LOS ANGELES STREET CIVIC BUILDING PLANNING LOS ANGELES STREET CIVIC BUILDING OLD PARKER CENTER...

15
ARCHITECTURE PLANNING LOS ANGELES STREET CIVIC BUILDING OLD PARKER CENTER EIR & CONCEPT DESIGN METRO DETENTION 911 CALL CENTER LOS ANGELES STREET FIRST STREET TEMPLE STREET DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING ARCHITECTURAL DIVISION A.K.A. OLD PARKER CENTER LOS ANGELES STREET CIVIC BUILDING DRAFT 6.29.16

Transcript of LOS ANGELES STREET CIVIC BUILDING PLANNING LOS ANGELES STREET CIVIC BUILDING OLD PARKER CENTER...

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

EIR & CONCEPT DESIGN

METRO DETENTION

911 CALL CENTER

LOS ANGELES STREET

FIRST STREET

TEMPLE STREET

DEPARTMENT OF PUBLIC WORKSBUREAU OF ENGINEERING ARCHITECTURAL DIVISION

A.K.A. OLD PARKER CENTER

LOS ANGELES STREET CIVIC BUILDINGDRAFT

6.29.16

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

TASK OVERVIEW02

v06_0524

AFTER FINAL EIR WAS PUBLISHED IN JUNE 2014 WITH THE MUNICIPAL FACILITIES COMMITTEE CONCURRENCE OF ALTERNATIVE B3 AS A PREFERRED OPTION; BUREAU OF ENGINEERING WAS DIRECTED TO PREPARE AND ANALYZE AN ALTERNATIVE B4 FOR PARKER CENTER SITE THAT PRESERVES THE EXISTING PARKER CENTER TOWER PROVIDING A NET USABLE AREA OF 588,000 SQ.FT. MATCHING ALTERNATIVE B3 OPTION.

THE PURPOSE OF THIS STUDY IS TO DIRECTLY COMPARE THE COST OF ALTERNATIVE B4 WITH THE ALTERNATIVE B3.

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B3CONCEPTUAL MASSING STUDIES 03

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B3CONCEPTUAL MASSING STUDIES 04

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B3 (UPDATE)CONCEPTUAL MASSING STUDIES 05

E TEMPLE ST

W 1ST ST

N LO

S AN

GELE

S ST

JOH

NAISO

ST

911 CALLCENTER

METRO JAIL

911 CALLCENTERPARKING

PLAZA

CAR ACCESS

PEDESTRIANACCESS PEDESTRIAN

ACCESS

OPEN SPACE

670,500GSF

20,530 GSF

45,550 SF

62,700 SF

275' - 0"

110'

- 0"

FLOOR PLANAXONOMETRIC

0 25 50 100

OFFICE ADDITION

LEGEND:

PUBLIC SPACE

ASSEMBLY

PARKING

OPEN SPACE

754

753,730D

EM

OLIT

ION

+B

UIL

DPARKING SPACES

GROSS SQUARE FEET

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B3 (EIR 2013)CONCEPTUAL MASSING STUDIES 06

v06_071316

L28

L27

L26

L25

L24

L23

L22

L21

L20

L19

L18

L17

L16

L15

L14

L13

L12

L11

L10

L9

L8

L7

L6

L5

L4

L3

L2

L1

82’-0

”CI

TY

HA

LLH

EIG

HT

EAST ELEVATION

TOTAL LEVELS 28TOTAL HEIGHT 392’-5”TYPICAL FLOOR PLATE DIMS 268’ X 110’TYPICAL FLOOR PLATE SF 29,500 SFTOTAL GSF 753,730 GSFPARKING LEVELS 3 ( 1 @ GRADE) PARKING SPACES 1,173

OFFICE ADDITION

LEGEND:

PUBLIC SPACE

ASSEMBLY

PARKING

OPEN SPACE

OPTION B3: TOWERORIGINAL (2013)

SITE 125,000 SF

1,173

753,730D

EM

OLIT

ION

+B

UIL

DPARKING SPACES

GROSS SQUARE FEET

Alternative B3 (EIR 2013) would result in the full demolition of the Parker Center building and construction of a new office building, which would consist of approximately 1,173 parking spaces with a maximum height of approximately 400 feet. The proposed 753,730 square-foot program could be accommodated in one or two buildings on the site. The new building(s) could take on a variety of configurations, but would generally fill the footprint of the existing Parker Center building. Outdoor open space and a pedestrian connection between City Hall to the west, and the Little Tokyo neighborhood to the east and south would be provided.

