetails with newly appointed Prant officer.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

27 Foods and Inns MSEDCL Electricity dutyrefund 18.05.2015

Investor has applied to MSEDCL, Nashik circle office for electricity duty refund as per EC granted underPSI 2007. Investor is eligible for such exemption between 01.06.2008 to 31.05.2023. Nashik office hasforwarded the proposal to Head office, MSEDCL, Mumbai on 20.08.2015. the issue is pending withMSEDCL Head office since then11.12.2015- Department update : MSEDCL committee has resolved the issue , once investor confirmrefund is availed, the issue to be closed from MAITRI forum. MSEDCL has recommended the proposal toDirectorate of Industries (DI) on 7.12.2015 for further approval.06.01.2016- investor update- The investor has not received the refund notification.29.02.2016- MSEDCL Update: The matter is referred to Hon'ble Minister (Energy)11.03.2016- IM decision: All issues related to electricity duty exemption/refund to be reviewed after 2months (May 2016)

MAITRI to share the list of allElectricity duty refund caseswith PS(I) for further action.

OPEN

Page 11 of 47

Page 12: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

28 Force Motors Ltd PMRDA /UDD

Building planapproval

Investor claims, that due to new planning authority establishment (PMRDA - Pune Metropolitan RegionDevelopment Authority) there is lot of confusion within the department and also there is shortage of staffswhich causing delay in getting the approvals.04.11.2015- Update from investor: Investor has received provisional fire NOC on 04.11.2015. Onlypending issue is building plan approval07.11.2015- Investor meeting decision: The investor to apply for building plan approval and theinvestor to approach MAITRI or DC(I) for assistance. MAITRI will not facilitate the Consultants.16.12.2015- Investor update- Investor will be getting required approval on their own in a day or two.Hence, they do not want to pursue the issue and requested to close the case from MAITRI.The case to be closed in January 2016 Investor Meeting11.03.2016- Investor update: The development plan by PMRDA has two roads passing through unit'splot, inside MIDC. For the said issue, Investor has requested to delete these two roads from the plan.MIDC has provided its comments to PMRDA that it does not have objection with deletion of the roads.PMRDA to proceed further.22.03.2016- PMRDA update: PMRDA has forwarded the proposal to UDD for next course of action anddecision.13.04.2016- IM Decision: Investor to meet Jt Secy on 13.04.2016 and PS UDD. Further, investor wasasked to write a note to DC (I) and MAITRI, which is to be forwarded to PS UDD.03.05.2016- Investor has shared the details of issues with DC office, which is received at MAITRI on03.05.2016.09.05.2016- Department update: Assistant Town planner, Pune have forwarded the file with theircomments to Under secretary, UDD

As the Nodal officer for MAITRIwas not present for the meeting,MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

29 Fristam Pumps India PLtd MIDC Land allottment 23.12.2015

Investor had made an application to MIDC, Pune for allotment of 5,000 sqm of land in Chakan IndustrialArea Phase–II in December 201510.05.2016: MAITRI has informed investor that land related issues will not be taken up at MAITRI Hence,the case to be closed in the next investor meeting

The issue was closed on20.05.2016 CLOSED

30 GE India Industrial PvtLtd MSEDCL Electricity duty

refund 14.12.2015

Investor has made an application to MSEDCL in September 2015 requesting the refund of electricity dutyamounting to INR 29.11 lakhs which is paid by them for the period from November-2014 to August-2015.18.05.2016: Department Update - The ED Refund proposal is forwarded vide TOL no. 38938 dated07.11.2015 to Govt of Maharashtra.

MAITRI to share the list of allElectricity duty refund caseswith PS(I) for further action.

Open

Page 12 of 47

Page 13: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

31 Ghatge Patil IndustriesPlant II MIDC BCC Extension 17.12.2015

The investor has requested MIDC for extension of time limit for BCC. The investor has made anapplication to MIDC for amount payable under Udhyog Sanjivani scheme. The scheme is ending on 31.01.2016 and hence investor is seeking early response from MIDC.11.01.2016- MIDC update- Investor has applied for it. MIDC will check eligibility of the unit for thescheme14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.29.01.2016- investor update: According to investor, Dy CEO MIDC has concluded to charge pre-payment charges from July 2013 to production date (May 2014) and will waive 50% under UdhyogSanjivani. MIDC will inform the amount to be paid as per discussion soon. The file is under process withJt CEO, MIDC22.02.2016- MIDC update: The file is under process with CEO, MIDC10.03.2016- MIDC update: the file is under process with RO, for issuance of demand note11.03.2016- Investor update: Demand note issued. Investor has shared the copy of the same on22.03.201629.03.2016- Investor update: RO, MIDC is saying the amount given by MIDC is incorrect. Hence,Investor is requesting Dy CEO to intervene.12.04.2016- MIDC update: MIDC is re-verifying the case.05.05.2016 - Investor Update: MIDC has issued a letter that Udyog Sanjivani has been expired and thelast demand note issued stands good.12.05.2016 Investor update: Investor has made a representation on the last letter issued by MIDC andis awaiting a hearing from Jt. CEO, MIDC18.05.2016- MIDC update- RO MIDC has issued demand letter to investor to pay as per previousamnesty scheme

MIDC to look into the matter toresolve the case,simultaneously the case to bereferred to Addl. Director,Industries

OPEN

32 Gigaplex Estate Pvt. Ltd EnvironmentDepartment

EnvironmentClearance 27.04.2015

Investor has applied for Environment clearance under category 8 (B) of EIA notification but is yet toreceive the same.Investor has complied with EIA report & related documents in August 2015.07.11.2015 Department update: The case to be discussed in the 40th SEAC 2 meeting that isscheduled on 17-18 November 2015.16.12.2015- Department website- SEAC 2 meeting has recommend to the SEIAA committee, subject toinvestor's compliance. Investor is required to submit EIA report.24.03.2016- Department website uploaded the agenda for 96th SEIAA meeting, which includes the case.Minutes are awaited25.04.2016- Department update: Minutes are uploaded and the clearance is issued to the unit. Hence,the case is closed from MAITRI forum

The issue was closed on20.05.2016 CLOSED

Page 13 of 47

Page 14: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

33 Gigaplex Estate Pvt. Ltd EnvironmentDepartment

EnvironmentClearance 25.08.2014

Due to enhanced growth of IT industry and changes in development norms and regulations by MIDC, fewmodifications are required in the project. Investor has submitted an application for amendment inEnvironment Clearance on 25 August 2014. Investor's application is pending for approval.07.11.2015 Department update: The case to be discussed in the 40th SEAC 2 meeting that isscheduled on 17-18 November 2015.16.12.2015- Department website- SEAC 2 meeting has recommend to the SEIAA committee, subject toinvestor's compliance. Investor is required to submit EIA report24.03.2016- Department website uploaded the agenda for 96th SEIAA meeting, which includes the case.Minutes are awaited25.04.2016- Department update: Minutes are uploaded and the clearance is issued to the unit. Hence,the case is closed from MAITRI forum

The issue was closed on20.05.2016 CLOSED

34 Givaudan India Pvt. Ltd. Directorate OfIndustries

PackageScheme ofIncentives

04.05.2015

Investor had made an application to avail state incentives under PSI (2007) for large units. But due toprolonged delay in getting land from MIDC, their investment period is almost passed. The investor hastherefore applied (on 4th May 2015) to consider incentives benefits as per PSI 2013 instead of 2007 onthe basis of merit of case.August 2015- Update from DI:The department is examining the case.27.10.2015- DI update: The said issue was discussed in the State Level Committee constituted underthe Chairmanship of PS(Inds) for PSI. The minutes of meeting is approved by Government. The case willbe scrutinised by DI as per the reasons submitted by the unit for delay in the project and decision will betaken in the case.19.05.2016- DI update: GR is issued. So the issue may be closed

The issue was closed on20.05.2016, but MAITRI to availthe copy of the GR

CLOSED

35Godrej & Boyce Mfg.Co. Ltd. (Phase I/ Southblock)

MGL PNG

The investor has been communicating with MGL and GAIL since two years for supply of PNG. MGL’ssupply will take more than 2 years, GAIL is not ready to supply gas unless the unit obtain NOC from MGL11.03.2016- IM Decision: Investor to meet PS(I) to seek guidance on the case26.03.1016- investor update: Letter submitted to GAIL for PNG supply

Mahanagar Gas Limited toprovide gas supply to the unit inRaigad. The department tomake the pipeline &infrastructure as per theirschedule. Unit to look for analternate solution and this caseis not to be taken up at MAITRI

CLOSED

Page 14 of 47

Page 15: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

36Godrej & Boyce Mfg.Co. Ltd. (Phase I/ Southblock)

MSETCLRealignment oftransmission

line26.08.2014

The investor has made an application on 26.08.2014 for realignment of 400 KV transmission line.MSETCL has done site survey on 07.08.2015. Profile Drawing is submitted by G & B. Final approval isawaited.11.09.2015- Investor meeting update: The issue to be resolved within next 4 days.29.09.2015 -Update from the department- the letter is issued to investor. confirmation from investor isawaited.The issue to be closed in October 2015 investor meeting07.08.2015- MSETCL has done site survey. Profile Drawing is submitted by the unit.06.11.2015 –Based on MSETCL’s standard tower drawing investor to share the design and drawings08.01.2016 – Investor has submitted the foundation drawings09.02.2016 – Foundation drawings approved, official estimate pending from MSETCL03.03.2016 – Official estimate is still awaited from MSETCL.11.03.2016- IM decision: Investor to submit tower design and MSETCL to share the estimate at theearliest. MAITRI to review the case 16.03.2016.22.03.2016- Investor update: They have submitted tower design. They have received the estimations.after reviewing the same, they will make payment through DD03.05.2016- Investor update: MSETCL has given demand note on 20/04/2016. G&B has submitted DDof supervision charges on 27/04/2016. Further G&B needs to start executing the project undersupervision of MSETCL.The issue is resolved and the works to be carried out by unit, hence, the case to be closed

The issue was closed on20.05.2016 CLOSED

37Godrej & Boyce Mfg.Co. Ltd. (Phase I/ Southblock)

MPCB Consent toestablish

Investor has made an application for extension and amendment of Consent to Establish. The unit wantsto have it approved on priority.11.03.2016- MPCB update: MPCB will renew it. Unit needs to apply afresh for new consent as consentto establish cant be extended.04.04.2016- MPCB update: It will be taken up in next CAC meeting02.05.2016- MPCB update: The case was discussed in CAC meeting of 29.04.2016. Minutes areawaited.17.05.2016: The Consent has been accorded and the issue to be closed in te upcoming investormeeting.

