Lve Roadmap

69
Land Vehicle for Education (LVE) The mission of the Land Vehicle for Education (LVE) family of projects is to design, develop, build, test, and deliver land vehicles with the Modular Student  Attachment (MSA) platform incorporating both the WOCCSE (R12003) radio and SESE (R12006) energy system for use by future freshman mechanical engineering design teams and undergraduate engineering class projects in the KGCOE, beginning fall semester 2013.  All work produced should be in an open ar chitecture open source format, encouraging use of the technologies by others. KGCOE Lower Division Students and Courses KGCOE Upper Division Students and Courses LVE technologies may be used as the subject of simple design tasks, technology demonstrations, or learning exercises by various first and second year courses in the engineering disciplines. LVE technologies may be used as the subject of detailed design projects, or systems integration projects by various courses in the engineering disciplines. Potential Incoming Engineering Freshmen - Ian Frasch Upper Level EE Student - Evan  Andrews Current Freshmen - Fall 2010 FYE Freshmen Survey

Transcript of Lve Roadmap

Page 1: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 1/95

Land Vehicle for Education (LVE)

The mission of the Land Vehicle for Education (LVE) family of projects is todesign, develop, build, test, and deliver land vehicles with the Modular Student

 Attachment (MSA) platform incorporating both the WOCCSE (R12003) radio and

SESE (R12006) energy system for use by future freshman mechanicalengineering design teams and undergraduate engineering class projects in theKGCOE, beginning fall semester 2013.

 All work produced should be in an open architecture open source format,encouraging use of the technologies by others.

Page 2: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 2/95

KGCOE Lower Division Students

and Courses

KGCOE Upper Division Students

and Courses

LVE technologies may be used asthe subject of simple design tasks,technology demonstrations, orlearning exercises by various first

and second year courses in theengineering disciplines.

LVE technologies may be used asthe subject of detailed designprojects, or systems integrationprojects by various courses in the

engineering disciplines.

Potential Incoming EngineeringFreshmen - Ian Frasch

Upper Level EE Student - Evan Andrews

Current Freshmen -Fall 2010 FYE Freshmen Survey

Page 3: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 3/95

Page 4: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 4/95

KGCOE MSD Students and Teams KGCOE Engineering Faculty Members

Multi-disciplinary Senior Design Teamsare the primary target users for LVEprojects. These teams will incorporateLVE subsystems into their future design

projects.

The Faculty of the KGCOE deliver allcourses in the college, and the LVEprojects must produce technologyartifacts that can be used for a variety of

engineering education purposes.

Item alpha Ed Hensel

Item beta Item Baker  Item delta Item CharlieItem gamma Item DogItem iota Item Echo

Page 5: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 5/95

Page 6: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 6/95

KGCOE Staff Members

The Staff of the KGCOE will be essentialto implement and support the LVEprojects after the MSD students graduate.When LVE technologies are incorporated

into lower division courses and projects,staff will play an important role intechnolo su ort.Item Apple

Item BananaItem CherryItem DateItem Elderberry

Page 7: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 7/95

Page 8: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 8/95

UseCase 1 First Stakeholder Scenario(timeunits) (units1) (units2) (units3) (units4)Time (hrs) 1 LVE 6 LVE 30 LVE

0 0 0 00.25 10 20 50

0.5 20 40 1000.75 30 60 100

1 40 80 1001.25 50 100.00 100

1.5 60 100.00 100

1.75 70 100.00 1002 80 100.00 100

2.25 90 100.00 1002.5 100 100.00 100

0

20

40

60

80

100

120

0 0.5 1 1.5 2 2.5 3

   S   a   t   i   s    f   a   c   t   i   o   n  -   % 

Battery Life - hrs

Life of Battery

1 LVE

6 LVE

30 LVE

Page 9: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 9/95

Use Case 2 Second Stakeholder Scenario(timeunits) (units1) (units2) (units3) (units4)Time Field House Clark Gym Xerox Aud. Classroom

0 0 0 0 07.5 10 16.6666667 20 5015 20 33.3333333 40 100

22.5 30 50 60 10030 40 66.6666667 80 100

37.5 50 83.3333333 100 10045 60 100 100 100

52.5 70 100 100 10060 80 100 100 100

67.5 90 100 100 10075 100 100 100 100

0

20

40

60

80

100

120

0 10 20 30 40 50 60 70 80

   S   a   t   i   s    f   a   c   t   i   o   n  -   % 

Range - m

Operational Range

Field House

Clark Gym

Xerox Aud.

Classroom

 

Page 10: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 10/95

Use Case 3 Third Stakeholder Scenario(timeunits) (units1) (units2) (units3) (units4)Time Attribute A Attribute B Attribute C Attribute D

0 0 10 0 10.1 1 9 0.02 0.980.2 2 8 0.08 0.920.3 3 7 0.18 0.820.4 4 6 0.32 0.680.5 5 5 0.5 0.50.6 6 4 0.72 0.28

0.7 7 3 0.98 0.020.8 8 2 1.28 -0.280.9 9 1 1.62 -0.62

1 10 0 2 -1

-2

0

2

4

6

8

10

12

0 0.2 0.4 0.6 0.8 1 1.2

   A   x   i   s   T   i   t    l   e

Axis Title

Use Case 3

Attribute A

Attribute B

Attribute C

Attribute D

Page 11: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 11/95

Benchmarks

 A) MSD Team P11211 LVE

B)Dagu Mr. Basic Mobile Robotic Platform

C)DFRobot 4WD Arduino Mobile Platform

(c) E. Hensel and P. Stiebitz Page 11 Confidential - Not for Dis

Page 12: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 12/95

Operation Hardware Design

The LVE will be used by freshmen

in a STEM based competition.

