Customer :
Supplier Name
Part No
Description
Production Part Approval Process
Customer :Supplier name: Part name : OILSEAL
Part No. : VOS 193
List of documents submitted(Tick inside the box)
PPAP manual ref no1 Design record a 1
2 Engineering change documents 2
3 Customer engineering approval 3
4 Design FMEA 4
5 Process flow diagram a 5
6 Process FMEA a 6
7 Dimensional results a 7
8 Material performance test results 8
9 Initial process study a 9
10 Measurement system analysis studies a 10
11 Qualified labarotary documentation 11
12 Control Plan a 12
13 Part submission Warrant a 13
14 Appearance approval report 14
15 Bulk material requirement check list 15
16 Sample product a 16
17 Master Sample 17
18 Checking aids a 18
19 Deviation and action plan -
PPAP rev no.: 0
Submission date: 16.09.10
List of documents submitted(Tick inside the box)
PPAP manual ref no
PPAP History SheetPART NO :VOS 193
SNO PPAP Details of Change SignatureRev .No Date
1 NIL 16.09.10 Initial submission
PREPARED BY : APPROVED BY:
Page 7 of 29
PROCESS FLOWPart Name / Description : Oil Seal Date (original) : 13.09.2010 Rev No : 00
Drawing / Part no : VOS 193 Revision Date : NIL
Process flow no : BI / PF/ 193 Customer Ref. No : BSE 0300B - WK 30.14(B)
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
_
_
Material Grade _
20.Storage of Raw Material Material Grade _
30.Weighing of Mix Ingredients Weight of the Ingredients _
40. Rubber Mixing Rubber Compound Mixing Time.
Customer Ref. No : BSE 0300B - WK 30.14(B)
Core Team : Production / Quality / Marketing (CFT)
10. A. Incoming Inspn. Of Raw Material. (Shell)
1.Wrong Specification Material shipped by supplier 2. Visual defects like Rust , Burr, Bend, cutshell, tool mark, Rust, Dent, OD line mark , Pit mark supplied by the Supplier
1. I.D. : Ø 44.10 ± 0.10 mm 2. P.D. : Ø 35.50 ± 0.15 mm 3. HT. : 6.35 ± 0.10 mm 4. ST :0.91 MATERIAL : CRCS IS 513 - 1994
10. B. Incoming Inspn. Of Raw Material. (Spring)
1.Wrong Specification Material shipped by supplier 2. Visual defects like Bend, Rust , Burr, peel off supplied by the Supplier
1. Spring Length : 103.00 mm 2. Coil Dia : Ø 1.58 mm 3. Wire Dia : Ø 0.30 mm MATERIAL : GI IS 4454 - 2001 PART1
10.C. Incoming Inspection of Chemicals & Raw Rubber
Wrong Specification Material shipped by supplier
1.Wrong Grade Material 2.Wrong Specification/Size Material 3.Defective material
1.Incorrect ingredients weight 2.Incorrect chemical selection. 3.Ingredients missed out 4. Instrument Error.
1. Poor Dispersion 2.Temperature variation of coolant circulation in roll mill.
30
10.A.
10.B.
10.C.
30
20
10.A.
10.B.
10.C.
40
Page 8 of 29
PROCESS FLOWPart Name / Description : Oil Seal Date (original) : 13.09.2010 Rev No : 00
Drawing / Part no : VOS 193 Revision Date : NIL
Process flow no : BI / PF/ 193 Customer Ref. No : BSE 0300B - WK 30.14(B)
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
Customer Ref. No : BSE 0300B - WK 30.14(B)
Core Team : Production / Quality / Marketing (CFT)
Variation in Rubber Hardness Hardness : 70 ± 5 shore A _
Specific Gravity variation. 1.20 ~ 1.25 _
Tensile Strength variation. Minimum 12.5 N/mm² _
Elongation variation. Minimum 250 %
60. Extrusion Over Cure of Rubber compound. Blank Shape Extrusion Time
70. Dipping Dipping Chemical Specific Gravity. Process Temperature.
50. Compound testing A)Hardness
50. Compound testing B)Specific Gravity
50. Compound testing C)Tensile Strength
50. Compound testing D) Ultimate Elongation
1) In correct/ Excess bonding layer in shell 2) Rust / Surface defects in shell 3) Process Temperature variation 4) Life time of dipping chemicals
50.A.
50.B.
70
50.A.
50.B.
60
50.C.
50.D.
Page 9 of 29
PROCESS FLOWPart Name / Description : Oil Seal Date (original) : 13.09.2010 Rev No : 00
Drawing / Part no : VOS 193 Revision Date : NIL
Process flow no : BI / PF/ 193 Customer Ref. No : BSE 0300B - WK 30.14(B)
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
Customer Ref. No : BSE 0300B - WK 30.14(B)
Core Team : Production / Quality / Marketing (CFT)
80. Rubber Cutting Rubber Blank _1) Incorrect Rubber selection 2) Variation in Rubber weight 3) Weighing Machine Error.
80 80
Page 10 of 29
PROCESS FLOWPart Name / Description : Oil Seal Date (original) : 13.09.2010 Rev No : 00
Drawing / Part no : VOS 193 Revision Date : NIL
Process flow no : BI / PF/ 193 Customer Ref. No : BSE 0300B - WK 30.14(B)
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
Customer Ref. No : BSE 0300B - WK 30.14(B)
Core Team : Production / Quality / Marketing (CFT)
90.Moulding _
100. Finishing Apperance _
110. Trimming _
120. Final Inspection _
Visual. _
140. Packing & Labelling Part No & Qty. _
1)Curing Temperature Variation 2) Pressure Variation 3)Time Variation 4) Visual Defects like Short fill , Poor flow, tearing , stripping, Bad mould, Under cure , foreign matter , Bad shell , Bond failure , Dent
1.Appearance. 2.Temperature. 3.Time. 4.Pressure.
1) Uneven Flash removal, Tearing., 2) Poor Finishing 3) Tool bit wear out 1) Trimming Needle wear out 2) Uneven location of seal in Trimming machine 3) Incorrect Trimming / I.D. Dimension variation
1) After trimming , Ensure Id thro ID checking Gauge. ID: 29.00 ± 0.25
1) Dimension Variation 2) Short fill , Poor flow, tearing , stripping, Bad mould, Under cure , foreign matter , Bad shell , Bond failure , Dent .
1) O.D. : 47.78 / 47.93 mm 2) I.D. : 28.75 ± 0.25 mm 3) Height : 8.00 ± 0.20 4) Free from visual defects like Short fill , Poor flow, tearing , stripping, Bad mould, Under cure , foreign matter , Bad shell , Bond failure , Dent .
