Luyster Creek Energy ProjectPublic Participation Plan
January 2010Revised November 2010
Pursuant to theNew York State Department of Environmental ConservationCommissioner's Policy CP-29, Environmental Justice and Permitting
Astoria Generating Company, L.P.
USPOWERGEN505 5th AvenueNew York, NY 10017
USPOWERGEN
I. Project Description
The Astoria Generating Company, L.P. (AGC), a USPowerGen (U5PG) Company, is proposing to update
the Astoria Generating Station (AGS) with the addition of approximately 500 to 750 megawatts (MW) of
new, cleaner, state-of-the-art, combined cycle, electric generation while reducing the actual netemissions of the entire facility (inclusive of the new equipment). Emissions reductions will be done byimplementing enforceable permit limits at the existing AGS. As currently envisioned, depending onmarket conditions, the Project may be constructed in two phases of 250 to 375 MW or a single phase of
500 to 750MW.
BACKGROUND
The existing AGS units are located on approximately 17 acres at 18-01 20th Avenue in Astoria, Queens
New York. They consist of three dual fueled (natural gas and No.6 oil) units, one natural gas unit, and a
small emergency combustion turbine with a total capacity of approximately 1,300 MW. The location of
the LCEP is at the AGS Fuel Oil Tank Farm (FOTF) on an adjacent parcel of approximately 12 acres that is
1,600 feet to the northeast of the existing units. The new combined cycle unit(s) would occupy
approximately 7.5 acres on this parcel. A new above ground fuel oil tank would also be constructed on
the fuel oil storage depot parcel for the storage of ultra low sulfur diesel (ULSD). Currently there is
approximately 8 million gallons of No.6 oil storage at this site in four tanks for the existing boilers at
AGS. Fuel is currently delivered by barge to the tanks from the adjacent A-I0 dock. The existing AGS
units are currently utifized to meet electric demand and maintain the electric grid stability. The new LCEP
will cause the older AGS units, as well as other less efficient plants in New York City, to run less while
allowing the newer, cleaner units to meet the continually growing electric demand within the City.
AGC believes that a coordinated improvement of the AGS by the addition of new cleaner technology is
the most beneficial way to plan for the increasing load requirements of the City and the eventual
retirement of older generating units, while reducing the environmental impacts of the existing units and
other displaced facilities. Therefore, operation of the LCEP will result in significant environmental benefits
and improve system reliability. The Project will also advance and is consistent with the goals set forth in
the Draft State Energy Plan with respect to assuring system reliability, replacement of older capacity,
greenhouse gas reductions, reduced electric costs and environmental improvements.
AGC evaluated several improvement opportunities including enhancing or replacing the existing
equipment to achieve the goals of increased capacity with decreased environmental effects. In fact, a
repowering of the facility was permitted under the Article X process in 2003. When USPG acquired AGe,
it performed a technical and commercial review of the approved repowering project and determined that
it was uneconomic to build the Project as proposed by the previous owners. AGC then commissioned an
engineering firm to evaluate the feasibility of locating additional capacity close by the existing AGS units
in a systematic phased approach to eliminate the features that made the approved project infeasible.
Potential areas for new equipment were identified. Layouts of the maximum capacity that could fit on the
locations were determined. The primary items that were to be optimized in a modified project were the
avoidance of potential aquatic impacts, reduction of interference with existing operations, and
minimization of other environmental concerns such as visual impact and water use. Ultimately, however,
it was determined that a modified project close by the existing AGS units could not avoid interfering with
existing utility infrastructure and would still require significant remediation and demolition. During
demolition and construction activities, existing AGS units would have to be taken off line for substantial
USPOWERGENLuyster Creek Energy Project Public Participotion Pion
January 20 I0
periods, with the resultant loss of revenue. In addition, a modified project was thought to be asignificant enough departure from the approved project that a new permitting process would have to be
started. These conditions resulted in the inability to develop an economic project in the same footprint
approved for the project.
Once it was clear that an economic option was not viable dose by the existing AGS units, AGe lookedmore broadly to determine if a project could be developed in another location that avoided thefundamental issues that were detrimental to development at the original location. That led to theadjacent AGS FOTF. This site is currently in use for oil storage and houses several retired above ground
storage tanks. Use of this site for the LCEP avoids removal of existing generation during the construction
period, reduces the demolition and remediation costs compared to the original concepts and allows for a
two phased build out if the market dictates.
As a result of the AGC evaluation, the following Project parameters have been determined:
1. The optimum location is FOTF parcel northeast of the existing AGS units.
2. Use of Siemens SCC6-S000F, GE Frame 7, or Mitsubishi SOlG combustion turbines in either a lx1 or
2X1 configuration, based on market conditions, with air cooled condensers and the lowest stack
heights possible to achieve ambient air quality standards.
see attached Figures 1 and 2.
