Longmeadow Parkway
SOI Informational Meeting
March 13, 2013
![Page 2: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/2.jpg)
Welcome
• Longmeadow Parkway Corridor
• Staff and their roles– Steve Coffinbargar, Assistant Director
– Paul LaFleur, Senior Project Manager
– Mike Zakosek, Senior Project Manager
![Page 3: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/3.jpg)
History of the Corridor – Part 1
• 1990 – Fox River Advisory Committee formed
• 1993 – Initiated Phase I Engineering
• 2002 – EIS & ROD approved
• 2002 – Project geometrics approved for land acq
• 2007 – 12 Supporting resolutions passed
• 2007 – Toll Bridge Task Force formed
• 2009 – Toll Bridge Financial Feasibility Study
• 2010 – Task Force recommends toll bridge
![Page 4: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/4.jpg)
History of the Corridor – Part 2
• Draft PDR ‐ IDOT comments
• Approved IDS docs for State Routes
• Draft IDS docs for Local Routes – IDOT comments
• Draft LDS – IDOT comments
• Draft Hydraulic Report – IDOT comments
• Draft TS&L ‐ IDOT comments
• Draft SGR – IDOT comments
• Addendum ESR submitted Nov 2012 – 6 months
![Page 5: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/5.jpg)
Packaging the Engineering
• Sections– Individual section limits
![Page 6: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/6.jpg)
![Page 7: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/7.jpg)
Packaging the Engineering
• Sections– Individual section limits
• Phase I– PDR largely with Section A
– Individual components with each section
– Reduced Scope
– Structures
![Page 8: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/8.jpg)
Packaging the Engineering
• Phase II– Environmental with Section C
– Stormwater Compliance
– Interconnect
– Lighting
– Landscaping
– Utilities
– MOT
![Page 9: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/9.jpg)
Packaging the Engineering
• VE
• Project schedule
![Page 10: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/10.jpg)
Engineering Schedule
• Selection Scheduleo March 4th – Advertise for SOIs
o March 13th – Informational meeting
o March 25th – SOIs due
o April 5th – Request for proposals issued
o April 26th – Proposals due
o April 29th – Interviews start
o May 8th – Interviews complete
![Page 11: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/11.jpg)
Engineering Schedule
• Selection Scheduleo May 13th – Initiate negotiations
o May 31st – Negotiations complete
o June 12th – Transportation committee approval
o July 9th – County board approval
o Late July – Notice to proceed
![Page 12: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/12.jpg)
Engineering Schedule
• Phase I Schedule o Complete by end of 2013
o Each contract segment (B, C & D) will have some phase I elements to coordinate with contract A
![Page 13: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/13.jpg)
Engineering Schedule
• Phase II Schedule o Duration of 18 to 24 months (from July, 2013)
o Will overlap with end of phase I
![Page 14: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/14.jpg)
Engineering Schedule
• Value Engineering o Will take place during phase II
![Page 15: Longmeadow Parkway (2) - Kane County, Illinoiskdot.countyofkane.org/Longmeadow Parkway/Longmeadow... · 2017-08-02 · oWill take place during phase II. Questions? Title: Microsoft](https://reader034.fdocuments.net/reader034/viewer/2022050123/5f52f3f1cf12af6477423132/html5/thumbnails/15.jpg)
Questions?