    1/34

    OGP Marine Risks Workshop Proceedings

    OGP

    . Tanker Conversions to FPSOsRob Potthurst, Lloyds Register

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Presentation onPresentation on

    Tanker ConversionsTanker Conversions

    toto FPSOsFPSOs

    RobRob PotthurstPotthurst

    Offshore Floating UnitsOffshore Floating Units

    Oil and GasOil and Gas

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    OverviewOverview

    Market summaryMarket summary

    LR ExperienceLR Experience

    Key issuesKey issues

    Rules and RegulationsRules and Regulations

    Hull strength and fatigueHull strength and fatigue

    Some lessons learnt (hopefully)Some lessons learnt (hopefully)

  • 8/13/2019 LR FPSO Design

    2/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    FPSO / FSO

    Market

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Total 70+ units worldwideTotal 70+ units worldwide

    NewbuildNewbuild

    (30%)(30%)

    ConversionConversion

    (70%)(70%)

    ShipShip--type Floatingtype Floating

    Production UnitsProduction Units

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    3/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Future Floating OffshoreFuture Floating Offshore

    Installation ProjectsInstallation Projects

    Analysis of asset types identified under theAnalysis of asset types identified under themost likely development solutionmost likely development solution

    TLPTLP

    (11%)(11%)

    FSOFSO

    (8%)(8%) SemiSemi

    (3%)(3%)

    SPARSPAR

    (18%)(18%)

    FPSOFPSO

    (60%)(60%)

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    F(P)SO CapabilitiesF(P)SO Capabilities

    Typical RequirementsTypical Requirements

    Storage 200,000 - 2,000,000 barrels

    Production 30,000 - 300,000 bopd

    Vessel 100,000 - 350,000 tonnes

    Water depth 70 - 1500 metres

    Topsides 2000 - 33000 tonnes

    Risers 1 - > 30

    Wave height benign - > 30 metres

    Air temp -20oC - > 30oC

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    4/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    LR Experience

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices LR ExperienceLR Experience

    FPSO and FSO Units

    Steel Fixed Platforms ~ 800

    Buoys Pipelines

    Jack-ups

    Semi-submersibles

    Concrete Structures

    ~ 40

    ~ 15

    ~ 70

    ~ 50

    ~ 75

    ~ 30

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    5/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Floating Production Installations

    - LR Worldwide Experience

    BraziBrazill33

    CanadaCanada33

    NorthNorthSeaSea1919

    MediterraneaMediterraneann44

    VietnaVietnamm22

    AustraliaAustralia55

    PhilippinePhilippiness22

    NewNewZealandZealand

    11

    West ofWest ofShetlandsShetlands

    11

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Recent Conversion ExperienceRecent Conversion Experience

    Amerada Hess TritonAmerada Hess Triton

    Amerada Hess FifeAmerada Hess Fife

    Amerada HessAmerada Hess BluewaterBluewater DurwardDurward/Dauntless/Dauntless

    BluewaterBluewater BleoBleo HolmHolm

    ExproExpro EfiatEfiat AbanaAbana

    MAS CurlewMAS Curlew

    PetechimPetechim VietsovpetroVietsovpetro DragonDragon

    PetrobrasPetrobras RoncadorRoncador

    PetrobrasPetrobras Barracuda (exBarracuda (ex PP.MoraesPP.Moraes))

    Reading & BatesReading & Bates SeallionSeallion

    Shell Todd Maui BShell Todd Maui B

    SLP/SLP/MaerskMaersk ConocoConoco MacCullochMacCulloch

    ShellShell soreenasoreena

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    6/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Example of ConversionExample of Conversion

    ConocoConoco MacCullochMacCulloch

    North Sea ProducerNorth Sea Producer -- TeessideTeesside

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Example of ConversionExample of Conversion

    FPSO Whakaaropaifor Shell Todd Maui B Field

    FPSO FPSO WhakaaropaiWhakaaropaifor Shell Todd Maui B Fieldfor Shell Todd Maui B Field

    Oil Storage Capacity approx. 760,000bbls

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    7/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandGasServices

    OilandGasServices

    OilandGasServices

    Conversions

    Key Issues

    OilandGas

    Services

    OilandGasServices

    OilandGas

    Services

    Overall requirementsOverall requirements

    Shallow/DeepwaterShallow/Deepwater

    Turret/Spread mooringTurret/Spread mooring

    arrangementsarrangements Permanent /Permanent / DisconnectableDisconnectable

    mooringsmoorings

    Small/Large displacement hullsSmall/Large displacement hulls

    Benign/Harsh environmentsBenign/Harsh environments

    Project management requiredProject management required

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    8/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    What makes an FPSO differentWhat makes an FPSO different

    from a trading tanker?from a trading tanker?