The issue was closed on20.05.2016 CLOSED

Page 15 of 47

Page 16: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

38Godrej & Boyce Mfg.Co. Ltd. (Phase I/ Southblock)

MSEDCL Electric linerelocation 10.09.2015

The investor has made an application on 10.09.2015 for relocation of 22KV overhead line, which ispassing through main entrance.06.11.2015 - Estimate & Demand letter for supervision charges to be received from MSEDCL09.12.2015 - Estimate & Demand letter for supervision charges to be received from MSEDCLDecember 2016- Investor update-to relocate the line, MSETCL proposed to shut down the expressfeeder for 1-2 days, but the other unit (M/s Positive packaging), getting supply from the same feeder isasking for compensation of losses due to proposed shut down. Godrej is in process of negotiation withthis unit.22.12.2015- Field visit update- Godrej to submit DDF undertaking and NOC from M/s enpack (positivepackaging) who uses dedicated express feeder of one of the two line (being relocated), post which, theestimates for works shall be submitted to chief engineer, MSEDCL by the Pen office.12.01.2016- Investor update-Investor is seeking MSEDCL's intervention to negotiate with other unit(Positive packaging)14.01.2016- Investor meeting decision: MSEDCL to negotiate with other unit (Positive packaging).The department to resolve the case on top priority and MAITRI to send the report to DC(I) every week onthe progress of the issue.The investor has submitted undertaking of DDF to MSEDCL.03.03.2016- Investor update: Jt meeting with MSEDCL and M/s Positive packaging is done. Survey iscompleted. MSEDCL to provide estimate of work and shut down plan in consultation with Positivepackaging. The investor will carry out the works afterwards26.03.2016 - Investor update: After joint discussion with M/s Enpack, it was decided by unit that it willbear the cost for demarcating lines in its premises only. Revised estimation & shutdown confirmation areawaited from SE pen.13.04.2016- IM Decision: MSEDCL to verify if entire underground works can be done and then,switchover can be done or not. MAITRI to follow up with MSEDCL.02.05.2016- MSEDCL update: Revised estimates are in process at HO.

MSEDCL informed that it willtake one day for the shutdownto carry out the works. It wassuggested that MSEDCL willnotify the unit M/s enpack(positive packaging) with a 15days notice to take a shutdownand go ahead with works.

OPEN

Page 16 of 47

Page 17: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

39Godrej & Boyce Mfg.Co. Ltd. (Phase I/ Southblock)

MSETCL Power 16.01.2015

The investor has made an application on 16th January 2015 for 100 KV power supply from TambatiSubstation. The investor has received a Grid Connectivity letter from State Transmission Utility, but theinvestor is still awaiting the load sanction letter from MSEDCL.11.09.2015- Investor meeting decision: CE (Commercial), MSEDCL, to expedite the process of issuingthe load sanction letter. Feasibility report from MSETCL is awaited, post which, the letter will be issued05.10.2015- Update from Investor: Drawing to be submitted by the investor and estimate is pendingfrom MSETCL09.10.2015- Update in the meeting: The sanction letter has been issued and the investor has obtainedhence, the issue to be closed in October 201508.12.2015 - DD for supervision charges is submitted.29.12.2015 - Investor has submitted all the drawings.30.01.2016 - Revised drawings submitted. 100KV Line route finalisation pending with the investor.11.02.2016- MSETCL approved drawings and investor has completed 100KV line route finalization and isawaiting revised estimate from MSETCL.26.02.2016- Investor has made application to MSEDCL TQA Pune for metering specs and fixing point ofsupply.11.03.2016- IM Decision: MSETCL to resolve the case within 1 week.

The unit has received approvalletter on 19.05.2016 for 100 KVpower supply from Tambatisubstation. The issue wasclosed on 20.05.2016.

CLOSED

40Godrej & Boyce Mfg.Co. Ltd. (Phase II/North block)

MGL PNG

The investor has been communicating with MGL and GAIL since two years for supply of PNG. MGL’ssupply will take more than 2 years, GAIL is not ready to supply gas unless the unit obtain NOC from MGL11.03.2016- IM Decision: Investor to meet PS(I) to seek guidance on the case26.03.1016- investor update: Letter submitted to GAIL for PNG supply

Mahanagar Gas Limited toprovide gas supply to the unit inRaigad. The department tomake the pipeline &infrastructure as per theirschedule. Unit to look for analternate solution and this caseis not to be taken up at MAITRI

CLOSED

Page 17 of 47

Page 18: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

41Godrej & Boyce Mfg.Co. Ltd. (Phase II/North block)

WaterResourcesDepartment

Water quotasanction 18.06.2015

Exe. engg and Secretary(WRD) to be called for nextMAITRI meeting or they may beinvited to a separate meeting atPS (I) office. MAITRI to draft aletter for the same

OPEN

Investor is seeking permission to take 0.4 MLD water from Patalganga River in Dhamni, Ta. Khalapur.He has submitted an application to Irrigation Department for grant of approval but awaiting the approvaltill date. The site inspection was done on 8th July 2015 and the file is under scrutiny with sub div office,Karjat.11.09.2015- Investor meeting decision: The department to expedite the process. MAITRI to share theissue of water resources department with DC (I) as the nodal officer/representative from the departmentwere not present in the meeting29.09.2015- Update from department: CE, Konkan region Mumbai is intimated the new proposal as perlatter dated 21.9.2015.05.10.2015- Update from Investor: The investor had received the Compliance letter on 16th September2015 and the investor has complied to the same on 29th September 2015.27.10.2015- WRD update: the file is under process at CE, Konkan region7.12.2015- Department update- File at field level at SDE, Karjat10.12.2015- Investor update- Investor has to make compliance for further action.11.12.2015- Investor update- Investor has shared a new application form received from departmentafter 4 months. Investor needs to apply again using this21.12.2015- Investor update- Investor has applied again to the department with necessary forms andaffidavit. The file is with CE, Konkan for process. The investor has revised the requirements to 0.8 MLDwater and complied accordingly05.01.2016- Investor Update- The investor has to comply with few more documents.12.01.2016- investor update- The investor has made compliance with the department. The KarjatOffice has recommended the same to Kolad region office. the case is now under process at Kolad regionoffice.14.01.2016- Investor meeting decision: The department to resolve the case on top priority and MAITRIto send the report to DC(I) every week on the progress of the issue.29.02.2016- Field visit update: The file is under process with Executive Engineer, Irrigation Dept, Fortoffice, Mumbai03.03.2016- field visit update: The file is under process with Asst Section Officer, Irrigation Dept,Mantralaya, Mumbai11.03.2016- Department update: The case to be presented in the cabinet by the end of March 2016.07.04.2016- WRD update: The file is sent back to regional office for queries.02.05.2016- Investor udpate: the compliance is pending from investor's end

Page 18 of 47

Page 19: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

42Godrej & Boyce Mfg.Co. Ltd. (Phase II/North block)

UDD realignment ofDP road 1.10.2015

With reference to meeting held on 06.08.2015 under chairmanship of Hon. Chief Minister, the investorhas made an application for Realignment of DP road, which is pending for the grant of approval.12.01.2015- Investor update- Investor has re-submitted the application copy to PS, UDD on 06.01.2016.14.01.2016- Investor meeting decision: The department to resolve the case on top priority and MAITRIto send the report to DC(I) every week on the progress of the issue.21.01.2016- Investor update: Investor met ADTP, Pune to discuss their proposal. Pune TP office hasforwarded the letter for remarks of Alibaug and Konkan Office.01.02.2016- The investor also met Jt Director, TP. The file is under process at JT Secy, UDD. Theinvestor to meet him.10.03.2016- Investor update: The file is under process with PS UDD24.03.2016- Investor update: The file is under process with Hon'ble CM (The file is sent to his deskwithout signature of PS UDD - as updated via field visit)18.05.2016- Department update: The file is under process with Jt Secy UDD19.05.2016- Investor update: The approval is given by the department and the investor is awaiting thenotification to be issued

As the Nodal officer for MAITRIwas not present for the meeting,MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

43Godrej & Boyce Mfg.Co. Ltd. (Phase II/North block)

UDD FSI 1.10.2015

With reference to meeting held on 06.08.2015 under chairmanship of Hon. Chief Minister the investorhas made an application to PS(UDD) on the following points:1) Increase in FSI to 1.0 for Industrial Zone.2) No Height Restriction for industrial sheds and other buildings in industrial Zone.3) Reduce the mandatory open area to 15% in Raigad district for industrial Zones12.01.2015- Investor update- Investor has re-submitted the application copy to PS, UDD on 06.01.2016.14.01.2016- Investor meeting decision: The department to resolve the case on top priority and MAITRIto send the report to DC(I) every week on the progress of the issue.21.01.2016- Investor update: Investor met ADTP, Pune to discuss their proposal. Pune TP office hasforwarded the letter for remarks of Alibaug and Konkan Office. Pune TP office has forwarded the letterfor remarks of Alibaug and Konkan Office. The investor is meeting Jt Director, TP on 01.02.2016. UDDwill share FSI circular with the unit for further reference.01.02.2016- The investor also met Jt Director, TP. The file is under process at JT Secy, UDD. Theinvestor to meet him.10.03.2016- Investor update: The file is under process with PS UDD24.03.2016- Investor update: The file is under process with Hon'ble CM. (The file is sent to his deskwithout signature of PS UDD - as updated via field visit)18.05.2016- Department update: The file is under process with Jt Secy UDD19.05.2016- Investor update: The approval is given by the department and the investor is awaiting thenotification to be issued

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

Page 19 of 47

Page 20: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

44Godrej & Boyce Mfg. CoLtd (Dhamni Pumphouse)

MSEDCL Power 08.01.2016

The investor has done permanent power supply application to MSEDCL on 08.01.2016 for Talthi -Dhamni pump house. MSEDCL reverted with requirement of 7/12 extract document , G&B will submit thesame. 09.02.2016 - 7/12extract document submitted to MSEDCL. Estimate received from MSEDCL on 06.02.2016. Investor toreview the estimate & submit the Demand Draft accordingly.03.03.2016- Investor has reviewed the document and estimation, and have initiated the process ofDemand Draft preparation for the payment to MSEDCL.03.05.2016- Investor update: The investor has paid DD for supervision charges on 17/03/2016. theinvestor to execute this project under supervision of MSEDCL.

The issue was closed on20.05.2016 CLOSED

45Godrej & Boyce Mfg. CoLtd (Dhamni Pumphouse)

RevenueDepartment /

MSRDC /MIDC

NA permission;building

permission14.01.2016

The investor has submitted the proposal for NA and Building construction permission at the CollectorOffice , Alibaug09.02.2016 - The file has been forwarded to Town Planning Office , PWD, Tehsildar, Zilla Parishad fortheir NOC from Collector's Office .26.02.2016- Investor update: Investor has shared support documents & applications with MAITRI. DIChas asked report/NOC from TP, PWD, Health dept and Tehsildar. TP has asked for compliance on04.02.2016.03.03.2016- Investor update: Collector has forwarded the file to TP, PWD, Tehsildar and ZP for theirNOCMSRDC is notified as Special Planning Authority for the region and hence, this matter will lbe forwardedto MSRDC. However, in absence of ready infrastructure and policy in place for MSRDC, Investor isrequesting to nominate MIDC as planning authority for industrial units. He is meeting PS industries for theissue.02.05.2016- Investor update: Investor is to submit proposal to MSRDC03.05.2016- Investor update: The investor has submitted two proposals for NA & Building ConstructionApproval on 31.03.2016

The NA permission will comefrom the Collector; whereas,Building plan will approved byMSRDC.As this plot is of 3 acre fallingunder recreational zone, MIDCto examine if they can be theplanning authority for suchprivate land and MIDC act canbe implemented on it or not.The investor to get in touch withthe Special Planning Authorityof MIDC.

OPEN

46Godrej & Boyce Mfg. CoLtd (Dhamni Pumphouse)

WaterResources

Department/MSRDC

NOC 14.09.2015

The investor has applied for an NOC of Water Resources Department for construction of pump house.04.03.2016- Investor update: Karjat Irrigation Dept. has forwarded the proposal to Kolad Irrigation Div.Additional file is submitted at Kolad as per their request.10.03.2016- Investor update: Investor shared the copy of application.

SICOM to make a field visit tofind out the approving authorityand status of application.