THE pROJECT
New York City requires a significant amount of generation be located in the City for system reliability. The
existing AGS units are older, tess effident units that are used for reliability and high load days.
Displacement of the older units with new higher efficiency units will provide a tremendous environmental
benefit. In addition to the environmental benefit, the cost of production of electricity would be reduced
due to the higher efficiency of the new unit(s). Load profiles and existing capacity resources in the City
require that NYC have additional qUick start and intermediate load generation capability to meet demand.
The LCEP will be designed to start up and shut down quickly and have greater operational flexibility than
the standard combined cycle facilities currently installed in the Oty. This flexibility will reduce emissions
during startup and allow the LCEP to be shut down if there are more economical sources rather than
operate during uneconomic periods.
The LCEP consists of two distinct components: the installation of new combined cycle combustion
turbine(s) and an emissions reduction strategy for the existing AGS. The improvement will be built on the
FOTF parcel adjacent to the existing AGS within an area zoned for heavy manufactUring (industrial) use
(M3-1). The new combustion turbines will be dual fuel-capable and bum natural gas as a primary fuel
and ULSD as backup fuel to be used for up to approximately 30 days annually which will require the
addition of a new oil storage tank.
Installation of the new units is being approached in a phased manner. Phase 1 will consist of the
installation of a single new 250 to 375 MW combined cycle unit to be operational to meet the anticipated
need for capacity in 2014. The potential emissions from this unit will be offset by the retirement of
Page 2
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 2010
existing Unit 2 and an enforceable permit limitation on the remaining units (3, 4, and/or 5) effective upon
commercial operation of the new unit. The reductions from the existing units plus the potential emission
from the new unit will result in an overall net reduction of emissions. Phase 2 would include the addition
of a second, new 250 to 375 MW combined cycle unit or another combustion turbine to operate with the
phase 1 combined cycle unit, enforceable permit limitation on the remaining existing unit (3, 4, and/or 5)
and/or shut down of another unit effective upon commercial operation of the new unit. The reductions
and/or retirement of Unit 5, plus the emissions from the second new unit will result in an overall net
reduction.
Market conditions may dictate that the amount of new capacity required in the timeframe, could require
the entire 500 to 750 MW be build as one phase, In this case, one 500 to 750 MW combined cycle unit
would be constructed. Effective upon commercial operation of the new unit, Unit 2 would be retired and
enforceable permit limits and/or retirement of the remaining existing units would be completed such that
the potential emissions from the new unit and remaining existing units will result in an overall net
reduction.
All of Queens County, NY, including the AGS, is located in a nonattainment area for ozone (03) and
particulate matter less than 2.5 microns in diameter (PM2.s). The United States Environmental Protection
Agency defines nonattainment areas as regions in which air pollution levels persistently exceed National
Ambient Air Quality Standards. The LCEP will not trigger review under Prevention of Significant
Deterioration or Nonattainment New Source Review regulations because AGC will commit to enforceable
permit restrictions that limit new emissions to levels below significant increase thresholds.
Benefits of the Project are that it will provide additional cleaner electric generation while reducing the
actual net emissions for carbon monoxide (CO), nitrogen oxides (NOx), particulate matter (PM) including
PM less than 10 microns (PM lO), particulate matter less than 2.5 microns in diameter (PM2.s), and sulfur
oxides (SOx), which is a precursor to PM2,s formation. NO.: is also a precursor to ozone formation. It will
also result in a decrease in carbon dioxide (C02), a greenhouse gas. Potential emissions resulting from
the additional generating capacity will be offset by implementing the strategies described below. These
actions will fully address community concerns and ensure that air emissions will be reduced by a
combination of methods that may include but are not limited to:
1. Use high efficiency, low emission combined cycle combustion turbines for the Project.
2, Permit caps on the total emissions from the new combined cycle equipment.
3. Permit caps on the total emissions from the existing AGS units.
4. Shut down of existing units.
5. Permit cap on sulfur content of the oil for the Project.
6. The new combined cycle unites) will employ air cooling and result in a reduction in cooling water use
by the existing AGS units,
Page 3
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 201 0
AGe will be electrically interconnecting into the grid via existing connections from the rnrrent units. As
such, the new unit interconnection should be easily achievable.
Though no significant adverse environmental impacts are anticipated as a result of the Project, AGe will
prepare and submit a Draft Environmental Impact Statement (OBS) in order to fully address potential
community concerns, including environmental justice issues. The DEIS will also include an alternatives
analysis.
