M00.1 LEGEND & GENERAL NOTES M06.1 BASEMENT E …...Apr 25, 2019 · lra locked rotor amps lsgv...
Transcript of M00.1 LEGEND & GENERAL NOTES M06.1 BASEMENT E …...Apr 25, 2019 · lra locked rotor amps lsgv...
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Revision DescriptionRev Date
APRIL 25, 2019
APRIL 25, 2019
BANGOR, MAINE
18660
G00.1
DWS
JSL
COVER
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
BANGOR, MAINE
DOROTHEA DIX PSYCHIATRICCENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
CONSTRUCTION DOCUMENTS
LIST OF DRAWINGS
G00.1 COVER SHEET
MECHANICAL DRAWINGSM00.1 LEGEND & GENERAL NOTESM06.1 BASEMENT E-BUILDING DEMOLITION PIPINGM06.2 BASEMENT F-BUILDING DEMOLITION PIPINGM06.3 FIRST FLOOR F-BUILDING DEMOLITION PIPINGM06.4 SECOND FLOOR F-BUILDING DEMOLITION PIPINGM06.5 THIRD FLOOR F-BUILDING DEMOLITION PIPINGM20.1 BASEMENT E-BUILDING PIPINGM20.2 BASEMENT F-BUILDING PIPINGM20.3 FIRST FLOOR F-BUILDING PIPINGM20.4 SECOND FLOOR F-BUILDING PIPINGM20.5 THIRD FLOOR F-BUILDING PIPINGM30.1 DETAILSM30.2 DETAILSM40.1 SCHEDULES
TIGHT SHUT-OFF VALVE
V
T
ACV 2 - WAY
ACV 3 - WAY
CAP - PIPE
CHECK VALVE
COMBINATION BALANCING, FLOW MEASURING &
FLOAT & THERMOSTATIC TRAP
ISOLATION VALVE
GLOBE VALVE
LOCKSHIELD GATE VALVE
MANUAL AIR VENT
OS&Y GATE VALVE
PETCOCK FOR GAUGE CONNECTION
PIPE ANCHOR
PIPE GUIDE
PLUG VALVE
PRESSURE GAUGE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
STRAINER
TAKE - OFF FROM BOTTOM OF PIPE
TAKE - OFF FROM TOP OF PIPE
THERMOMETER
THERMOMETER WELL
THERMOSTATIC TRAP
UNION
DESCRIPTIONSYMBOL
EXISTING SUPPLY PIPING TO REMAIN
EXISTING RETURN PIPING TO REMAIN
NEW SUPPLY PIPING
NEW RETURN PIPING
PIPE DOWN
PIPE UP
DIFFERENTIAL PRESSURE SENSORDPS
INVERTED BUCKET TRAP
PIPING LEGEND
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
10'-0" FL1.2 GPM
RADIATION I.D. ( TYPE A, 10'-0" FINNED LENGTH, BALANCED TO 1.2 GPM) WITH DAMPERA
10'-0" FL/D1.2 GPM
A RADIATION I.D. ( TYPE A, 10'-0" FINNED LENGTH, BALANCED TO 1.2 GPM) WITHOUT DAMPER
H
HS
HUMIDISTAT
HUMIDITY SENSOR
TEMPERATURE SENSOR
THERMOSTAT
THERMOSTAT COOLING
THERMOSTAT HEATING
THERMOSTAT - NIGHT
THERMOSTAT - HEATING/COOLING
T
TS
TC
H
N
H/C
T
T
T
DESCRIPTIONSYMBOL
CONTROLS LEGEND
AM10.1 SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)
DESCRIPTIONSYMBOL
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
DEMOLISHED EQUIPMENT, DUCTWORK, OR PIPING
GENERIC LEGEND
CONNECT NEW TO EXISTING
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/7/
2019
9:3
4:04
AM
BANGOR, MAINE
18660
M00.1
DWS
JSL
LEGEND & GENERALNOTES
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
ABBREV DESCRIPTIONLAT LEAVING AIR TEMPERATURE
LPCR LOW PRESSURE CONDENSATERETURN (LESS THAN 15 PSI)
LPS LOW PRESSURE STEAM(LESS THAN15 PSI)
LRA LOCKED ROTOR AMPSLSGV LOCK & SHIELD GATE VALVELWT LEAVING WATER TEMPERATURE
M MOTORIZED DAMPERMAX MAXIMUMMBH 1000 BRITISH THERMAL UNITSMCA MINIMUM CIRCUIT AMPSMIN MINIMUM
MOPD MAXIMUM OVERCURRENTPROTECTIVE DEVICE
MPCR MEDIUM PRESSURE CONDENSATERETURN(16-30 PSIG)
MPS MEDIUM PRESSURE STEAM (16-30PSIG)
NA NOT APPLICABLENC NOISE CRITERIANIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALE
OA OUTSIDE AIROC ON CENTEROED OPEN END DUCT
OS&Y OUTSIDE SCREW & YOKE GATEVALVE
PD PRESSURE DROPPRD PRESSURE RELIEF DAMPERPRV PRESSURE REDUCING VALVEPSI POUNDS PER SQUARE INCHPSIG POUNDS PER SQUARE INCH GAUGE
RET RETURNRET RETURNRL REFRIGERANT LIQUIDRLA RATED LOAD AMPERESRPM REVOLUTIONS PER MINUTERS REFRIGERANT SUCTION
S SMOKE DAMPERSP STATIC PRESSURESS STAINLESS STEELSUP SUPPLY
TEMP TEMPERATURETT THERMOSTATIC TRAPTYP TYPICAL
V VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVE
W/ WITHW/O WITHOUTWC WATER COLUMNWG WATER GAUGEWMS WELDED WIRE MESH SCREENWPD WATER PRESSURE DROP
Z ZONE DAMPER
PREFIX OF X EXISTING
ABBREV DESCRIPTIONACV AUTOMATIC CONTROL VALVEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEALD ACOUSTICAL LINED DUCTAMS AIRFLOW MEASURING STATIONAPD AIR PRESSURE DROP
ATC AUTOMATIC TEMPERATURECONTROL
B BAROMETRIC DAMPERBD BACKDRAFT DAMPERBHP BRAKE HORSEPOWERBPD BYPASS DAMPERBTU BRITISH THERMAL UNITS