OPEN

Page 20 of 47

Page 21: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

47Goradia Special SteelsLtd MSEDCL

Support forrehabilitation of

sick MSMEundertaking

3.02.2014

The unit is declared sick by BIFR under SICA 1985 vide case reference number 274/1998. Also the unithas received eligibility certificate from Directorate of Industries on 4 July 2008 vide reference numberDI/BIFR/VCL/516/2008/B-29198 for relief and concessions as per clause 12.2 of GOM Policy, 2006.Investor has submitted an application on 29 July 2008 to MSEDCL to seek relief and concession as perthe above mentioned policy but MSEDCL rejected to forgo any of its dues. Investor is seeking the issueto be resolved.11.09.2015- Update from department- CE(Comm) has conveyed the guideline regarding the specialAmnesty scheme to Investor on 13.05.2014. The stand taken by MSEDCL for granting relief to sickindustrial unit under BIFR rehabilitation scheme is conveyed to GoM, which is as under."A) MSEDCL is unable to sacrifice any of its dues.B) GOM may grant any rehabilitation scheme already approved by it.C) The actual amount of sacrifice /subsidy worked out by MSEDCL as per scheme at (B) above inrespect of the particular company will have to deposit by the GoM in advance with MSEDCL.D) The advance granted by GoM will be paid by the company to the MSEDCL as per the provisions ofthe scheme and when the company turn around the said amount will be paid to the GoM as and whenrecovered from MSEDCL. "09.10.2015- Investor meeting update: The department to reconsider the case and put an hearing againto pass a final order06.11.2015- Department update: the matter is put up before competent authority.13.01.2016- Department update: As on today there is no change in MSEDCL Stand. The stand ofMSEDCL is same and common for all BIFR cases and Any change in the stand of MSEDCL mayincrease financial burden for all such BIFR cases. The matter is under process for decision fromcompetent authority11.03.2016- IM decision: MSEDCL to write to the investor informing about the decision taken by thedepartment.01.04.2016- MSEDCL update: revised proposal is sent to higher authority and it is under process.Investor will be intimated accordingly.

MSEDCL to decide in the matterand inform the investorregarding their decision to closethe case.

OPEN

48 Haier Appliances EnvironmentDepartment

EnvironmentClearance 18.11.2015

Investor has applied for Environment Clearance on 18.11.2015 which will be examined by MS, Env Deptin the SEIAA meeting. However, due to this, the construction work is stalled. Investor is requesting toissue a provisional Environment Clearance so that they can continue the construction work.14.01.2016- Department update: The project was discussed in 117th meeting of SEAC-1 (held on30.12.2015) and ToR was issued to the project Proponent. Investor is required to submit EIA report24.02.2016- Investor update: The investor has submitted EIA report.30.04.2016- The matter was discussed in the 126th SEAC meeting held on 30.04.2016. MOM awaited.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Environment) for furtheraction.

OPEN

Page 21 of 47

Page 22: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

49 Hindustan Platinum(make in India) MIDC amalgamation

and approval

In May 2011 the investor was allotted 11 different plots for expansion, but due to ComprehensiveEnvironmental Pollution Index (CEPI) being high in Navi Mumbai MPCB had put all expansion of newprojects on hold. After certain modifications in the current buildings the investor obtained the BCC in2014. Since than the investor is following up with MIDC to amalgamate the remaining plots which is stillpending with the department.14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of theapplication, if applied and also follow up with the department for updates.12.04.2016- MIDC update: Investor to apply for BCC extension first. then MIDC will proceed further foramalgamation.17.05.2016 - MIDC update: The file is under process with Jt. CEO MIDC.

MAITRI to follow up with theMIDC to resolve the case. OPEN

50 Honeywell AutomationIndia Limited

Sales TaxDepartment VAT Refund 19.03.2014

The investor is requesting credit of Rs 2,14,94,222 taxes paid in excess of tax assessed/ determined inappeals for the Financial Year 2002-03, 2003-04 & 2004-05 either through refund or issue RefundAdjustment Orders

Department to provide a list ofcompliance with the investorlike original chalan, originalRAO copies, etc. Investor tocomply with the departmentand share a copy of the samewith MAITRI. The issue to beresolved within 1 month.

Open

51IGATE Global SolutionsLtd (Phase 1, NaviMumbai)

MPCB Consent toOperate 18.11.2015

The investor has made an application for Consent to Operate (Phase I) which is still pending for grant ofapproval with the department11.03.2016- MPCB update: The case has already been discussed in the CC meeting awaiting theminutes of the meeting.12.04.2016-MAITRI status: No agenda uploaded shows this case as on date.13.04.2016- Department update: The case was discussed in CAC meeting dated 02.02.2016, theinvestor was asked for compliance.02.05.2016- Investor update: Investor has received the approval. The issue to be closed.

The issue was closed on20.05.2016 CLOSED

Page 22 of 47

Page 23: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

52 Indus Ferro metal(ghatege patil) MIDC BCC Extension 17.12.2015

The investor has requested MIDC for extension of time limit for BCC. The investor has made anapplication to MIDC for amount payable under Udhyog Sanjivani scheme. The scheme is ending on 31.01.2016 and hence investor is seeking early response from MIDC11.01.2016- MIDC update- Investor has applied for it. MIDC will check eligibility of the unit for the scheme14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.29.01.2016- investor update: According to investor, Dy CEO MIDC has concluded to charge pre-payment charges from July 2013 to production date (May 2014) and will waive 50% under UdhyogSanjivani. MIDC will inform the amount to be paid as per discussion soon. The file is under process withJt CEO, MIDC22.02.2016- investor update: The file is under process with CEO, MIDC10.03.2016- MIDC update: the file is under process with RO, for issuance of demand note11.03.2016- Investor update: demand note is issued and investor shared the same with MAITRI on22.03.201629.03.2016- Investor update: RO, MIDC is saying the amount given by MIDC is incorrect. Hence,Investor is requesting Dy CEO to intervene.12.04.2016- MIDC update: MIDC is re-verifying the case.05.05.2016 - Investor Update: MIDC has issued a letter that Udyog Sanjivani has been expired and thelast demand note issued stands good.12.05.2016 Investor update: Investor has made a representation on the last letter issued by MIDC and isawaiting a hearing from Jt. CEO, MIDC

MIDC to look into the matter toresolve the case,simultaneously the case to bereferred to Addl. Director,Industries

OPEN

Page 23 of 47

Page 24: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

53 Jayesh Industries Ltd. MIDC BCC Extension 09.02.2009

Investor has initially submitted the application to issue part BCC on 9th February 2009 to DeputyEngineer, MIDC Mahape office for the plot nos. W 104D, W 104/1 and W 104/2 located at TTC IndustrialArea, Navi Mumbai. This application is still pending for the grant of approval.07.11.2015- Investor meeting decision: The investor has acquired another plot of MIDC for expanding theunit, for amalgamation- Dy. CEO, MIDC to give an hearing by 09.11.2015. MIDC to take decision within15-20 days, otherwise to be reviewed in December 2015 meeting. The case also to be sent for CSmeeting09.11.2015- Investor update: No papers available at MIDC HO, hence investor was asked to contactMIDC on 18.11.201517.11.2015- Department update: the file has been received at HO MIDC. It is under process for approvalof Dy CEO MIDC04.12.2015- MIDC update- the file is with area manager, MIDC who will send his remarks afterscrutinizing the proposal to the Dy CEO24.12.2015- Department update-Investor to comply with certain documents. MIDC has informed thesame to the investor01.02.2016- Department update: Investor has complied with necessary documents and the report fromDE Planning, Mhape (H P Awar) is awaited.04.03.2016- Investor update: The surveyor from office of Dy. Engg, MIDC has not come to take upsurvey activities, to confirm the amalgamation of plots is done by MIDC or not.29.03.2016- MIDC update: RO, MIDC to give inputs on remarks given by Dy Engg for the survey report.12.04.2016- MIDC update: Dy Engg, Planning to forward the file to HO, MIDC by 11.04.2016.12.04.2016- The file is at RO, Mhape02.05.2016- MIDC update: the file is sent back to HO, MIDC for clarification18.05.2016- MIDC update- The file is with Central Planning dept for amalgamation

MAITRI to follow up with thedepartment to resolve the case. OPEN

54 Jotun India Pvt.Ltd MSEDCL Electricity dutyrefund 18.09.2015

MSEDCL has approved the monthly electricity duty exemption from Oct'15 onwards, but the investor hasmade an application forElectricity duty refund of Rs. 1,20,59,508 for the period Sep 2008 to Sep 2015 under PSI scheme 2007which is still under process with the department13.04.2016- IM decision: The file pertaining to Elect duty refund are under process at desk of Hon'bleMinister (Energy). The case to reviewed along with other cases of Elect duty.

MAITRI to share the list of allElectricity duty refund caseswith PS(I) for further action.

OPEN

Page 24 of 47

Page 25: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

55 Jsons Foundry Ltd. MIDC BCC Extension 2013 and8.09.2015

The investor has purchased a closed sick unit (M/s J.F Laboratories) at MIDC, Kurkumbh. The earlierunit applied for BCC in 1994, but was never issued the same. The current investor has changed theproduct to be manufactured (Oil required for ayurvedic medicines). Hence, he has applied for theextension of time limit for BCC, which is pending with RO, Pune since 2013.11.09.2015- Investor meeting update: RO, MIDC (Sangli) to resolve the issue in 8 days. If theapplication is declined, the investor may re-apply to Jt CEO, MIDC07.10.2015- Update from Investor: The file is sent to HO, MIDC for approval.07.12.2015- MIDC update- MIDC has given the extension to the investor. MIDC to share the copy ofextension letter given11.12.2015- Investor meeting update by department-The file is pending at Jt CEO level for decision.23.12.2015- MIDC update- Investor to comply with signed documents to MIDC. Investor has compliedwith the same on 29.12.201528.03.2016- MIDC update: Investor need to comply with his production details11.04.2016- Investor update: He is awaiting the formal communication from MIDC.18.05.2016- MIDC update- The letter will be issued today

MAITRI to find out from theinvestor if the unit is inproduction and department tolook into the matter and updateMAITRI on the same.

OPEN

56 Jyoti Steel Industries RevenueDepartment Local issues 22.02.2016

Investor is facing extortion from local people for giving them contracts. Since investor is not fulfilling theirdemand, the local people are now demanding to close the unit stating the noise from unit is disturbing thenearby school.Although, the investor has supported the school by providing computer, clean drinking water and byrepairing the school building.Investor has requested Dist. Collector to resolve the issue. He has also proposed to run the unit duringnon-school hours as well as to install sound proof material and air conditioner in six classrooms of theschool. The investor has also shown willingness to find a different location and relocate the school.11.03.2016- IM decision: PS has writer a letter to the collector in order to look into the matter to resolvethe case.MPCB too had visited the unit to check noise levels/pollution. The case to be presented in CM meeting.The unit is currently working in non-school hours only. It was suggested to the unit that it may continue towork as per norms and if school is creating issues, he may approach MAITRI.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

Page 25 of 47

Page 26: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

57 KGN Pharma MIDC Building PlanApproval 03.12.2015

The investor applied for building plan approval to deputy engineer, Tarapur, MIDC which is pending forgrant of approval. An RTI activist has lodged a complaint against MIDC on 20.02.2012 stating theaccounts are not clear between the first owner and the second owner of the said plot and PoliceJurisdiction failed to intervene being a civil matter. The activist has now approached the Palghar courtand registered a criminal case on MIDC, other government agencies, M/s Thane Esskay Rolling Mill, M/sPharma Martis and the broker. Due to this, investor's application for building plan (of the said plot) ispending.10.02.2016 - Department Update: The hearing of court is awaited in this case.22.02.2016- MIDC update: Legal division, MIDC has instructed Regional MIDC office, Palghar to issueBuilding plan approval.10.03.2016- Investor update: Investor has obtained conditional building plan approval that court orderwill be binding to investor.11.03.2016- IM decision: MIDC to reconsider the conditional Building plan approval issued by thedepartment.29.03.2016- MIDC update: MIDC has sought opinion of GM, Legal, MIDC on decision of IM March 2016to reconsider the conditional building plan approval.12.04.2016- MIDC update: Investor has received building layout plan approval. Legal division hasforwarded the file to Dy CEO, MIDC18.05.2016- MIDC update- Building plan is approved.