II. Other AGe Assets within the Community
Currently, AGe owns three electric generating facilities within the confines of New York City including the
AGS, the Narrows Generating Station (NGS, located In the Sunset Park area of Brooklyn), and the
Gowanus Generating Station (GGS, located in the Sunset Park area of Brooklyn). The South Pier
Improvement Project at the GGS which will add 100 MW of new efficient generation was recently
(October 21, 2009) approved and permitted by the NYSDEC. This new facility will result in a net
decrease of all air emissions in the Sunset Park area of Brooklyn, resulting in environmental
improvements to the community. The emission reduction strategy under consideration or the LCEP Is
based on the successful SPIP model.
In accordance with Commissioner Policy 29 (CP-29) of the NYSDEC, the sections that follow outline the
steps that AGe will undertake to inform the local community and the broader public about the Project and
to invite vigorous partidpation in the permitting and environmental review processes.
RELEVANT GEOGRAPHIC CONTEXT
The existing AGS units and the lCEP are located in an area NYSDEC has identified as a Potential
Environmental Justice Area (PEJA). Therefore, AGC has reviewed the CP·29 guidelines in preparing a
proactive, enhanced program for engaging community organizations and residents in the Astoria, Queens
area. The Project location is shown below.
Page 4
USPOWERGENLuyster Creek Energy Project Public Participation Plan
January 2010
AGe recognizes that this Project takes place within a neighborhood context where priorities and plans for
future development may be established.
III. AGe Contact and Central Communication
AGe will establish a website specifically for the LeEP. The website will provide:
• Reports and analyses on the LeEP
• Preparatory materials for public briefings and meetings
• Fact sheets and Frequently Asked Questions (FAQs) in the languages predominant in the Astoria area
of Queens
• Summary reports from public meetings
• Regular reports to NYSDEC on implementation of the Public Participation Plan
• Draft and final Environmental Impact Statements (EIS) as they are completed
• Contact information for AGe representatives
• Functionality for receiving and posting public comments on the LCEP
Page 5
USPOWERGENLuyster Creek Energy Project Public Participation PIon
January 201 0
For those who do not have access to the internet, documents will be placed in convenient repositories
and there will be a toll*free number set up to receive comments and questions.
On a monthly or bi·monthly basis, the schedule to be agreed upon with stakeholders, AGe will prepare
progress reports, as further discussed in Section VII below, which will summarize the outreach activities
during the previous period and respond to comments and questions collected on the website or byphone. Summary responses to major themes and issues raised on the website may be addressed, as
appropriate, at public meetings described in detail below.
The primary contact and leader of this process for AGC will be:
David PerriAstoria Generating Company, LP. a US PowerGen Company505 Fifth Avenue, 21 51 FloorNew York, N.Y. [email protected]
IV. Stakeholders
A draft set of stakeholders is attached as Appendix A. It includes those organizations listed on the
NYSDEC website as organizations active in environmental justice in Astoria; local institutions and other
organizations intended to provide wide coverage of a community that is ethnically, socially and religiously
diverse, As necessary, the list will be supplemented as the Project proceeds and will be divided into
Primary and Secondary Stakeholders, as described in NYSDEC guidance or other subgroupings as
suggested in initial meetings. Except for meeting notices which will be sent via email and US mail as
described below, each Stakeholder will be asked whether they prefer to receive materials via email or US
mail.
v. Meeting Postings and Notifications Relative to Permitting Process
For distribution of information about public meetings as well as background and follow~up
documentation, AGC will follow the procedures outlined below.
Notification
Meetings will be announced at least three weeks in advance via email and US mail to the stakeholder
list and postings on the AGe website. Public notice of the meetings will also be given in appropriate
local weekly newspapers and one daily newspaper of general circulation.
TIming
Meetings will be scheduled for weekday nights that do not coincide with major religious or secular
holidays, after working hours, generally during the period between 6:00 and 9:00 pm, unless
otherwise determined as a result of discussion with stakeholders.
Page 6
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 2010
Location
AGe will work with stakeholders to select a location optimally suited for community participation.
Translation
Translation into Greek and Spanish and other languages if necessary, will be available at meetings
upon request. At stakeholders request, AGe will arrange for a briefing on the DEIS in one of these
two predominant non-English languages.
Basic meeting materials - fact sheets, FAQs and meeting announcements - will be produced and
distributed in predominant local languages.
Preparatory Materials
Background materials prepared for public meetings will be mailed to the stakeholder list via email or
US mail, as preferred, at least a week in advance of the meeting in question and posted on the AGC
website. For the first briefing and subsequent public meeting, these materials will include:
• A brochure and FAQ explaining the LCEP
• A permitting schedule
• An explanation of the Public Participation process
The DEIS will be released before the second public meeting (see schedule below).
As necessary, AGC may also include responses to specific inquiries or concerns that have arisen in
postings on the website or by phone.
Summary and FoIIQw~Up Information
A transcript in English of the proceedings at each public meeting will be prepared and posted on the
AGC website.