The LVE must be a modular platform

that can support a generic payload andmove that payload easily along apredetermined course.

Should be used by freshmen MEstudents

 Able to carry 1 kg payload

Freshmen should apply STEMknowledge

The platform must be able to carry apayload designed by the freshmen MEstudents

 Able to drive up 15 degree inclineBe able to mount MSA

Must be able to drive on flat smoothsurfaces: tile, carpet, field housefloor and clark gym floor 

The pland for the payload are for it to bea 4 bar linkage

Integrate SESE power storage Powered by SESE technology

Integrate WOCSSE System Must not exceed constraints

Reduce risk of breaking due to drop Use batteries with a lower discharge rate

Must maintain freshmen intrest Greater Battery Output

Communicate using WOCCSEShorter amount of time to rechargebatteries

Will be used in a freshmancompetition

Decrease memory effect in batteries

Long battery life -Lam Battery Pack Easily Removable

Freshmen Probably have somebackground experience withrobotics

MSA interface is multipurpose and easyto use

Programming will be most difficultpart for most freshmen Sustainable designrobot should respond quickly toinputs Aesthetically pleasing

Planned student group size of 4Stable source of power for controls andMSA

Driven along user specified pathStandardized geometric tolerances anddimensionsRobot can accept feedback from MSALVE has MSA Interface

Page 13: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 13/95

Maintenance Future Uses

The LVE must be easy to maintain and

last for many years

The LVE should be modular so that it

can be used for purposes that it was notoriginally designed for.

Vehicles maintained by shop staff The robot may be used for otherapplications at other schools or inindustry

Vehicles stored in ME department To influence other ME deptarments

Low Maintenance and Repair Cost isdesired

Make sure robot can travel across anytype of terrain

Easy to store Surveillance ability

Current chassis should be easy to repair Chemical Detection

Most difficult component to repair is MSAcontrol board

Modular to support extra sensoratachments

Robots should last 10 years with regularmaintenance and a possible overhaul of

the power and controls after 5 years

MSA boards will stack together and theattachments can be easily stored in bins

No current plan for storage of LVEs

Storage availible in ME Dept.

Page 14: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 14/95

Production

The LVE must meet the bidget

requirements and eb ready for launch inFall 2013.

Must be available to Launch in sept 2013

1 robot manufactured for every 3-4students in a 35 person class

 Assembled using primarily in houseprocesses and tools

Reduce the manufacturing cost of thechassis

Ideally the platform would bemanufactured in house

Robot needs to be robust

The current platform can be improvedupon to reduce cost

modularity is good

Biggest problem was budget

The current prototype costs $425 ($500with shipping fees)Goal for budget is $5,000 for the initial

production run

Planned 10 robot platforms with 30MSAs

$60 dollars per chassis

Page 15: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 15/95

0

2

4

6

8

10

12

Pairwise

Comparison:

Place an "R" if the

row is more

important. Place

a "C" if the

column is more

important

Operation Hardware Design Maintenance Future Uses Production Column Total

Ser

Ser

Ser

Ser

Ser

Ser

Ser

Ser

Ser

Ser

Page 16: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 16/95

 Affinity Weights

Pairwise Comparison: Place an

"R" if the row is more important.Place a "C" if the column is more

important OperationHardwareDesign

Maintenance

FutureUses Production Row Total

Operation r r r r   4

Hardware Design c c r   1

Maintenance r c 1

Future Uses c 0

Production 0

Column Total 0 0 1 1 2

(c) E. Hensel and P. Stiebitz Page 16 Confidential - Not for Distribution

Page 17: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 17/95

 Affinity Weights

ColumnTotal

Row +ColumnTotal

RelativeWeight

0 4 40%

0 1 10%

1 2 20%

1 1 10%

2 2 20%

10 100%

(c) E. Hensel and P. Stiebitz Page 17 Confidential - Not for Distribution

Page 18: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 18/95

Affinity Group Name

Customer

Objective

Number Customer Objective Description

1.1 Used by Freshmen

1.2 STEM based competition

1.3 4 students per LVE

1.4 Quickly respond to various inputs

1.5 Recharge between classes

2.1 MSA designed by freshmen

2.2 Robust

2.3 Modular 

2.4 Carry 1kg MSA

2.5 Mount MSA

2.6 Integrate WOCCSE system

2.7 Integrate SESE power system

2.8 2 hr battery life

2.9 Easily removed battery pack

2.10 Sustainable

2.11  Aesthetically pleasing

2.12 Power MSA

3.1 Compact storage

3.2 Easy to repair 

3.3 10 year life

4.1 Surveillance

4.2 Chemical detection

4.3  All-terrain

4.4 Open Source design

5.1 MSA built by freshmen

5.2 Launch Sept. 2013

5.3 10 LVE, 30 MSA

5.4 < $60 per Chassis

Operation

Hardware Design

Maintenance

Future Uses

Production

Page 19: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 19/95

Measure of Effectiveness

Control layout is similar to a video game layout

LVE can traverse a preplanned course

Enough LVEs can be produced with the available budget to divide classes into groups of 4

LVE responds to inputs with no visible delay

LVE reaches full charge in less than an hour 

MSA platform has multiple mounting options to encourage creativity

The LVE is fully funtional when dropeed from a high of 3 feet

Can support extra or different motors, sensors, and controls

LVE Funtions according to all specs with MSA attached

MSA securely attaches to MSA/LVE interface

WOCCES is used for communication

SESE is used for power 

Battery lasts 2 hours under team defined duty cycle

Battery is removed quickly and does not need tools

Zero-landfill design

Smooth surfaces, RIT color scheme

LVE supplies sufficient power to operate MSA under team defined duty cycle

LVE can fit in a typical bin storage system

Less then 5 tools used to repair any broken componenets

LVE lasts 10 years under current team defined duty cycle before having to be replaced