MAITRI to follow up with thedepartment to resolve the casefor conditions

OPEN

58 Killick Paints Directorate OfIndustries

Change ofmanufacturing

activities31.10.2013

Investor has submitted an application to obtain permission for change in manufacturing activity for theirexisting four SME units. The application was submitted on 31 October 2013, which is still pending forapproval.August 2015- The unit was not operational since 2004, but the investor had still claimed the benefitsfrom the department. Hence, Western Maharashtra Development Corporation (WMDC) has filed a courtcase on the investor to recover INR 1,23,18,355. WMDC has sent a letter to DI seeking their inputs inthis matter. DI to look into matter

MAITRI to follow up with thedepartment to resolve the case. OPEN

59 KSPG Automotive IndiaPvt.Ltd MIDC Local Issues

11.09.2015 - Investor meeting update: Investor is facing local issues with the villagers which in turn iscreating disruption of the work at the construction site.11.09.2015- Investor meeting decision: RO, MIDC to accompany investor to SP office in order toresolve the issue.14.01.2016- Investor update: The issue has been resolved and no local intervenion at the contructionsite hence the issue was closed on 14.01.2016 from MAITRI forum.08.02.2016 - Investor Update: The issue is not yet resolved and the villagers are still disruption at theconstruction Site.28.03.2016- MIDC update: Investor to take up the case with local committee (SP, MIDCrepresentatives).13.04.2016- IM decision: MAITRI to visit the local committee to resolve the case.

MAITRI to draft a DO letter tolocal committee quoting GR forresolving local issues inindustrial area and share it withPS(I)

OPEN

Page 26 of 47

Page 27: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

60 KSPG Automotive IndiaPvt.Ltd MIDC water 19.05.2015

The investor is seeking guidance for piped water supply application to satisfy 165 CMD water demand.As there is no infrastructure provided in Supa Parner industrial park at present, water supply connectioncan not be given to the plot holder at present.August 2015- update from MIDC: MIDC, Nashik Div has floated tenders to provide infrastructure in theindustrial park. Once the work of laying pipeline from existing Supa water supply scheme is completed,the water connection can be given to the investor.24.08.2015- MIDC update: Tenders are floated11.12.2015- Department update- The tender works will be completed by February 2016. To bereviewed in March 2016 investor meeting.13.01.2016- Department update- the work is expected to be completed by first week of April 2016.12.04.2016- MIDC update: the work will be completed by end of April 2016.18.05.2016- MIDC update- MIDC has made temporary arrangement for investor. the works under tenderwill be completed by end of May 2016

MAITRI to follow up with thedepartment to resolve the case. OPEN

61 Laxmi organicIndustries Ltd

Environmentdepartment

Environmentclearance

9.06.20142.03.2015

Investor's application for environment clearance was considered in the 86th SEAC1 meeting. However,due to the draft notification released by MoEF on Eco Sensitive Area, the EC was put on hold since theproject site is located within 2.8 Km from Matwan Village which comes under ESA. Under thiscircumstances, the state committee had referred the case to central EAC under category “A” and theproposal was submitted to MoEF on 31.10.2014 (vide reference number IA/MH/IND/25440/2014).Investor then represented the case to state committee on 2.03.2015 and they were granted TOR at the98th SEAC meeting. Investor also complied with the Environment Impact Assessment report 05.09.2015and requested EC under category B project. However, investor has not received approval till date10.03.2016- Environment department update: the issue will be considered in 123rd SEAC-1 meetingto be held on 11-12th March, 201611.04.2016- Department update: The case was not discussed in the said meeting since the investorwas not available with his representation. The matter will be discussed in the next meeting.09.05.2016: The matter was discussed in the 125th SEAC meeting and EC approved

The issue was closed on20.05.2016 CLOSED

Page 27 of 47

Page 28: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

62 Liebherr AppliancesIndia Pvt. Ltd., MIDC Well closing

Permission 12.10.2015

The investor has made an application to close the wells located at plot no. A-1/6, Shendra MIDC as thewells are dry and also it is affecting the internal production layout and project development.12.02.2016- Investor update: MIDC's earlier visit concluded that 2 out of 3 wells, were dried and one washaving water. The file seeking guidance (due to non availability of policy in this mater is available) wasforwarded to HO, MIDC. By the time, third well also dried up and investor's works are hampered due towell in his campus.16.02.2016-Investor update: MIDC has granted closing of one well while, other two well having water areasked to cover (if falling under construction area) and investor was asked to use the water of these twowell for construction purpose29.02.2016- Investor update: Investor has shared his reply to MIDC, according to which, the well underhis construction area will have to be filled and closed to avoid unstable well walls falling under heavypressure traffic movement above it. Other wells are also about to get dry and cant provide sufficientwater for construction works. He has requested MIDC to resolve the case so as not to hamper hisconstruction activities and schedule28.03.2016- MIDC Update: CP has made field visit for inspection of site and is processing the file12.04.2016- MIDC update: The file is forwarded to Dy Engg.27.04.2016- Investor update: The investor has received the letter permitting the closing of well.

The issue was closed on20.05.2016 CLOSED

Page 28 of 47

Page 29: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

63 Manner & SkillInternational Pvt. Ltd UDD Building Plan

Approval 22.07.2015

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

Survey No. 30/2, 31/3 & 35-1/B at Village Konas Sawantwadi is the ancestral land of the investor, onwhich he want to set up mineral water plant. The said land is notified as other forest area by townplanning department without informing the investor. Forest department does not recognise this landparcel as other forest area.The investor is facing issues in obtaining the NA permission, Building permission, etc. even with revisedlayout plans. His applications are pending at Tehsildar , Sawantwadi.09.10.2015- Investor meeting update: UDD to look into the matter and update MAITRI. Investor to becalled for the next investor meeting. MAITRI to visit the Tehsildar of Sawantwadi and collect the tourismMap.02-11-2015- Department update: TP officer, Sindhudurg has submitted ground reality report to Jt.Director , Konkan region on 01.11.2015. Issue is pending with Jt Director, Konkan region07.11.2015- investor meeting decision: As the plot is notified as "other forest zone", the investor willhave to apply for the Zone Conversion. MAITRI to share the contact details of Jt. Secretary, UDD, whowill guide the investor in making the application for zone conversion. MAITRI has shared details on17.11.2015. Investor has met Secy, UDD on 4.12.201523.11.2015- Field visit update: File is with Shri. Shende (Jt. Director Town Planning). Expected time toforward the file to Shri. Rajan Kop (Dir. Town Planning) is 1 week.1.12.2015- Investor update- File is sent to Pune office for further action on 1.12.201510.12.2015- Investor update: They have obtained approval of CGWA with condition to invest certainamount of money within 6 months, which is ending in a month. The investor is requesting early resolutionof UDD issue so that he can start his project without any problem further.The investor was asked to carry out a contour survey (30 degree) and ensure to have 12 mtr wide roadnear his plot14.01.2016- Investor meeting decision: MAITRI to write a draft letter to Jt. Director, Konkan Regionasking for the empanelled agencies for contour report. MAITRI to visit the Nodal officer and take it inwriting the list of empanelled agencies. The issue to be resolved on priority. A weekly report to be sent toDC(I) on the progress of the issue.19.01.2016- Investor update-Investor has hired architect for contour survey and applied to grampanchayat for NOC for the road. Field visit update: UDD does not have empanelled list for carrying outthe activities. the architect of the investor should attach his certificate with the report. Investor needs toapply for zone conversion with Divisional commissioner, TP with reference to GR dated 6.5.2015 and4.1.2016)22.01.2016- MAITRI has shared draft DO letter with DC (I) to be written to Jt Dire, TP for sharingempanelled architects list with Investor.01.02.2016- Department update: The proposal for conversion of said land (if slope=<30 degree) toAgriculture-no development land is forwarded to UDD Mantralaya. (So that, unit like manner & skill, ifapplicable, can apply for NA permission on the land). The report of contour survey form investor will bereferred in this. As per the department, the procedure of conversion of land and notification issuance willtake 6-8 months. Department asked the investor to meet them18.02.2016- Meeting update: In a meeting of UDD with investor, The entire region is falling under KasturiRanjan committee. But being a green category project, he is allowed to put up the project in the region.The ground reality report is forwarded to Hon'ble Minister, UDD.28.04.2016- Field visit update: The file is moved to Hon'ble CM's desk

Page 29 of 47

Page 30: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

64 Matsyodari Steel &Alloys Pvt Ltd.

Industries &Mining

Department

InvestmentPeriod

Extension03.11.2015

Unit was issued mega offer letter dated 15th November 2011 with the condition to complete theinvestment within 5 years. However due to delay in getting environment clearance for phase 2(Application Date - February 2013) investor is requesting for extension of investment period by 2.5 years.09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards

MAITRI to follow up with thedepartment to resolve the case. OPEN

65 Matsyodari Steel &Alloys Pvt Ltd.

Industries &Mining

Department

Change inmega status 03.11.2015

Unit was issued mega offer letter dated 15th November 2011 on the basis of Investment amount 110Crore and 550 employment generation.Now Investor requesting to change the status of Mega (Investment) to Mega (Employment)09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards17.05.2016- department update- the proposal is to be discussed in HPC meeting of 26.05.2016

MAITRI to follow up with thedepartment to resolve the case. OPEN

66 Melting CentreIndustries &

MiningDepartment

Extension ofInvestment

Period17.11.2015

In 2013, the unit was given mega project status on the basis of proposed employment. However, due tothe delay in obtaining land from MIDC and Name change procedure of the company by MIDC, theinvestor is unable to implement the project within stipulated time frame. Hence the investor is requestingfor the extension in setting up the Mega Project.13.01.2016- department update- the name change process is completed by Industries dept (for offerletter) and the case is being considered for HPC

MAITRI to follow up with thedepartment to resolve the case. OPEN

Page 30 of 47

Page 31: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

67 MITC Rolling Mills Pvt.Ltd.

WaterResources

Department/MIDC

Water quotasanction 17.10.2013

As the Nodal officer for MAITRIwas not present for the meeting,, the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(WRD) forfurther action.