Following public meetings, a set of follow-up documents will be mailed to those participants who sign
in via e-mail or US mail, as preferred by the participant, and posted on the AGC website. These
documents, which may be made part of the next scheduled progress report as reqUired in Section VII
below, will include:
• A meeting summary and/or minutes
• Responses to specific issues or concerns raised during the meetings
• Updates on AGe's work and on the public outreach process
Reminders and/or revisions to the meeting schedule, time or location
Page 7
USPOWERGENLuyster Creek Energy Project Public Participation PIon
January 2010
VI. Public Briefings and Dialogues
The meetings described below capture only the more structured elements of Public Participation. AGe
anticipates a dynamic process that will indude additional meetings as circumstances dictate, thedevelopment of working groups for specific tasks if necessary, and informal meetings with individual
stakeholders or 5ubgroupings of community representatives. AGe's primary representative will stand
ready to respond to questions and concerns on an ongoing basis. To the maximum extent, formal and
informal engagement with the community will be documented and included in reporting.
1. Formal Briefing Prior to State Environmental Quality Review (SERR) Scoping Meeting
Date - To be Determined
AGe will hold a formal briefing on its plans for the LCEP with elected officials and key Stakeholders
with a role in protecting the local environment. Participants will be asked to review and comment on
the draft list of Stakeholders (Appendix A) and on the public outreach process proposed in this
document. 1he further meetings below represent major milestones in the SEQR process.
Partidpants in this initial briefing will be asked to consider whether any additional forum or
representative working group would be helpful. The outreach process wilt be updated based upon
their comments.
In addition, stakeholders will be invited to tour the Project site for a direct experience of the existing
AGS units and the location and impact of the state of the art generators.
2. Public Meeting 1; SEaR 5copjng Process
Date - To be Determined
Representatives of AGC will present in detail the plans for the LCEP and outline the anticipated
impacts on local energy systems and the environment. They will also review in detail the SEQR
process and the permitting schedule. The meeting will provide an opportunity for community
organizations to discuss impacts of the lCEP on their constituents among the diverse array of
Astoria's religious, social and ethnic groups. The SEQR scoping process establishes the
environmental issues that the DEIS will focus on, the methodology to be used, and the parameters
for study of alternatives and mitigation strategies. While the lead agency will circulate the scope for
public comment, this first public meeting will provide a formal vehicle for discussion and gathering of
public input that will shape the scope of the EIS.
Stakeholders will also to comment on AGe's plans for further public outreach. Following the meeting,
the outreach plan will be revised to reflect stakeholder input. Once finalized, the final DEIS scope will
be drculated to Stakeholders. AGC may invite the key stakeholders to play an active role in later
public outreach meetings.
A draft scope will be circulated in advance of the public meeting as discussed in section IV above.
3. public Meeting 2: Draft EIS
Date - To be Determined
Page 8
USPOWERGENLuyster Creek Energy Project Public Participation Plan
January 2010
AGe will hold a meeting to discuss the results of the DEIS for the lCEP, The DEIS will be shared in
advance of the meeting, as well as fact sheets translated into predominant neighborhood languages
conveying the results in summary form.
At the meeting representatives of AGe will give a presentation that conveys the results of the DEIS in
a concise format. Participating stakeholders will be divided into break-out groups for facilitated small
group discussion. At the end of the meeting, output from small discussion groups will be shared in
summary form with the full assembly of participants.
As discussed above, each of these meetings may be preceded or followed by additional informal meetings
with key stakeholders in person and via teleconference. These outreach efforts will be documented and
included in reporting.
VII. Document Repositories
Full documentation, covering every public document produced for the LCEP and transcripts of pubHc
briefings, will be stored at the public libraries located the Queens Borough Public Library, 89-11 Merrick
Boulevard, Jamaica, NY 11432 and the Queens Borough Branch Library Astoria Branch, 14-01 Astoria
Boulevard, Long Island City, NY 11101. The same materials will be made available on the AGC website
(www.USPowerGen.com). Stakeholders, as well as other interested parties, will be encouraged to store
in the same locations any documents they produce pertaining to the permitting of the LCEP so that the
repositories include documentation of the full public dialogue.
VIII. Progress Reports
AGC anticipates written updates to the Lead Agency monthly or bi-monthly. The reports will include any
public documents produced during the previous period, transcripts of any formal public meetings,
descriptions of other outreach activities, and any other work completed in the permitting process. The
progress reports without the bulky attachments will be mailed to stakeholders via email or US mail, as
preferred. The progress reports with all attachments will be posted on the AGC website and placed in the
repositories.
IX. Final Report
Upon receipt of the permit, AGC will prepare a final report on public participation in the permitting
process with the full record of documents produced for the process and transcripts of meetings included
as appendices. If permits are received and work proceeds on schedule, AGC anticipates completion of
this report after receipt of all permits.
A summary of the report will be mailed to the stakeholder list via email or US mail, as preferred.