CBD COUNTERBALANCED BACKDRAFTDAMPER
CFM CUBIC FEET PER MINUTECHWR CHILLED WATER RETURNCHWS CHILLED WATER SUPPLYCO CLEANOUTCTE CONNECT TO EXISTINGCWR CONDENSER WATER RETURNCWS CONDENSER WATER SUPPLY
DCW DOMESTIC COLD WATERDEG.F DEGREES FAHRENHEITDHW DOMESTIC HOT WATERDIA DIAMETERDN DOWN
EAT ENTERING AIR TEMPERATUREESP EXTERNAL STATIC PRESSUREEWT ENTERING WATER TEMPERATUREEXG EXISTINGEXH EXHAUST
F&T FLOAT & THERMOSTATIC TRAP
F/S FIRE AND SMOKE COMBINATIONDAMPER
FC FLEXIBLE CONNECTIONFD FIRE DAMPERFL FINNED LENGTH OF RADIATIONFM FLOW METERFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFPF FINS PER FOOTFPI FINS PER/INCHFPM FEET PER MINUTEFT FEETFT-HD FEET OF HEADFT-WG FEET WATER GAUGEFTR FIN TUBE RADIATOR
GAL GALLONSGPM GALLONS PER MINUTE
HP HORSEPOWER
HPCR HIGH PRESSURE CONDENSATERETURN (OVER 30 PSIG)
HPS HIGH PRESSURE STEAM (OVER30PSIG)
HRR HEAT RECOVERY RETURNHRS HEAT RECOVERY SUPPLYHWR HOT WATER RETURNHWS HOT WATER SUPPLY
IN INCHES
GENERAL NOTES1. VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH
EXISTING CONDITIONS, AND TO TAKE MEASUREMENTS AS NECESSARY FORCOMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN INTENT OF THECONTRACT DOCUMENTS.
2. COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHERTRADES.
3. PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFYLOCATIONS.
4. MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48INCHES AFF TO TOP OF ITEM. PROVIDE ELECTRICAL WALL BOX ATTACHED TOFRAMING.
5. WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHTSWITCHES, INSTALL SO THAT LIGHT SWITCHES ARE NEARER TO THE DOORJAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SOTHEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.
6. PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OFBUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHINDSUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR GAPS.
7. PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND ASINDICATED. WHERE PIPES DROP IN BLOCK WALLS, PROVIDE 1/2" THICKINSULATION MINIMUM.
8. SEAL PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRUFIRE-RATED ASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.
CONSTRUCTION DOCUMENTS
VALVE WITH HOSE-END DRAIN CONNECTION
BASEMENT E
EXISTING HPSTO REMAIN (TYP.)
EXISTING HPSTO REMAIN (TYP.)
EXISTING HPS TOBE REMOVED (TYP.)
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
7:02
PM
BANGOR, MAINE
18660
M06.1
DWS
JSL
BASEMENT E-BUILDINGDEMOLITION PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 BASEMENT E-BUILDING DEMOLITION PIPING PLAN
DEMO KEY NOTESCODE DESCRIPTION
D001 EXISTING STEAM HEATING ELEMENT IN ELEVATOR SHAFT TO BE REMOVED.D002 EXISTING STEAM PRV STATION TO BE REMOVED.D003 EXISTING BARE SINGLE TIER HEATING ELEMENT TO BE REMOVED.D004 EXISTING CAST IRON RADIATOR TO BE REMOVED.D005 EXISTING BARE DOUBLE TIER HEATING ELEMENT TO REMAIN.D006 EXISTING RADIATOR FABRICATED BY SERPENTINE PIPING TO BE REMOVED.D007 EXISTING PNEUMATIC AIR DRYER TO REMAIN.D008 EXISTING PNEUMATIC OUTDOOR AIR TEMPERATURE RESET PANEL TO REMAIN.D009 EXISTING PNEUMATIC DAY-NIGHT PANEL TO REMAIN.D010 EXISTING SIMPLEX CONDENSATE RECEIVER TO BE REMOVED.D011 EXISTING SHELL-AND-TUBE DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED.D012 EXISTING ELECTRIC DOMESTIC WATER HEATER TO REMAIN.D013 EXISTING DUPLEX CONDENSATE RECEIVER TO REMAIN.D014 EXISTING BASEBOARD RADIATION TO REMAIN. ASSOCIATED PNEUMATIC CONTROL VALVE TO
BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D015 EXISTING CAST IRON RADIATOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL
VALVE TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D016 EXISTING CLASSROOM VENTILATOR TO REMAIN. CONTRACTOR SHALL SERVICE EQUIPMENT
TO BE IN WORKABLE CONDITION.D017 EXISTING PNEUMATIC THERMOSTAT TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO
REMAIN.D018 EXISTING WATER COOLER TO BE REMOVED. CAP PIPING WITHIN WALL CAVITY AND REPAIR
WALL SURFACE TO MATCH ADJACENT.D019 EXISTING CONVECTOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL VALVE TO BE
REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.