OPEN

The investor applied for the approval of lifting of water from Palkhed Dam- to Irrigation Department. Theapproval is awaited.They have obtained NOC from MIDC to lay the pipeline (0.2 MCM water) and they are ready to pay theproportionate part of Royalty and Establishment charges. However, the NOC states that once MIDC putan extra line from the Palkhed Dam, the investor’s pipeline will be discarded. Investor has requested tohave exclusive right on the pipeline. But no decision has been taken on this matter till date.August 2015-Update from MIDC:MIDC is not going to undertake any augmentation to the existing water supply scheme of Dindori Indarea, the exclusive rights of the pipeline will be with the investor, a note to this effect is approved byMIDC , Nashik vide TR. NO A18317 Dated 13.05.2015.However, clearance from water resource department is awaited. DI has written a letter to PS (Irrigation)regarding the issue.09.09.2015 - Update from WRD: Matter open for settlement of issue between MIDC & MITC Rolling MillsPvt Ltd. Not pending at Water Resources Department level.27.10.2015- WRD update- Investor has filled online application on 1.10.2015. It is under process3.11.2015- Investor update: after a joint meeting between MIDC, MITC, irrigation dept on 3.11.2015,Irrigation dept has written to investor for applying through MIDC Dindori. MIDC dindori is given reservedquota of 0.11 unit water, which is not sufficient for MITC's requirement of 0.242 units. unit is directed touse water supply to nearby MIDC Talegaon, having reserve water quota from Palkhed dam of 2.51 unit.MITC have to construct pipeline and jack well on their own cost- between MITC unit to Palkhed dam.However, water supply will be available once MIDC Talegaon will make the payment. Investor hasagreed to the same and applied to MIDC for onward submission to irrigation dam and for issuing NOC.20.11.2015- Investor update: MIDC has written a letter to WRD mentioning that payment for MIDCTalegaon water supply to WRD is under process and has requested WRD to grant approval to MITC toconstruct jack well and structure in the dam.04.02.2016- WRD update: Appropriate instruction are given to field level Exe Engg to sanction as perprevailing policy to lift water from quota of Talegaon MIDC08.03.2016- WRD Update (verbal): The dept did not want to discuss the case stating that MIDC has notpaid the amount for Talegaon water supply11.03.2016- IM decision: MIDC to make payment to Water Resources Department in order to expeditethe issue.23.03.2016- MIDC update: MIDC has requested WRD to share break up of charges to be paid and towaive off the interest charges.01.04.2016- field visit update: Exe. Engg Palkhed dam has reverted to MIDC with break up of cost andhas approved the construction work to be done by the unit.12.04.2016- MIDC update: WRD is not sure about chargeability of "water commitment charges" to MIDC.Hence they are seeking clarity from WRD13.04.2016- IM decision: WRD to decide if commitment charges needs to be levied on MIDC andcommunicate accordingly to MIDC05.05.2016- Department update: The file related to commitment charges is sent to WRD, Mantralaya forclarifications and the investor has already started the Jack well contruction

Page 31 of 47

Page 32: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

68 Monsanto Holdings Pvt.Ltd.

Ground WaterSurvey and

DevelopmentAgency

Ground Watersurvey and

Issuing NOC27.01.2016

Investor has submitted an application to GSDA requesting for conducting a ground water survey &issuing NOC which is pending from the department.10.03.2016- Department update: It is under process with department for allotment of date for survey,due to limited machineries available07.04.2016- Department update: It will be executed within a month.

MAITRI to follow up with thedepartment to resolve the case. OPEN

69 Mungi engineering MIDCNOC for laying

ElectricalPower cable

12.12.2011

The unit was granted conditional NOC by MIDC on 19.01.2012 to lay 22 KV HT cable from 400 KVsubstation (Plot No. P-10) Phase-III to "MVML supplier park" (the mail client of Mungi engineering).According to this NOC, MIDC did not have possession of land (from point E to F) of approx 350 mtr andthus, midcap did not granted NOC for this stretch. All works of cable laying is done by the unit except forthe said stretch. Investor is requesting for NOC of 350 mtr land now.28.03.2016- MIDC update: Dy CEO2 to be approach for resolution18.05.2016- MIDC update- DY CEO2 to make the field visit by 20.05.2016

MAITRI to follow up with thedepartment to resolve the case. OPEN

70 New Holland Fiat (India)Pvt. Ltd. MIDC water 08.01.2014

The investor applied for 600KL/day water supply, which is pending with the department.August 2015- Update from the department:Infrastructure of water supply distribution is not yet provided near plot of the investor. The tenders forintermediate water supply scheme are invited. Once the work of distribution line is laid, the departmentwill issue sanction letter.24.08.2015- update from MIDC- tenders are floated11.12.2015- MIDC update- The tender work will be completed in April 2016. hence the issue to bereviewed in May 2016

The Pipeline work is completed.The department to extend theconnection to the unit by05.06.2016

OPEN

71 Octaga Green Power &Sugar Co. Ltd.

ExciseDepartment

Permission toenhanceBottlingcapacity

22.01.2014

The investor submitted an application to Superintendent, Excise Kolhapur on 22 January 2014 toenhance the capacity of their Bottling Plant which is still pending for the grant of approval.05.11.2015- Department update: Superintendent, Excise Kolhapur has forwarded the file with his NOCto Excise commissioner, Mumbai on 16.05.201507.11.2015- Investor meeting (VC) decision: MAITRI to write a letter to Commissioner of Excisedepartment, If no response in 15 days MAITRI to inform DC(I) about the same. The case to bepresented for the next CS meeting22.01.2016- MAITRI has shared Do letter written to Excise dept22.04.2016- Excise dept update: permission has been issued to the investor. The case was closedfrom MAITRI

The issue was closed on20.05.2016 CLOSED

Page 32 of 47

Page 33: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

72 PDP Gas & ChemicalPvt Ltd.

RevenueDepartment

NOC (forstorage ofAnhydrousAmmonia)

01.03.2012

Investor had applied for NOC from District Collector office, on 1st March 2012. The investor wasinformed in 2015 that he has to comply with NA permission for want of NOC. The NA permission is notgiven to the investor and hence, the issue is still pending.11.09.2015- Investor meeting decision: Once the issue of NA permission is resolved, revenuedepartment to look into the matter31.10.2015- Investor update: investor has submitted NA permission required for further process toobtain NOC15.12.2015- Department update: collector has raised some inquiries since the application is made is2012, hence a site visit will be made from collector office. Post which, Collector will decide further toissue the NOC20.12.2015- Department update- SDO has completed the site visit and submitted the site visit report toDy. Tehsildar.01.02.2016- Department update: Dy Tehsildar has received the report. The site visit will commence inthis week and they will update MAITRI on the same.08.03.2016- Department update: Investor to meet Tehsildar office.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

73 Penna CementIndustries Ltd

LandAcquisition 03.05.2016

Out of total 27 acres required for the proposed project investor has already acquired 22 acres.Remaining 5 acres land is required for railway siding which is owned by multiple persons, afterpersuading with owners for more than 2 years, investor is finding it difficult to bring them to conclusion inspite of offering a compensation way above the market rate. Now, Investor claims that the owners of theabove mentioned 5 acres land are either ill-guided or have the fraudulent motives as their approachtowards their proposal is always inconsistent and ambiguous. Investor has already invested heavily inthis project (based on the promise given by owners), assuming complete land will become available. Atthis stage, it isimpossible for investor to move out from the proposed site, given that it will lead to irrevocable financialloss to the company.

The government do not assistinvestor for acquiring privateland. The issue not be taken upat MAITRI. However, theinvestor will share the details ofthe issue and MAITRI willforward the same to AdditionalDirector, DI for issuebackground check and decidewhether they can help theinvestor or not

CLOSED

74 Posco Electrical SteelIndia Pvt Ltd MIDC Land allottment 03.12.2015

For the purpose of expansion, Investor has applied for 18000sqm land adjoining to their existing unit inVile Bhagad MIDC on December 2015 at MIDC regional office Panvel. The application is still pending forthe grant of approval.18.05.2016- MIDC update- The matter was discussed in minor modification committee. Now it will betaken up in next LAC

Informed investor that landrelated issues will not be takenup at MAITRI, hence the issuewas closed in the investormeeting held on 20th May 2016

CLOSED

75 Posco Electrical SteelIndia Pvt Ltd MIDC Infrastructure 02.02.2016

Investor has applied to Regional Officer, MIDC Panvel for the repair of road near his unit (which wasdamaged due to continuous flow of natural water, frequent movement of public vehicles & heavy trailersetc). The damaged road with pits in front of the unit entrance causes obstruction in vehicle movementand also affecting operation and sales.

The tender will be issued anddepartment to look into thismatter

Open

Page 33 of 47

Page 34: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

76 Procat tech LLP MIDC Consent toEstablish 16.04.2015

Application was submitted on 16.04.2015. Investor took over a part of the land and products from anexisting company, which already had consent to operate. MPCB kept denying the CTE on variousgrounds even after investor applied for ZLD; received legal opinion from MPCB legal cell that the partyshould be granted the consent and; even after investor submitted a letter from MIDC stating that theyhave given permission for the project.Investor is claiming that the process does not involve any hazardous chemicals, it only involves inorganicsalts and the effluent also contained easily separable inorganic salts of benign elements. Investor isproposing to manufacture catalysts which are very important for green processes, but not available toIndian companies because of its strategic importance.13.04.2016- IM Decision: SIO (I) to put up a note to PS (I) to intervene in this matter. DC (I) hasrequested Technical Advisor, MIDC for clarity over issue, as MIDC should issue permission to the unit asper high court order. The issue to be reviewed every week for updates from MIDC.11.5.2016: department update: The Consent was issued under Green Category which is not servingthe purpose of the investor. MIDC has abolished the policy to issue NOC (as per TA's update).

MPCB to share court order withMIDC and MIDC to give NOC toMPCB

OPEN

77 Proposed Pvt Ltd Co MIDC BCC Extension 20.02.2014

The unit was given possession of land in 2007, but according to him, the roads were not developed byMIDC up to their plot. He had communicated the same and requested MIDC to provide the road so thathe can start the development works. The unit has already get extension for BCC time line by paying thenecessary amount (in 2012, 2013 and 2014).MIDC has issued notice to investor on 4th October 2015 for surrendering the plot as there is nodevelopment done since the plot allotted to him. As per investor approach road has provided to the plotin January 2013. Hence asking for the extension of 5 years i.e. Till Jan 2018. However, as per allotmentletter, he was given the time to complete the works within 3 years.14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.10.02.2016- MIDC update: The file was under process with RO, MIDC who will send the file to HO, MIDCfor approvals an guidance.22.02.2016- MIDC update; It is under process at HO, MIDC22.03.2016- MIDC update: MIDC has written letter to investor about application in Udyog Sanjivanischeme and shared the copy with MAITRI. MAITRI has informed the same to the investor.28.04.2016- Investor update: Investor has made representations that application under Udhyog sanjivaniwill enable him for extension of one year only. while he wants free extension for 5 years.29.04.2015- Mids. update: MIDC will write to investor regarding its decision.02.05.2016 - Investor update: MIDC has asked the investor to vacat the plot, as no development on thesaid plot within the time frame.13.05.2016 - Investor Update : The investor has made the representation on MIDC's Letter.18.05.2016- MIDC update- RO to reply on investor's representation

MIDC to issue a letter to theinvestor stating that therepresentation made will not beconsidered. On issuance of theletter MAITRI to close the case.