Page 9
USPOWERGEN
ApPENDIX A - STAKEHOLDERS
Revised November 2010
AI Gentile30th Avenue Area Merchant Association36-17 30th AvenueAstoria, NY 11103Tel: 718-956-3366 Fax: 718-278-1766
Asbestos Workers Union Local 122519 43rd AvenueLong Island aty, NY 11101Tel: 718-784-3456
Michael GianarisAssembly Member21·77 31 Street, Suite 107Astoria, NY 11105Tel: 718·545-3889 Fax: 718-545-3607
Cathy NolanAssembly Member41·02 Queens Boulevard, Suite 26Sunnyside, NY 11104Tel: 718-784-3194 Fax: 718-472-0648
E-mail: [email protected]
E-mail: [email protected]
Peter IwanowiczAssistant Secretary for EnvironmentState CapitolAlbany, NY 12224Tel: 518-402-8448 E-mail: [email protected]
Astoria Homeowners, Tenants and Business Civic Association21·20 49th StreetAstoria, NY 11105Tel: 718-721-3690
Astoria Islamic Center Inc.2221 33rd StreetAstoria, NY 11105
Astoria Residents Reclaiming Our World (ARROW)P.O. Box 9060Astoria, NY 11103Tel: 718·595-2829 E-mail: [email protected]
Astoria Restoration Association3128 Ditmars BoulevardAstoria, NY 11105Tel: 718-726-0034 Fax: 718-726·0034
uSPOW ERG ENLuyster Creek Energy Project Public Participation PIon
January 2010
Karen OvertonAstorla/UC Waterfront Parks! Astoria UC Catalyst Coordinator35-30 35th 5treetAstoria, NY 11106Tel: 718-706·8044 E-mail: [email protected]
Bangladesh American Association for Rehabilitation in New York2363 5teinway StreetAstoria, NY 11105Tel: 718-278-8181 Fax: 718-278-8181 E-mail: [email protected]
BFFY 5teinway Senior Center20-43 Steinway StreetAstoria, NY 11105Tel: 718-728-8473 Fax: 718-278-5301
Blasters, Drill Runners &. Miners Local 294302 Ditmars BoulevardAstoria, NY 11105
Tom KleinBoilermakers Local No.524 Van SUcen AvenueFloral Park, NY 11001Tel: 718-895-7722 Fax: 516-326-3435
Steven LudwlgssonBoilermakers local No.524 Van Silcen AvenueFloral Park, NY 11001Tel: 516-326-2500 Fax: 516-326-3435
Bronx Community Board 13024 Third AvenueBronx, NY 10455Tel: 718-585-7117 Fax: 718-292-0558
Bronx Community Board 21029 East 163rd StreetBronx, New York 10459Tel: 718-328-9125 Fax: 718-991-4974
Catholic War Veterans of the USA Inc21 43 29th 5treetAstoria/ NY 11105
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
Cement and Conaete Wor1c:ers Union local #203636 33rd StreetAstoria, NY 11106Tel: 718-361-8131
Page 2
USPOWERGENLuyster Creek Energy Project Public Participation Plan
January 2010
Marie Tomiali, Executive DirectorCentral Astoria Local Development Corporation25-69 38th StreetAstoria, NY 11103Phone: 718·728-7820 Fax: 718·728·7413 E-mail: [email protected]
Cephalonian Association Aenos Inc23 17 29th StreetAstoria, NY 11105Tel: 718-204-8491
Garry BrownChair New York Public Service Commission3 Empire State PlazaAlbany, NY 12223
Church of Christ Holy Spirit SCience of Mind World Mission Inc.2106 35th Street, Apt SFAstoria, NY 11105
Jim GennaroCity Council Member185-10 Union TurnpikeFresh Meadows, NY 11366Tel: 718-217-4969 Fax: 718-217-4968
Peter Valone Jr.City Councilman22-45 31st Street, 2nd FloorAstoria, NY 11105Tel: 718-274-0007 Fax: 718-274-6060
E-mail: [email protected]
E-mail: [email protected]
Clean Air NY342 Broadway, Suite 404New York, NY 10013Tel: 877-458-8247 E-mail: [email protected]
Coalition Helping Organize a Kleaner Environment (CHOKE)33-60 21st StreetLong Island City, NY 11106Tel: 718-274-4767 Fax: 718-278-0919 E-mail: [email protected]
Cas HollowayCommissioner NYC Department of Environmental Protection59-17 Junction BoulevardFlushing, NY 11373Tel: 212-788-8235 Fax: 212-788-3229 E-mail: [email protected]
Communications Workers of America AFL-CIO (CWA)28 10 Astoria BoulevardLong Island City, NY 11102
Page 3
USPOWERGEN
Richard M. Cherry, President and ceoCommunity Environmental Center43-10 11th 5treetlong Island City, NY 11101Tel: 718·784-1444 x 107 Fax: 718-784-8347
Luyster Creek Energy Prole,t Public Participation PIonJanuary 2010
