Luis Medeiros Romão Dirk Vandeplassche SCK CEN
description
Transcript of Luis Medeiros Romão Dirk Vandeplassche SCK CEN
Luis Medeiros RomãoDirk Vandeplassche
SCKCEN
Roadmap towards theMYRRHA Accelerator Construction
MYRRHA Accelerator 1st International Design Review – Brussels, 12 – 13 November 2012
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 1
Agenda
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 2
• Context• Scope• Time frame• Reactor’s roadmap• General needs• R&D Roadmap• Road to construction• Concluding thoughts
Context
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 3
• SCKCEN:• promoting ADS• but…without accelerator tradition• and…in a nuclear reactor environment
• Belgium:• supporting ADS• without accelerator development tradition in the research
environment
Scope, in a nutshell
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 4
• Superconducting Proton Linac (coupled to sub-critical reactor): 600MeV 4mA CW MTBF > 250h
• Full power beam-dump (2.4MW)• ISOL@MYRRHA beam deviation system (optional)
What do we want to build ?
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 5
Injectors Building
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 6
Acc. Element #
Ion Source 2
LEBT 2
4-rod RFQ 2
RT-CH cavities 4
SC-CH cavities 8
Magnets 21
Re-bunchers (spoke cav.)
4
Other Elements #
RF amplifiers 14
Power supplies N
Other electronics N
Clean room 1
Mechanical workshop
1
RF workshop 1
Office space
Linac Tunnel & RF Gallery
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 7
Acc. Elements #Spoke cryomodules 24
Elliptical cryomodules Section 1
17
Elliptical cryomodules Section 2
15
Magnets 114
RF Gallery Elements #RF Amplifiers 142Power supplies NOther electronics N
HEBT
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 8
Acc. Elements #Magnets 41
ISOL@MYRRHA deviation 1FP beam-dump 1
Ancillary & Distributed Systems
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 9
SystemsElectrical power 13MW
Cooling 10MWHVACVacuumCryogenics 2K
/5MWDiagnostics NControl System EPICSMPSPPS
MYRRHA’s Time Line
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 10
2010-2014- R&D- Front EndEngineeringDesign
2019On site
assembly
2016-2018Construction ofcomponents &civil engineering
2015 Tendering &
Procurement
2020-2022 Commissioning
2023Progressivestart-up
2024-Full
exploitation
FEED(Front End Engineering
Design)
Minimisetechnological
risks
Securethe licensing
Secure a sound
management and
investment structure
PDPpreliminary dismantling
plan
PSARpreliminary
safety assesment
EIARenvironmental
impact assesment
CentralProjectTeam
OwnerEngineering
Team
OwnerConsortium
Group
MYRRHA in 2024
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 11
ReactorSubcritical or Critical modes65 to 100 MWth
Accelerator(600 MeV - 4 mA proton)
FastNeutronSource
Spallation Source
Lead-Bismuthcoolant
MultipurposeFlexible
IrradiationFacility
Reactor’s roadmap
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 12
Design & Experiments•SCK•CEN•European FP projects•Other scientific collaborations (ex: Von Karman Institute)
Component and Integration Engineering •SCK•CEN (specific reactor core components)•FEED Engineer - Industrial Consortium
Building & Manufacturing•MYRRHA Consortium (incl. SCK•CEN)•Industrial partners•Including accelerator infrastructures
Reactor’s roadmap
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 13
Installation• MYRRHA Consortium (incl. SCK•CEN)• Industrial partners
Commissioning • MYRRHA Consortium (incl. SCK•CEN)• Industrial partners
Operations • MYRRHA Consortium (incl. SCK•CEN)
Accelerator Postulate
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 14
The accelerator is a unique engine with first of a kind performances that can be acquired by the MYRRHA Consortium from an external scientific – industrial collaboration, the Accelerator Consortium.
General Needs
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 15
Present Accelerator Roadmap
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 16
Design & Prototyping•European FP projects•SCK•CEN•Other scientific collaborations (ex: CNRS, Ganil, …)
Component and Integration Engineering •Accelerator Consortium – Scientific & Industrial Collaboration•SCK•CEN
Manufacturing •Accelerator Consortium•SCK•CEN
R&D Roadmap
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 17
17
today
RFQ@UCLPhase 1
Cryomodule prototypes
end 2014
INJ@UCLPhase 2RT-CH RAFI
FP8
• engineering• construction• test
end 2016
end 2018
SC-CH spoke
INJ@UCLPhase 3SC-CH
ellipticProd
Prod
elliptic
MAXFP7
Prod
2014 Recruitement plan
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 18
2011 2012 2013 20140
1
2
3
4
5
6
7
8
Cryogenics Engineer
Technician 2
Technician 1
Control System Engineer
RF Engineer
System Engineer
Licensing Officer
Program Manager
Head of ADT
2015
todayBu
ildin
g la
yout
Road to construction
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 19
2017
2019
Elec
tricit
y
Cool
ing
Vent
ilatio
n
Cryo
geni
cs
RF g
alle
ry
Acce
lera
tor
Integration Integration
Manufacturing and Installation
Global Integration
2020
Present Accelerator Scenario
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 20
Installation• MYRRHA Accelerator Consortium (incl.
SCK•CEN)• Industrial partners
Commissioning• MYRRHA Accelerator Consortium (incl.
SCK•CEN)• Industrial partners
Operations • MYRRHA Consortium (incl. SCK•CEN)
Concluding thoughts
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 21
• MLA can be considered as an engine– 2 choices: Make or Buy– SCK’s present position: Buy is the choice really open ?
• Is this model viable ? – Other similar projects follow a different path– Strong internal involvement in every phase– European project is in preparation in order to analyse
this scenario
Concluding thoughts
Luis Medeiros Romão, MLA 1st International Design Review, Brussels, 12-13 November, 2012 22
• Longer term issues:– Operations– Maintenance– Reengineering– Configuration management
Can the MYRRHA Consortium live without the Accelerator Consortium after delivery ?
23
Thank-you!