Massachusetts Water Resources Authority Frederick A. Laskey Executive Director Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel March 8, 2004

Transcript of Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced...

Page 1: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

Massachusetts Water Resources Authority

Frederick A. LaskeyExecutive Director

Long-Term CSO Control Plan for North Dorchester Bay and

the Reserved Channel

March 8, 2004

Page 2: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

2

How Sewer Separation Works

Page 3: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

3

How CSOs Work: Dry Weather

CSO Outfall

Headworks

To Deer Island

Page 4: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

4

How CSOs Work: During Heavy Rains

Headworks

To Deer Island

Page 5: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

5

MWRA’s CSO Communities

• Boston, Cambridge, Chelsea and Somerville have combined sewer systems that connect toMWRA's sewer system

• Boston Harbor, the Charles, the Mystic and the Neponset Rivers are subject to overflows of combined stormwater and sewage during heavy rains

Page 6: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

6

The CSO Problem

• In 1985, the service area had:

– 84 combined sewer outfalls

– Thousands of overflows per year

– Over 3 billion gallons of CSO discharges

Page 7: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

7

Status Of CSO Control Nation-Wide

• 772 CSO communities

• 32% have submitted documentation on Nine Minimum ControlsMWRA

• 19% have approved long-term control plansMWRA

• 17% have initiated implementation of long-term control plans or other CSO facility plans

MWRA

Page 8: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

8

Annual CSO Volume Has Been Reduced Dramatically

Untreated Treated

0

0.5

1

1.5

2

2.5

3

3.5

1988 1992 2003 2008

Bill

ions

of G

allo

ns• Annual CSO volumes have already been reduced by over 2.5 billion

gallons

• By 2008, 95% of the remaining CSO flows will be treated

Page 9: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

9

Court-approved plan

$0

$100

$200

$300

$400

$500

$600

$700

$800

$900

$1,000

Conceptual Plan (Dec 1994)

Facilities Plan/EIR (Aug 1997)

FY04-06 CIP Current Estimate withPotential Additional

Costs

Mill

ions

$406 M

$481 M

$645 M

Risk of cost increases -$200-300M

CSO Project Costs

Does not include overall system improvements (e.g. Deer Island)

Court-approved plan

Page 10: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

10

South Boston Beaches

Page 11: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

11

South Boston Beaches

Page 12: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

12

North Dorchester Bay: Existing Conditions

• Seven CSO outfalls discharge to North Dorchester Bay

• During a typical year, each outfall activates between one (BOS085) and 21 times (BOS081) per year and discharge a total of approximately 8 million gallons of CSO flow into North Dorchester Bay

• Discharges are caused both by constraints in the interceptor system and the capacity of the Columbus Park Headworks

• Rain events occur 108 times per year discharging approximately 144 million gallons of separate stormwater through these outfalls

Page 13: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

13

North Dorchester Bay/Reserved Channel: Existing System

Columbus ParkHeadworks

076078

079079 080

081

082

083084085

086

087

BMD to DITP

Page 14: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

14

CSO Control Plan Reassessment

• Reassessment initially examined 160 alternatives and identified 58 potential locations for siting CSO facilities

• North Dorchester Bay control alternatives were narrowed to interceptor relief and a storage tunnel, with sewer separation recommended for Reserved Channel

• Ultimately focused on four key objectives:– Increasing storage capacity to virtually eliminate CSO discharges

without a massive pump station– Modifying design to accept some stormwater without compromising

CSO control– Minimizing impacts during construction– Minimizing siting issues

• These objectives are met by a large diameter storage tunnel mined with a tunnel boring machine

Page 15: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

15

Columbus ParkHeadworks

076078

079

080

081

082

083084085

086

087

BMD to DITP10-mgd

Pump Station

Odor ControlFacility

17-Foot Soft Ground Tunnel: 25-Year CSO Control

17-foot, soft ground storage tunnel with pump-out at Conley Terminal

Odor control facility at State Police Barracks

Virtual elimination of CSOs to North Dorchester Bay

Page 16: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

16

Columbus ParkHeadworks

076078

079

080

081

082

083084085

086

087

BMD to DITP10-mgd

Pump Station

Odor ControlFacility

StormwaterGates

Operable Gates: 25-Year CSO Control and Up To 1-Year Stormwater Control

Gates open and tunnel accepts stormwater

No CSO or stormwater discharges to North Dorchester Bay

Page 17: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

17

Columbus ParkHeadworks

076078

079

080

081

082

083084085

086

087

BMD to DITP10-mgd

Pump Station

Odor ControlFacility

StormwaterGates

Enlarged Morrissey Boulevard Storm Drain: 25-Year CSO Control and Up To 5-Year Stormwater Control