LVE can easily be upgraded to support a camera

Can support chemical detection sensors

Upgradable to support off-road components

Design package available on internet to other schools

The required MSA connections are easily machinable

 All components are take less then a quarter to machine and assemble

10 LVEs and 30 MSAs can be produced with available budget

Chassis costs less than $60 to produce

Page 20: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 20/95

Function Propulsion & Turning Vehicle PlatformDynamics Mount MotorsStability Mount WOCCSE All-Terrain Mount Battery

Mount MSASub-

Functions

Page 21: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 21/95

Vehicle Command and Control Data CommControl & Power MSA Issue Commands from user to C&CControl & Power Motors Receive Commands from C&C to User  Talk to Data Comm Recive commands from user  Talk to Battery Transmit Data to User  

Page 22: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 22/95

Vehicle Power RechargeBattery LifePower to Veh C&CPower to WOCCSE

Page 23: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 23/95

Functional Module

NameEngineering

Specification Number  a.1 a.2 a.3 a.4 a.5 a.6 a.7 b.1

Engineering

Specification

Description

   M  e  a  s  u  r  e

   d   A  c  c  e   l  e  r  a

   t   i  o  n  w

   i   t   h   M   S   A  -

   0  -

   T  o  p

   S  p  e  e   d

   M  e  a  s  u  r  e

   T  o  p

   S  p

  e  e

   d  w

   i   t   h   M   S   A

    M  e  a  s  u  r  e

   d   S   t  o  p

   t   i  m  e

   f  r  o  m

   T  o  p

   S  p  e  e

   d  w

   i   t   h   M   S   A

   L   V   E  m  e  a  s  u  r  e

   d   t  u  r  n  r  a

   d   i  u  s

   L   V   E   d  o  e  s  n  o

   t  r  o   l   l  o  n

   2   0   d  e  g

   i  n  c

   l   i  n  e

   i  n  a

   l   l   d   i  r  e  c

   t   i  o  n  s

   C   l  e  a  r  a  n  c  e

   f  o  r   O

   f   f  -   R  o  a

   d  p  a  r   t  s

   A   d   j  u  s

   t  a   b   l  e   G  r  o  u  n

   d   C   l  e  a  r  a  n  c  e

   S  p  a  c  e

   f  o  r

   M  o

   t  o  r

Measure of

Performances mph s in binary binary in in^3

Preferred Direction Down Up Down Down Target Target Target Target

Nominal Value 1 1.6 0.50 0 0 x 1.1

Marginal Value 2 0.8 1 12 N/A N/A x x

Propulsion & Turning

Page 24: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 24/95

 b.2 b.3 b.4 b.5 b.6 b.7 b.8 b.9 b.10 b.11 c.1 c.2

   S  p  a  c  e

   f  o  r

   S   E   S   E

   S  p  a  c  e

   f  o  r

   W   O   C   C   S   E

   W   O   C   C   S   E   P   h  y  s

   i  c  a

   l   I  n   t  e  r   f  a  c  e

   S   E   S   E   P   h  y  s

   i  c  a   l   I  n

   t  e  r   f  a  c  e

   S  p  a  c  e

   f  o  r

   L   V   E   C

  o  n

   t  r  o   l   B  o  a  r   d

   P   h  y  s

   i  c  a

   l   I  n   t  e  r   f  a  c

  e   f  o  r

   M   S   A

   C  a  n  s  u  s

   t  a   i  n   f  a   l   l   f  r  o  m

   h  e

   i  g   h   t

   A   b   l  e   t  o   S  u  p  p  o  r   t  p  a  y

   l  o  a

   d

   V  e

   h   i  c   l  e   W  e

   i  g   h   t

   Z  e  r  o

   L  a  n

   d  -   f   i   l   l

   P  o  w  e  r

   t  o   M   S   A  -

   P  e  a

   k

   D  a

   t  a   t  o   M   S   A

in^3 in^3 Binary Binary in^3 Binary ft lb lb binaryVolts/A

mpsbits/s

Target Target Target Target Target Target Up Up Down Target Target Up

24.75 22 1 1 22 1 5 5 3.5 1 6V 3A 1000

x x N/A N/A x N/A 3 3 5 N/A x 500

2 pinMolex

Vehicle Platform Vehi

Page 25: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 25/95

c.3 c.4 c.5 c.6 d.1 d.2 d.3 e.1 e.2 e.3 e.4

   P  o  w  e  r

   t  o   M  o

   t  o  r  s

  -   P  e  a

   k

   D  a

   t  a   f  r  o  m

   b  a

   t   t  e  r  y

   D  a

   t  a   t  o   W   O   C   C   S

   E

   D  a

   t  a   f  r  o  m

   W   O   C   C   S   E

   D  a

   t  a   f  r  o  m

   W   O   C   C   S   E   t  o   C  o  n

   t  r  o   l   B  o  a  r   d

   D  a

   t  a   t  o   W   O   C   C   S

   E   f  r  o  m

   C  o  n

   t  r  o   l   B  o  a  r   d

   W   i  r  e   l  e  s  s

   R  a  n  g  e

   R  e  c

   h  a  r  g  e

   T   i  m  e

   B  a

   t   t  e  r  y

   L   i   f  e

   P  o  w  e  r

   C  o  n

   t  r  o   l   B

  o  a  r   d  -

   P  e  a

   k

   P  o  w  e  r

   W   O   C   C   S   E

  -   P  e  a

   k

Volts/Amps

bits/s bits/s bits/s bits/s bits/s ft hours hoursVolts/A

mpsVolts/Amp

sTarget Up Up Up Up Up Up Up Up Target Target

6V 7A 2 2000 2000 2000 2000 200 1 2 6V 10 A 3.3V .25A

x 1 1000 1000 1000 1000 150 1.5 1 x x

le Command & Control Data Comm. Vehicle Power  