130. Spring Fitment (Spring with oil seal)
1) Wrong Spring selection 2) spring open out while fitment with seal
1) Quantity Variation 2) Incorrect packing media. 3)Product Mixup
130
70.
70. 90
100
110
140
120
CONTROL PLANPrototype Pre-launch Production
Control plan Number : BI / CP/193 Key Contact / Phone : Date (original) : 13.09.2010Revision Date : NILRev No : 00Part Name / Description : Oil Seal Core Team : PRODUCTION ,QUALITY, MARKETING Customer Eng. Approval / Date : N/ADrawing / Part no : VOS 193 Engineering change level : Nil. Customer Quality approval / Date : N/ASupplier Code : Supplier / Plant approval / Date : Other Approval Date ( If required ) : Plant / Location :
Characteristics Methods
Resp.No Product Process Size Frequency Control methods
10.A. Digi Vernier Dimension _ Nil Each lot
10. B. Dimension Nil Each lot
10.C. Material Grade Nil Each lot
20 Material Grade Nil Each lot Store
30 Weight of the ingredients Nil Every Batch
40 Two Roll Mill. Rubber Compound Mixing Time As per Milling procedure. Nil Every Batch
50.A. Hardness _ Hardness : 70 ± 5 shore A Nil Every Batch Testing Records.
50.B. Densimeter. Specificgravity _ 1.20 ~ 1.25 Densimeter Nil Every Batch Testing Records.
50.C. a.Tensile Strength _ Minimum 12.5 N/mm² Nil Testing Records.
50.D. Ultimate Elongation _ Minimum 250 % Nil Testing Records.
Part / Process Numbe
r
Process Name/Operation Description
Machine,Device,Jigs,Tools
for Mfg
Spercial
Char. Class
Reaction Plan /
Corrective action
Product/Process Spercification / tolerance
Evaluation / Measureme
nt Technique
Error Proofi
ng
10. A. Incoming Inspn. Of Raw Material. (Shell)
1. I.D. : Ø 44.10 ± 0.10 mm 2. P.D. : Ø 35.50 ± 0.15 mm 3. HT. : 6.35 ± 0.10 mm 4. ST :0.91 MATERIAL : CRCS IS 513 - 1994
Digimatic Vernier
caliper, Dial Indicator ,
Micrometer.
As Per sampling
PlanIncoming
Inspection ReportReject the RM
Store & QC
10. B. Incoming Inspn. Of Raw Material. (Spring)
Digi Vernier & Scale
1. Spring Length : 103.00 mm 2. Coil Dia : Ø 1.58 mm 3. Wire Dia : Ø 0.30 mm MATERIAL : GI IS 4454 - 2001 PART1
Digimatic Vernier caliper,
Steel Scale.
As per sampling
planIncoming
Inspection ReportReject the RM
Store & QC
10.C. Incoming Inspection of Chemicals & Raw Rubber
Ensure Chemical Grade Number, Weight, Quantity with respect to D.C.
Visual check
Every time
Supplier Test Report
Reject the RM
Store & QC
20.Storage of Raw Material
1.Correct Grade of material 2.Correct specification/size of material
Visual check
Every time
Visual check , stock Record.
Reject the RM
30.Weighing of Mix Ingredients
Weighing Machine
As per mixing weight chart.
Weigh Machine
Read out.Every time
Receipe Check List
Stop & Correct
the process.
Milling Section
40. Rubber Mixing
Visual check
Every time
As per Milling procedure.
Stop & Correct
the process.
Milling Section
50. Compound testing A)Hardness
Hardness Tester
Hardness Tester
One sample
Stop & Correct
the process.
Lab Assistant
50. Compound testing B)Specific Gravity
One sample
Stop & Correct
the process.
Lab Assistant
Compound testing C)Tensile Strength
UTM(Universal Testing Machine)
UTM(Universal Testing Machine)
Two Sample
15 days once.
Stop & Correct
the process.
Lab Assistant
Compound testing E) Ultimate Elongation
UTM(Universal Testing Machine)
UTM(Universal Testing Machine)
Two Sample
15 days once.
Stop & Correct
the process.
Lab Assistant
CONTROL PLANPrototype Pre-launch Production
Control plan Number : BI / CP/193 Key Contact / Phone : Date (original) : 13.09.2010Revision Date : NILRev No : 00Part Name / Description : Oil Seal Core Team : PRODUCTION ,QUALITY, MARKETING Customer Eng. Approval / Date : N/ADrawing / Part no : VOS 193 Engineering change level : Nil. Customer Quality approval / Date : N/ASupplier Code : Supplier / Plant approval / Date : Other Approval Date ( If required ) : Plant / Location :
Characteristics Methods
Resp.No Product Process Size Frequency Control methods
Part / Process Numbe
r
Process Name/Operation Description
Machine,Device,Jigs,Tools
for Mfg
Spercial
Char. Class
Reaction Plan /
Corrective action
Product/Process Spercification / tolerance
Evaluation / Measureme
nt Technique
Error Proofi
ng
60 60. Extrusion Blank Shape. Extrusion Time. Nil Every Batch Visual check
70 70. Dipping Cleaning Chemical Process Temperature. As per Work Instruction Nil Every Day
Cleaning Chemical Process Time As per Work Instruction Nil Every Day _
Drying Section Dryer Drying Temperature As per Work Instruction _ Nil _ Every lot Visual check _
Drying Section Dryer Drying Time As per Work Instruction _ Nil _ Every lot Visual check _
Dipping
Hydrometer
_ As per Work Instruction Hydrometer Nil Every Day Testing Records.
80 Rubber Blank. _ As per Loading Chart Nil Random Every Batch Visual check
90 90.Moulding 90 Appearance Visual Nil Random Every Lift
Temperature 170°c ± 5°c Pyrometer Nil 2 Times Every Shift
Curing Time 3.5 mins Nil Every Lift Every Lift
Pressure. 1500psi - 2000psi Nil Every Lift Every Lift
Oilseal _ Nil Each sizes QC
Extruder & Die
Uniformity of Rubber blank.
Visual check
Every time
Stop & Correct
the process.
Extrusion operator.
Temperature Controller. Thermomet
erSampling
PlanProcess Condition
Record FR/DPC/27a
Stop & Correct
the process.
Dipping Section
Cleaning Process
Timer Controller Time
IndicatorSampling
PlanProcess Condition
Record FR/DPC/27a
Dipping Section
Temperature Controller. Dipping
Section
Timer Controller
Dipping Section
Dipping Solution - Specificgravity.
Sampling Plan
Stop & Correct
the process.