BASEMENT F
EXISTING HPS TOBE REMOVED (TYP.)
D001
D002
D002
D002
D003
D004 D004 D004
D004
D004
D005
D006
EXISTING PUMPEDCONDENSATE TO REMAIN
D007
D008D009
D010
D011
D012
D013
COMPLETELY DEMOLISH ELECTRICAL CIRCUITINGAND ELECTRICAL DEVICES PRESENTLY SERVINGCONDENSATE PUMP TO BE DEMOLISHED
NOTE: MAINTAIN EXISTINGVALVED DOMESTIC HWAND DOMESTIC CW CONNECTIONS
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
7:19
PM
BANGOR, MAINE
18660
M06.2
DWS
JSL
BASEMENT F-BUILDINGDEMOLITION PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 BASEMENT F-BUILDING DEMOLITION PIPING PLAN
DEMO KEY NOTESCODE DESCRIPTION
D001 EXISTING STEAM HEATING ELEMENT IN ELEVATOR SHAFT TO BE REMOVED.D002 EXISTING STEAM PRV STATION TO BE REMOVED.D003 EXISTING BARE SINGLE TIER HEATING ELEMENT TO BE REMOVED.D004 EXISTING CAST IRON RADIATOR TO BE REMOVED.D005 EXISTING BARE DOUBLE TIER HEATING ELEMENT TO REMAIN.D006 EXISTING RADIATOR FABRICATED BY SERPENTINE PIPING TO BE REMOVED.D007 EXISTING PNEUMATIC AIR DRYER TO REMAIN.D008 EXISTING PNEUMATIC OUTDOOR AIR TEMPERATURE RESET PANEL TO REMAIN.D009 EXISTING PNEUMATIC DAY-NIGHT PANEL TO REMAIN.D010 EXISTING SIMPLEX CONDENSATE RECEIVER TO BE REMOVED.D011 EXISTING SHELL-AND-TUBE DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED.D012 EXISTING ELECTRIC DOMESTIC WATER HEATER TO REMAIN.D013 EXISTING DUPLEX CONDENSATE RECEIVER TO REMAIN.D014 EXISTING BASEBOARD RADIATION TO REMAIN. ASSOCIATED PNEUMATIC CONTROL VALVE TO
BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D015 EXISTING CAST IRON RADIATOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL
VALVE TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D016 EXISTING CLASSROOM VENTILATOR TO REMAIN. CONTRACTOR SHALL SERVICE EQUIPMENT
TO BE IN WORKABLE CONDITION.D017 EXISTING PNEUMATIC THERMOSTAT TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO
REMAIN.D018 EXISTING WATER COOLER TO BE REMOVED. CAP PIPING WITHIN WALL CAVITY AND REPAIR
WALL SURFACE TO MATCH ADJACENT.D019 EXISTING CONVECTOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL VALVE TO BE
REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.
T
T
T T
T
T T TT T T
T
T
T T
T
T
TT T
TT
TTT
T
T
TT
T
TT
T
T
T
BUILDING 'F' 1ST FLOOR
D014
D014
D014 D014
D014
D014
D014
D014 D014
D014
D014
D014
D014 D014 D014 D014 D014 D014
D014
D014
D014 D014
D014
D014D014D014
D014D014
D014D014D014
D014
D015
D015
D019
D015 D015
D015
D015
D015
D015
D016
D017
D017
D017
D017
D017
D017
D017D017 D017
D017 D017 D017
D017
D017 D017
D017
D017
D017
D017
D017 D017
D017
D017
D017D017D017
D017D017
D017D017
D017
D017D017
D017
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
7:36
PM
BANGOR, MAINE
18660
M06.3
DWS
JSL
FIRST FLOOR F-BUILDINGDEMOLITION PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 FIRST FLOOR F-BUILDING DEMOLITION PIPING PLAN
DEMO KEY NOTESCODE DESCRIPTION
D001 EXISTING STEAM HEATING ELEMENT IN ELEVATOR SHAFT TO BE REMOVED.D002 EXISTING STEAM PRV STATION TO BE REMOVED.D003 EXISTING BARE SINGLE TIER HEATING ELEMENT TO BE REMOVED.D004 EXISTING CAST IRON RADIATOR TO BE REMOVED.D005 EXISTING BARE DOUBLE TIER HEATING ELEMENT TO REMAIN.D006 EXISTING RADIATOR FABRICATED BY SERPENTINE PIPING TO BE REMOVED.D007 EXISTING PNEUMATIC AIR DRYER TO REMAIN.D008 EXISTING PNEUMATIC OUTDOOR AIR TEMPERATURE RESET PANEL TO REMAIN.D009 EXISTING PNEUMATIC DAY-NIGHT PANEL TO REMAIN.D010 EXISTING SIMPLEX CONDENSATE RECEIVER TO BE REMOVED.D011 EXISTING SHELL-AND-TUBE DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED.D012 EXISTING ELECTRIC DOMESTIC WATER HEATER TO REMAIN.D013 EXISTING DUPLEX CONDENSATE RECEIVER TO REMAIN.D014 EXISTING BASEBOARD RADIATION TO REMAIN. ASSOCIATED PNEUMATIC CONTROL VALVE TO
BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D015 EXISTING CAST IRON RADIATOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL
VALVE TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D016 EXISTING CLASSROOM VENTILATOR TO REMAIN. CONTRACTOR SHALL SERVICE EQUIPMENT
TO BE IN WORKABLE CONDITION.D017 EXISTING PNEUMATIC THERMOSTAT TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO
REMAIN.D018 EXISTING WATER COOLER TO BE REMOVED. CAP PIPING WITHIN WALL CAVITY AND REPAIR
WALL SURFACE TO MATCH ADJACENT.D019 EXISTING CONVECTOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL VALVE TO BE
REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.
