Lugo Marine Wind Cargo Presentation 2011
-
Upload
lugomarine -
Category
Documents
-
view
393 -
download
0
description
Transcript of Lugo Marine Wind Cargo Presentation 2011
![Page 1: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/1.jpg)
Scopes of Work For Windmill Components
Design & EngineeringRailcar Layout
Installation of Tiedown ComponentsLoading of Components
Securing of Components as per AAR RegulationsMaintenance of Components While In Storage
Set Up of Railcar for Power Generation toNacelles While in Transit
![Page 2: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/2.jpg)
Railcar Layout & Installation of BladeContainer Supports
![Page 3: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/3.jpg)
Railcar Layout & Installation of Nacelle BracketSystems
![Page 4: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/4.jpg)
Loading and securing of Nacelles
![Page 5: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/5.jpg)
Loading And Securing of Blade Containers
![Page 6: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/6.jpg)
Single Blade Railcar Setup
![Page 7: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/7.jpg)
Direct Discharge and Loading of Windmill
Hubs From Ship To Railcar.
![Page 8: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/8.jpg)
Direct Discharge and Loading ofWindmill Hubs From Ship To Railcar.
![Page 9: Lugo Marine Wind Cargo Presentation 2011](https://reader033.fdocuments.net/reader033/viewer/2022052623/559eccbe1a28abd1338b471c/html5/thumbnails/9.jpg)
For Rate Inquiries, Please Contact:
- Norbert LugoManaging Director-Operations & [email protected] (832) 349 - 5251
- Robert Lugo, Jr.Managing [email protected] (832) 423 - 4281