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B3 (UPDATE)CONCEPTUAL MASSING STUDIES 07

v08_071316

L28

L27

L26

L25

L24

L23

L22

L21

L20

L19

L18

L17

L16

L15

L14

L13

L12

L11

L10

L9

L8

L7

L6

L5

L4

L3

L2

L1

EAST ELEVATION

TOTAL LEVELS 28TOTAL HEIGHT 392’-5”TYPICAL FLOOR PLATE DIMS 268’ X 110’TYPICAL FLOOR PLATE SF 29,500 SFTOTAL GSF 753,730 GSFPARKING LEVELSPARKING SPACES 754

OFFICE ADDITION

LEGEND:

PUBLIC SPACE

ASSEMBLY

PARKING

OPEN SPACE

OPTION B3: TOWER

2 ( 1 @ GRADE / L0)

NEW (2016)

SITE 125,000 SF

754

753,730D

EM

OLIT

ION

+B

UIL

DPARKING SPACES

GROSS SQUARE FEET

Alternative B3 (update) would result in the full demolition of the Parker Center building and construction of a new office building, which would consist of approximately 754 parking spaces with a maximum height of approximately 400 feet. The proposed 753,730 square-foot program could be accommodated in one or two buildings on the site. The new building(s) could take on a variety of configurations, but would generally fill the footprint of the existing Parker Center building. Outdoor open space and a pedestrian connection between City Hall to the west, and the Little Tokyo neighborhood to the east and south would be provided.

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B4CONCEPTUAL MASSING STUDIES 08

v06_0524

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B4CONCEPTUAL MASSING STUDIES 09

v06_0524

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B4CONCEPTUAL MASSING STUDIES 10

v06_0524

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B4CONCEPTUAL MASSING STUDIES 11

v06_0524

FLOOR PLANAXONOMETRIC

0 25 50 100

E TEMPLE ST

W 1ST ST

N LO

S AN

GELE

S ST

JOH

NAISO

ST

911 CALLCENTER

METRO JAIL

911 CALLCENTERPARKING

PLAZA

125' - 0"

200'

- 0"

203' - 8"

61' -

5"

89' -

5"

86' -

7"

214' - 0"

CAR ACCESS

PEDESTRIANACCESS

PEDESTRIANACCESS

OPEN SPACE

587,850 GSF

201,920 GSF

28,730 GSF

40,435 SF

197,511 GSF

OFFICE ADDITION

LEGEND:

PUBLIC SPACE

ASSEMBLY

PARKING

OPEN SPACE

819

818,600S

ELE

CT

IVE

D

EM

OLIT

ION

, R

EH

AB

LIL

ITA

TIO

N

+B

UIL

DPARKING SPACES

GROSS SQUARE FEET

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVE B4CONCEPTUAL MASSING STUDIES 12

v07_071316

EAST ELEVATIONEAST ELEVATION

420’

-0”

200’-0”

L29

L28

L27

L26

L25

L24

L23

L22

L21

L20

L19

L18

L17

L16

L15

L14

L13

L12

L11

L10

L9

L8

L7

L6

L5

L4

L3

L2L1L1

OPTION B4: TOWER

TOTAL LEVELS 29*TOTAL HEIGHT 420’-0”TYPICAL FLOOR PLATE DIMS 125’-0” x 200’-0”TYPICAL FLOOR PLATE SF 25,000 SFTOTAL GSF 818,600 GSFPARKING LEVELS 8PARKING SPACES 819

* ONE ADDITIONAL FLOOR PLATE HAS BEEN ADDED TO ALLOW FLEXIBILITY

SITE 125,000 SF

L6

819

818,600S

ELE

CT

IVE

D

EM

OLIT

ION

, R

EH

AB

ILIT

AT

ION

+B

UIL

DPARKING SPACES

GROSS SQUARE FEET

Alternative B4 would result in the partial demolition of the Parker Center site, rehabilitation and seismic reinforcement of existing Parker Center tower, and construction of a new 588,000 net s.f. office building. This will total to approximately 818,600 gross square feet, and 819 parking spaces with a maximum height of approximately 420 feet.

No feasible mitigation measures were identified that would address the resulting impacts and meet project objective. Alternative B4 EIR significant impact is not mitigable. An amendment to the current EIR is required, whichwill extend the schedule by about 1 year.

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

ALTERNATIVES DATA SUMMARY13

v06_0524

ALTERNATIVES DATA SUMMARY [B3 vs B4]

GROSS SQUARE FEET 1

ALTERNATIVE B3 (NEW 2016) ALTERNATIVE B4

NET SQUARE FEET

2

APPROXIMATE PARKING

MAXIMUM HEIGHT 4

818,600 GSF

588,000 NSF

70%

450 FT. (MAX. ENVELOPE)(MAX. ENVELOPE)

753,730 GSF

588,000 NSF

78%

450 FT.

819 SPACES3

754 SPACES

20,000 SF / COMMERCIAL + CHILDCARE

568,000 NSF / OFFICE

20,000 SF / COMMERCIAL + CHILDCARE

568,000 NSF / OFFICE

[ 230,650 GSF / EXISTING 587,850 GSF / NEW ]

(Approx.)