Dipping Section
80. Rubber Cutting
Weighing Machine
Digital Read out of
Weighing Machine.
Stop & Correct
the process.
Rubber Cutting Section.
Hydraulic Press Cavity
& Tools
Part should be free from Short fill , Poor flow, tearing , stripping, Bad moulding, Under cure , foreign matter , Bad shell , Bond failure , Dent
In patrol Inspection
Report.
Stop & Correct
the process.
QC - Patrol
Inspector.
Temperature Controller.
In patrol Inspection
Report.
Stop & Correct
the process.
QC - Patrol
Inspector.
Timer Controller
Time Indicator
In patrol Inspection
Report.
Pressure Gauge
Pressuer Indicator
In patrol Inspection
Report.
Seal Dimension
1) O.D. : 47.78 / 47.93 mm 2) I.D. : 28.75 ± 0.25 mm 3) Height : 8.00 ± 0.20 4) Free from visual defects like Short fill , Poor flow, tearing , stripping, Bad mould, Under cure , foreign matter , Bad shell , Bond failure , Dent .
Digimatic Vernier caliper.
First off (Every setting)
In First-off Approval Record
(FR/FAM/29b)
Stop & Correct
the process.
CONTROL PLANPrototype Pre-launch Production
Control plan Number : BI / CP/193 Key Contact / Phone : Date (original) : 13.09.2010Revision Date : NILRev No : 00Part Name / Description : Oil Seal Core Team : PRODUCTION ,QUALITY, MARKETING Customer Eng. Approval / Date : N/ADrawing / Part no : VOS 193 Engineering change level : Nil. Customer Quality approval / Date : N/ASupplier Code : Supplier / Plant approval / Date : Other Approval Date ( If required ) : Plant / Location :
Characteristics Methods
Resp.No Product Process Size Frequency Control methods
Part / Process Numbe
r
Process Name/Operation Description
Machine,Device,Jigs,Tools
for Mfg
Spercial
Char. Class
Reaction Plan /
Corrective action
Product/Process Spercification / tolerance
Evaluation / Measureme
nt Technique
Error Proofi
ng
100 100. Finishing Visual As per Work Instruction Nil Random Each lot Visual check
110 110. Trimming ID Dimension I.D. Gauge Nil Each lot
120 Nil Each lot QC
Finishing Motor,
Mandrel & Emery sheet.
Visual check
Stop & Correct
the process.
Finishing Section
Trimming Machine
1) After trimming , Ensure Id thro ID checking Gauge. ID: 29.00 ± 0.25
First off (Every setting)
In First-off Approval Record
(FR/FAT/29a)
Stop & Correct
the process.
Trimming Section
120. Final Inspection
Gauge, Digi.vernier & ID plug
Gauge
1. Visual 2. Dimension.
1) O.D. : 47.78 / 47.93 mm 2) I.D. : 28.75 ± 0.25 mm 3) Height : 8.00 ± 0.20 4) Free from visual defects like Short fill , Poor flow, tearing , stripping, Bad mould, Under cure , foreign matter , Bad shell , Bond failure , Dent .
Digimatic Vernier caliper.
As per Sampling Plan. 2) 100% Visual Inpection.
Final Inspection Report.
Reject the
Material.
PROCESS FMEAPart Name / Description : Oil Seal Drawing / Part no : VOS 193 Date(Orijnal): 13.9.2010 Model Year / Vehicle(s) : FMEA Number : BI / FMEA / 193 Revision Date : NILCustomer Ref. No : BSE 0300B - WK 30.14(B) Core Team : QUALITY,MARKETING & PRODUCTION. (CFT) Rev no : 00
Potential Failure Mode Det Action Taken Action taken S O D RPN
8 2 2 32
8 2 2 32
8 2 5 80
Product reject . 5 2 3 30
8 2 2 32
40. Rubber Mixing 8 2 2 32
Variation in Rubber Hardness 6 2 2 24
Specific Gravity variation. 6 2 2 24
8 2 UTM Test Result 2 32
Elongation Variation 8 2 UTM Test Result 2 32
Process Function \ Requirements
Potential effects of Failure
Sev
PC Clas
sPot. Cause(s) /
Mechanism of FailureOcc
Current Process Control Detection
RPN
Respty and target /
Comp. Date
10. A. Incoming Inspn. of Raw Material. (Shell)
1.Wrong Specification Material shipped by supplier 2. Visual defects like Rust , Burr, Bend, cutshell, tool mark, Rust, Dent, OD line mark , Pit mark supplied by the Supplier
Product reject and return to the
supplier.
Incorrect material supplied by the
supplier.
1)Incoming Inspection with respect to sampling plan. 2) Incoming Inspection Report( Ref : WI/II/01 - Rev-00)
10. B. Incoming Inspn. Of Raw Material. (Spring)
1.Wrong Specification Material shipped by supplier 2. Visual defects like Bend, Rust , Burr, peel off supplied by the Supplier
Product reject and return to the
supplier.
Incorrect material supplied by the
supplier.
1)Incoming Inspection with respect to sampling plan. 2) Incoming Inspection Report( Ref : WI/II/01 - Rev-00)
10.C. Incoming Inspection of Chemicals & Raw Rubber
Wrong Specification Material shipped by supplier
Product reject and return to the
supplier.
Incorrect material supplied by the
supplier.1) As per test certificate
20.Storage of Raw Material
1.Wrong Grade Material 2.Wrong Specification/Size Material 3.Defective material
1) Incorrect Method of stacking raw material. 2) Storekeeper product knowledge / less awareness.,
1) Work instruction displayed 2)Skill Matrix & Training for concern person /operator ( Ref : WI/SI/13 - Rev-00)
30.Weighing of Mix Ingredients
1.Incorrect ingredients weight 2.Incorrect chemical selection. 3. Life time of ingredients 4.Ingredients missed out
Performance get reduced &
Difficult to meet customer
requirement
1.Sequence of material pick - up not
followed.1)Weight Machine
1. Hardness variation 2. Poor Dispersion 3.Temperature variation of coolant circulation in roll mill.
Performance get reduced &
Difficult to meet customer
requirement
1. Inadequate mixing time.
2.Excess mixing time.
1)Harddness testing method 2)visual
50. Compound testing A)Hardness
Performance get reduced
1. Inadequate mixing time.
2.Excess mixing time.
Hardness tester Indicator
50. Compound testing B)Specific Gravity
Performance get reduced
Sequence of material added not followed.
Densimeter output values/ Testing
results
50. Compound testing C)Tensile Strength
a.Tensile Strength Variation Performance get reduced
1.Inadequate mixing time.
2.Excess mixing time.