Page 26: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 26/95

Functional Module

Name

Engineering

Specification

Number 

Engineering Specification Description

a.1 Measured Acceleration with MSA - 0 - Top Speed

a.2 Measure Top Speed with MSA

a.3  Measured Stop time from Top Speed with MSA

a.4 LVE measured turn radius

a.5 LVE does not roll on 20 deg incline in all directions

a.6 Clearance for Off-Road parts

a.7  Adjustable Ground Clearance

 b.1 Space for Motor 

 b.2 Space for SESE

 b.3 Space for WOCCSE

 b.4 WOCCSE Physical Interface

 b.5 SESE Physical Interface

 b.6 Space for LVE Control Board

 b.7 Physical Interface for MSA

 b.8 Can sustain fall from height

 b.9  Able to Support payload

 b.10 Vehicle Weight

 b.11 Zero Land-fill

c.1 Power to MSA - Peak

c.2 Data to MSA

c.3 Power to Motors - Peak

c.4 Data from battery

c.5 Data to WOCCSE

c.6 Data from WOCCSE

d.1 Data from WOCCSE to Control Board

d.2 Data to WOCCSE from Control Board

d.3 Wireless Range

e.1 Recharge Time

e.2 Battery Life

e.3 Power Control Board - Peak

e.4 Power WOCCSE - Peak

Propulsion &Turning

Vehicle Platform

Vehicle Command

& Control

Data Comm.

Vehicle Power 

Page 27: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 27/95

Measure of

Performance

Preferred

DirectionNominal

Value

Marginal

Value

s Down 1 2

mph Up 1.6 0.8

s Down 0.5 1

in Down 0 12

binary Target 0 N/A

binary Target 0 N/A

in Target x x

in^3 Target 1.1 x

in^3 Target 24.75 x

in^3 Target 22 x

Binary Target 1 N/A

Binary Target 1 N/A

in^3 Target 22 x

Binary Target 1 N/A

ft Up 5 3

lb Up 5 3

lb Down 3.5 5

binary Target 1 N/A

Volts/Amps Target 6V 3A x

bits/s Up 1000 500

Volts/Amps Target 6V 7A x

bits/s Up 2 1

bits/s Up 2000 1000

bits/s Up 2000 1000

bits/s Up 2000 1000

bits/s Up 2000 1000

ft Up 200 150

hours Up 1 1.5

hours Up 2 1

Volts/Amps Target 6V 10 A x

Volts/Amps Target 3.3V .25A x

Page 28: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 28/95

Measured Acceleration with MSA - 0 - Top Speed

Measure Top Speed with MSA + +

 Measured Stop time from Top Speed with MSA - -

LVE measured turn radiusLVE does not roll on 20 deg incline in all directions

Clearance for Off-Road parts

Ad ustable Ground Clearance + +

S ace for Motor - - +

Space for SESE --

Space for WOCCSE --

WOCCSE Physical Interface -SESE Physical Interface -

Space for LVE Control Board -

Physical Interface for MSA -

Can sustain fall from hei ht

Able to Su ort a load

Vehicle Weight -

Zero Land-fill

Power to MSA - Peak 

Data to MSA

Power to Motors - Peak + + + + + +

Data from battery

Data to WOCCSE

Data from WOCCSE

Data from WOCCSE to Control Board + +

Data from WOCCSE to Control Board + +

Wireless RangeRecharge Time

Battery Life + +

Propulsion & Turning

Land Vehicle for Education (LVE)

Page 29: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 29/95

Position Title /

Discipline Name

Disc Skill

Number 

ME1

ME2

ME3

ME4

ME5ME6

EE1

EE2

EE3

CE1

CE2

CE3

CE4

IE1

IE2IE3

Mechanical Engineer 

Electrical Engineer 

Computer Engineer 

Industrial Engineer 

Page 30: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 30/95

Engineering Discipline Skill Description

Perform ANSYS Finite Element Analysis of Structural Integrity

Develop Simulink Model of Device Dynamics

Create Pro-Engineer Solid Model of the Device Package

Machining and Fabrication of Components

Labview programmingExperience leading and scheduling a group

Power management and interfacing electrical components

Digital electronic design

 Analog electronic design

Interface and data transfer 

Software programming of microcontrollers

Software programming of remote controller 

Signal protocol design and interface

Design of sustainable materials

Interface design and managementExperience leading and scheduling a group

Page 31: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 31/95

Notes About This Skill - For example, what kind of experience

would this student likely have had in the past?

 ACT

System Dynamics

Engineering Design Graphics

Intermediate Machining Lab

Labview experienceDPM

Built electrical components

Digital Design Class Sequence

analog design experience (PSPICE)

software or firmware experience

Experience programming microcontrollers

Experience programming remote controller 

Experience integrating different signals between electronics

Sustainable Design

Interface experienceDPM

Page 32: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 32/95

a.1 a.2 a.3 a.4 a.5 a.6 a.7 b.1 b.2 b.3 b.4 b.5 b.6 b.7 b.8 b.9 b.10 b.11 c

   M  e  a  s  u  r  e   d   A  c  c  e   l  e  r  a   t   i  o  n  w   i   t   h   M