T
TT
TT
T
T TT
T T
T T
TT T
T
T
T
T
TTT
T
TTT
TT
T
TT
TT
T
BUILDING 'F' 2ND FLOOR
D014
D014
D014D014
D014 D014
D014
D014 D014
D014
D014 D014 D014 D014 D014
D014
D014
D014D014D014D014
D014D014
D014D014D014D014
D014
D015
D015
D015
D015D015 D015
D015
D015
D015
D015
D017D017
D017
D017
D017
D017
D017
D017
D017
D017
D017
D017D017
D017 D017
D017
D017D017 D017
D017
D017
D017D017
D017D017D017D017
D017D017D017
D017
D018COMPLETELY DEMOLISH ELECTRICAL CIRCUITINGAND ELECTRICAL DEVICES PRESENTLY SERVINGWATER COOLER TO BE DEMOLISHED
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
7:52
PM
BANGOR, MAINE
18660
M06.4
DWS
JSL
SECOND FLOORF-BUILDING DEMOLITION
PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 SECOND FLOOR F-BUILDING DEMOLITION PIPING PLAN
DEMO KEY NOTESCODE DESCRIPTION
D001 EXISTING STEAM HEATING ELEMENT IN ELEVATOR SHAFT TO BE REMOVED.D002 EXISTING STEAM PRV STATION TO BE REMOVED.D003 EXISTING BARE SINGLE TIER HEATING ELEMENT TO BE REMOVED.D004 EXISTING CAST IRON RADIATOR TO BE REMOVED.D005 EXISTING BARE DOUBLE TIER HEATING ELEMENT TO REMAIN.D006 EXISTING RADIATOR FABRICATED BY SERPENTINE PIPING TO BE REMOVED.D007 EXISTING PNEUMATIC AIR DRYER TO REMAIN.D008 EXISTING PNEUMATIC OUTDOOR AIR TEMPERATURE RESET PANEL TO REMAIN.D009 EXISTING PNEUMATIC DAY-NIGHT PANEL TO REMAIN.D010 EXISTING SIMPLEX CONDENSATE RECEIVER TO BE REMOVED.D011 EXISTING SHELL-AND-TUBE DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED.D012 EXISTING ELECTRIC DOMESTIC WATER HEATER TO REMAIN.D013 EXISTING DUPLEX CONDENSATE RECEIVER TO REMAIN.D014 EXISTING BASEBOARD RADIATION TO REMAIN. ASSOCIATED PNEUMATIC CONTROL VALVE TO
BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D015 EXISTING CAST IRON RADIATOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL
VALVE TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D016 EXISTING CLASSROOM VENTILATOR TO REMAIN. CONTRACTOR SHALL SERVICE EQUIPMENT
TO BE IN WORKABLE CONDITION.D017 EXISTING PNEUMATIC THERMOSTAT TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO
REMAIN.D018 EXISTING WATER COOLER TO BE REMOVED. CAP PIPING WITHIN WALL CAVITY AND REPAIR
WALL SURFACE TO MATCH ADJACENT.D019 EXISTING CONVECTOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL VALVE TO BE
REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.
T
T
TT
T T
T
TT T T T
T
T
T
TT
T
TT
T
TTTT
T
TTTTT
BUILDING 'F' 3RD FLOOR
D014
D014
D014
D014
D014
D014 D014
D014
D014
D014
D014
D014 D014 D014 D014 D014
D014
D014
D014D014
D014
D014
D014
D014D014D014D014
D014D014
D014D014D014D014
D014
D014
D015
D015
D017
D017
D017
D017D017
D017
D017
D017D017
D017
D017D017
D017
D017
D017
D017
D017
D017
D017
D017D017
D017
D017
D017D017
D017D017
D017
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
8:09
PM
BANGOR, MAINE
18660
M06.5
DWS
JSL
THIRD FLOOR F-BUILDINGDEMOLITION PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 THIRD FLOOR F-BUILDING DEMOLITION PIPING PLAN
DEMO KEY NOTESCODE DESCRIPTION
D001 EXISTING STEAM HEATING ELEMENT IN ELEVATOR SHAFT TO BE REMOVED.D002 EXISTING STEAM PRV STATION TO BE REMOVED.D003 EXISTING BARE SINGLE TIER HEATING ELEMENT TO BE REMOVED.D004 EXISTING CAST IRON RADIATOR TO BE REMOVED.D005 EXISTING BARE DOUBLE TIER HEATING ELEMENT TO REMAIN.D006 EXISTING RADIATOR FABRICATED BY SERPENTINE PIPING TO BE REMOVED.D007 EXISTING PNEUMATIC AIR DRYER TO REMAIN.D008 EXISTING PNEUMATIC OUTDOOR AIR TEMPERATURE RESET PANEL TO REMAIN.D009 EXISTING PNEUMATIC DAY-NIGHT PANEL TO REMAIN.D010 EXISTING SIMPLEX CONDENSATE RECEIVER TO BE REMOVED.D011 EXISTING SHELL-AND-TUBE DOMESTIC HOT WATER HEAT EXCHANGER TO BE REMOVED.D012 EXISTING ELECTRIC DOMESTIC WATER HEATER TO REMAIN.D013 EXISTING DUPLEX CONDENSATE RECEIVER TO REMAIN.D014 EXISTING BASEBOARD RADIATION TO REMAIN. ASSOCIATED PNEUMATIC CONTROL VALVE TO
BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D015 EXISTING CAST IRON RADIATOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL
VALVE TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.D016 EXISTING CLASSROOM VENTILATOR TO REMAIN. CONTRACTOR SHALL SERVICE EQUIPMENT
TO BE IN WORKABLE CONDITION.D017 EXISTING PNEUMATIC THERMOSTAT TO BE REMOVED, HOWEVER PNEUMATIC TUBING TO
REMAIN.D018 EXISTING WATER COOLER TO BE REMOVED. CAP PIPING WITHIN WALL CAVITY AND REPAIR
WALL SURFACE TO MATCH ADJACENT.D019 EXISTING CONVECTOR TO BE REMOVED. ASSOCIATED PNEUMATIC CONTROL VALVE TO BE
REMOVED, HOWEVER PNEUMATIC TUBING TO REMAIN.