50.Compound testing D) Ultimate Elongation
Performance get reduced
1.Inadequate mixing time.
2.Excess mixing time.
PROCESS FMEAPart Name / Description : Oil Seal Drawing / Part no : VOS 193 Date(Orijnal): 13.9.2010 Model Year / Vehicle(s) : FMEA Number : BI / FMEA / 193 Revision Date : NILCustomer Ref. No : BSE 0300B - WK 30.14(B) Core Team : QUALITY,MARKETING & PRODUCTION. (CFT) Rev no : 00
Potential Failure Mode Det Action Taken Action taken S O D RPNProcess Function \ Requirements
Potential effects of Failure
Sev
PC Clas
sPot. Cause(s) /
Mechanism of FailureOcc
Current Process Control Detection
RPN
Respty and target /
Comp. Date
60. Extrusion Over cure of Rubber compound. 8 2 2 32
70. Dipping 8 2 2 32
80. Rubber Cutting Product Rejection 5 2 2 20
90.Moulding Product Rejection 8 3 2 48
100. Finishing Product Rejection 7 2 Visual 2 28
110. Trimming Product Rejection 8 2 2 32
1. Incorrect Inspection 8 2 2 32
8 2 2 32
6 2
_
2 24
NOTE:A Typer- Detect on failur HIC- High impact characteristics FC-Functional charactisticsB Typer- Detect on failure cauBP- Blue print IP - Inprocess product characteristicsC Typer -Prevent on failure cauES- Engineering spercification
Operable at reduced level of
performance.
1. Not feed the material
continuously. 2.Problem in water circulation.
1) Periodic checking of water circulation. 2) visual1) In correct/ Excess bonding layer in
shell 2) Rust / Surface defects in shell 3) Process Temperature variation 4) Process Time variation. 5)Dipping Procedure Variation. 6)Life time of dipping chemicals.
1) Bond failure 2)Curing process may delay
Process not followed as per Work Instruction.
1)Testing Method 2) Work Instruction Displayed. ( Ref : WI/DI/02 - Rev-00)
1) Incorrect Rubber selection 2) Variation in Rubber weight
Manual cutting of Rubber blank.
Digital Read out of weigh Machine
1) Visual Defects like Short fill , Poor flow, tearing , stripping, Under cure , foreign matter , Bad shell , Bond failure , Dent, Badmoulding.
1. Hydraulic pressure , Curing Time , Temperature variation (Heater Problem ). 2.Lack of cavity cleaning
Patrol Inspection Record.
1) Uneven Flash removal, Tearing., 2) Poor Finishing
1. Improper Finishing. 2. Incorrect
selection of Tool.
1) Trimming Needle wear out 2) Incorrect Trimming / I.D. Dimension variation
Improper trimming and Improper tool Finishing.
In First-off Approval Record (FR/FAT/29a)
120. Final Inspection
Performance get reduced /
Fitment problem to the End User.
Inadequate Visual Aids and defect
samples.
1) Final Inspection Report 2) 100% Visual Inspection ( Ref :
130. Spring Fitment (Spring with oil seal)
1) Wrong Spring selection 2) spring open out while fitment with seal
Performance get reduced /
Fitment problem to the End User.
Due to carelessness of the operator.
1) I.D. Checking Gauge available.,.
140. Packing & Labelling
1) Quantity Variation 2) Incorrect packing media. 3)Product Mixup
Customer dissatisfaction.
1. Similar Parts placed at near by location or same location. 2. Counting Error.
STATISTICAL PROCESS CONTROL STUDY PART NAME: Oilseal INSTRUMENT: Digi.vernier L.COUNT: 0.01 mm
DATE: 15.09.10 PART NO.: VOS 193 SPEC: 29.00 ± 0.25 MACHINE: Trimming Machine SAMPLE SIZE: 50 PARAMETER: INNER DIAMETER NO.OF DECIMALS: 2DATA COLLECTION: -
S. NO. 1 2 3 4 5 6 7 8 9 10
U.T.L. 41.25SAMPLE D2 A2 D4
1 28.94 29.02 29.08 29.04 29.05 29.02 29.06 29.12 29.02 29.06 1 1.123 2.560 3.270
2 28.96 29.03 29.06 29.04 29.06 29.04 29.05 29.08 29.04 29.04 2 1.128 1.880 3.270
3 28.96 29.02 29.04 29.02 29.04 29.05 29.06 29.10 29.02 29.01
L.T.L. 40.753 1.693 1.020 2.570
4 28.92 29.04 29.06 29.04 29.06 29.03 29.04 29.12 29.05 29.04 4 2.059 0.730 2.230
5 28.94 29.02 29.05 29.05 29.06 29.05 29.04 29.10 29.04 29.05 5 2.326 0.590 2.110CALCULATIONS: -FOR HISTOGRAM
28.96 29.04 29.08 29.05 29.06 29.05 29.06 29.12 29.05 29.06 Xmax.= 29.1200 NO.OF NON CONFORMING PART = 50 NOS.
28.92 29.02 29.04 29.02 29.04 29.02 29.04 29.08 29.02 29.01 Xmin.= 28.9200 RANGE 0.04 0.02 0.04 0.03 0.02 0.03 0.02 0.04 0.03 0.05 R-BAR = 0.03200 NO. OF PARTS ABOVE U.T.L. = 0 NOS. AVG. 28.94 29.03 29.06 29.04 29.05 29.04 29.05 29.10 29.03 29.04 X-BAR = 29.0386 NO. OF PARTS BELOW L.T.L. = 50 NOS. Process Width ( P ) = 0.2000 Specification Width(S) = 0.5000 Index (K)={2 x (D-XBAR) / S}= 47.8456 INTERVAL FREQ. CU. FREQ.
Design Centre ( D ) = 41.0000 Interval = 0.0400 Selecting no. of classes = 5 28.8000 28.8400 0 0 Starting Point = 28.9200 No. of readings= 50.0000 Shift Of 'X-BAR' from 'D' = 11.9614 28.8400 28.8800 0 0
28.8800 28.9200 0 0
28.9200 28.9600 1 1
28.9600 29.0000 4 5
29.0000 29.0400 0 5
29.0400 29.0800 23 28
29.0800 29.1200 18 46
29.1200 29.1600 4 50
29.1600 29.2000 0 50
29.2000 29.2400 0 50
29.2400 29.2800 0 50
29.05748
29.01972
0.0675200000000001
0
0.039952.08600
REMARKS : PROCESS IS EXCELLENT Ppk=Min(PPL,PPU)= -97.71847
XLARGE
XSMALL
U.C.L.XBAR =
L.C.L.XBAR =
U.C.L.RBAR =
L.C.L.RBAR =
Std.Dev."s"=Pp=(S/6s)=
29 29 29 29 29 29 29 29 29 29 29 29
29 29 29 29 29 29 29 29 29 29 29 29
0
5
10
15
20
25 HISTOGRAM
DIMENSION
FREQ
.