OPEN

Page 34 of 47

Page 35: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

78 Renaissance IndusInfra Ltd UDD Zone

conversion19.03.201130.07.2012

The investor applied for zone change of 258 acre land and has complied with required documents on21.04.2014. He is still awaiting the approval.14.08.2015-Update from the department:The file has recently been approved by the office of CM and the department is in process of publication ofnotification.31.08.2015-Verbal update from department:UDD will publicise the matter within 2 days.16.08.2015- verbal update from UDD: UDD will issue letter to investor for payment of premium chargesfor zone conversion. upon payment, the zone conversion would take place.09.10.2015- Investor meeting update: The letter for premium payment has been issued to the investor.The investor has represented to waive off the said premium charges on basis of zone conversion policy.UDD has referred the case for policy decision to the CM level. Investor has paid the necessary fees inJanuary 2016.04.02.2016- Investor update: Investor have been issued the premium payment demand letter withnamed M/s Renaissance Infrastructure instead of M/s Renaissance Indus Infra Ltd. Hence Investor hasrepresented the letter to UDD asking to rectify the same and issue a new demand letter.11.03.2016- Department update: new demand note is issued to the investor.16.05.2016 - Investor update: The file is under process with UDD, Mantralaya. Investor is yet to acquire65 acres (out of 258 acre), due to which, the department has not convert the land and rasied the query toinvestor. Investor has submitted undertaking that he will purchase the balance land- 65 acre

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

79 Rex Polyextrusion Pvt.Ltd. MIDC

Approach Road& BCC

Extension26.07.2012

The investor informed MIDC that his plot is not accessible without a proper approach road. Due to this,the development work is not possible. Investor has obtained conditional building plan approval on01.10.2014 that it will stand cancelled, if the construction work is not started within 12 months (i.e.01.10.2015) from the date of issuance of this approval.Till date, approach road is not provided to the unit and hence, the investor could not start developmentwork. He is requesting for an approach road and a free time limit extension for BCC.28.03.2016- MIDC update: The file is under process with CEO, MIDC12.04.2016- MIDC update: Tender work is under progress. The file for BCC extension is with Dy. CEO218.05.2016- MIDC update- The note is submitted to Jt CEO

MIDC to look into the matter toresolve the case. OPEN

Page 35 of 47

Page 36: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

80 Robo Silicon PrivateLimited

Environmentdepartment

EnvironmentClearance 12.04.2013

Investor initially submitted the application for Obtaining Environment Clearance on 12.04.2013 which wasdiscussed in 75th, 82nd, 83rd, 96th and 104th SEAC meetings. However, the EC was not accorded tothe unit. Lastly proposal has been discussed in the 95th SEIAA meeting on 12.01.2016 in whichcommittee has recommended for reconsideration in SEAC1 meeting10.03.2016- Environment dept update: Will be considered in ensuing SEAC-1 meeting as directed bySEIAA in its 95th meeting.11.03.2016- IM Decision: If the case is not taken up in SEAC1 meeting, then the investor to be called forthe next Investor Meeting.29.03.2016 - Department has uploaded meeting agenda, which includes the case of this unit. Investor isinformed for the same. Minutes are awaited.10.04.2016- Department update- According to minutes, SEAC 1 committee has requested MSRDC toprovide the NOC.16.05.2016- Investor update: MSRDC yet to write a letter to Bombay IIT for conducting the survey at theplant location and preparing the report.18.05.2016- Investor update: MSRDC has written letter to IIT Bombay for conducting the survey.Further, the NOC from GSDA will be issued to the investor shortly.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Environment) for furtheraction.

OPEN

81 Samartha Opto-Electropolymer Pvt. Ltd.

Grampanchayat

NOC (powerconnection &

start of activity)10.04.2015

The investor has purchased the land and building through Auction process (from official liquidator Highcourt, Alibaug) in 2012. As per investor, delayed documents from High court resulted in delayedregistration - in 2015.The investor has applied to Gram panchayat for its NOC to obtain power connection for the unit but tilldate, it has not been received by the unit. The investor has also sent reminder on 11.02.2016 to grampanchayat in this regards11.03.2016- IM decision: The case to be presented for the CM meeting. SICOM to visit the grampanchayat to expedite the issues.

MAITRI to follow up with thedepartment to resolve the case. OPEN

82 Samartha Opto-Electropolymer Pvt. Ltd. MSEDCL Power 15.01.2016

The investor, post purchase of the property through auction process, intimated MSEDCL to file for anypending dues form previous owner vide form no. 66 to Official liquidator as per high court order andrequested to intimate the investor so that they can apply for the new connection. The investor requestedMSEDCL to grant a connection on 17.05.2015 and applied online on 15.01.2016 for the connection. Theyhave not received any communication in this regards.09.03.2016- Investor update: MSEDCL has requested to comply with certain documentation, whichinvestor will submit shortly10.03.2016- MSEDCL update: The SDO, Alibaug Subdivision have asked some clarification regardingthe matter vide letter no Add EE/ABG-I/T/495 dated 09.03.2016 regarding confirmation of M/s Ahura issame as M/S jaycore (defaulter).11.03.2016- IM decision: The case to be presented for the CM meeting. The department to look intothe matter to expedite the case.22.03.2016- Investor update: Investor has received payment notification from MSEDCL. Investor tomake the payment.07.04.2016- Investor update: Investor has made the payment13.05.2016 - Investor update : The required power is santioned, hence the issue is to be closed in theupcoming investor meeting.

The issue was closed on20.05.2016 CLOSED

Page 36 of 47

Page 37: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

83 Samsonite South AsiaPvt. Ltd. MSEDCL Power

The unit is connected with 33 KV line, but due to frequent power failures and fluctuations, the productivityof their existing unit is getting affected. The investor has requested to expedite the installation of analternative lines to ensure uninterrupted power supply.August 2015- Update from department:It is proposed to connect the unit on 220 KV Raymond substation through a new link line of 33 KV. Tocarry out this work, tender was floated on 1st June 2015 (which received no bids) and refloated on 27thJune 2015 (Last date for bid submission 11 July 2015).Meanwhile, a revised instruction have been received from Head Office to issue Infra - II tenders locallyfor Nasik (R) Division which includes above work.12.08.2015-update from SICOM: 4 bids have been received for the last tender floated and approval ofboard is awaited to issue the LOA. Expected time: 10 days04.09.2015- Update from Department: LOA to be issued in next 2 days.10.09.2015- Update from department to SICOM- the contractor has been issued LOA and agreementwill be signed by 15.09.201511.09.2015- Investor meeting decision: MIDC will schedule regular meeting to expedite issuespertaining to MSEDCL/MSETCL in MIDC area08.10.2015- Update from department: Survey for the work has given to contractor. Tentative time - 2months. To be reviewed in January 201613.01.2016- MSEDCL update- The said work of substation is under progress. Meanwhile, the powersupply is extended to Investor's premises from another feeder.01.04.2016- MSEDCL update: Work to be completed within 2 months.13.04.2016- IM decision: the work is stuck due to right of way issue. MSEDCL to get in touch withCollector to resolve the issue and execute the works.

Right of way issue has beenresolved and work of erectingthe poles for 33 KM HT line iscompleted. Work of conductorstringing and Cable laying willbe completed within 10 days.

OPEN

84 Satara Mega Food ParkWater

ResourcesDepartment

Water quotasanction 02.01.2015

The investor is seeking permission to lift water from Urmodi river which is about 4 kms from the factorysite.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(WRD) forfurther action.

Open

85 Seco Tools India Pvt.Ltd. MPCB

Consent toOperate-renewal

19.01.2016Investor has applied for renewal of Consent to Operate vide acknowledgement no 056935 which is stillpending for the grant of approval.13.04.2016- MPCB update: it will be taken up in next meeting

MAITRI to share the list of allconsent related cases withPS(I) to be sent to MS (MPCB)requesting a meeting to be heldin PS(I) office.

OPEN

Page 37 of 47

Page 38: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

86 Sew Eurodrive IndiaPvt. Ltd MIDC Water 6.03.2014

MIDC has issued Building Completion Certificate to the unit on 6 March 2014 and verbally assured theinvestor that the water supply will commence from May 2014. But, the investor is still awaiting watersupply due to which the investor is forced to procure the water at higher charges through tankers,resulting in increased Project cost. With this regards, the investor has tried to submit an application toMIDC which was not accepted by the department.August 2015- MIDC update- Tenders are floated24.08.2015 MIDC update- Tenders are floated11.12.2015- MIDC update- the tender works will be completed by April 2016. the issue to be reviewed inMay 2016.16.05.2016 - Investor update: MIDC tender work has been completed and the internal pipeline work isgoing on. It will be completed by 17.05.2016

The department have alreadyreleased the water supply theunit on 19.05.2016. MAITRI toclose the case at the forum

CLOSED

87

Shekhar Opto-Electronics & polymerPvt. Ltd. (Old name:Shekhar Glass FiberPvt. Ltd.)

MIDC refund of olddues paid 03.08.2015

The investor has purchased MIDC property from Auction process (by recovery officer, DRT and Officialliquidator , Bombay High court) in January 2011. To transfer the property in name of the unit, the investorapplied to MIDC. MIDC has asked the investor to submit details along with No Dues certificate fromMIDC Mahad.As per RTI reply received from MIDC and as per consumer protection act, the investor is saying that heis not liable to pay older dues form pervious tenant. however, Since the "No dues certificate" wasrequired to transfer the property, the investor paid the amount (INR 100,373) at that time.The investor has requested MIDC to refund the same and is not yet granted the same. The file iscurrently under process with Exe. Engg, MIDC Mahad11.03.2016- IM decision: The case to be presented for the CM meeting. MIDC to look into the matterand update MAITRI on the same.14.03.2016 MIDC update: Exe. Engg , SPA has forwarded the file to RO, MIDC for onward submissionto CEO, MIDC, with his remarks.28.03.2016- MIDC update: The file is with Dy CEO1 for process.12.04.2016- MIDC update: The file is under process at RO, MIDC for change of name process15.05.2016 MIDC update: The file is under process with HO, MIDC18.05.2016- MIDC update- The file is sent back to RO for their inputs on queries

According to MIDC the issue willbe resolved by the end of thismonth

OPEN

88

Shekhar Opto-Electronics & polymerPvt. Ltd. (Old name:Shekhar Glass FiberPvt. Ltd.)

MSEDCL Power 19.01.2016

The investor has purchased MIDC property from Auction process (by recovery officer, DRT and Officialliquidator , Bombay High court) in January 2011. Investor has applied for power connection on19.01.2016. MSEDCL has asked the investor to submit " no dues certificate" and " wiring completion-testing report". The previous unit has outstanding of INR 18 lakh with MSEDCL. The investor is seekingpower connection without payment of dues left by previous owner11.03.2016- IM decision: The case to be presented for the CM meeting. The department to look intothe matter to expedite the case.

As policy related mater, MDMSEDLC to take decision onthe issue or else it will bereferred to CM. MAITRI to followup with the department toresolve the case.

OPEN

Page 38 of 47

Page 39: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

89

Shekhar Opto-Electronics & polymerPvt. Ltd. (Old name:Shekhar Glass FiberPvt. Ltd.)

Grampanchayat

No duescertificate 23.01.2012

The investor has purchased MIDC property from Auction process (by recovery officer, DRT and Officialliquidator , Bombay High court) in January 2011. In order to transfer the property in name of thepurchaser, MIDC asked the unit to obtain and submit "no dues certificate" from gram panchayat (forgram panchayat taxes), Mahad. The investor has applied to Gram panchayat for NOC on 23.01.2012.the gram panchayat is asking for older dues (by previous unit) - INR 30,000. Which the investor is notliable to pay. The investor is requesting issue of No due certificate as above11.03.2016- IM decision: The case to be presented for the CM meeting. SICOM to visit the grampanchayat to expedite the issues. A review meeting to be called at the office of DC(I) after 12-15 days.14.03.2016- Investor update: It is interlinked with name change issue with MIDC. Once it is resolved,this will be processed further.02.05.2016- Investor update: Investor requested to close the issue from MAITRI as no dues certificateis not required by investor anymore.

The issue was closed on20.05.2016 CLOSED

90

Shekhar Opto-Electronics & polymerPvt. Ltd. (Old name:Shekhar Glass FiberPvt. Ltd.)