BASEMENT E
2"
RUN HPS THROUGHEXISTING WALL OPENING
HPS
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
8:25
PM
BANGOR, MAINE
18660
M20.1
DWS
JSL
BASEMENT E-BUILDINGPIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 BASEMENT E-BUILDING PIPING PLAN
KEY NOTESCODE DESCRIPTION
M001 PIPING UP THROUGH FLOOR TO HEATING ELEMENT ON FLOOR ABOVE.M002 PIPING RISER THROUGH FLOOR AS PART OF NEW HOT WATER HEATING SYSTEM.M003 PIPING SHALL BE EQUAL TO WIRSBO HEPEX BY UPONOR. PIPING SHALL BE 3/4"
PRE-INSULATED WITH 1-1/2" INSULATION.
T
T
BASEMENT F
RUN HPS THROUGHEXISTING WALL OPENING
2"
NOTE: PIPING SHOWN ON THISPLAN SERVES HEATING ELEMENTSLOCATED ON THE FLOOR ABOVE
M001 M001 M001
M001
M001 M001
M001
M001
M001
M001
M001
M001
M001
M001
M001M001M001M001M001M001M001
M001M001
M001
M001
M001
M001
M002M002
M30.21
M001
M001
M001
M001
M001
M001 M001
M003M003
M003
M003 M003
M003
M003M003
M003
M003
M003
M003
M003
M003
M003
M003
M003M003
M003
M003M003
M003
M003M003
M003
M003
M003
M003
M003
M003
M003
M001
M003
1"3/4"
3/4"
3/4"
1"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
3/4"
1"
1"
1-1/4"
1-1/4"1-1/2" 1-1/2"
1-1/2" 1-1/4"
1-1/4"
1-1/2"2"2"
2"
1-1/4"
2" HWR UP 2" HWS UP
1"
1"
2"
2"
0.5 GPM
0.5 GPM
ET-1
1"
MOTOR RATEDSWITCH
MOTOR RATED SWITCHWITH HOMERUN TO PANEL
MOTOR RATEDSWITCH
MOTOR RATEDSWITCH
UH-1
UH-2
UH-3
UH-4
PUMP VFDS MOUNTEDON THIS WALL
NOTE: RUN 3 #12, 1 #12G IN 3/4" CONDUIT FROM EACH INDIVIDUAL PUMP VFD TONEAREST EXISTING 208/120V PANEL WITH (6) SPACES. RELOCATE EXISTING LOADSAND REMOVE EXISTING BREAKERS AS REQUIRED TO CREATE (2) 3 POLE SPACES.PROVIDE (2) 15A, 3 POLE BREAKERS IN AVAILABLE SPACES. NEW BREAKERS SHALLMATCH EXISTING TYPE INCLUDING ARC RATING.
NOTE: RUN 2 #12, 1 #12G IN 3/4" CONDUIT FROM UNIT HEATER UH-2 TO NEARESTEXISTING 208/120V PANEL WITH (1) POLE SPACE AVAILABLE. PROVIDE (1) 20A, 1 POLEBREAKER IN AVAILABLE SPACE. NEW BREAKER SHALL MATCH EXISTING TYPEINCLUDING ARC RATING. ALL (4) UNIT HEATERS CIRCUITED TO HOMERUN AT UH-2.
TYPE A BASEBOARDWITHOUT COVER7'-0" OF ELEMENT
STAND ALONE TSTATFOR UNIT HEATERS
STAND ALONE TSTATFOR BASEBOARD
NOTE: BASEBOARD RADIATION IN ELEVATOR SHAFT SHALL BE MANUALLY CONTROLLEDVIA BALL VALVE.
NOTE: BALANCE UNIT HEATERS TO 2.5 GPM EACH.
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
8:43
PM
BANGOR, MAINE
18660
M20.2
DWS
JSL
BASEMENT F-BUILDINGPIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 BASEMENT F-BUILDING PIPING PLAN
KEY NOTESCODE DESCRIPTION
M001 PIPING UP THROUGH FLOOR TO HEATING ELEMENT ON FLOOR ABOVE.M002 PIPING RISER THROUGH FLOOR AS PART OF NEW HOT WATER HEATING SYSTEM.M003 PIPING SHALL BE EQUAL TO WIRSBO HEPEX BY UPONOR. PIPING SHALL BE 3/4"
PRE-INSULATED WITH 1-1/2" INSULATION.