1 2 3 4 5 6 7 8 9 100.000.010.020.030.040.050.060.070.08 R- CHART
RANGEU.C.L.L.C.LR-BAR
1 2 3 4 5 6 7 8 9 1028.85
28.90
28.95
29.00
29.05
29.10
29.15 X-CHARTAVG.U.C.L.L.C.L.X-BAR
SAMPLE
VALU
E
Gauge Repeatability & Reproducibility StudyAPPRAISER/ PART VOS 193 AVERAGETRIAL # 1 2 3 4 5 6 7 8 9 101(A) 1 29.02 28.94 29.12 29.08 29.06 29.12 29.02 28.96 29.14 29.04 29.0502 2 29.03 28.95 29.13 29.09 29.07 29.11 29.02 28.97 29.15 29.03 29.0553 3 29.02 28.95 29.13 29.08 29.07 29.11 29.02 28.96 29.15 29.04 29.053 Average 29.023 28.947 29.127 29.083 29.067 29.113 29.020 28.963 29.147 29.037 Xabar = 29.05Range 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.01 0.01 0.01 Rabar = 0.01
4(B) 1 29.02 28.94 29.12 29.08 29.06 29.12 29.02 28.96 29.14 29.04 29.050
5 2 29.02 28.93 29.13 29.07 29.06 29.11 29.03 28.97 29.14 29.03 29.049
6 3 29.03 28.94 29.13 29.08 29.07 29.11 29.02 28.96 29.15 29.04 29.053
Average 29.023 28.937 29.127 29.077 29.063 29.113 29.023 28.963 29.143 29.037 Xbbar = 29.0507
7 Range 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Rbbar = 0.010
7 (C) 1 29.02 28.94 29.12 29.09 29.06 29.12 29.02 28.96 29.14 29.04 29.051
78 2 29.02 28.93 29.12 29.08 29.06 29.12 29.03 28.96 29.14 29.04 29.050
9 3 29.03 28.94 29.13 29.08 29.07 29.11 29.02 28.97 29.15 29.05 29.055
Average 29.023 28.937 29.123 29.083 29.063 29.117 29.023 28.963 29.143 29.043 Xcbar = 29.0520
Range 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Rcbar = 0.010
16 Part Xdbar = 29.0518
Average(Xp) 29.023 28.940 29.126 29.081 29.064 29.114 29.022 28.963 29.144 29.039 Rp= 0.2
17 [Ra = 0.009 ]+[Rb= 0.010 ] + [Rc= 0.010 } / {# OF APPRAISERS =3] = Rdbar = 0.01
18 [MAX X= 29.0527 ]-[MIN X= 29.0507 0.0020
19 [ R = 0.010 UCLr = 0.0249
20 [ R = 0.010 LCLr = 0.000NOTE:- * D4=3.27 for 2 trials and 2.58 for 3trials, D3= 0 for up to 7 trials Uclr represents the limit of UCLx = 29.0617 indvidual R's. Circle those that are beyond this limit. Identify the cause and correct. Repeat LCLx = 29.0419 these readings using the same appraiser and unit as originally used or discard values and re-average and recompute R and the limiting value from the remaining observations. APPRAISER ( a ) ---- P.PAGIYA LAKSHMIAPPRAISER ( b ) ---- M.VIGNESHAPPRAISER ( c ) ---- A.SARAVANAN
ANALYSIS OF R(bar) CHART :
No. of Points outside UCLr = 0
% of Points outside UCLr = 0 %
As the Range chart is in control, so we can proceed forthe Average chart (Xbar).
ANALYSIS OF X(bar) CHART :
No. of Points outside UCLx = 15No. of Points outside LCLx = 14Total Points outside UCL & LCL = 29
% of Points outside UCLx & LCLx = 96.7
As this % is greater than 50% , the Measurement system is adequate to detect part to part variation
] XDIFF
]x[D4*=2.58] = UCLR
]x[D3*=0.00] = LCLR
a a a a a b b b b b b C C C C28.800
28.850
28.900
28.950
29.000
29.050
29.100
29.150
29.200
X(BAR) CHART
UCLx
LCLx
X(bar)
0 5 10 15 20 25 30 350.000
0.005
0.010
0.015
0.020
0.025
0.030
RANGE CHART
UCLr
LCLr
R(bar)
MEASUREMENT SYSTEM ANALYSIS
Part Name- OILSEAL Gage Name: VERNIER Date - 13.09.2010Identification No.:- 561311009
Specs. - 41.00 ± 0.25From data sheet :Rdbar = 0.010 0.0020 Rp = 0.204
Measurement Unit Analysis % Total Variation (TV)
Repeatability - Equipment Variation (EV).= 8.84 %
.= 0.006 Trials K12 0.88623 0.5908
Reproducibility - Appraiser Variation (AV)100[AV/TV]
.= 1.6 %.= 0.0010
n=number of parts Appraisers 2 3r=number of trials K2 0.7071 0.5231Repeatability & Reproducibility (R&R)
R & R = .= 8.99 %
.= 0.006 Parts K32 0.7071
Part Variation (PV) 3 0.52314 0.4467
.= 0.064 5 0.4030 .= 99.6 %6 0.37427 0.35348 0.3375
Total Variation (TV) 9 0.3249 ndc = 1.41(PV/R&R) TV = 10 0.3146 .= 12.6 ~ 13
.= 0.065
Note:-
Under 10% error - the measurement system is acceptable.10% to 30% error - may be acceptable based upon importance of application, cost of gauge,cost of repairs,etc.Over 30% error - measurement system needs improvement. Make every effort to identify the problems and have them corrected.
(Refer MSA Manual - Third Edition)
Characteristics:- ID
XDIEFFbar =
% EV = 100 [EV/TV] EV = Rdbar x K1
% AV = AV = [(XDIEFF x K2)2 - (EV2/nr)]
% R&R = 100[R&R/TV](EV2+AV2)
PV=Rp x K3 % PV = 100[PV/TV]
(R&R2+PV2)
1. All calculations are based upon predicting 5.15 sigma (99%of the area under the normal distribution curve).
2. AV- If a negative value is calculated under the square root sign, AV defaults to zero(0).
3. Guidelines for acceptance of gage repeatability and reproducibility (%R&R) are.
4. ndc is truncated to the integer & ought to be greater than or equal to 5.