E-mail: [email protected]
Edward BaborCongresswoman Carolyn Maloney22·11 Astoria BoulevardAstoria, NY 11102Tel: 718 932 1804 Fax: 718932 1805
Council on the Environment of NYC51 Chambers Street, Room 228New York NY 10007Tel: 212-788-7900 Fax: 212-788-7913
Jonathan SzottCouncilman Peter Vallone Jr.22-45 31st StreetAstoria, NY 11105Tel: 718-274-4500 Fax: 718-726-0357
Cypreco of America Inc2350 27th 5treetAstoria, NY 11105
Tom CongdonDeputy secretary for EnergyState CapitolAlbany, NY 12224E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
Earthjustice156 William Street, Suite 800New York, NY 10038Tel: 212-791-1881 x 224 Fax: 212-918-1556
EI Diario La Prensa1 Metrotech center, 18th FloorBrooklyn, NY 11201
Excavators' 731 Property Corp (Excavators Union Local 731)3411 35th AvenueAstoria, NY 11106Tel: 718-706-0720
Page 4
USPOWERGENLuyster Creek Energy Project Public Participation PIon
January 2010
Federation of Hellenic Societies of Greater New York Inc.2251 29th StreetAstoria, NY 11105Tel: 718-204-6500 Fax: 718-204-8986
Federation of Italian-American Organizations of Queens Inc.29·21 21st AvenueAstoria, NY 11105
Free Apostolic Church of Pentecost2047 Steinway StreetAstoria, NY 11105Tel: 718-841-9291
Giannitsa Association Megas Alexandros Inc2226 23rd StreetAstoria, NY 11105
Greater Astoria Historical Society35-20 Broadway, 4th Floorlong Island City, NY 11106Tel: 718-278-0700
Greek American Broadcasting Info & Cultural Activities Corporation20 12 20th StreetAstoria, NY 11105
Greek American Home Owners of New York Inc.23·24 31st StreetAstoria, NY 11105
Demetres BeryelesGreek Cultural Center26-80 30th StreetAstoria, NY 11102Tel: 718-726-7329 E-mail: [email protected]
Katie ElmanGreen Shores25-11 34th Street, Apt 3FAstoria, NY 11103Tel: 917-497-6273 E+mail: elmank@yahoo,com
International Brotherhood of Electrical Workers (IBEW)158+11 Harry Van Arsdale Avenue, 4th FloorFlushing, NY 11365Tel: 718-591-4000 Fax: 718-380-8998
International Brotherhood of Teamsters3609 21st AvenueAstoria, NY 11105
Page 5
USPOWERGENLuysfer Creek Energy Project Public Participotion Pion
January 2010
Iron Workers Locals 40 & 36 Joint35*23 36th StreetAstoria, NY 11106Tel: 718-433-4195
Kefalos Society of America Inc.2043 Steinway StreetAstoria, NY 11105Tel: 718-358-1133
Kid Krazy Early Childhood Development Center Annex21·3521 AvenueAstoria, NY 11105Tel: 718-545-5728 Fax: 718-545-5840 E-mail: [email protected]
Kiwanis International2131 Shore BoulevardAstoria, NY 11105
Marcia Bystrynleague of Conservation Voters30 Broad StreetNew York, NY 10004-2909Tel: 212-361-6350 Fax: 212-361-6363
UCIAstoria Journal69-60 Grand AvenueMaspeth, NY 11378
E-mail: [email protected]
Michael CavanaughLocal 740 Millwrights and Machinery Erectors89-07 Atlantic AvenueWoodhaven, NY 11421Tel: 718,849-3636 E-mail: mcavanaugh740@verizon,net
Local 807 Labor-Management Health Pension Funds3243 49th StreetAstoria, NY 11103Tel: 718-274-5353
Local 8913641 28th StreetLong Island City, NY 11106
Materials For The Arts33,00 Northern Boulevard, 3rd FloorLong Island City, NY 11101Tel: 718-729-3001 Fax: 718-729-3941 E-mail: info@mfta,nyc.gov
Page 6
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 2010
Dr. Robert Kulikowski, DirectorMayor's Office of Environmental Coordination2538roadway, 14th FloorNew York, NY 10007E-mail: [email protected]
Adam FreedMayor's Office of Sustainability253 Broadway, 10th FloorNew York, NY 10007Tel: 212-788-1400 Fax: 212-788-7558
Carolyn MaloneyMember of Congress28-11 Astoria BoulevardAstoria, NY 11102-1933Tel: 718-932-1804 Fax: 718-932-1805
Muslim American Society of Queens3513 23rd AvenueAstoria, NY 11105
E-mail: [email protected]
E-mail: [email protected]
National Coalition of Physicians for Healthcare Awareness Inc2202 Steinway StreetAstoria, NY 11105