MIDC Change ofName 22.12.2014

The investor applied for change of name of the unit in MIDC- from "Shekhar fibre glass P Ltd" to "Shekhar optoelectronics & Polymer P Ltd". MIDC has asked investor to submit details. The investor hasmade compliance but the matter is still not resolved09.03.2016- MIDC update: MIDC has asked investor to comply with certain documents on 22.02.201611.03.2016- IM Decision: The case to be presented for the CM meeting. MIDC to look into the matterand update MAITRI on the same.14.03.2016- MIDC and investor update: Investor need to comply with documents of share holdingpatterns etc29.03.2016- Investor update: Investor has complied with the documents.12.04.2016- MIDC update: The file is with RO MIDC for process.13.04.2016- IM decision: MIDC to issue name change documents once the investor makes payment.15.04.2016- Investor update: Investor has received the documents and requested to close the case.

The issue was closed on20.05.2016 CLOSED

91 Shri Gurudatt SugarsLtd

Directorate OfIndustries

PackageScheme ofIncentives

10.02.2015

The application to avail incentive under PSI 1993 is pending for approval.Update from DI:Decision will be taken as per the Policy (PSI 1993)19.05.2016- DI Update- The file is approved and sent to RO.

MAITRI to confirm with theinvestor with regards to theapproval and close the case.

OPEN

92 Shri Omtee Steel Pvt.Ltd. MPCB Consent to

Establish 17.03.2012

The unit had not obtained consent to establish before starting the construction work and therefore hasbeen issued show cause notice by MPCB seeking explanation. The unit wants to obtain Consent toEstablish and Operate together and wants to know the solution to come out of this situation.Update from Regional Office, Nagpur:Till the time moratorium is not lifted, Industry cannot commence production.

MAITRI to close the case afterintimating the investor that theunit cannot be operationalneither will be approvals begranted to the unit till theMoratorium is not lifted from thislocation.

CLOSED

Page 39 of 47

Page 40: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

93 Sindhudurg MiningIndustries &

MiningDepartment

Extension ofMOU 30.07.2012

Application has been made for MOU extension for next five years in view of delay in obtaining MiningLease. Investor has submitted application for renewal of MOU in 2012.August 2015- Update from the department:Application has been forwarded to State Government for approval.13.01.2016- Department update- the proposal will be referred to HPC17.05.2016- Department update- the proposal is being scrutinized

MAITRI to follow up with thedepartment to resolve the case. OPEN

94 Solar Industries IndiaLtd.

ForestDepartment

Diversion ofForest land 13.04.2013

The investor submitted application for diversion of 87.97 Ha of forest land to comply with the safety zonerequirement to manufacture defence explosives. The proposed forest land is not a part of the wildlifesanctuary nor a wildlife corridor. Some NGO and Wildlife Warden has raised objections. Their file ispending for approval with PCCF Nagpur since 20 January 2015.August 2015- Update from the department: Proposal under Forest (Conservation) Act for diversion offorest land has been processed for approval of Govt of Maharashtra. After approval of Govt ofMaharashtra, the same will be forwarded to MoEF & CC.23.09.2015- Investor update: File is with Minister (Forest), who will take views of the Mr. Bagrodia, MLC(the opponent) in some time01.10.2015- Update from Department: Proposal under Forest (Conservation) Act for diversion of forestland has been processed for approval of Govt of Maharashtra. After approval of Govt of Maharashtra, thesame will be forwarded to MoEF & CC.07.11.2015- department update: Minister had a meeting with opponent who has raised concerns aboutwildlife activities in 84 hectare area. A study of tiger activities in the said area is carried out with help ofcameras by DCF. The report from PCCF will be completed in next 15-20 days.16.12.2015- Department update- PCCF report is received however the local MLA (Mr Sunil Kedar) hasraised concerns about tiger habitat with MoEF.14.01.2016- Department update-A meeting was held by Forest Minister on 16.12.2015 at Nagpur withMr. Kedar, MLA. It was agreed that restudy (of 7 days) will be done by involving Mr. Kedar in theproposed area by camera trap. Mr. Kedar wanted department to ascertain if company has done anyencroachment on forest land and provide information about cattle kill in said area. All information’s havebeen provided on 5/1/2016. However, restudy is yet to be started.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(Forest)for further action.

open

95 SRM Industries MIDC

Possession ofland & BCC

time limitextension

11.03.2013

With reference letter dated 01.02.2016 from MIDC, the allotment of the plot has been cancelled as nodevelopment on the plot and also the DD of Rs. 68073 has been encashed. But according to the investorthe DD is not encashed and also the development of the plot is not possible as the possession of the plotwas not obtained by him (till date) even after continuous follows. The investor has paid the servicecharge as well before obtaining the possession of the plot.Investor is now requesting MIDC to revoke the plot cancellation order, give possession of the plot and 2years’ time limit extension to set up the unit.18.05.2016- MIDC update- MIDC cannot give possession. the letter of refund is issued to the investor.

MAITRI to close the case, onobtaining the documents fromMIDC. The issue was closed on20.05.2016

CLOSED

Page 40 of 47

Page 41: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

96 Supreme Industries Ltd.

MunicipalCommissioner / Revenuedepartment

NA permission 20.04.2016

Investor is planning for an expansion of his existing project but no land is available in MIDC. Thedirectors of the company own two plots adjoining to the existing unit and these plots require Industrial NApermission to start the work for expansion. The plots are 242/1, 242/2, 244/2+3, 4, 5.Plot 242/1 and 242/2 already has commercial NA permission and needs to be changed to industrial.(Pending with Commissioner).Plot 244/2+3, 4, 5 is agricultural plot and investor already applied to Dist. Collector Jalgaon to change itto Commercial NA which is expected to be received within this week. Once the commercial NA isreceived from Collector's office, the Municipal Commissioner, Jalgaon will have to authorise the transferfrom Commercial NA to Industrial NA. (Pending with collector).

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

97 Supreme PetrochemLtd.

Industries &Mining

Department

Revision inscope of Mega

Projectinvestment

20.05.2012

The unit was accorded Mega Project status for its proposed investment of 1115 Croce on 9.08.2006.However, due to the unforeseen delay in acquiring land for a minor port to import hazardous rawmaterial, the unit is unable to commit the full resources and requesting to change the Mega Projectinvestment amount to 520 Crore and a time extension up to December 2017.17.05.2016- Department update- The unit is asked for submission of compliance

MAITRI to follow up with thedepartment to resolve the case. Open

98 Swarovski Pvt. Ltd. Grampanchayat Tax 21.10.2015

The investor is requesting Gram panchayat Karegaon to issue revised bill for gram panchayat tax basedon G.N. of Bombay High court dated 3.12.1999.07.11.2015- Investor meeting decision: SICOM to coordinate with RDD regarding same.December 2015- Investor update: the file is pending with CEO, ZP09.12.2015- ZP update- ZP, CEO has instructed Gram panchayat to hold the matters of gram panchayatlevied tax quoting a GR issued by the Principal Secretary.10.12.2015- Investor update-Investor is requesting MAITRI to approach RDD to direct CEO, ZP.Investor has requested MAITRI to take up his suggestion on draft MH panchayat taxes and fees(amendment) of 7.11.2015.1.1.2016- MAITRI has forwarded unit's suggestions received on 28.12.2015 to the PS Industries , DC (I)and PSI for further process. and informed the investor that MAITRI cannot assist in this issue.07.04.2016- Field visit update: The issue was to be taken up in the ZP board meeting on 11.04.2016.They are awaiting another notification from Government.06.05.2016- Field visit update: The investor is citing rule-9 of payment and lump sum contribution byfactories lieu of taxes, Rules 1961- according to which- In the event of failure on the part of a Panchayat& the occupier to arrive at an agreement, the matter shall be referred either by the panchayat or theoccupier to arrive at an agreement, to the State Government through Chief Executive Officer concerned,who shall submit the same after obtaining the views of the standing committee of the Zilla Parishad to theState Government for decision through the Commissioner with all the necessary documents." However,the ZP is not referring the case to RDD and keeping the file on hold

The case is referred to RDD on18.05.2016. Investor to becalled for the next MAITRIMeeting.

OPEN

Page 41 of 47

Page 42: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

99 Swarovski Pvt. Ltd. MIDC BCC Extension

The investor is able to obtain BCC for the DTA unit on plot no. D-85 which is in production since 2004.The investor has applied for time limit extension and have produced all pertinent documents to prove thatthe production was started since 2004. But the Regional officer Of MIDC is requesting for additionaldocuments. If the penalty is levied for time limit extension than the project will become un viable.07.11.2015- Investor meeting decision: Dy. CEO MIDC to give a hearing to the investor on Monday09.11.2015 at MIDC HO and take a decision on the same.17.11.2015- Investor update: Investor was asked to apply again at RO office, Pune. Investor hasapplied to the same24.12.2015- Investor update- the investor has applied for BCC on 15.12.2015 and has shared the copyto MAITRI04.01.2016 - MIDC update- Investor is asked to comply with certain document02.05.2016 Investor update - The investor has already complied with the relevant documents18.05.2016- MIDC update- The file is with Dy CEO2

Investor to be called for the nextMAITRI Meeting. OPEN

100 Swarovski Pvt. Ltd. MIDC Infrastructure 17.11.2015

The Investor is constructing a storage Hall at Plot No. D-108 with necessary permission of MIDC. Thereis no discharge from the Storage Hall, and want connection to Strom Water line of MIDC to dischargepure rain water. But the permission was denied. Investor is requesting for Storm Water connection forhis storage Hall.07.11.2015 - Investor Meeting Decision: Dy. CEO MIDC to give a hearing to the investor on Monday09.11.2015 at MIDC HO and take a decision on the same.09.11.2015 - Investor Update - Investor to make a fresh application to Dy. Engineer MIDC and thenMIDC to look into the matter.22.12.2015 - Update from the investor: The investor has made an application on 17.11.2015 to Dy.Engineer MIDC. MIDC to look into the matter and update MAITRI.20.01.2016- Investor update: MIDC rejected the application by saying that storm water can be directedthrough exclusive rainwater harvest pits and there is no need to give connection to rainwater drainageline of MIDC. Investor to apply now at HO, Mids. to pursue the matter. Investor will apply for the same insometime11.03.2016- IM decision: The investor to resubmit the application copy to MIDC, HO Mumbai25.03.2016- Investor update: Invetor has resubmitted the application18.05.2016- MIDC update- Investor needs to comply

Investor to be called for the nextMAITRI Meeting. OPEN

Page 42 of 47

Page 43: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

101 Tata ConsultancyServices Ltd.

EnvironmentDepartment /

Ministry ofenvironmentand forest

EnvironmentClearance 17.01.2014

GOM had identified IT as a key industry and had granted exemption to IT Industry from any type ofEnvironment Regulations. The investor has a letter from MS, MPCB clarifying the non-applicability ofEnvironment Clearance on 23.01.2006. However, as per the amendment dated 1st December 2009 byMOEF, the proposed IT Park falls under the Prior EC Requirement Category.Prior to the date of the amendment by MOEF, investor had already received the Plinth CompletionCertificate. But a few changes in the building plan for Phase II by investor, now he is liable forEnvironment Clearance.Investor has made the application to Environment department in 2014 which is still pending with the grantof approval.09.10.2015- department update: The investor has violated the regulations hence the department isseeking clarification from MOEF. MAITRI to follow up with the department to expedite the issue. If theissue remains unresolved the investor to the called for the December 2015 investor meeting07.11.2015- Investor meeting decision: Secretary UDD to direct Municipal Corporation for furtherprocess. The department has shared the copy of the letter sent to MOEF on 30.11.2015.14.01.2016- Department update: The project was considered in 34th meeting of SEAC-2 (20.07.2015and was referred to Environment department for further needful pertaining to Violation committed by theinvestor. The environment dept had issued proposed directions under section 5 of environment (P) Act,1986 on 02.12.2015. Personal hearing on this matter will be extended to the investor before A.C.S(environment) after receiving present status report from MCGM & MPCB.10.03.2016- Env Department update: Personal Hearing in this matter will be extended to the PP beforeA.C.S. (Environment) on 16.03.2016.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Environment) for furtheraction.