Suppliers Name
List of checking Aids Date: 13.09.10
Part No.:VOS 193 Customer :
Part namOILSEAL
Rev. No.: 0Sl. Characteristic / Gauge / Instrument Gauge Availabile Calibration No Description Description Least Count Drg. of gauge / frequency/agency
Rev. No. Instrument1 OUTER DIAMETER 0.01 mm 561311009 6Months
2 INNER DIAMETER Plug Gauge BI / PG / 151 1Year
3 HEIGHT 0.01 mm QA 1Year & 6Months
4 SPRING LENGTH STEEL SCALE 1.0 mm BSS 01 1Year
PREPARED BY : APPROVED BY:
DIGITAL VERNIER CALIPER
DIAL INDICATOR / DIGITAL VERNIER
CALIPER
BI / DI / 01 /
561311009
frequency/agency
TO Date: Description: Oil Seal
Our Ref: VOS 193Dimension: 48*30*8Hardness: 70 +/- 5 Shore ASample size: Qty:
DIMENSIONAL INSPECTION
Sl.NO Description Method Specification Observation in mmOf Max Min
Checking mm mm 1 2 3 4 5
1) Outer Dia Digi.Vernier 47.93 47.78 47.89 47.84 47.82 47.81 47.85
47.91 47.92 47.86 47.88 47.82
2) Inner Dia Gauge 29.00 28.50 ok ok ok ok ok(with spring)
ok ok ok ok ok
3) Height Digi.Vernier 8.20 7.80 7.94 8.06 7.92 8.00 8.04
8.04 8.08 7.98 8.04 8.08
OK OK OK OK OK4) Visual
Conclusion:Accepted Rejected Con.Accept
P
Inspected By: Approved By:
INSPECTION REPORTCustomer Ref: BSE 0300B - WK 30.14(B)
Feb2009 CFG-1001
Part Submission Warrant
Part Name Cust. Part Num
Shown on Drawing No. Org. Part Numb
Engineering Change Level Dated
Additional Engineering Changes --- Dated ---
Safety and/or Government Regulation Purchase Order No. Weight (kg)
Checking Aid No. Checking Aid Engineering Change Level N/A Dated N/AORGANISATION MANUFACTURING INFORMATION CUSTOMER SUBMITTAL INFORMATION
Customer Name/Division
Street Address Buyer/Buyer Code
\ Region Postal Code Country Application RUBBER MOULDING
Has Customer-required Substances of Concern information been reported?
Submitted by IMDS or other customer format :
Are polymeric parts identified with appropriate ISO marking codes?REASON FOR SUBMISSION ( Check at least one )
Initial submission Change to Optional Construction or MaterialEngineering Change (s) Sub-Supplier or Material Source ChangeTooling: Transfer, Replacement, Refurbishment, or additional Change in Part ProcessingCorrection of Discrepancy Parts produced at Additional LocationTooling Inactive > than 1 year Other - please specify below
REQUESTED SUBMISSION LEVEL (Check one)Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.Level 2 - Warrant with product samples and limited supporting data submitted to customer.Level 3 - Warrant with product samples and complete supporting data submitted to customer.Level 4 - Warrant and other requirements as defined by customer.Level 5 - Warrant with product samples and complete supporting data reviewed at organisation's manufacturing location.
SUBMISSION RESULTSThe results for dimensional measurements material and functional tests appearance criteria statistical process packageThese results meet all design record requirements: (If "NO" - Explanation Required)Mold / Cavity / Production ProcessDECLARATIONI affirm that the samples represented by this warrant are representative of our parts which where made by a process that meets all production part
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below.EXPLANATION/COMMENTS:
Is each Customer Tool properly tagged and numbered?
Organisation Authorised Signature Date
Print Name: Phone No. FAX No.
Title E-mail
FOR CUSTOMER USE ONLY (IF APPLICABLE)PPAP Warrant Disposition:
Customer Signature DatePrint Name Customer Tracking Number ( Optional )
Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate of _2800 / __8___ hours.
YES NO
Approved Rejected Other
Yes No
Yes No n/a
Yes No n/a
Yes No n/a
Page 24 of 29
PROCESS FLOW
Part Name : " INSERT " Rev No :
Part Number : SI/RF/MECH : 1469 Date origin : 03.01.08 Revision Date :
Process Sheet : 01 Process flow no : GAJ 01 Department :TOOLROOM.
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
20.Storage of Raw Material
30.Strip Shearing of sheets
40. Shell forming & Piercing
50.Facing
60.Deburring Free from burr
10. Incoming Inspn. Of Raw Material. ( Material - IS 513 Grade 'DD' )
1.Wrong Specification Material shipped by supplier 2.Rusted/Pitted Material supplied by the Supplier 3.Incorrect Thickness supplied by the supplier 4. Wrong report attache
1.Correct Specification of RM 2.Rust/Pit mark free material 3.Correct Report with every consignment
1.Inspector training for intrepretation of report. 2.Operator knowledge on Rust/ Pit mark material identification,while unloading the material
1.Wrong Grade Material 2.Wrong Specification/Size Material 3.Rust/Pit mark observed material
1.Correct Grade of material 2.Correct specification/size of material 3.Rust prevention of material
1.Moisture/Acid content in Storage Area 2.Application of Rust prevention on the material surface 2.Operator knowledge on identifying / storage of Raw Material 3.Material Handling methodology / Equipment 4.Duration of storage
1.Incorrect Size (Thickness,Width & Length) of Material 2.Wrong Grade Raw Material
1.Length:1250±3.0 2.Width:70.0 ±0.50 3.Thick ness: 0.60 4.Appearance:Free from burr, bend,twist,tool mark&cut blank.
1.Operator knowledge on Parameter setting on shearing machine 2.Operator knowledge on identifying the correct Raw Material to be fed
3.Cleanliness and condition of Shearing machine 4.Capacity of the machine
Forming locator is offset to punch profile.
1.Outer dia-1:Ø 54.00 ± 0.20 2.Outer dia-2: ø48.00±0.20
Forming locator symmetrical to punch profile.
Carriage stopper length variation & tool performance.
1.Height Face:7.80 ± 0.10
Maintain stopper distance&tool bit performance.
Improper butting & belt grinder m/cbelt performance
Proper butting&maintainbelt grinding M/C belt performance.
10
30
20
40
50
60
Page 25 of 29
PROCESS FLOW
Part Name : " INSERT " Rev No :
Part Number : SI/RF/MECH : 1469 Date origin : 03.01.08 Revision Date :
Process Sheet : 01 Process flow no : GAJ 01 Department :TOOLROOM.