    Operations and safety requirementsOperations and safety requirements

    Layout and arrangementLayout and arrangement

    Specified service/locationSpecified service/location Rules and regulationsRules and regulations

    Design/construction/commissioningDesign/construction/commissioning

    InIn--situ inspection/maintenancesitu inspection/maintenance

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Key Choice DriversKey Choice Drivers

    Project and client requirementsProject and client requirements

    time to first oiltime to first oil

    location/environmentlocation/environment

    functionfunction

    life cycle costslife cycle costs

    Statutory and National Authority requirementsStatutory and National Authority requirements Ship Yard scheduleShip Yard schedule

    availability / capability / priceavailability / capability / price

    locationlocation Availability of suitable tonnageAvailability of suitable tonnage

    capacitycapacity

    condition, agecondition, age

    upgrading scopeupgrading scope

    New build: 2 to 3 years; Conversion: 1 to 2 yearsNew build: 2 to 3 years; Conversion: 1 to 2 years

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    9/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Hull Selection Issues (conversion)Hull Selection Issues (conversion)

    Vessel age, condition and service historyVessel age, condition and service history hull global strengthhull global strength remaining corrosion marginsremaining corrosion margins remaining fatigue liferemaining fatigue life structural steelwork replacementstructural steelwork replacement

    Mooring structureMooring structure internal or external modificationsinternal or external modifications structural reinforcementstructural reinforcement

    Topside integrationTopside integration structural reinforcementstructural reinforcement

    UpgradesUpgrades equipment / systemsequipment / systems coatings / corrosion controlcoatings / corrosion control machinerymachinery accommodationaccommodation

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices ConversionConversion -- Major WorksMajor Works

    Existing HullExisting Hull

    Removals/modificationsRemovals/modifications hull steelwork, coatings etc.hull steelwork, coatings etc. propulsion and other machinerypropulsion and other machinery rudder/steering gearrudder/steering gear accommodation, deckhouses andaccommodation, deckhouses and helideckhelideck piping systemspiping systems

    UpgradesUpgrades marine and topsides control system integrationmarine and topsides control system integration fire protection systems and their integrationfire protection systems and their integration power generation systems and their integrationpower generation systems and their integration cargo tank venting arrangementcargo tank venting arrangement ballast and cargo oil pumps and valvesballast and cargo oil pumps and valves inert gas systeminert gas system utility systems (utility systems (egegwater, steam, heating)water, steam, heating)

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    10/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices ConversionConversion -- Major WorksMajor Works

    Hull AdditionsHull Additions

    turret or spread mooring system, equipment, etcturret or spread mooring system, equipment, etc

    riser porches or fluid transfer system and pipingriser porches or fluid transfer system and piping

    provision of thrustersprovision of thrusters

    installation of process deck supportsinstallation of process deck supports

    process systemsprocess systems PAUsPAUs, flare and piping, flare and piping

    blast wallsblast walls life saving equipmentlife saving equipment

    fire and gas equipment and systemsfire and gas equipment and systems

    evacuation measuresevacuation measures

    bulwark and breakwaterbulwark and breakwater

    lifting equipmentlifting equipment

    loading instrument (computer)loading instrument (computer)

    offloading systemoffloading system

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Mooring ArrangementsMooring Arrangements

    BowBow

    MooringMooring

    InternalInternalTurretTurret

    MooringMooring

    SpreadSpread

    MooringMooring

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    11/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Turret Mooring SystemsTurret Mooring Systems

    Large Internal TurretLarge Internal Turret Small Internal TurretSmall Internal Turret Riser Turret MooringRiser Turret Mooring

    (D)(D)

    External Turret MooringExternal Turret MooringSubmerged TurretSubmerged Turret

    Production (D)Production (D)Buoyant TurretBuoyant Turret

    Mooring (D)Mooring (D)

    InternalInternal ExternalExternal

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices General arrangementGeneral arrangement

    Living quarters at the sternLiving quarters at the stern

    Living quartersLiving quarters

    OilOilSep.Sep.