T
T
T T
T
T T TT T T
T
T
T T
T
T
TT T
TT
TTT
T
T
TT
T
TT
T
T
T
T
T
T
BUILDING 'F' 1ST FLOOR
NOTE: PIPING SHOWN ON THISPLAN SERVES HEATING ELEMENTSLOCATED ON THE FLOOR ABOVE
M001
M002 M002
M001
M001M001
M001
M001
M001
M001 M001 M001 M001 M001 M001 M001 M001 M001 M001
M001
M001
M001
M001M001
M001
M001
M001
M001M001M001M001M001M001M001
M001M001
M001
M001M001
M001
M001
M001
M001
M003
M003
M003
M003
M003
M003
M003M003
M003
M003
M003 M003 M003 M003
M003
M003M003
M003
M003
M003
M003
M003M003M003M003
M003M003M003M003
M003
M003
M003M003
M003
1-1/2"
1-1/2" 1-1/2"
1-1/2"
1-1/2" 1"1-1/4" 1-1/4"
1-1/4" 1-1/4"
1-1/4" 1-1/4"
1-1/4"
1-1/4"
1"
1" 1" 1"
1"
1"
3/4"
3/4"
3/4"
M003
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1-1/2" HWR UP,2" HWR DOWN 1-1/2" HWS UP,
2" HWS DOWN
REFURBISH EXISTING CLASSROOMUNIT VENTILATOR AND BALANCETO 3.5 GPM
TYPE A BASEBOARD16'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT
TYPE ABASEBOARD5'-0" OF ELEMENT
TYPE A BASEBOARD5'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT EACH
STAND ALONE TSTATFOR BASEBOARD
STAND ALONE TSTATFOR BASEBOARD
STAND ALONE TSTATFOR BASEBOARD
0.5 GPM
BALANCE ENTIRE ROOMTO 1 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM 0.5 GPM
0.5 GPM 0.5 GPM 0.5 GPM 0.5 GPM
0.5 GPM 0.5 GPM 0.5 GPM 0.5 GPM 0.5 GPM 0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM0.6 GPM0.5 GPM
0.7 GPM
0.5 GPM0.5 GPM0.5 GPM
0.7 GPM
0.5 GPM
0.5 GPM0.5 GPM
0.5 GPM
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
9:03
PM
BANGOR, MAINE
18660
M20.3
DWS
JSL
FIRST FLOOR F-BUILDINGPIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 FIRST FLOOR F-BUILDING PIPING PLAN
KEY NOTESCODE DESCRIPTION
M001 PIPING UP THROUGH FLOOR TO HEATING ELEMENT ON FLOOR ABOVE.M002 PIPING RISER THROUGH FLOOR AS PART OF NEW HOT WATER HEATING SYSTEM.M003 PIPING SHALL BE EQUAL TO WIRSBO HEPEX BY UPONOR. PIPING SHALL BE 3/4"
PRE-INSULATED WITH 1-1/2" INSULATION.
T
TT
T
T
TT T
T
T T
T T
TT T
T
T
T
T
TTT
T
TTT
TT
T
TT
TT
T
TT
T
BUILDING 'F' 2ND FLOOR
NOTE: PIPING SHOWN ON THISPLAN SERVES HEATING ELEMENTSLOCATED ON THE FLOOR ABOVE
M001
M002 M002
M001
M001
M001
M001
M001 M001
M001M001
M001
M001 M001
M001
M001
M001M001
M001
M001 M001
M001
M001
M001
M001
M001
M001M001
M001
M001M001
M001
M001M001M001M001M001
M001
M001
M001
M003
M003
M003
M003
M003
M003
M003
M003
M003
M003 M003
M003
M003M003
M003 M003M003
M003
M003
M003
M003
M003
M003
M003
M003
M003M003M003M003
M003
M003M003M003
M003
M003
M003
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"1-1/4"
1-1/4"
1-1/4"
1"
1" 1"
1"
1"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1-1/2" HWRDOWN
1-1/2" HWSDOWN
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD5'-0" OF ELEMENT
TYPE A BASEBOARD7'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT
TYPE A BASEBOARD5'-0" OF ELEMENT
TYPE A BASEBOARD5'-0" OF ELEMENT
TYPE A BASEBOARD4'-0" OF ELEMENT EACH
STAND ALONE TSTATFOR BASEBOARD
STAND ALONE TSTATFOR BASEBOARD
STAND ALONE TSTATFOR BASEBOARD
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM 0.5 GPM
0.5 GPM
0.5 GPM 0.5 GPM
0.5 GPM
0.5 GPM 0.5 GPM
0.5 GPM FOR ROOM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM0.5 GPM0.5 GPM
0.7 GPM
0.5 GPM0.5 GPM0.5 GPM
0.5 GPM0.7 GPM
0.5 GPM
0.5 GPM0.5 GPM0.5 GPM
0.5 GPM
0.5 GPM
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
9:23
PM
BANGOR, MAINE
18660
M20.4
DWS
JSL
SECOND FLOORF-BUILDING PIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 SECOND FLOOR F-BUILDING PIPING PLAN
KEY NOTESCODE DESCRIPTION
M001 PIPING UP THROUGH FLOOR TO HEATING ELEMENT ON FLOOR ABOVE.M002 PIPING RISER THROUGH FLOOR AS PART OF NEW HOT WATER HEATING SYSTEM.M003 PIPING SHALL BE EQUAL TO WIRSBO HEPEX BY UPONOR. PIPING SHALL BE 3/4"
PRE-INSULATED WITH 1-1/2" INSULATION.
