Magellan Telescopes Observatory Report

23
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress

description

Magellan Telescopes Observatory Report. Personnel Accomplishments Observing Statistics Common Problems Work in Progress. Personnel. Jorge Bravo has been hired as a new Instrument Specialist - PowerPoint PPT Presentation

Transcript of Magellan Telescopes Observatory Report

Magellan Telescopes Observatory Report

• Personnel

• Accomplishments

• Observing Statistics

• Common Problems

• Work in Progress

Personnel

• Jorge Bravo has been hired as a new Instrument Specialist

• Victor Meriño Has been promoted to Instrument Specialist. He will begin working in the new position as soon as the new telescope Operator is trained

• Mauricio Martinez has been hired as a new Telescope Operator and will begin working on September 27

• Jorge Araya has been hired as a new Telescope operator and is now in training

•Felipe Sanchez has been promoted to Programmer and will begin in his new position after training the new telescope operator

Accomplishments

• Three M1 cell Hard-Points in Clay were removed and serviced

• Work continues on the actuator air cylinder repairs• Complete service of Enclosure Trucks and Drives Both

Enclosures• Designed, built and installed the LDSS-3 cable wrap and

designed and install the Guider cable wrap• Installed IRMA, U of A 225 GHz and Ohio State PWV

sensors

The new LDSS-3 and guider wraps

Accomplishments (cont.)

• Iodine cell for MIKE installed on retractable arm (Dec)

•Software control was implemented in July

• S-H tests carried out at NASE and NASW ports to characterize collimation of M1, M2, and M3 (Dec, Jan, Mar)

• Adjustments of M3 tilt made in March and later have significantly decreased focal plane tilt

•Testing continues as weather and time permit

Accomplishments (cont.)

• Plan developed for long-term systems administration

• Internet access will be through CTIO (instead of the Chilean telephone company)

• The transition to CTIO system administration is underway

• El Pino and LCO network and fiber backbone upgrades are underway

•All new computer installations are being done by CTIO

Baade Telescope Instrumentation Usage:

21 Sep 2004-

12 Apr 2005

12 Apr 2005

14 Sep 2005

IMACS 63% 63%

PANIC 37% 37%

Observing Statistics

Clay Telescope Instrumentation Usage:

21 Sep 2004-

12 Apr 2005

12 Apr 2005-

14 Sep 2005

MIKE 51% 60%

MIKE fibers 7% 3%

LDSS-2 14% --

LDSS-3 13% 23%

MagIC + CCD 7% 9%

B&C 8% --

Other 5%

Observing Statistics

Baade + Clay Telescopes Instrumentation Usage:21 Sep 2004-

12 Apr 2005

12 Apr 2005

14 Sep 2005

IMACS 31% 32%

MIKE 26% 29%

MIKE fibers 3% 1%

PANIC 18% 19%

LDSS-2 7% --

LDSS-3 7% 12%

B&C 4% --

MagIC 4% 4%

Other -- 3%

Observing Statistics

May 2001 through Apr 2005

Long-Term Trends: Instrument Usage

May 01-Oct 01

Nov 01- Apr 02

May 02-Oct 02

Nov 02-Apr 03

May 03-Oct 03

Nov 03-Apr 04

Apr 04-Sep 04

Sep 04-Apr 05

Apr 05-Sep 05

MagIC+CCD 20% 31% 13% 18% 15% 8% 8% 4% 4%

B&C 44% 17% 34% 18% 20% 6% 9% 4% --

LDSS-2 28% 40% 31% 19% 10% 6% 2% 7% --

LDSS-3 -- -- -- -- -- -- -- 7% 12%

MIRAC 8% 3% 13% 4% -- -- -- -- --

Classic Cam -- 9% 9% 8% -- -- -- -- --

MIKE -- -- -- 31% 34% 30% 30% 26% 29%

MIKE fibers -- -- -- -- -- -- -- 3% 1%

PANIC -- -- -- 2% 17% 21% 15% 18% 19%

IMACS -- -- -- 4% 29% 36% 31% 32%

Other -- 3%

12 Apr-14 Sep 2005:

Observing Statistics

Baade Clay

% Open 66.8% 70.0%

% Lost to Weather 31.1% 28.7%

% Lost to Telescope 1.1% 0.6%

% Lost to Instrument 0.9% 0.1%

% Lost to Computer 0.1% 0.6%

% Total Downtime 2.1% 1.3%

Instrument Downtime:

21 Sep 2004-

12 Apr 2005

12 Apr 2005-

14 Sep 2005

MIKE 0.2% 0.2%

MIKE fibers 4.6%* 0.0%

MagIC 0.0% 0.1%

LDSS-2 0.5% --

LDSS-3 0.0% 0.0%

B&C 0.0% --

IMACS 0.5% 1.4%

PANIC 1.1% 0.2%

Other -- 0.0%

Observing Statistics

Long-Term Trends

Baade May 01-Oct 01

Nov 01- Apr 02

May 02-Oct 02

Nov 02-Apr 03

May 03-Oct 03

Nov 03-Apr 04

Apr 04-Sep 04

Sep 04-Apr 05

Apr 05-Sep 05

% Open 74.8 85.6 67.1 94.4 71.4 92.7 69.9 88.4 66.8%

% Lost to Weather 20.6 9.7 31.1 3.1 23.7 4.3 27.4 9.6 31.1%

% Lost to Telescope 1.3 3.6 1.1 1.4 2.7 1.4 1.8 0.9 1.1%

% Lost to Instrument 2.5 1.0 0.7 0.6 2.1 1.5 1.0 0.7 0.9%

% Lost to Computer 0.4 0.2 0.1 0.5 0.1 0.2 0.0 0.4 0.1%

% Total Downtime 4.2 4.8 1.9 2.5 4.9 3.1 2.8 2.0 2.1%

Clay May 01-Oct 01

Nov 01- Apr 02

May 02-Oct 02

Nov 02-Apr 03

May 03-Oct 03

Nov 03-Apr 04

Apr 04-Sep 04

Sep 04-Apr 05

Apr 05-Sep 05

% Open -- -- 76.6 89.2 81.3 93.1 69.8 88.6 70.0%

% Lost to Weather -- -- 13.6 4.3 16.1 4.3 26.9 9.4 28.7%

% Lost to Telescope -- -- 7.5 4.4 2.1 1.6 2.8 1.3 0.6%

% Lost to Instrument -- -- 1.5 1.9 0.4 0.8 0.1 0.5 0.1%

% Lost to Computer -- -- 0.9 0.2 0.1 0.1 0.4 0.3 0.6%

% Total Downtime -- -- 9.9 6.5 2.6 2.5 3.3 2.1 1.3%

Most Common Problems: Telescopes

• Primary mirror support (mirror panics, faulty actuators, hard point actuators)

• Campaign underway to seal air cylinders in actuators; redesign of actuator electronics cards in progress; ~50% of all time lost on both telescopes is due to these problems (but improvement is being seen)

•Leaking hard point breakaway seals cause primary mirror crashes

•Faulty connector on Hard Point #2 LVDT sensor

Hard Point #6 in Clay cell

Hard-point Breakaway AssemblyHard Point Breakaway Cylinder

Problems and Failures Enclosures

• Shutter structure on Clay is scheduled for the October and November Engineering runs

• Enclosure Truck Bearing failures

• Louver seals

• Wind Screen & Moon Roof drives

• Rotating interface seal

Bearing failure on Baade enclosure truck

Work in Progress

• Telescopes– Actuator leak repair– Hard-point breakaway leak repairs– New actuator control cards– New PWM amps on rotators (on hold)– M1 thermal control mixing valves

Work in Progress

• Enclosures– Louver seals– Enclosure Truck bearing failures– Rotating interface seals– Windscreen & Moon roof drives– Rotating seal (Baade)

Work In Progress

• Software– M3 Tip-Tilt automation– Code normalization, ini files– Translate Fortran to C++ (enclosure)– Windscreen & Moon roof automation– EDS query tools– PWM Amps, Rotator guiding, servos– M1 thermo control servo

Gemini Silver and Aluminum Coatings

LLNL Protected Silver