    P.G.P.G.

    GasGasComp.Comp.

    MeteringMetering

    Flare TowerFlare Tower

    TurretTurret

    Living quartersLiving quarters

    P.G.P.G.

    OilOilSep.Sep.

    GasGasComp.Comp.

    MeteringMetering

    Flare TowerFlare Tower

    TurretTurret

    Living quarters at the bowLiving quarters at the bow

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    12/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    FPSO

    Rules and Regulations

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Governing RegulationsGoverning Regulations

    Local National AuthorityLocal National Authority

    Class Rules for FPSO InstallationsClass Rules for FPSO Installations

    Flag StateFlag State

    International ConventionsInternational Conventions

    SOLAS, MARPOL, LOADLINE,SOLAS, MARPOL, LOADLINE,TONNAGETONNAGE

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    13/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices National RegulationsNational Regulations

    U.K.U.K. HSE safety case and verificationHSE safety case and verification

    Canada(NS)Canada(NS) CNOPB, TC(flag) ,RQF, classCNOPB, TC(flag) ,RQF, class

    BrazilBrazil (BNW), class, flag(BNW), class, flag

    NigeriaNigeria Marine Notice, class, flag(N)Marine Notice, class, flag(N) Gulf of MexicoGulf of Mexico FollowsFollows

    __________________________________________________________

    International ConventionsInternational Conventions

    SOLAS, MARPOL, LOADLINE,SOLAS, MARPOL, LOADLINE,TONNAGETONNAGE

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    DefinitionsDefinitions

    ClassClass

    Rules Based / Risk BasedRules Based / Risk Based

    CertificationCertification

    To Regulations and CodesTo Regulations and Codes VerificationVerification

    To Performance CriteriaTo Performance Criteria

    ClassClass\\CertificationCertification\\VerificationVerification

    often combinedoften combined

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    14/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Rules for a Floating OffshoreRules for a Floating Offshore

    Installation at Fixed LocationInstallation at Fixed Location

    Rules and

    Regulations

    Part 4

    Rules and

    Regulations

    Part 4

    Rules and

    Regulations

    Part 4

    Rules and

    Regulations

    Part 4

    Rules and

    Regulations

    Part 5

    Rules and

    Regulations

    Part 4

    Rules and

    Regulations

    Part 3Rules and

    Regulations

    Part 2

    Rules and

    Regulations

    Part 1ARules andRegulations

    Part 1

    Parts 2 to 9

    Technical Regulations

    Parts 2 to 9Parts 2 to 9

    Technical RegulationsTechnical Regulations

    Part 1APart 1A

    Risk Based ApproachRisk Based Approach

    Part 1Part 1

    RegulationsRegulations

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Scope of LR FPSO RulesScope of LR FPSO Rules

    LR Rules cover the followingLR Rules cover the following

    aspects :aspects :

    Hull and Marine SystemsHull and Marine Systems

    Mooring SystemsMooring Systems

    Risers (optional)Risers (optional)

    Process plant (optional)Process plant (optional)

    Drilling plant (optional)Drilling plant (optional)

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    15/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    LR ClassificationLR Classification

    AlternativesAlternatives

    Prescriptive RulesPrescriptive Rules -- business as usualbusiness as usual

    Flexibility of Risk Based optionsFlexibility of Risk Based options

    Risk Based SolutionsRisk Based Solutions

    Applicable to Design of both hull andApplicable to Design of both hull andtopsides, although generally hulltopsides, although generally hulladopts prescriptive approachadopts prescriptive approach

    Applicable to Periodic InspectionApplicable to Periodic Inspection(draft LR guidance available)(draft LR guidance available)

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    AA6cAA6c

    LR Guidance NotesLR Guidance Notes

    Supporting the RulesSupporting the Rules

    An Overview of Regulatory Issues

    Conversion of Tankers for Floating

    Production Service Ship Type Hull Structural Appraisal and

    supplement Additional Structural Aspects

    Positional Mooring Systems and supplement FibreRopes for Offshore Moorings

    Periodic Inspection

    Design Appraisal of Semi-Submersible Units

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    16/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Conversions