$ 514,000,000 $ 621,000,000

$ 107,000,000

EST. PROJECT COST (ROM)

DIFFERENCE IN PROJECT COST

27 STORIES 29 STORIES ( 6 ABOVE GRADE PARKING)

4. All elevations are taken from floor level of existing Parker Center Building at Los Angeles Street.2. Net square footage is calculated by taking the gross square footage less the square footage for the following areas: auditoriums, all vertical shafts, elevators, stairs, duct/conduit shafts, mechanical rooms, electrical rooms, and tele/ data rooms, exterior walls (including new structure), lobbies, elevator lobbies, hallways, toilets, and janitor closets.

3. The property is zoned “PF” which does not require additional parking. The percentage is based on a typical requirement of 1 space per 1,000 GSF.

1. Gross square footage is calculated [per the BOMA (Building Owners and Managers Association) gross method] to the outside face of the exterior walls.

NOTES

EFFICIENCYRATIO: NET / GROSS

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

CONCEPT STUDYPROBABLE COST 14

PROBABLE COST [B3 vs B4]

v07_0606

NOTES1. Summary Estimate - EIR Alt. B3 - prepared 10/15/2013 by Cumming 2. Summary Estimate are based on the Addit. Opt. Study B4 - prepared 5/10/2016 by Cumming.

(a) The 4/16 Structured Parking cost summary (EIR Alt. B3) reflect a reduction from the 1173 stalls to 754 stalls.

(b) The 4/16 Site Development costs (EIR Alt. B3) reflect an increase for Haz. Matl. Abatement and historic elements/artifact relocation. * Unit Costs are rounded to the nearest whole number.

Building (New and/or Existing)SFBuilding Net SFParking Structure

Building ConstructionExisting Bldg. Constr.

New Building Constr.

Structured Parking

Site Development

Subtotal Bldg, Site & Parking

Design/Estimating Contingency

Soft cost (Design Fees, PM/CM)

Estimated Project Cost (ROM)

3/8/2016

FF&E

Subtotal

Subtotal GC, B&LI & GC Fee

Subtotal Bldg.

2016 Option Analyisis

NEW ALT B4 (WITH 818 STALLS)

818,600

588,000

381,300,869$

122,938,000$

258,362,869$

21,925,691$

10,317,800$

413,544,360$

98,443,408$

30,000,000$

620,660,447

2

(∆ B3 &B4 TOTAL = $106,885,918)

230,650 GSF587,950 GSF{ }

$ 60,000,000

492,217,039$

$

818 Stalls

78,672,678$

Unit Cost*

$ 758

-

295,573,770$

(a) 28,104,600$

(b) 14,931,000$

338,709,370$

80,629,088$

30,000,000$

$ 513,774,529

2016 Alt. B3 (WITH 754 STALLS)

753,730588,000

$ 60,000,000

403,145,441$

754 Stalls

64,436,071$

295,573,770$

Unit Cost*

$ 682

-

295,573,770$

44,032,325$

(b) 14,931,000$

354,537,095$

84,396,846$

30,000,000$

536,381,078

EIR Alt. B3 (UPDATE 2016)

753,730588,399

$ 60,000,000

421,984,232$

$

1,173 Stalls

67,447,137$

295,573,770$

$ 712

Unit Cost*

EIR Alt. B3 (2013)

753,730588,399

-

293,789,034$

40,460,000$

10,285,548$

344,537,520$

40,999,965$

30,000,000$

474,797,939

1

403,797,974$

$

1,173 Stalls

59,260,453$

293,789,034$

Unit Cost*

$ 630

( NOT CONSIDERED )

ARCHITECTUREPLANNING

LOS ANGELES STREET CIVIC BUILDINGOLD PARKER CENTER

EIR PROJECT15

v06_0524

1

NOTES1. PARKER CENTER SITE2. LEASED BUILDINGS3. OWNED BUILDINGS

2

2

2

EXISTING PARKER CENTER

PERSONNEL BUILDING- 142,000 S.F.- 388 EMPLOYEES

CITY HALL SOUTH- 80,000 S.F.- 200 EMPLOYEES

LA MALL- 10,000 S.F.- 50 EMPLOYEES

GARLAND BUILDING- 201,735 S.F.- 906 EMPLOYEES

FIGUEROA PLAZA- 385,812 S.F.- 983 EMPLOYEES

PARAMOUNT BUILDING- 35,054 S.F.

- 128 EMPLOYEES

MEDIA CENTER- 61,000 S.F.

- 322 EMPLOYEES

PUBLIC WORKS BUILDING- 438,000 S.F.- 1,286 EMPLOYEES

BRADBURY BUILDING- 40,591 S.F.

- 150 EMPLOYEES

CALTRANS BUILDING- 9,000 S.F.- 450 EMPLOYEES

3

3

3

3

1.6 MILES

1.9

MIL

ESN