   S   A  -   0  -   T  o  p   S  p  e  e   d

   M  e  a  s  u  r  e   T  o  p   S  p  e  e   d  w   i   t   h   M   S   A

    M  e  a  s  u  r  e   d   S   t  o  p   t   i  m  e   f  r  o  m   T  o  p

   S  p  e  e   d  w   i   t   h   M   S   A

   L   V   E  m  e  a  s  u  r  e   d   t  u  r  n  r  a   d   i  u  s

   L   V   E   d  o  e  s  n  o   t  r  o   l   l  o  n   2   0   d  e  g   i  n

  c   l   i  n  e   i  n  a   l   l   d   i  r  e  c   t   i  o  n  s

   C   l  e  a  r  a  n  c  e   f  o  r   O   f   f  -   R  o  a   d  p  a  r   t  s

   A   d   j  u  s   t  a   b   l  e   G  r  o  u  n   d   C   l  e  a  r  a  n  c  e

   S  p  a  c  e   f  o  r   M  o   t  o  r

   S  p  a  c  e   f  o  r   S   E   S   E

   S  p  a  c  e   f  o  r   W   O   C   C   S   E

   W   O   C   C   S   E   P   h  y  s   i  c  a   l   I  n   t  e  r   f  a  c  e

   S   E   S   E   P   h  y  s   i  c  a   l   I  n   t  e  r   f  a  c  e

   S  p  a  c  e   f  o  r   L   V   E   C  o  n   t  r  o   l   B  o  a  r   d

   P   h  y  s   i  c  a   l   I  n   t  e  r   f  a  c  e   f  o  r   M   S   A

   C  a  n  s  u  s   t  a   i  n   f  a   l   l   f  r  o  m   h  e   i  g   h   t

   A   b   l  e   t  o   S  u  p  p  o  r   t  p  a  y   l  o  a   d

   V  e   h   i  c   l  e   W  e   i  g   h   t

   Z  e  r  o   L  a  n   d  -   f   i   l   l

Engineering Discipline Skill Description

   D  o  w  n

   U  p

   D  o  w  n

   D  o  w  n

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   T  a  r  g  e   t

   U  p

   U  p

   D  o  w  n

   T  a  r  g  e   t

Perform ANSYS Finite Element Analysis of 3 3 1

Develop Simulink Model of Device Dynamics 3 3 3 3 3

Create Pro-Engineer Solid Model of the Device 3 3 3 3 3 1 1 3 1 1 1 1

Machining and Fabrication of Components 3 3 3 1 1 3 1 1 1 1Labview programming

Experience leading and scheduling a group

P t d i t f i l t i l

for Education (LVE) family of projects

st, and deliver land vehicles with the

MSA) platform incorporating both the

SE (R12006) energy system for use byal engineering design teams and

s projects in the KGCOE, beginning fall

ester 2013.

  or Education (LVE) VPropulsion & Turning Vehicle Platform

Page 33: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 33/95

Case Project Issue

1 P07201Slipping mitre gears under roation andbending

2 LV1 Material could not be welded3 LV1 Vehicle cant run for long periods of time

4 LV1 Vehicle Cost too high5 LV1 Vehcile to fragile to be to dropped

6 LV1Sideplate for motor module could notwithstand high motor torques

7 LV1 Sideplay in wheel along shaft

8 LV1 Too much power to modules

Design FMEA

Page 34: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 34/95

Why

Improper axial support. Only suppport wasa set screwWelder couldn't weld materialBattery life is too short

Miscommunication during design processDesign not robust enough

Design not robust enough

Wheels not fastened properly

Improper wiring, No module powerprotection

Page 35: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 35/95

 A DPM Student will beresponsible for the worksheetsassociated with this project

Enter the name(s) of the DPMStudent(s) responsible for thisproject within the roadmap.

Enter the proposed project numberin this column, such as P12nnn orP13nnn

Project ID in Worksheet DPM Contributors EDGE Project Number  

1

234

5

Page 36: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 36/95

Enter a short project title or name here. In general,each project should be responsible for developingone module within the roadmap.

Enter the proposedquarter for seniordesign 1

Enter the proposedquarter for seniordesign 2

Project Name MSD 1 Term MSD 2 Term

Project 1 name goes here

Project 2 name goes hereProject 3 name goes hereProject 4 name goes here

Project 5 name goes here

Page 37: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 37/95

Part 1 Part 2 Part 3 Part 4

Subassembly 1A Subassembly 1B Subassembly 1C Subassembly 1D

Subassembly 2A Subassembly 2B Subassembly 2C Subassembly 2DSubassembly 3A Subassembly 3B Subassembly 3C Subassembly 3DSubassembly 4A Subassembly 4B Subassembly 4C Subassembly 4D

Subassembly 5A Subassembly 5B Subassembly 5C Subassembly 5D

List up to seven subassemblies, parts, or components that are the most important parts of this modul

Page 38: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 38/95

Part 5 Part 6 Part 7

Subassembly 1E Subassembly 1F Subassembly 1G

Subassembly 2E Subassembly 2F Subassembly 2GSubassembly 3E Subassembly 3F Subassembly 3GSubassembly 4E Subassembly 4F Subassembly 4G

Subassembly 5E Subassembly 5F Subassembly 5G

e

Page 39: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 39/95

Function 1 Function 2

Page 40: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 40/95

Page 41: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 41/95

Page 42: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 42/95

Interface Requirement Number Interface Requiement Decription

Page 43: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 43/95

Page 44: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 44/95

Page 45: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 45/95

Project 1 name goes

hereart omponent

Subassembly

Characteristic

Number  a.1 a.2 a.3 a.4 a.5 a.6 b.a b.2 b.3 b.4 b.5 b.6 c.1

Part / Component /

Subassembly Design

Specification

Description

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

Design Specification units units units units units units units units units units units units units

Preferred Direction Up Down Target Up Down Target Up Down Target Up Down Target Up