Op. / Brief Desc. Incoming Sources of Variations Process Flow Diagram Product Characteristics Process Characteristics
70. Patrol Inspection
4.Lighting in Inspection Area
90. 100% Visual Final Inspection
100.Packaging & Labelling
110.Despatch to customer 1.Wrong Label / Part Correct shipment of Part / Invoice / DC
1.Accept Good Part 2.Reject Bad Part
1.Operator skill 2.Operator knowledge on disposition methodology 3.Operator vision Capability
80.Storage after pressing (in Bins) in station / Inventroy Area
1.Parts with Pitmark/Rust 2.Damaged Parts 3.Parts with out proper identification
1.No Pit mark/Rust on parts 2.No Damages on parts 3.Correct identification with complete details
1.Operator knowledge on stacking methodology of parts in Bin 2.Bin cleanliness 3.Selection of storage Bins 4.Quantity stacked 5.Duration of storage of P
1.Thick ness:0.60±0.10 2.Material specification:IS:513 GRADE"DD" 3.Outer dia-1:Ø 54.00 ± 0.20 4.Outer dia-2: ø48.00±0.20 5.Height Face:7.80 ± 0.10 6.Appearance: Free from burr,bend,cutting taper,rust,blow holes&scratches.
1.Operator skill 2.Operator knowledge on disposition methodology 3.Operator vision Capability 4.Operator knowledge on keeping the material with identification
1.Quantity in Pack 2.Correct selection of Packing media 3.Attach correct Standard Label
1.Operator knowledge on Pack Quantity / Stacking method
110
70
90
80
100
Page 26 of 29
PROCESS FMEA
Part Name : " INSERT " Part Number : SI/RF/MECH : 1469 FMEA No : GAJ 01
Model Year / Vehicle(s) : Date(Orig ) : 3.01.08 Revision Date :
Prepared by : Core Team : TOOLROOM,QUALITY,MARKETING&PRODUCTION. Process Responsibility:TOOLROOM
Potential Failure Mode Sev Occ RPN S O D RPN
7 1 7 49
7 1 3 21
7 1 7 49
Product reject. 5 2 Proper locator 4 40
50.Facing Height u/s&o/s. Product reject. 5 3 3 45
60.Deburring Burr 6 3 3 54
Rev no :
Process Function \ Requirements
Potential effects of Failure
PC Clas
sPot. Cause(s) /
Mechanism of FailureCurrent Process
Control Prevention
Current Process Control Detection
Det
Rec. Actions
Respty and target /
Comp. Date
Action
taken10. Incoming Inspn. Of Raw Material. ( Material - IS 513 Grade 'DD' )
1.Wrong Specification Material shipped by supplier 2.Rusted/Pitted Material supplied by the Supplier 3.Incorrect Thickness supplied by the supplier
Cust- Difficult to meet production shedule
Delivery not checked asper invoice while unloading
1.Propper incoming inspection of raw material. 2.Inspector training
RM verification against P.O.while offlaoding Visual Inspection of RM Verification of Rust/Pit mark on the surface by random check 20.Storage of Raw
Material1.Wrong Grade Material 2.Wrong Specification/Size Material 3.Rust/Pit mark
Cust- Difficult to meet production shedule
Wrong receipt from supplier Wrong disposition of RM
1.Material size&Grade specifications provided on Rmstorage room.
RM verification during incoming stage Training for Inspectors
Operator knowledge on idnetifying / storage of RM
1.Operator training
Training to operators
1.Material handling methodology/Equipment 2.Duration of RM storage
1.Operator training
WI for RM handling PM of trollys as per schedule 30.Strip Shearing of
sheets1.Incorrect Size (Thickness,Width & Length) of Material 2.Wrong Grade Raw Material
Cust- Silver streaks
Supplier compounding / formulation error / process error
Two sides&opposite sides stopper provided.
A.Visual inspection after pressing of the part
3.Cleanliness and condition of Shearing machine 4.Capacity of the machine
WI for cleaning of De-humidifier WI for cleaning of RM feeding area
40. Shell forming & Piercing
Forming locator is offset to punch profile.
1.Forming tool 2.Machine,method & operator.
Frequency & training.
2.Facing tool,lathe method & operator.
Frequency & training.
Detail work instruction given in pcp
Product reject&rework.
1.Belt grinding m/c belt performance.
Frequency & training.
Maintain belt performance
Page 27 of 29
PROCESS FMEA
Part Name : " INSERT " Part Number : SI/RF/MECH : 1469 FMEA No : GAJ 01
Model Year / Vehicle(s) : Date(Orig ) : 3.01.08 Revision Date :
Prepared by : Core Team : TOOLROOM,QUALITY,MARKETING&PRODUCTION. Process Responsibility:TOOLROOM
Potential Failure Mode Sev Occ RPN S O D RPN
Rev no :
Process Function \ Requirements
Potential effects of Failure
PC Clas
sPot. Cause(s) /
Mechanism of FailureCurrent Process
Control Prevention
Current Process Control Detection
Det
Rec. Actions
Respty and target /
Comp. Date
Action
taken5 3 3 45
7 2 3 42
5 3 4 60
4 3 4 48
Wrong label / Part 6 Stores personnel skill 2 3 36
NOTE:A Typer- Detect on failure HIC- High impact characteristics FC-Functional charactisticsB Typer- Detect on failure causeBP- Blue print IP - Inprocess product characteristics
C Typer -Prevent on failure caus ES- Engineering spercification
70..First & Patrol Inspection
1.Operator skill 2.Operator knowledge on disposition methodology 3.Operator vision capability
Training to operators
Lighting in Inspection Area
Proper lighting near the machine
80..Storage after moulding in Bins in station / Inventory Area
Parts with scratches Damaged Parts
Difficult to meet customer schedule
Operator knowledge on stacking methodology of parts in Bins
Training to operators
1.Bin cleanliness 2.Selection of storage Bins 3.Quantity stacked 4.Duration of storage of Parts
Training to store personnel
90. 100% Visual Final Inspection
Accept bad Part
Difficult to meet customer schedule
1.Operator skill 2.Operator knowledge on disposition methodology 3.Operator vision capability 4.Operator knowledge of Rejection methodology
100%Visual & Gauge check up in final inspection.