T
T
TT
T T
T
T
T T T TT
T
T
TT
T
TT
T
TTTT
T
TTTTT
T
T
BUILDING 'F' 3RD FLOOR
TYPE A BASEBOARD4'-0" OF ELEMENT
STAND ALONE TSTATFOR BASEBOARD
STAND ALONE TSTATFOR ALL BASEBOARDIN APARTMENT
0.5 GPM
0.5 GPM
0.5 GPM
0.7 GPM
0.5 GPM
0.5 GPM 0.5 GPM 0.5 GPM
0.7 GPM
0.5 GPM 0.5 GPM 0.5 GPM 0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM0.5 GPM0.5 GPM
0.5 GPM0.5 GPM
BALANCE THE ENTIREROOM TO 0.9 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
0.5 GPM
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
9:39
PM
BANGOR, MAINE
18660
M20.5
DWS
JSL
THIRD FLOOR F-BUILDINGPIPING
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"1 THIRD FLOOR F-BUILDING PIPING PLAN
KEY NOTESCODE DESCRIPTION
M001 PIPING UP THROUGH FLOOR TO HEATING ELEMENT ON FLOOR ABOVE.M002 PIPING RISER THROUGH FLOOR AS PART OF NEW HOT WATER HEATING SYSTEM.M003 PIPING SHALL BE EQUAL TO WIRSBO HEPEX BY UPONOR. PIPING SHALL BE 3/4"
PRE-INSULATED WITH 1-1/2" INSULATION.
ENCLOSURE LOUVER
OPENING
ELEMENT
FIN TUBE SUPPORT SUPPORT W/ BALL
BEARING CRADELS
SECURING SCREWS
WALL
FINISHED FLOOR
RETURN PIPE AS REQUIRED PER PLANS SUPPORT PIPE AS RECOMMENDED BY UNIT MFR.
FULL BACKPLATE
ENCLOSURE 16 GAUGE
STEEL
SEE
SCH
EDU
LE
SEE
SCH
EDU
LE
MINIMUM 6 IN.
PIPE MAIN
COIN-OPERATED AIR VENTOR PUSHBUTTON TYPEMANUAL AIR VENT EQUAL TOMAID-O-MIST NO.95
BALL VALVE, CLOSE VALVEAFTER SYSTEM START UP
PIPE TO DRAIN
CAP END OF MAIN
6-IN. LONG AIR CHAMBERFULL SIZE OF MAIN PIPE
EXCEPT 1" MINIMUM
AUTOMATIC AIR VENT
PIPING HIGH POINT VENT
END OF MAIN VENT
PUMPNO. 2
SILENT CHECKVALVE
FOR FLOW MEASURINGONLY. DO NOT USEFOR THROTTLING FLOW
BALL VALVE,(TYP. OF 2)
1/4" MIN.
PUMPNO. 1
(NOTES FOR PUMP NO. 1ARE TYPICAL FOR PUMP NO. 2)
AS-1PUMPS P-1, 2
CONDENSATE MAIN
F&TTRAP
F&TTRAP
1/2"
CEILING STRUCTURE
HOT WATERSUPPLY TO
PUMPS
LOCKABLEBALL VALVE
3/4"
3/4"
PIPE TOFD FUNNEL WITH
AIR GAP
ASME PRESSURERELIEF VALVE (TYP)
VIBRATIONISOLATOR
GLOBE VALVE
LPS
6" DEEPDIRT LEG
HWR
HWS
HWR
HWS MAIN FROM PUMP
LPC
SIZE EACH TRAP FOR FULL LOAD
TO ACT, TYPICAL
STEAM MAIN
LPS
PIPE TOFD FUNNEL WITH
AIR GAP
ACVs SIZED FOR 1/3& 2/3 OF CAPACITY
3/4" FAST FILL
3/4" COLD WATERMAKE UP
PIPE TOFD FUNNEL WITH AIR GAP
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER,SEE PLUMBING
4-INCH CONCRETEPAD W/1-INCH CHAMFER, TYP.
ET-1
PLUG DRAIN FITTINGON AIR SIDE OF TANK
3/4"
18 IN.
MIN
1"
BRAZED PLATEHEAT EXCHANGER(HX-1, HX-2)
F1
F2
F3
F4
1/2" PLUGGED TEEFOR DRAIN
PITCH UP
PITCH UP
COMBINATION BALANCING, FLOW MEASURING, & TIGHT SHUT-OFF VALVE
SHUT-OFF VALVEUNION
STRAINER
ACV
V
V
AIR VENT
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:1
9:55
PM
BANGOR, MAINE
18660
M30.1
DWS
JSL
DETAILS
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
NO SCALE1 FINTUBE RADIATION WALL MOUNTEDNO SCALE3 AUTOMATIC AND MANUAL AIR VENT
NO SCALE4 IN LINE PARALLEL PUMPNO SCALE5 STEAM TO HOT WATER CONVERSION DETAIL
SCALE: 1/8" = 1'-0"2 HOT WATER RADIATION
2-1/2" GLOBE VALVE 1/3 CONTROL VALVE SIZEDAT 460 #/HR
2/3 CONTROL VALVE SIZEDAT 940 #/HR
2" GLOBEVALVE
2" GLOBE VALVE
P-1
P-2
AS-1
HX-1
HX-2
HX-3
1/3 CONTROL VALVE SIZEDAT 350 #/HR
2/3 CONTROL VALVE SIZEDAT 720 #/HR
2" HPS
2" HWR
2" HWS
2" HWS
2" HWREXISTING PUMPED CONDENSATE
2-1/2" LPS
1-1/2" LPS
2" LPS
1-1/2" LPS
2" LPS
2" LPS
2-1/2" LPS
EXISTING CONDENSATE RECEIVERCONNECT TO EXISTING DOMESTIC HWAND DOMESTIC CW VALVED CONNECTIONS
2-1/2" HWS
2-1/2"
2" HWS
CONDENSATE MAIN
F&TTRAP
F&TTRAP
1/2"