Nominal Value

Marginal Value

Subassembly 1A Subassembly 1B

Page 46: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 46/95

c.2 c.3 c.4 c.5 c.6 d.1 d.2 d.3 d.4 d.5 d.6 e.1 e.2 e.3 e.4 e.5

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units units units units

Down Target Up Down Target Up Down Target Up Down Target Up Down Target Up Down

Subassembly 1C Subassembly 1D Subassembly 1E

Page 47: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 47/95

e.6 f.1 f.2 f.3 f.4 f.5 f.6 g.1 g.2 g.3 g.4 g.5 g.6

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units

Target Target Up Up Up Up Down Target Up Down Target

Subassembly 1GSubassembly 1F

Page 48: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 48/95

Page 49: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 49/95

Project Number 

Project Name

Prepared By

FMEA ID

Part / Component or

Subassembly

Potential Failure

Modes

Potential Causes of

Failure Mode

Likelihood of

Occurrence

1 Subassembly 1A

2 Subassembly 1A

3 Subassembly 1A

4 Subassembly 1A

5 Subassembly 1A

6 Subassembly 1A

7 Subassembly 1A

8 Subassembly 1A

9 Subassembly 1A

10 Subassembly 1A

11 Subassembly 1A12 Subassembly 1A

13 Subassembly 1A

14 Subassembly 1A

15 Subassembly 1A

16 Subassembly 1A

17 Subassembly 1A

18 Subassembly 1A

19 Subassembly 1A

20 Subassembly 1A

21 Subassembly 1A

22 Subassembly 1A

23 Subassembly 1A24 Subassembly 1A

25 Subassembly 1A

26 Subassembly 1A

27 Subassembly 1A

28 Subassembly 1A

29 Subassembly 1A

30 Subassembly 1A

31 Subassembly 1A

32 Subassembly 1A

33 Subassembly 1A

34 Subassembly 1A

35 Subassembly 1A36 Subassembly 1A

37 Subassembly 1A

38 Subassembly 1A

39 Subassembly 1A

40 Subassembly 1A

41 Subassembly 1A

42 Subassembly 1A

43 Subassembly 1A

44 Subassembly 1A

45 Subassembly 1A

0

Project 1 name goes here

0

Page 50: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 50/95

46 Subassembly 1A

47 Subassembly 1A

48 Subassembly 1A

49 Subassembly 1A

50 Subassembly 1A

Page 51: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 51/95

End Effects of Failure Mode on

Product, Users, or other Systems

Severity of

Occurrence

Detection Method or Current

Prevention Controls

Failure Modes and Effects Analysis

Page 52: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 52/95

Page 53: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 53/95

Detection Of

Occurrence RPN Score

Actions Recommended to

Reduce RPN

0

000000000

0000000000

00

0000000000

00

0000000

0000

Page 54: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 54/95

0

0000

Page 55: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 55/95

Project 2 name goes

hereart omponent

Subassembly

Characteristic

Number  a.1 a.2 a.3 a.4 a.5 a.6 b.a b.2 b.3 b.4 b.5 b.6 c.1

Part / Component /

Subassembly Design

Specification

Description

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

Design Specification units units units units units units units units units units units units units

Preferred Direction Up Down Target Up Down Target Up Down Target Up Down Target Up

Nominal Value

Marginal Value

Subassembly 2A Subassembly 2B

Page 56: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 56/95

c.2 c.3 c.4 c.5 c.6 d.1 d.2 d.3 d.4 d.5 d.6 e.1 e.2 e.3 e.4 e.5

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units units units units

Down Target Up Down Target Up Down Target Up Down Target Up Down Target Up Down

Subassembly 2C Subassembly 2D Subassembly 2E

Page 57: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 57/95

e.6 f.1 f.2 f.3 f.4 f.5 f.6 g.1 g.2 g.3 g.4 g.5 g.6

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units

Target Target Up Up Up Up Down Target Up Down Target

Subassembly 2GSubassembly 2F

Page 58: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 58/95

Page 59: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 59/95

Project Number 

Project Name

Prepared By

FMEA ID

Part / Component or

Subassembly

Potential Failure

Modes

Potential Causes of

Failure Mode

Likelihood of

Occurrence

1 Subassembly 2A

2 Subassembly 2A

3 Subassembly 2A

4 Subassembly 2A

5 Subassembly 2A

6 Subassembly 2A

7 Subassembly 2A

8 Subassembly 2A

9 Subassembly 2A

10 Subassembly 2A

11 Subassembly 2A12 Subassembly 2A

13 Subassembly 2A

14 Subassembly 2A

15 Subassembly 2A

16 Subassembly 2A

17 Subassembly 2A

18 Subassembly 2A

19 Subassembly 2A

20 Subassembly 2A

21 Subassembly 2A

22 Subassembly 2A

23 Subassembly 2A24 Subassembly 2A

25 Subassembly 2A

26 Subassembly 2A

27 Subassembly 2A

28 Subassembly 2A

29 Subassembly 2A

30 Subassembly 2A

31 Subassembly 2A

32 Subassembly 2A

33 Subassembly 2A

34 Subassembly 2A

35 Subassembly 2A36 Subassembly 2A

37 Subassembly 2A

38 Subassembly 2A

39 Subassembly 2A

40 Subassembly 2A

41 Subassembly 2A

42 Subassembly 2A

43 Subassembly 2A

44 Subassembly 2A

45 Subassembly 2A

0

Project 2 name goes here

0

Page 60: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 60/95

46 Subassembly 2A

47 Subassembly 2A

48 Subassembly 2A

49 Subassembly 2A

50 Subassembly 2A

Page 61: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 61/95

End Effects of Failure Mode on

Product, Users, or other Systems

Severity of

Occurrence

Detection Method or Current

Prevention Controls

Failure Modes and Effects Analysis

Page 62: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 62/95

Page 63: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 63/95

Detection Of

Occurrence RPN Score

Actions Recommended to

Reduce RPN

0

000000000

0000000000

00

0000000000

00

0000000

0000

Page 64: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 64/95

0

0000

Page 65: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 65/95

Project 3 name goes

hereart omponent

Subassembly

Characteristic

Number  a.1 a.2 a.3 a.4 a.5 a.6 b.a b.2 b.3 b.4 b.5 b.6 c.1

Part / Component /

Subassembly Design

Specification

Description

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

Design Specification units units units units units units units units units units units units units

