LPA Program Overview LPA Projects

49
LPA Program Overview LPA Projects Kenneth D. Fenton P.S. Clark County Engineer’s Office

description

LPA Program Overview LPA Projects. Kenneth D. Fenton P.S. Clark County Engineer’s Office. I’m from ODOT and I’m here to help you!. LPA’s Point of View. Construction of Local Projects. What Works? What Doesn’t?. ODOT’s processes are tried-and-true - PowerPoint PPT Presentation

Transcript of LPA Program Overview LPA Projects

Page 1: LPA Program Overview LPA Projects

LPA Program OverviewLPA Projects

Kenneth D. Fenton P.S.Clark County Engineer’s

Office

Page 2: LPA Program Overview LPA Projects

I’m from ODOT and I’m here to help you!

Page 3: LPA Program Overview LPA Projects

LPA’s Point of View

Construction of Local Projects

Page 4: LPA Program Overview LPA Projects

What Works? What Doesn’t? ODOT’s processes are

tried-and-true

LPA conformance to ODOT’s material and construction requirements

Possible changes and improvements

Page 5: LPA Program Overview LPA Projects

ODOT’s processes are Tried-and-True.def. Tested and

proved to be worthy or goodODOT CMS

Office of Material

Management

LPA Construction

Contract Administrati

on

Page 6: LPA Program Overview LPA Projects

Put it in writing . . .

Document

Document

Document

Page 7: LPA Program Overview LPA Projects

LPA Documentation Checklist Documentation should support an audit. If it isn’t documented, it

didn’t happen.  Project Inspection

Daily Diary. The daily diary should be up to date and contain the following information: All work performed by the contractor List of equipment Project personnel and hours worked Pay quantities. Check to see that they match the calculated

values and how the pay quantity is determined. Daily weather conditions (weather affects the majority of work

performed and is needed to determine time extensions based upon weather delays)

Special notes and instructions to the contractor Any unusual events occurring on or adjacent to the project,

even those not related to construction

Page 8: LPA Program Overview LPA Projects

LPA Documentation Checklist Measurements

Measurements should be shown either in the daily diary or some other form of documentation. The inspector must indicate that the measurement is an actual field measurement. Even if the measurement is a plan dimension, note that the dimension has been field verified.

If the measurements in the diary are transferred from other documentation, has the engineer indicated where to find that documentation?

Calculations Do the calculations use the measured or plan dimensions?

This should be indicated; field verification is required. Note whether a tape is included with the calculations. All calculations should include item of work, location, date

and initials.

Page 9: LPA Program Overview LPA Projects

LPA Documentation Checklist Tickets

Each tickets must include: JMF, date, location, item and initials

Any sequence of tickets that are not in order or have tickets missing need to have a calculator tape verifying the accumulative total.

Testing and Results Inspections Maintenance of Traffic Document any plan changes 

Material Management Is the inspector getting necessary documentation for the

materials records? Documentation should provide for quality, quantity, and basis for payment.

How is the project manager organizing the materials documentation?

The project engineer must approve all materials and solve any deficiencies.

Page 10: LPA Program Overview LPA Projects

LPA Documentation Checklist Payment & Reimbursements

Change Orders / Pricing for extra work Claims / Dispute Resolution Schedule and Completion Date / Time Extensions / Liquidated

Damages Timeliness of payments Railroad, Utility Force Account

Prevailing Wage, EEO, DBE (if applicable)

Page 11: LPA Program Overview LPA Projects
Page 12: LPA Program Overview LPA Projects
Page 13: LPA Program Overview LPA Projects
Page 14: LPA Program Overview LPA Projects
Page 15: LPA Program Overview LPA Projects
Page 16: LPA Program Overview LPA Projects
Page 17: LPA Program Overview LPA Projects
Page 18: LPA Program Overview LPA Projects
Page 19: LPA Program Overview LPA Projects
Page 20: LPA Program Overview LPA Projects
Page 21: LPA Program Overview LPA Projects

LPA Conformance to ODOT’s Material and

Construction Requirements

Page 22: LPA Program Overview LPA Projects
Page 23: LPA Program Overview LPA Projects
Page 24: LPA Program Overview LPA Projects
Page 25: LPA Program Overview LPA Projects

Tracking and

Issuing Payments

Page 26: LPA Program Overview LPA Projects
Page 27: LPA Program Overview LPA Projects
Page 28: LPA Program Overview LPA Projects
Page 29: LPA Program Overview LPA Projects
Page 30: LPA Program Overview LPA Projects
Page 31: LPA Program Overview LPA Projects
Page 32: LPA Program Overview LPA Projects
Page 33: LPA Program Overview LPA Projects
Page 34: LPA Program Overview LPA Projects
Page 35: LPA Program Overview LPA Projects

Prevailing Wage

Page 36: LPA Program Overview LPA Projects
Page 37: LPA Program Overview LPA Projects
Page 38: LPA Program Overview LPA Projects
Page 39: LPA Program Overview LPA Projects
Page 40: LPA Program Overview LPA Projects
Page 41: LPA Program Overview LPA Projects
Page 42: LPA Program Overview LPA Projects
Page 43: LPA Program Overview LPA Projects
Page 44: LPA Program Overview LPA Projects
Page 45: LPA Program Overview LPA Projects
Page 46: LPA Program Overview LPA Projects
Page 47: LPA Program Overview LPA Projects

Possible Changes or Improvements

Page 48: LPA Program Overview LPA Projects

PULL IT ALL TOGETHER

Utilize ODOT’s resources

Share your knowledge

There is always room to improve

Page 49: LPA Program Overview LPA Projects