    Hull strength and fatigue

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Hull Design ConsiderationsHull Design Considerations

    hull strength, arrangement and materials 100-year site specific criteria local connection details and fatigue life (min 20 years) range of loading conditions vessel motions and accelerations mooring system and hull integration process support structure slamming and green seas sloshing helideck, cranes and cargo offloading system accommodation corrosion control construction tolerances and fabrication quality philosophy for in-service periodic survey interfaces

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    17/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Model TestingModel Testing -- supportsupport

    To support design calculationsTo support design calculations

    Riser & mooring designRiser & mooring design

    Loading, excursions, separationLoading, excursions, separation

    FPSO/shuttle tanker interactionFPSO/shuttle tanker interaction

    Hull motions, slamming, greenHull motions, slamming, greenseasseas

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Ship RulesShip Rules -- basic hull strengthbasic hull strength

    Parametric equations for :Parametric equations for :

    Wave bending moment/shear forceWave bending moment/shear force

    inertiainertia

    Hull modulusHull modulus

    FEA requirementFEA requirement(strength/fatigue)(strength/fatigue)

    Local strengthLocal strength

    WW service (limitation options)WW service (limitation options)

    Equivalence through IACSEquivalence through IACS

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    18/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices FPSO HullFPSO Hull -- Global StrengthGlobal Strength

    Minimum class rule standardMinimum class rule standard

    Site specific environmental criteriaSite specific environmental criteria

    Effect of mooring systemEffect of mooring system(+(+weathervaningweathervaning))

    Process facilitiesProcess facilities Long term service (at site)Long term service (at site)

    Range of loading conditionsRange of loading conditions

    (including inspection and accidental cases)(including inspection and accidental cases)

    Slamming/green seasSlamming/green seas

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    FF2FF2--1g1g

    Global Hull DesignGlobal Hull Design wave BM & SFwave BM & SF

    Still water loading conditions often more severefor FPSOs

    Class Rules permit review of Rule versus Sitespecific wave bending moments and shear forces

    Will depend upon site environmental criteria Harsh environment wave BM and SF are close to and

    may exceed Ship Rule requirements Benign environment are less than Ship Rules but not to

    be taken less than 70% of unrestricted service Ship Rulerequirements in general

    Multisite operation may require assessment Owners requirements, eg corrosion margins Towing and temporary conditions to be

    considered

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    19/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    100 Year Hs /100 Year Hs / TpTp ContoursContours

    2 6 10 14 18 22 26 304

    6

    8

    10

    12

    14

    16

    18

    2020

    4

    Hs12 i

    Hs22 i

    Hs32 i

    302 TP12 i

    TP22 i

    TP32 i

    West of ShetlandWest of Shetland

    Northern North SeaNorthern North Sea

    Central North SeaCentral North Sea

    Hs

    Tp

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Some typical criteriaSome typical criteria

    HsHs TpTp

    NigeriaNigeria 3.13.1 7.67.6

    Offshore IranOffshore Iran 5.95.9 10.210.2

    AustraliaAustralia 7.27.2 11.111.1U.K. CentralU.K. Central 13.013.0 15.215.2

    West of ShetlandWest of Shetland 17.117.1 16.016.0

    Nova ScotiaNova Scotia 16.016.0 14/1814/18

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    20/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Accidental LoadsAccidental Loads

    Collision due to supply boat /Collision due to supply boat /shuttle tanker / icebergshuttle tanker / iceberg

    Dropped objectDropped object

    Explosion / blastExplosion / blast

    Ultimate strength criteriaUltimate strength criteria

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Steel GradesSteel Grades

    Class rules for shipsClass rules for ships

    New requirements for lowNew requirements for low

    temperature operationtemperature operation

    Structural categoriesStructural categories ThicknessThickness

    LocationLocation

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    21/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Hull Strength/Fatigue FEAHull Strength/Fatigue FEA

    Cargo / ballast tank areaCargo / ballast tank area

    Hopper knuckle connectionHopper knuckle connection

    Mooring structure and hull integrationMooring structure and hull integration

    Riser porches and supporting structureRiser porches and supporting structure

    Topsides support structure and hull integrationTopsides support structure and hull integration

    Flare tower support structureFlare tower support structure Access tower support structureAccess tower support structure

    Offloading station support structureOffloading station support structure

    Main crane pedestals and support structureMain crane pedestals and support structure

    HelideckHelideck structurestructure

    Additional locations depending on vesselAdditional locations depending on vessel

    function and owners requirementsfunction and owners requirements

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Fatigue LifeFatigue Life

    Factors of SafetyFactors of Safety

    Substantial consequences of failure are defined as loss of life,uncontrolled outflow of hazardous products, collision orsinking and should include for progressive failure scenarios.