Preferred Direction Up Down Target Up Down Target Up Down Target Up Down Target Up

Nominal Value

Marginal Value

Subassembly 3A Subassembly 3B

Page 66: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 66/95

c.2 c.3 c.4 c.5 c.6 d.1 d.2 d.3 d.4 d.5 d.6 e.1 e.2 e.3 e.4 e.5

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units units units units

Down Target Up Down Target Up Down Target Up Down Target Up Down Target Up Down

Subassembly 3C Subassembly 3D Subassembly 3E

Page 67: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 67/95

e.6 f.1 f.2 f.3 f.4 f.5 f.6 g.1 g.2 g.3 g.4 g.5 g.6

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units

Target Target Up Up Up Up Down Target Up Down Target

Subassembly 3GSubassembly 3F

Page 68: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 68/95

Page 69: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 69/95

Project Number 

Project Name

Prepared By

FMEA ID

Part / Component or

Subassembly

Potential Failure

Modes

Potential Causes of

Failure Mode

Likelihood of

Occurrence

1 Subassembly 3A

2 Subassembly 3A

3 Subassembly 3A

4 Subassembly 3A

5 Subassembly 3A

6 Subassembly 3A

7 Subassembly 3A

8 Subassembly 3A

9 Subassembly 3A

10 Subassembly 3A

11 Subassembly 3A12 Subassembly 3A

13 Subassembly 3A

14 Subassembly 3A

15 Subassembly 3A

16 Subassembly 3A

17 Subassembly 3A

18 Subassembly 3A

19 Subassembly 3A

20 Subassembly 3A

21 Subassembly 3A

22 Subassembly 3A

23 Subassembly 3A24 Subassembly 3A

25 Subassembly 3A

26 Subassembly 3A

27 Subassembly 3A

28 Subassembly 3A

29 Subassembly 3A

30 Subassembly 3A

31 Subassembly 3A

32 Subassembly 3A

33 Subassembly 3A

34 Subassembly 3A

35 Subassembly 3A36 Subassembly 3A

37 Subassembly 3A

38 Subassembly 3A

39 Subassembly 3A

40 Subassembly 3A

41 Subassembly 3A

42 Subassembly 3A

43 Subassembly 3A

44 Subassembly 3A

45 Subassembly 3A

0

Project 3 name goes here

0

Page 70: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 70/95

46 Subassembly 3A

47 Subassembly 3A

48 Subassembly 3A

49 Subassembly 3A

50 Subassembly 3A

Page 71: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 71/95

End Effects of Failure Mode on

Product, Users, or other Systems

Severity of

Occurrence

Detection Method or Current

Prevention Controls

Failure Modes and Effects Analysis

Page 72: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 72/95

Page 73: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 73/95

Detection Of

Occurrence RPN Score

Actions Recommended to

Reduce RPN

0

000000000

0000000000

00

0000000000

00

0000000

0000

Page 74: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 74/95

0

0000

Page 75: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 75/95

Project 4 name goes

hereart omponent

Subassembly

Characteristic

Number  a.1 a.2 a.3 a.4 a.5 a.6 b.a b.2 b.3 b.4 b.5 b.6 c.1

Part / Component /

Subassembly Design

Specification

Description

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

Design Specification units units units units units units units units units units units units units

Preferred Direction Up Down Target Up Down Target Up Down Target Up Down Target Up