Ashok GuptaNatural Resources Defense Council40 West 20th StreetNew York, NY 10011Tel: 212-727-2700 Fax: 212-727-1773
Jennifer PowersNatural Resources Defense Council40 West 20th StreetNew York, NY 10011Tel: 212-727-2700 Fax: 212-727-1773
New York City Asthma Partnership2 Lafayette Street, Box eN 36ANew York, NY 10007Tel: 212-513-0528 Fax: 212-676-2071
New York Daily News450 West 33rd StreetNew York, NY 10001Tel: 212-210-2100
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
Page 7
USPOWERGENlvyster Creek Energy Project Public Participation Pion
January 2010
Ross MacWhinney &. Melissa Reburiano, Project CoordinatorsNew York Public Interest Research Group (NVPIRG) Queens College ChapterCity University of New York65-30 Kissena BoulevardStudent Union Building, Room 8-22Flushing, NY 11367Tel: 718-997-3954 E-mail: [email protected]
Jason Chin-Fatt, Project CoordinatorNew York Public Interest Research Group (NVPIRG) Queensborough Community CollegeChapter222+05 56th AvenueStudent Union Building, BasementBayside, NY 11364Tel: 718-225-9121 E-mail: [email protected]
Rajendra AddepaliNew York State Department of Public Service3 Empire State PlazaAlbany, NY 12223
NY 1 News75 Ninth AvenueNew York, NY 10011Tel: 212-379-3311
NY Power Authority123 Main StreetWhite Plains, NY 10601-3170Tel: 914-287-4271 E-mail: [email protected]
John LiuNYC ComptrollerOne Centre StreetNew York, NY 10007Tel: 212~669-3500 Fax: 212-669-2707
Amanda M. Burden, DirectorNYC Department of Planning22 Reade StreetNew York, NY 10007Tel: 212-720-3200 Fax: 212-720-3219
Toby Ann StaviskyNYS Senator144-36 Willets Point BoulevardFlushing, NY 11357Tel: 718-445-0004 Fax: 718-445-8398
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
Page 8
USPOWERGENLuyster (reele Energy Project Public Participation Pion
JOl'lUory 2010
Pancyprian Association Inc2315 31st StreetAstoria, NY 11105Tel: 718-278-9729
Peniel Baptist Church Inc.1954 38th StreetAstoria, NY 11105Tel: 718-956-4732
Polish Navy Veterans Association of America Inc.2208 5teinway StreetAstoria, NY 11105
Mary FayePrivate Citizen311 77th StreetJackson Heights, NYE·mail: [email protected]
Bill de BlasiaPubic Advocate1 Centre Street, 15th RoorNew York, NY 10007Tel: 212-669-7200 Fax: 212-669-4701
Helen MarshallQueens Borough President120-55 Queens BoulevardKew Gardens, NY 11424Tel: 718-286-3000 Fax: 718-286-2876
Jack FriedmanQueens Chamber of Commerce7520 Astoria BoulevardFlushing, NY 11370-1131Tel: 718-898-8500 Fax: 718-898-8599
Queens ChronicleP.O. Box 74-7769Rego Pari<, NY 11374Tel: 718-205-8000
Joan Asselin, Lucille HartmannQueens Community Board 136·01 35th AvenueAstoria, NY 11106Tel: 718-786-3335 Fax: 718-786-3368
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
E-mail: [email protected]
Page 9
USPOWERGENLuyster Creek Energy Project Public Participation PIon
January 2010
Gloria D'AmicoQueens County Clerk's office88·11 Sutphin Boulevard, 1st floorJamaica, NY 11439
Queens Courier SChneps Publications Inc38-15 Bell BoulevardBayside, NY 11361Tel: 718-224-5863 Fax: 718-224-5441 E·mai1: [email protected]
Queens Philharmonic2028 27th StreetAstoria, NY 11105
Queens Tribune174-15 Horace Harding ExpresswayFresh Meadows, NY 11365Tel: 718-357-7400
Reserve Officers Association of the United states2139 38th StreetAstoria, NY 11105
Sacred Patriarchal &. Stavropegial Orothodox Monastary of st. Irene3604 23rd AvenueAstoria, NY 11105Tel: 718-626-6225
James Gallagher, senior Vice President for EnergyEconomic Development Corporation110 William StreetNew York, NY 10038E-mail: [email protected]
Sons of Italy in America2037 28th StreetAstoria, NY 11105
South East Queens Concerned NeighborsP.O. Box 200600South Ozone Park, NY 11420
Roy Wilkins ParkSouthern Queens Park Association177th Street & Baisley BoulevardJamaica, NY 11434Tel: 718-276-4630 Fax: 718-276-4630 E-mail: [email protected]
