December 14, 2012DepartConcepts and FEED#1
Maersk Oil Decomissioning
Name of Speaker
Michael Erting
• Mechanical Engineer from DIA-M 1979
• Worked for Atlas Danmark
• Employed by AP Møller 1981
• Worked on the gas development project- Tyra
• Worked on Dan F project
• Head of engineering for Svend, Harald and Roar
• Head of engineering for Dan FF
• Head of engineering for Dan Center
• Head of concepts and FEED for Danish business Unit
December 14, 2012#2 Department
Danish Underground Consortium &Maersk Oil
• APMM was granted the license in 1962 for 50 years
• The license has been renegotiated a number of times and
in 2003 it was extended to 2042
• Danish underground Consortium was formed as a
partnership
• Today DUC consist of Shell, Texaco, Nordsøfonden og
APMM
• Maersk Oil is the operator for DUC.
December 14, 2012#3 Department
Where are Danish Business Unit• Production started on Dan field in 1972. Oil export by
tanker
• Gorm Field started production in 1981. Oil export by
tanker
• Tyra Field in 1984 – Gas export to Denmark
• Dan F and Gorm E in 1987 – Oil export via pipeline to
Fredericia
• Skjold and Rolf introduced in 1986 as normally
unmanned satellites
• STAR concept installed on Dagmar and Kraka as
minimum concepts
• Svend, Harald and Roar installed as marginal fields
• Halfdan Development was started as a satellite to Gorm
December 14, 2012#4 Department
Danish production of oil and gas
December 14, 2012#5 Department
Safety
• Safety is of vital importance for Maersk and contractors
• Our goal is to be incident free
• Dansk industry ~ 21 incidents per 1 mill. Working hours
December 14, 2012#6 Department
Protection of the Environment
• Decommissioning will increase the potential for spills
• All spills has to be reported to the Danish authorities
• Clean environment is a requirement during the entire
decommissioning process
• Account for all materials
• Maximum recycle
• NORM material handling
• Return the area to original conditions
• New tendency - To evaluate short term damage and
long term
December 14, 2012#7 Department
Danish Oil and Gas Fields
Only producing and commercial fields – not including
exploration
December 14, 2012#8 Department
14 December 2012#9 Department
Existing infrastructure
• DUC operates an extensive infrastructure in the North Sea including:
• Process centers
• Harald
• Tyra East and West
• Gorm
• Dan F
• Halfdan
• Twelve satellite platforms
• Interfield pipelines
• Multiphase
• Wet gas
• Live oil
• Water Inject
• Export pipelines
• Crude oil pipeline to onshore Denmark
• Gas pipeline to onshore Denmark
• Gas pipeline to the Dutch Sector
• Processing capacities
• Significant spare processing capacities are presently available on the
processing centers for the tight oil project (and for other possible
developments), but these capacities will gradually disappear with time
in order to reduce costs, if not utilized
Tyra East A process platform
December 14, 2012#10 Department
Gorm C, Tyra East and West
December 14, 2012#11 Department
Gorm F initial installation
Gorm F was installed as a
multi layer module which
could be expanded as
required.
Water injection and
additional separation was
added later
December 14, 2012#12 Department
Dan FF Water injection module
Newer platforms has
been built with
additional load bearing
capacity allowing
additional modules
being installed when
required.
December 14, 2012#13 Department
Dan FF additional water injection
December 14, 2012#14 Department
Dagmar installation
Installation of a STAR platform by a rig.
Slim tripod adapted for Rig installation
December 14, 2012#15 Department
DagmarCompletion of topsides installation
December 14, 2012#16 Department
Regnar FieldSubsea well controlled by floating buoy
December 14, 2012#17 Department
Regnar well connection
December 14, 2012#18 Department
Tyra South East platformSatellite platform producing gas from 7 wells
December 14, 2012#19 Department
Dan FF installation8500 tons module. 32 slot wellhead, separation,
compression, produced water treatment, water injection.
December 14, 2012#20 Department
Halfdan B load outAccommodation module for Halfdan B loaded on to barge
December 14, 2012#21 Department
Tyra West slug catcher moduleAdd on module to be lifted separate
December 14, 2012#22 Department
Dan F jacket being piledBoth with leg piles and skirt piles
Module support frame
December 14, 2012#23 Department
Structures onshore handling4 cranes for handling one of the small substructures
December 14, 2012#24 Department
Artificial reef effectsMove a number of structure to a common ground
Beneficial for marine environment specially fish
December 14, 2012#25 Department
Reverse installationRebuilt and extended in many step makes it very
complicated to decommission
December 14, 2012#26 Department
Wells plug and abbandonment300 wells
December 14, 2012#27 Department
Plug and abandon wells – 390 wells
Pipelines
• Large transportation Pipelines
laying on the seabed will require
corridors without fishing
•Interfield pipelines mostly buried in
the seabed
•OSPAR 98/3 do not cover pipelines
•Danish authorities has included
options for removal
•Environmental considerations
against large impact to the marine
environment and leave in place.
December 14, 2012#28 Department
Restrictions offshore
• Available beds restricts the number of working hours
which can be executed each year
• Presently is 2 mobile accommodation rigs engaged to
compensate
• Detailed Planning is required to structure the work and
ensure availability of materials and workers.
• Experienced workforce is required to ensure workflow
and safety level
December 14, 2012#29 Department
Decommissioning cost
Negative cashflow
determins the COP date
for the individual field
Marginal fields will
influence the main fields
by filling the prodution
systems
Oil prices influence the
COP date
December 14, 2012#30 Department
December 14, 2012Department#31
Thank you
New equipment - 2013Allseas Pieter Schelte 48000 tons topsides 25000 tons jacket
December 14, 2012#32 Department
December 14, 2012#33 Department
December 14, 2012#34 Department
December 14, 2012#35 Department
Cranes
Power
Alternatives wind, arteficial reefs