    Note 1Note 1 : includes external components which can be dry inspected / repa: includes external components which can be dry inspected / repaired.ired.

    Note 2Note 2 : includes external components below the minimum operating draft: includes external components below the minimum operating draftwhich can only be inspected in water , but dry repairs could bewhich can only be inspected in water , but dry repairs could be carried out.carried out.

    Inspectable/

    Repairable

    Fatigue Life Factor

    Consequence of Failure

    Non-substantial Substantial

    Yes, dry(see note 1)

    1 2

    Yes, wet(see note 2)

    2 4

    No 3 10

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    22/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Typical Critical AreasTypical Critical Areas

    Process SupportsProcess Supports

    Stress ConcentrationStress Concentration

    MisalignmentMisalignment

    WeldingWelding

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    FPSO Fatigue EnhancementFPSO Fatigue Enhancement

    Details (conversion)Details (conversion)

    Examples of modification to hull longitudinal connection detailsExamples of modification to hull longitudinal connection details

    Additional lugAdditional lug

    Longitudinal/Transverse frameLongitudinal/Transverse frameconnectionconnection

    AdditionalAdditional

    bracketbracket

    LongitudinalLongitudinal

    Transverse frameTransverse frame

    Shell plateShell plate

    AdditionAdditionalalbracketbracket

    Transverse frameTransverse frame

    LongitudinalLongitudinal

    Shell plateShell plate

    Transverse frameTransverse frame

    LongitudinalLongitudinal

    Shell plateShell plate

    AdditionalAdditionalbracketbracket

    Within cargo and ballastWithin cargo and ballast

    tankstanks

    ItemItem

    ExtenExten

    ttBottom and side shell (up toBottom and side shell (up tolimit of wetted area)limit of wetted area)

    Bilge areaBilge area andand side shellside shell(up to limitof wetted(up to limitof wetted

    Additional LugsAdditional Lugs

    AdditionalAdditional BktsBkts

    area)area)

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    23/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Green SeasGreen Seas

    RuleRulerequirementsrequirements

    Model testinModel testin PressuresPressures

    BreakwaterBreakwater

    DrainageDrainage

    typtyp..

    88--14m14m

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Bottom SlammingBottom Slamming

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    24/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Sloshing in Cargo Oil TanksSloshing in Cargo Oil Tanks

    Tank SizeTank Size

    Hull formHull form

    EnvironmentEnvironment

    Natural PeriodsNatural Periods

    LR FLUIDSLR FLUIDS

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Typical Hull Protection SystemTypical Hull Protection System

    HighHighperformanceperformance

    coatingcoating

    High performance coating +High performance coating +cathodiccathodic protection systemprotection system

    WaterWaterballastballast

    Max. W.L.Max. W.L.

    Min. W.L.Min. W.L.

    HPCHPC

    ++

    SASA

    HPCHPC

    CoatingCoating

    NB : ImpressedNB : Impressedcurrent systemcurrent system

    not allowed innot allowed inCargo oilCargo oiltankstanks

    CoatingCoating

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    25/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Fabrication Tolerances and WeldingFabrication Tolerances and Welding

    tolerances should be in accordance withgood shipbuilding practice, and agreed withLR

    special attention given to fatigue sensitiveareas

    enhanced NDE levels will be necessary foridentified fatigue sensitive areas

    assumptions used in analytical fatigueassessments to be consistent withconstruction

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices NDE Testing of WeldsNDE Testing of Welds -- generalgeneral

    Intersection of butts and seams & section weldsIntersection of butts and seams & section welds

    Butt welds in platingButt welds in plating

    Seam welds in platingSeam welds in plating

    Bilge keel buttsBilge keel butts

    Structural items fabricated with full/part penetrationStructural items fabricated with full/part penetration

    weldingwelding (hopper knuckles,(hopper knuckles, sheerstrake, hatchway coamings)