OPEN

102 Top Band India P Ltd MIDC Land allottment 21.12.2015

Investor had made an application to MIDC, Pune for allotment of 16,000 sqm of land in Chakan IndustrialArea Phase–II in December 201510.05.2016: Informed investor that land related issues will not be taken up at MAITRI to be closed in thenext investor meeting

The issue was closed on20.05.2016 CLOSED

103 Top worth Urja & metalsLtd. MPCB

Transfer ofConsent to

Establish andConsent to

Operate

5.10.2015

The investor has won the e-auction of Marki Mangli -I coal mine and executed 'Coal Mine Development &Production Agreement (CMDPA)' with Ministry of Coal on 30.09.2015. Hence, applied to MPCB fortransfer of Consent to Establish and Consent to Operate from the previous owner (B.S. Ispat Ltd) to hisname (vide letter no. TUML/NGP/MM-I/2015-16/0108). The transfer is pending for the grant of approval.13.04.2016- MPCB update: the proposal was approved in CC meeting dated 23.03.2016. minutes areawaited/19.05.2016- MPCB update: The transfer of both consent is approved. Hence the case is closed.

The issue was closed on20.05.2016 CLOSED

104 Topworth Urja & metalsLtd.

Industries &Mining

DepartmentMining lease 5.10.2015

The investor has won the e-auction of Marki Mangli -I coal mine and executed 'Coal Mine Development &Production Agreement (CMDPA)' with Ministry of Coal on 30.09.2015. Investor has applied to obtainmining lease for the Marki Mangli - I coal mine to Directorate of geology and Mining, Nagpur. The case isstill pending.17.05.2016- Department update: The orders issued on 28.03.2016

The issue was closed on20.05.2016 CLOSED

Page 43 of 47

Page 44: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

105 Uttam Galva UDD ZoneConversion 29.08.2013

Enhancement of Industrial area admeasuring 745 Hectares at villages Satarda & Satose Taluka -Sawantwadi in the Regional plan of Sindhudurg District. The investor was informed that 40 hectares ofland was having remarks from forest department hence, investor requested to delete 40 hectares and toissue remaining area as industrial zone -to UDD.13.08.2015- Update from forest department: Forest has sent remarks to UDD on 18th June 2015. Fileis under process with UDD.08.10.2015- Update from department: The file is yet to be put up with PS (UDD). There is no clarity onexpected time frame for processing the file.07.11.2015- Forest department update: Forest department do not have any objection for other area.07.11.2015- Investor meeting decision: UDD to look into the matter and resolve the same.23.11.2015 - UDD update: The file is forwarded to Forest Department for remarks.12.01.2016- Forest department update- The department has received the file on 6.01.2016.14.01.2016- Forest department has sent remarks to UDD on 13.01.201611.02.2016- Investor update: Investor is expected to meet UDD on 18/19 February 201618.02.2016- Meeting update: In the meeting with UDD, Forest officials, Investor explained that althoughhis land is falling in region under Kasturi Ranjan committee area, he is starting the project based onapproval form MoEF as the unit has applied for it before Kasturi Ranjan committee report/ 2013. Theinvestor was asked to submit the said approval of MoEF, contour survey, Slope analysis of +/-1.5 Mtr.22.02.2016- Investor update- Investor has shared MoEF approval for 1.5 T plant (Env Clr), expansionproject approval (Env Clr), MoEF EAC Committee approval.30.03.2016- The file is with UDD. it is yet to be forwarded to Forest dept

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(UDD) forfurther action.

OPEN

Page 44 of 47

Page 45: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

106 Vaishvik Foods Pvt Ltd RevenueDepartment

Amendment inNA Permission

& BuildingCompletionCertificate

03.01.2015

Investor has submitted application for amendment in NA permission and Building Completion Certificatefor (change of warehouse to industrial purpose) at SDO office, Wai. The same is pending.Although Investor made an application in January 2015, the issue was taken up by SDO, Wai (nowtransferred) in August 2015 for unknown reasons, wherein, his letter mentions date of application asAugust 2015.The SDO had asked opinions from various departments like MPCB, Fire department, DISH and DyCollector in August 2015, which, till date, are not received by the SDO office.27.11.2015- SDO update- SDO has written to all concerned department about status of the same. Thedepartment's comments are yet to respond on the same11.12.2015- Department update- Revenue has shared replies received in response to the written lettersfrom Dy Collector office. Reply of MPCB, Fire and DISH are still awaited14.01.2016- Investor meeting decision: MAITRI to follow up with the department to expedite the case.MAITRI to share the history of the issue with DC(I).21.01.2016- SDO update- the replies have been received from concerned department and now file ispending with SDO.27.01.2016- Department update: SDO has asked for Provisional Fire NOC from the investor. Investorhas paid the fees for Provisional fire NOC on 7th January 2016 and NOC is awaited from the fire dept (30days time line-standard)30.01.2016- Investor update: Investor has received provisional fire NOC and has shared the same withSDO. the file is under process with SDO03.03.2016- Investor update: Investor has received demand note to pay differential amount. Uponpayment, the issue is expected to be resolved. Investor has paid it too. (15.03.2016)13.05.2016-Department update: The file is under process with SDO, Wai for the signature.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Revenue) for further action.

OPEN

Page 45 of 47

Page 46: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

107 VHM Industries Limited MIDC / MPCB Consent tooperate 30.03.2015

Investor's unit has been given conditional Consent to Establish permission stating that the Consent toOperate approval will be granted only after CETP of MIDC will be commissioned. Investor is ready toinstall their own ETP and is expecting completion of over all construction work by year end. Investor isworried if MIDC CETP is not commissioned by that time then they will have to face huge loss.August 2015-Update from the department:The department is awaiting feasibility study report from MIDC on SSHEHS to develop the HRTS systemfor disposal of treated effluent.11.09.2015- MIDC has shared the report to MPCB. MPCB to look into the matter.08.10.2015- Update from department: The issue was discussed in the CAC meeting held on 07thOctober 2015 awaiting the minutes of the meeting.October update from investor: Investor has requested to relax the limits of LSI and MSI units for CETPbeing built by MIDC in Amravati Ind area, since the effluent from his unit is having higher BOD and CODcontent then the standards allowed for CETP. In this way, he has to incur double cost of effluenttreatment, which is economically not feasible.MIDC has expressed its agreement to relax the standard of MSI-LSI in the letter to MPCB written on29.07.201527.10.2015- MPCB update- A joint meeting between MPCB, MIDC and end users of CETP will be held totake decision.As per the letter issued by MIDC, construction work of CETP Amravati, 1 MLD capacity & HRTS was tobe completed by December 2015. But the contractor has not yet applied for Consent to Operate.14.01.2016- Investor meeting decision: MIDC to look into the matter and MAITRI to follow up on thesame to expedite the case.08.02.2016- MIDC update- CETP has applied for Consent to operate on 29.01.2016.26.02.2016- MIDC update: MIDC has complied with documents to MPCBAs on 12.04.2016- MIDC is saying that they have complied while MPCB is saying MIDC has not compliedyet.13.04.2016- MPCB update: as discussed in joint meeting with industry representatives, NEERI is hired toprepare verification report regarding HRTS developed by MIDC. Accordingly, a site visit is planned on12.04.2016

MPCB to take up the Consent toOperate of CETP I the next CCmeeting and MAITRI to sharethe list of all consent relatedcases with PS(I) to be sent toMS (MPCB) requesting ameeting to be held in PS(I)office.

OPEN

Page 46 of 47

Page 47: Maharashtra Industry Trade Investment Facilitation Cellmaitri.mahaonline.gov.in/PDF/MAITRI_Investor meeting_May 2016.pdf · Maharashtra Industry Trade Investment Facilitation Cell

Maharashtra Industry Trade Investment Facilitation Cell

S.No Name of the Company Department Name of theService

ApplicationDate Issue description and chronology Action to be taken by MAITRI Issue

Status

MINUTES OF 21st INVESTOR MEETING DATED 20th May 2016 AT INVESTOR FACILITATION CELL (MAITRI)

108 Vinati Organics EnvironmentDepartment

EnvironmentClearance 30.01.2014

Investor's application for Environment Clearance was taken up by SEAC in August 2014. Due to the draftnotification on Eco Sensitive Area by MoEF, investor was asked to approach MoEF. The case was takenup by MoEF in 32nd EAC meeting on 21.01.2015 and investor was asked to represent in SEAC againbecause the said notification was draft notification only.SEAC took up the case in 100th meeting and one part of the project was cleared. Further SEIAA clearedthe proposal in 88th meeting on August 2015. The rest part of the expansion project is now held up dueto revised draft notification of ESA issued in September 2015.As per the investor, the project should be cleared since the notification is in draft mode only. But theproject is on hold by SEAC.10.03.2016- Environment department update: the issue will be considered in 123rd SEAC-1 meetingto be held on 11-12th March, 201630.03.2016- MPCB update: It is taken up in the meeting. Minutes are awaited11.04.2016- Department update: The case was discussed in the said meeting, Investor is asked forcompliance.12.05.2016 - Investor update: The matter was discussed in the 125th SEAC meeting and a field visithappened on 23.04.2016. Investor also complied with the clarification of the EC department and thematter will be taken up in 127th SEAC meeting.Investor's application for Environment Clearance was taken up in 95th SEIAA meeting held on11.01.2016 and the case was approved by the committee. However, investor has not yet received aformal copy of the environment clearance due to which Factory license and Consent to Establish arepending.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent toPS(Environment) for furtheraction.

OPEN

109 Voestalpine BohlerWelding India Pvt Ltd. MIDC Sub letting

charges 30.05.2014

MIDC has issued a demand note for payment of sub letting charges for carrying the commercial activity(training) on the industrial plot. Investor claims that company carries out welding, engineering andfabrication activities which are industrial in nature and not characterized as commercial activities. HenceInvestor has requesting MIDC to re-issue the demand letter on the basis of industrial activity.11.03.2016- MIDC update: The field visit report of RO, MIDC confirmed the activities as of Industrialnature, while Jt. CEO, MIDC has defined the project as commercial activities.11.03.2016- IM decision: Investor to resubmit the project report with details of activities carried out forvarious clients which defines their industrial activities. MAITRI will draft DO letter in name of DC, writtento Jt CEO, MIDC to look into the matter, once the investor's report is shared with MAITRI. (not sent byDC sir)12.04.2016- MIDC update: The file is under process at Jt CEO, MIDC

Jt. CEO, MIDC to look into thematter and update MAITRI onthe same

Open

110 Yazaki India Pvt Ltd LabourDepartment

2nd shiftpermission for

female staff23.12.2015

Investor has initially submitted the application on 23rd December 2015 and 4th May 2016 to DeputyDirector of DISH, Pune to allow the female staff to work in the 2nd shift at their wiring harnessmanufacturing plant. The application is still pending for the grant of approval.

As the Nodal officer for MAITRIwas not present for the meeting,the issue was not discussed.MAITRI to prepare the list of allthe issues and share it withPS(I) to be sent to PS(Labour)for further action.

Open

Page 47 of 47