Page 10
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 2010
Springfield Rosedale CommunityP.O. Box 220265Rosedale, NY 11422Tel: 718-723-6463 Fax: 718-361-3886
St. Irene Chrysovalantou Nursery &. Kindergarten36-07 23 AvenueAstoria, NY 11105Tel: 718-626·6225 Fax: 718-626-7665 E-mail: [email protected]
Kim HarrimanState CapitalState CapitalAlbany, NY 12224
George OnoratoState Senator28-11 Astoria BoulevardLong Island City, NY 11102Tel: 718-545-9706 Fax: 718-726-2036
Sullogos Nomou Magnislas Argonayte ltd3811 Ditmars Boulevard 119Astoria, NY 11105Tel: 718-728-5887
E-mail: [email protected]
Sunnyside Foundation for Community Planning It. Preservation45-18 Skillman AvenueSunnyside, NY 11104Tel: 718-392-9139
Syllogos Kreton Minos Inc.2227 33rd StreetAstoria, NY 11105
The Hellenic Link Inc.38-11 Ditmars Boulevard, Suite 278Astoria, NY 11105
The Peoples Museum2227 Crescent StreetAstoria, NY 11105Tel: 718-204-7941
Times Ledger Newspapers41-02 Bell Boulevard, 2nd FloorBayside, NY 11361Tel: 718-229-0300
Page 11
USPOWERGENLuyster Creek Energy Project Public Participation Pion
January 2010
Rosemary PoveromovoUnited Community Civic Association22-32 81st StreetJackson Heights, NY 11370Tel: 718-932-5415 Fax: 718-932-9014
United Contractors Alliance21-77 31st StreetAstoria, NY 11105
United Piano Workers Union local 1022810 Astoria BoulevardLong Island City, NY 11102Tel: 718-728-1070
E-mail: [email protected]
Elizabeth YeampierreUPROSE166A 22nd StreetBrooklyn, NY 11232Tel: 718-492-9307 E-mail: [email protected]
Charles B. RangelUS House of Representatives163 West 125th Street, Room 737New York, NY 10027Tel: 212-663-3900 Fax: 212-663-4277
Charles SChumerUS senate757 Third Avenue, Room 1702New York, NY 10017Tel: 212-486-4430 Fax: 212-486-7693
Kirsten GillibrandUS Senate780 Third Avenue, Suite 2601New York, NY 10017Tel: 212-688-6262 Fax: 212-688-7444
Utility Workers Union of America5 West 37th Street, 7th FloorNew York, NY 10018Tel: 718-575-4400 Fax: 718-575-3852
E~mail: [email protected]
E~mail: [email protected]
James SlevioUWUA 1-25 West 37th StreetNew York, NY 10019Tel: 212~S7S~4400 E~mail: james.slevin@uwua1~2.org
Page 12
USPOWERGENLuyster Creek Energy ProJect Public Participation Plan
January 2010
Western Queens Gazette42-16 34th Avenuelong Island City, NY 11101Tel: 718-361-6161 Fax: 718-784-7552
Zoodohos Pighl of Andros Society Inc2119 28th StreetAstoria, NY 11105
Email Contactsj
E-mail: [email protected]
Julie Greenberg [email protected])Asbid Rapp ([email protected])Hali Canson ([email protected])David Cohen ([email protected])Eric Bergman ([email protected])John Beck ([email protected])Mark Pereria ([email protected])Matthew Cindr ([email protected])Shaun Campbell ([email protected])[email protected]@[email protected]@mail.house.gov
Lead Agency;
NYSDECKevin KispertE-mail: [email protected]
Stephen TomasikE-mail: [email protected]
Jack NascaE-mail: [email protected]
Michelle MooreE-mail: [email protected]
project Team CUSpG, Nixon Peabody, ESS Group. Inc,):
USPGDavid PerriE-mail: [email protected]
John ReeseE-mail: [email protected]
Uam BakerE-mail: [email protected]
Ralph VanacoreE-mail: [email protected]
Andy OliverE-mail: [email protected]
Barry DurhamE-mail: [email protected]
Mark SudbeyE-mail: [email protected]
Jeff HunterE-mail: [email protected]
Craig HartE-mail: [email protected]
Page 13
USPOWERGENLuyster Creek Energy Project Public PartkipOlion Plan
Januory 2010
Nixon PeabodyScott TurnerE-mail: [email protected]
ESS Group, Inc.Steve WoodE-mail: [email protected]
Additional Contactsj
Chris ReinE·mail: [email protected]
NY Building CongressDick AndersonPhone: 212·481·9230 E-mail: [email protected]
Assodation for a better NYJen HensleyPhone: 212-835-2767 E-mail: [email protected]
Deputy MayorsBob SteeleStephen Goldsmith E-mail: [email protected]
Poge 14