    Penetrations & attachments to hullPenetrations & attachments to hull (sea inlets, piping, anode(sea inlets, piping, anodesupports)supports)

    MoonpoolMoonpool integration structureintegration structure

    Topside support structure connections to hull structureTopside support structure connections to hull structure

    Additional requirements for low temperature operationsAdditional requirements for low temperature operations

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    26/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    FPSO some

    In-service feedback

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    FF1FF1--3c3c

    Some Design Life IssuesSome Design Life Issues

    Holistic approach for project / goodcommunications

    Design for required service Compatibility of hull structural, systems and

    topsides interfaces Production equipment for required service Marine equipment robustness, particularly

    cargo/ballast and control/electrical systems OIWS requirements and corrosion protection Access arrangements Provision of spare parts

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    27/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices DesignDesign-- Frequent areas of concernFrequent areas of concern

    Marine/offshore regulations and practices

    Topsides structure supports (alignment, motions)

    Hull vibration

    Crane specification and integration with hull

    Corrosion - general

    Access and escape routes compatibility

    Hazardous area and classification interfaces

    Piping systems (compatibility/flexibility)

    Topside equipment / motions / helicopter operations Marine / Topside system integration

    Use of GRP / FRP, pipework etc

    Wave impact and green sea loading

    Rudder and steering gear

    Laydown areas

    Effect of exhaust (heli-operations)

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices Design IssuesDesign Issues -- InterfacesInterfaces

    Interface Management is a critical influence onInterface Management is a critical influence onproject successproject success

    LR Project Manager provides interface betweenLR Project Manager provides interface betweendesign and class/certification processesdesign and class/certification processes

    Technical interfaces to be developed include:Technical interfaces to be developed include: Escape and access routingEscape and access routing

    Hazardous area definitionHazardous area definition Venting arrangements (clear of hazardous areas and for inspectioVenting arrangements (clear of hazardous areas and for inspectionn

    activities)activities)

    Power generation and supply systems, normal and backupPower generation and supply systems, normal and backup

    BundingBunding/prevention of spillage to main deck/prevention of spillage to main deck

    Control System and alarm circuitsControl System and alarm circuits

    Crude oil pumping and piping system between vessel, process andCrude oil pumping and piping system between vessel, process andoffloading systems, including materialsoffloading systems, including materials

    Fire Water, Cooling and Injection WaterFire Water, Cooling and Injection Water

    Heating system, Compressed air supplyHeating system, Compressed air supply

    Topsides structure alignment at integration with deckTopsides structure alignment at integration with deck

    Deck crane integration with hull structureDeck crane integration with hull structure

    Mooring system integration with hull structureMooring system integration with hull structure

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    28/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Structural InspectionStructural Inspection

    Carried out on locationCarried out on location

    Provides detection / monitoringProvides detection / monitoringcapacitycapacity

    Annual, intermediate & majorAnnual, intermediate & majorsurveyssurveys

    Major survey (5 years or continuous)Major survey (5 years or continuous)

    IWS in lieu of dry dockingIWS in lieu of dry docking

    Internal surveyInternal survey cleaning & gas freeingcleaning & gas freeing

    access arrangements/safetyaccess arrangements/safety

    lighting/ventilationlighting/ventilation

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices FPSO Incident History ExamplesFPSO Incident History Examples

    Hull Structure

    Shuttle tanker collision

    Bow Wave Impact Damage

    Tank Overpressurisation

    Seawater caissonpreferential Corrosion

    Integration of surface andsubsea corrosion protection

    Rudder/steering gear

    Marine Equipment

    Corrosion in cooling andheating systems due to poorfluid chemistry control

    Material problems onseawater systems

    TopsidesTopsides

    Vibration induced failuresVibration induced failures

    Inadequate application ofInadequate application ofPFPPFP

    Gas Turbine problemsGas Turbine problems

    Produced WaterProduced WaterCorrosionCorrosion

    Damage due to waveDamage due to waveimpact (green water)impact (green water)

    Cargo Venting SystemCargo Venting Systemfailurefailure

    Pipework and ProductionPipework and ProductionTrain LeakageTrain Leakage

    Riser / turret connectionsRiser / turret connections

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    29/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices FPSO Incident HistoryFPSO Incident History