GLOBE VALVE
LPS
6" DEEPDIRT LEG
LPC
SIZE EACH TRAP FOR FULL LOAD
STEAM MAIN
LPS
ACVs SIZED FOR 1/3& 2/3 OF CAPACITY
18 IN.
MIN
BRAZED PLATEHEAT EXCHANGER(HX-3)
F1
F2
F3
F4DONESTIC CWINLET
DONESTIC HWOUTLET
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:2
0:12
PM
BANGOR, MAINE
18660
M30.2
DWS
JSL
DETAILS
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
SCALE: 1/2" = 1'-0"1 BASEMENT F-BUILDING PIPING PLAN - Callout 1NO SCALE2 DOMESTIC STEAM TO HOT WATER CONVERSION DETAIL
Graphic Scale
AUBURN PORTLAND PORTSMOUTHBOSTON
Graphic Scale
Graphic ScaleGraphic Scale
Graphic ScaleGraphic Scale
Key Plan
Harriman Project No.
PA / PE:
Drawn By: Harriman Associatesc
Proj North
Plo
t Dat
e:
Revision DescriptionRev Date
APRIL 25, 2019
5/6/
2019
8:2
0:28
PM
BANGOR, MAINE
18660
M40.1
DWS
JSL
SCHEDULES
2019
DOROTHEA DIXPSYCHIATRIC
CENTERF-BUILDING HYDRONICSYSTEM CONVERSION
CONSTRUCTION DOCUMENTS
AIR SEPARATOR SCHEDULETAG MANUFACTURER MODEL SERVICE PIPE SIZE
FLOW(GPM)
WPD (FTWG)
DIAMETER(IN)
HEIGHT(IN) NOTES
AS-1 TACO 49025A HOT WATER 2 1/2" 0 0 7 14
FINTUBE RADIATION SCHEDULE
TAGMANUFACTURE
R MODELPIPE SIZE
(IN.)CAPACITY
BTU/FT
FINDIMENSIONS WxH (IN) FPF ROWS
ENCLOSUREDIMENSIONS
W x H (IN.) NOTESA STERLING JVA-S11 3/4" 640 3-1/4" SQ. 40 1 4-3/8"x 11"
EXPANSION TANK SCHEDULETAG MANUFACTURER MODEL SERVICE
VOLUME(GAL.)
MIN TEMP.(DEG. F)
MAX TEMP(DEG .F)
DIAMETER(IN)
HEIGHT(IN)
WEIGHT(LBS) NOTES
ET-1 Taco CA500-125 HW SYSTEM 119.0 50 185 24 86 420
HEAT EXCHANGER SCHEDULE
TAG MANUFACTURER MODEL SERVICECAPACITY(MBTUH)
LOAD SIDE SOURCE SIDE (LPS)
NOTESEWT
(DEG.F)LWT
(DEG.F)FLOW(GPM)
PD(FT.HD)
FLUIDTYPE
ENTERINGPSI
LBS/HR(DEG.F)
HX-1 BELL & GOSSETT BP423-20 HEATING HW 1025 155 185 70 9 WATER 10 1070HX-2 BELL & GOSSETT BP423-20 HEATING HW 1025 155 185 70 9 WATER 10 1070HX-3 BELL & GOSSETT BP424-10 DOMESTIC HW 1345 50 140 30 3 WATER 10 1400
PUMP SCHEDULE
TAG MANUFACTURER MODEL SERVICEFLOW(GPM)
HEAD(FT.WG)
SUCTIONFLANGE
(IN)SPEED(RPM)
ELECTRICMOTOR
CONTROL NOTESHP PHASE VOLTSP-1 Taco KV2007 HEATING HW 70.0 GPM 50 2" 1760 2 3 208 V VFDP-2 Taco KV2007 HEATING HW 70.0 GPM 50 2" 1760 2 3 208 V VFD
UNIT HEATER SCHEDULETAG MANUFACTURER MODEL SERVICE
OUTPUT(MBH)
AIR FLOW(CFM)
EWT(DEG.F)
WPD(IN.WG)
ELECTRIC MOUNTINGTYPE NOTESHP PHASE VOLTS
UH-1 STERLING HS-125A BASEMENT 21.23 460 185 °F 2.2 9W 1 120 V HUNG FROMCEILING
UH-2 STERLING HS-125A BASEMENT 21.23 460 185 °F 2.2 9W 1 120 V HUNG FROMCEILING
UH-3 STERLING HS-125A BASEMENT 21.23 460 185 °F 2.2 9W 1 120 V HUNG FROMCEILING
UH-4 STERLING HS-125A BASEMENT 21.23 460 185 °F 2.2 9W 1 120 V HUNG FROMCEILING
1-1/4" 880 4 324 4
70 2