Trainign to operators / Inspectors
100.Packaging & Labelling
1.Operator knowledge on Pack Quantity / Stacking method
Training to operators
110.Despatch to customer
Customer dissatisfied
Training to store personnel
Page 28 of 29
CONTROL PLANPrototyper Pre-launch Production
Control plan Number : SI/RF/Mech:1469 Date(Orig.):05.01.08 Rev No : Revision Date :Part Name : " INSERT " Core Team : TOOLROOM,QUALITY,MARKETTING&PRODUCTION. Customer Eng. Approval / Date : N/APart Number : SI/RF/MECH : 1469 Engineering change level : A Customer Quality approval / Date : N/ASupplier Code : 57372 Supplier / Plant approval / Date : Other Approval Date ( If required ) : Plant / Location :Bright, Pondicherry
Characteristics Methods
Resp.No Product Process Size Control methods
10 10.01 Nil Each lot MAT & QA
20 20.01 Visual check Nil Each lot PRD
20.02 Nil HR
20.03 Nil HR
30 30.01 Nil IN-process ins rep PRD
30.02
Visual check Nil PRD
40 40.01 Nil 5 Nos IN-process ins rep
50 50.Facing Center lathe 50.01 Nil 5 Nos IN-process ins rep PRD
60 60.Deburring 60.01 Free from burr Maintain belt performance Free from burr Visual check Nil 5 Nos IN-process ins rep PRD
Key Contact / Phone : Mr.M..MURUGAVEL 09344006009 , 09345202505
Part / Proces
s Numbe
r
Process Name/Operation Description
Machine,Device,Jigs,Too
ls for Mfg
Spercial
Char. Class
Reaction Plan /
Corrective actionProduct/Process
Spercification / toleranceEvaluation /
Measurement Technique
Error Proofin
gFrequenc
y
10. Incoming Inspn. Of Raw Material. ( Material - IS 513 Grade 'DD' )
1.Correct Specification of RM 2.Rust/Pit mark free material
1.Inspector training for interpretation of replort 2.Operator knowledge on repacking methodology after inspcetion 3.Operator skill to use measuring instruments/ gauges
IS513GRADE:DD Length:2500±3.0
Supplier test certificate
As per sampling plan
Visual inspection on raw material. Check as per invoice while unloading
Reject the RM
20.Storage of RM
1.Correct Grade of material 2.Correct
Moisture content in storage area
IS513GRADE:DD
Every time
Operator knowledge on identifying / storage of RM
Correct identification Alloted location
Training to Store personnel
one time
As per training calender
Training Record Skill RecordMaterial handling
methodology / Equipment Duration of storage
WI for material handling & Equipment As per FIFO
Training to Store personnel
one time
As per training calender
Training Record Skill Record
30.Strip Shearing of sheets
Shearing machine
1.Length:1250±3.0 2.Width:70.0 ±0.50 3.Thick ness: 0.60 4.Appearance:Free from burr, bend,twist,tool mark&cut blank.
1.Maintain stopper distance 55.00 mm 2.Operator knowledge on identifying the correct RM to be fed
1.Length:1250±3.0 2.Width:70.0 ±0.50 3.Thick ness: 0.60 4.Appearance:Free from burr, bend,twist,tool mark&cut blank.
Measuring tape Vernier Micrometer.
Each tray
Every time
Stop &correct
3.Cleanliness and condition of Shearing machine 4.Capacity of the machine
Every time
whenever colour changes
Machine capacity record
40. Shell forming & Piercing
Power press&forming&Piercing tool
1.Outer dia-1:Ø 54.00 ± 0.20 2.Outer dia-2: ø48.00±0.20
Forming locator symmetrical to punch profile.
1.Outer dia-1:Ø 54.00 ± 0.20 2.Outer dia-2: ø48.00±0.20
1.Vernier
F.O.S. everyhour
Stop &correct
1.Height Face:7.80 ± 0.10
Propper cariage stopper distance.
1.Height Face:7.80 ± 0.10
Vernier Micrometer. Visual check
Once in hour
Stop &correct
Belt grinder M/C
Once in hour
Stop &correct
Page 29 of 29
CONTROL PLANPrototyper Pre-launch Production
Control plan Number : SI/RF/Mech:1469 Date(Orig.):05.01.08 Rev No : Revision Date :Part Name : " INSERT " Core Team : TOOLROOM,QUALITY,MARKETTING&PRODUCTION. Customer Eng. Approval / Date : N/APart Number : SI/RF/MECH : 1469 Engineering change level : A Customer Quality approval / Date : N/ASupplier Code : 57372 Supplier / Plant approval / Date : Other Approval Date ( If required ) : Plant / Location :Bright, Pondicherry
Characteristics Methods
Resp.No Product Process Size Control methods
Key Contact / Phone : Mr.M..MURUGAVEL 09344006009 , 09345202505
Part / Proces
s Numbe
r
Process Name/Operation Description
Machine,Device,Jigs,Too
ls for Mfg
Spercial
Char. Class
Reaction Plan /
Corrective actionProduct/Process
Spercification / toleranceEvaluation /
Measurement Technique
Error Proofin
gFrequenc
y
70 70.01 As per sample Visual check Nil 3 shots QA
Lighting in Inspection Area Visual check Nil Per shift QA
80 80.01 Training to operator Nil HR
80.02 Visual check Nil STR
90 90.01 Nil 100% Each lot F.I.R. QA
100 100 As per packaging standard Visual check Nil 100% Each lot Visual Inspection STR
110 110 STR
70.First part & Patrol Inspection
1.Accept Good Part 2.Reject Bad Part
1.Operator skill 2.Operator
Initial Once in 2 hrs
First Part Approval Patrol Inspection
Reject the part
Proper lighting in Inspection area
One time
80.Storage after Pressing in Bins in station /
Scratch Damage Warpage
Operator knowledge on stacking methodology of parts in Bins
One time
As per schedule
Training Record Skill Record
Bin Cleanliness Selection of storage Bins Quantity stacked Duration of storage of parts
One time
Every shift
90. 100% Visual Final Inspection
1.Thick ness:0.60±0.10 2.Material specification:IS:513 GRADE"DD" 3.Outer dia-1:Ø 54.00 ± 0.20 4.Outer dia-2: ø48.00±0.20 5.Height Face:7.80 ± 0.10 6.Appearance: Free from burr,bend,cutting taper,rust,blow holes&scratches.
1.Operator skill 2.Operator knowledge on disposition methodology 3.Operator vision capability
1.Thick ness:0.60±0.10 2.Material specification:IS:513 GRADE"DD" 3.Outer dia-1:Ø 54.00 ± 0.20 4.Outer dia-2: ø48.00±0.20 5.Height Face:7.80 ± 0.10 6.Appearance: Free from burr,bend,cutting taper,rust,blow holes&scratches.
Vernier Micrometer. Visual check
Reject the part
100.Packaging & Labelling
Quantity in dunnage Correct selection of dunnage Correct standard label
1.Operator knowledge on Pack Quantity / Stacking method
110.Despatch to customer
Correct shipment of Part / Invoice / DC
Training to store personnel