    Statistics (Reported)Statistics (Reported)

    Ref : 22 vessels, approx 10 years of recordsRef : 22 vessels, approx 10 years of records

    See alsoSee also Quantified Frequency of shuttle tanker collision during offtakeQuantified Frequency of shuttle tanker collision during offtake operationsoperations, IMCA, IMCA

    VesselSystem

    Nature of Incident No. ofIncidents

    Hull Structure failure in heavy weather 1Other structural failure 3Collision 6

    Topsides Structural failure in heavy weather 3

    Process equipment failure 2Fire 0

    Machinery Engine Room fire 2Engine Room power failure 1Main engine failure 1Rudder / steering gear failure 3

    Other Hydrocarbon release 2Explosions 0Loss of anchor(s) 1

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Vibration DamageVibration Damage flare stackflare stackVortex vibrations @ Beaufort 4Vortex vibrations @ Beaufort 4 -- 55

    View A

    View B

    View A

    View B

    Turret Deckhouse

    Brace on Port Side -cracked over 180o atconnection to forwardchord.

    Proposedreinforcements - twolateral braces.

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    30/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Mooring System InstallationMooring System Installation

    Problems Experienced

    Handling equipment failures

    Wire ropes

    Poor tension control

    Loops formed

    Bird caging

    Chains

    Lack of straightness

    Installed with twist

    Tangles & breakage

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Results from a Structural SurveyResults from a Structural Survey

    Example of DefectExample of Defect

    AreaAreashownshown

    Cargo/ballast tanksCargo/ballast tanks DefectDefect

    B B B B

    LocationsLocations

    on Side Shellon Side Shell

    B B B

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    31/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices

    Typical DamageTypical Damage

    Side shell longitudinal connectionSide shell longitudinal connection

    CrackCrack

    CrackCrack

    ShellShelllongitudinallongitudinal

    ShellShellplatingplating

    Face barFace bar

    Web frameWeb framestiffenerstiffener

    Broken weldingBroken welding

    Web frameWeb frame

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    Examples of Internal WeldedExamples of Internal Welded

    RepairsRepairs

    Side shellSide shellBulkheadBulkheadstiffenerstiffener

    Side longitudinalSide longitudinal

    FractureFracturelocationslocations

    TransverseTransversebulkheadbulkhead

    StiffenerStiffener

    Side shellSide shell PillarPillarstiffenerstiffener

    Additional lugAdditional lug

    Backing bracketBacking bracket

    Side shellSide shell

    SideSidelongitudinlongitudin

    alal

    NewNewlongitudinallongitudinal

    sectionsection

    BulkheadBulkheadstiffenerstiffener

    Transverse bulkheadTransverse bulkhead

    AdditionalAdditionalradius bracketradius bracket

    Stiffener withStiffener withsoft toesoft toe

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    32/34

    International Association of Oil & Gas Producers

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices Internal RepairInternal Repair -- NonNon--WeldedWelded

    Hole drilled at crackHole drilled at crackterminationtermination

    Bolted platesBolted plates

    StiffenerStiffener

    FrameFrame

    LongitudinalLongitudinalFacingFacingplateplate

    Crack

    Crack

    length

    length

    TransverseTransverseweb frameweb frame

    CrackCrack

    Local weld GrindingLocal weld GrindingSection of hullSection of hullExternal girderExternal girder

    reinforcementreinforcement

    OilandGa

    sServices

    OilandGa

    sServices

    OilandGa

    sServices

    End of LREnd of LR

    PresentationPresentation

    Tanker Conversions to FPSOs - Rob Potthurst, Lloyds Register ()

  • 8/13/2019 LR FPSO Design

    33/34

    OGP Marine Risks Workshop Proceedings

    OGP

    OilandG

    asServices

    OilandG

    asServices

    OilandG

    asServices LR Contact DetailsLR Contact Details

    Bob Boon

    Business Development, Oil & Gas, LondonTel : 020 7423 2248

    Fax : 020 7423 2066

    e-mail : [email protected]

    Rob Potthurst

    Offshore Floating Units, LondonTel : 020 7423 2314

    Fax : 020 7423 2066

    e-mail : [email protected]