Nominal Value

Marginal Value

Subassembly 4A Subassembly 4B

Page 76: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 76/95

c.2 c.3 c.4 c.5 c.6 d.1 d.2 d.3 d.4 d.5 d.6 e.1 e.2 e.3 e.4 e.5

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units units units units

Down Target Up Down Target Up Down Target Up Down Target Up Down Target Up Down

Subassembly 4C Subassembly 4D Subassembly 4E

Page 77: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 77/95

e.6 f.1 f.2 f.3 f.4 f.5 f.6 g.1 g.2 g.3 g.4 g.5 g.6

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units

Target Target Up Up Up Up Down Target Up Down Target

Subassembly 4GSubassembly 4F

Page 78: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 78/95

Page 79: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 79/95

Project Number 

Project Name

Prepared By

FMEA ID

Part / Component or

Subassembly

Potential Failure

Modes

Potential Causes of

Failure Mode

Likelihood of

Occurrence

1 Subassembly 4A

2 Subassembly 4A

3 Subassembly 4A

4 Subassembly 4A

5 Subassembly 4A

6 Subassembly 4A

7 Subassembly 4A

8 Subassembly 4A

9 Subassembly 4A

10 Subassembly 4A

11 Subassembly 4A12 Subassembly 4A

13 Subassembly 4A

14 Subassembly 4A

15 Subassembly 4A

16 Subassembly 4A

17 Subassembly 4A

18 Subassembly 4A

19 Subassembly 4A

20 Subassembly 4A

21 Subassembly 4A

22 Subassembly 4A

23 Subassembly 4A24 Subassembly 4A

25 Subassembly 4A

26 Subassembly 4A

27 Subassembly 4A

28 Subassembly 4A

29 Subassembly 4A

30 Subassembly 4A

31 Subassembly 4A

32 Subassembly 4A

33 Subassembly 4A

34 Subassembly 4A

35 Subassembly 4A36 Subassembly 4A

37 Subassembly 4A

38 Subassembly 4A

39 Subassembly 4A

40 Subassembly 4A

41 Subassembly 4A

42 Subassembly 4A

43 Subassembly 4A

44 Subassembly 4A

45 Subassembly 4A

0

Project 4 name goes here

0

Page 80: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 80/95

46 Subassembly 4A

47 Subassembly 4A

48 Subassembly 4A

49 Subassembly 4A

50 Subassembly 4A

Page 81: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 81/95

End Effects of Failure Mode on

Product, Users, or other Systems

Severity of

Occurrence

Detection Method or Current

Prevention Controls

Failure Modes and Effects Analysis

Page 82: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 82/95

Page 83: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 83/95

Detection Of

Occurrence RPN Score

Actions Recommended to

Reduce RPN

0

000000000

0000000000

00

0000000000

00

0000000

0000

Page 84: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 84/95

0

0000

Page 85: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 85/95

Project 5 name goes

hereart omponent

Subassembly

Characteristic

Number  a.1 a.2 a.3 a.4 a.5 a.6 b.a b.2 b.3 b.4 b.5 b.6 c.1

Part / Component /

Subassembly Design

Specification

Description

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

Design Specification units units units units units units units units units units units units units

Preferred Direction Up Down Target Up Down Target Up Down Target Up Down Target Up

Nominal Value

Marginal Value

Subassembly 5A Subassembly 5B

Page 86: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 86/95

c.2 c.3 c.4 c.5 c.6 d.1 d.2 d.3 d.4 d.5 d.6 e.1 e.2 e.3 e.4 e.5

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units units units units

Down Target Up Down Target Up Down Target Up Down Target Up Down Target Up Down

Subassembly 5C Subassembly 5D Subassembly 5E

Page 87: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 87/95

e.6 f.1 f.2 f.3 f.4 f.5 f.6 g.1 g.2 g.3 g.4 g.5 g.6

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

   R  e  p

   l  a  c  e

   t   h   i  s  c  e

   l   l  w   i   t   h   O   N   E   S   I   N   G   L   E   d  e  s

   i  g  n  s  p  e  c

   i   f   i  c  a   t   i  o  n .

units units units units units units units units units units units units units

Target Target Up Up Up Up Down Target Up Down Target

Subassembly 5GSubassembly 5F

Page 88: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 88/95

Page 89: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 89/95

Project Number 

Project Name

Prepared By

FMEA ID

Part / Component or

Subassembly

Potential Failure

Modes

Potential Causes of

Failure Mode

Likelihood of

Occurrence

1 Subassembly 5A

2 Subassembly 5A

3 Subassembly 5A

4 Subassembly 5A

5 Subassembly 5A

6 Subassembly 5A

7 Subassembly 5A

8 Subassembly 5A

9 Subassembly 5A

10 Subassembly 5A

11 Subassembly 5A12 Subassembly 5A

13 Subassembly 5A

14 Subassembly 5A

15 Subassembly 5A

16 Subassembly 5A

17 Subassembly 5A

18 Subassembly 5A

19 Subassembly 5A

20 Subassembly 5A

21 Subassembly 5A

22 Subassembly 5A

23 Subassembly 5A24 Subassembly 5A

25 Subassembly 5A

26 Subassembly 5A

27 Subassembly 5A

28 Subassembly 5A

29 Subassembly 5A

30 Subassembly 5A

31 Subassembly 5A

32 Subassembly 5A

33 Subassembly 5A

34 Subassembly 5A

35 Subassembly 5A36 Subassembly 5A

37 Subassembly 5A

38 Subassembly 5A

39 Subassembly 5A

40 Subassembly 5A

41 Subassembly 5A

42 Subassembly 5A

43 Subassembly 5A

44 Subassembly 5A

45 Subassembly 5A

0

Project 5 name goes here

0

Page 90: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 90/95

46 Subassembly 5A

47 Subassembly 5A

48 Subassembly 5A

49 Subassembly 5A

50 Subassembly 5A

Page 91: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 91/95

End Effects of Failure Mode on

Product, Users, or other Systems

Severity of

Occurrence

Detection Method or Current

Prevention Controls

Failure Modes and Effects Analysis

Page 92: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 92/95

Page 93: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 93/95

Detection Of

Occurrence RPN Score

Actions Recommended to

Reduce RPN

0

000000000

0000000000

00

0000000000

00

0000000

0000

Page 94: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 94/95

0

0000

Page 95: Lve Roadmap

8/12/2019 Lve Roadmap

http://slidepdf.com/reader/full/lve-roadmap 95/95

The definitions on this worksheet are used in the pulldown menus on the other worksheets. Thesedefinitions should not have to be modified.

There is no relationship betweenthese parameters

There is a weak, indirect relataionship 1There is a linear relationship 3There is a stronger than linear relationship 9

Very Positive + +

Positive +

Neutral

Negative -Very Negative - -

This is a low risk 1

This is a moderate risk 2

This is a high risk 3

Prefer to decrease this value Down

Prefer to achieve this value Target

Prefer to increase this value Up

 AY 2011-12, Fall Quarter 2011-1 AY 2011-12, Winter Quarter 2011-2

 AY 2011-12, Spring Quarter 2011-3

 AY 2012-13, Fall Quarter 2012-1

 AY 2012-13, Winter Quarter 2012-2 AY 2012-13, Spring Quarter 2012-3

Function Names

Propulsion & Turning

Pairwise Nonlinear Relationships

Rooftop Correlation Codes

FMEA Codes

Directions

Academic Terms