BOS087 stormwater is redirected to an enlarged stormwater drain along Morrissey Boulevard and discharged to South Dorchester Bay

5-year level of stormwater control for North Dorchester Bay

EnlargedStorm Drain

Page 18: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

18

BOS087 Stormwater Tributary Area

Page 19: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

19

Pleasure Bay

Page 20: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

20

Columbus ParkHeadworks

076078

079

080

081

082

083084085

086

087

BMD to DITP10-mgd

Pump Station

Odor ControlFacility

StormwaterGates

Pleasure Bay Stormwater

Pleasure Bay outfalls redirected to BOS080 for discharge to Reserved Channel

EnlargedStorm Drain

Page 21: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

21

Columbus ParkHeadworks

076078

079

080

081

082

083084085

086

087

BMD to DITP10-mgd

Pump Station

Odor ControlFacility

StormwaterGates

EnlargedStorm Drain

Separate ~ 355-acre area between Reserved Channel and East 4th Street

Reduce frequency of CSO discharges from 37 to 3 in a typical year

Reduce CSO discharge volume from 41 mg to 1.4 mg in a typical year

Reserved Channel Sewer Separation

Page 22: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

22

Performance Summary

• North Dorchester Bay: 25-year level of CSO control and 5-year level of separate stormwater control

• Pleasure Bay: Eliminate stormwater discharges

• Reserved Channel: Reduce CSO discharges from 37 to 3 in a typical year

• South Dorchester Bay: Roughly 15% increase in stormwaterdischarges in a typical year

Page 23: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

23

Recommended Plan

Page 24: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

24

Pump Station Location

Page 25: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

25

Pump Station Elevation View

3,360 square foot building, 56 ft. x 60 ft.

Page 26: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

26

Comparison of Pump Station Sizes

• The proposed footprint is one-fifth the size of the previous plan

• The proposed building volume is one-tenth the size of the previous plan

Page 27: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

27

Pump Station Proximity to Residences

-1000’-

Page 28: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

28

Proposed 20-Inch Dewatering Force Main

Farragut Street to East 5th Street to N Street

Page 29: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

29

Odor Control Facility Location

Page 30: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

30

Odor Control Facility Elevation View

2,900 square foot building, 45 ft. x 64 ft.

Page 31: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

31

Comparable MWRA Facility

Page 32: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

32

How Odor Control Works

Page 33: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

33

Tunnel Construction Methods

• Tunnel will be constructed using a soft-ground tunnel boring machine (TBM) designed and built specifically for this project

• Tunnel construction would proceed 24 hours per day

• As the tunnel is mined, a pre-cast, segmental concrete lining will be installed behind the TBM

• Construction of the tunnel will be performed from a mining shaftlocated near the entrance of Conley Terminal

• Upon completion, the TBM will be removed through a receiving shaft located behind the State Police barracks

Page 34: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

34

Dropshaft Locations

Page 35: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

35

Example of Dropshaft at End of N Street

Page 36: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

36

Example of Diversion Structure Construction at Dropshaft

Page 37: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

37

Truck Route for Mining Operation and Pump Station Construction

Page 38: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

38

Conceptual Construction Timeline

North Dorchester Bay

May-05

Nov-05

May-06

Nov-06

May-07

Nov-07

May-08

Nov-08

May-09

Nov-09

May-10

Nov-10

May-11

Design

Bid/Award Construction

Mobilization/Mining Shaft

Mine & Line Tunnel

Complete Pump Station & Odor Control Bldg.

Reserved Channel

Mar-05

Aug-05

Mar-06

Aug-06

Mar-07

Aug-07

Mar-08

Aug-08

Mar-09

Aug-09

Mar-10

Aug-10

Mar-11

Design

Bid/Award Construction

Construction

Page 39: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

39

Projected Costs

(in 2004 dollars)

Storage Tunnel $186 million

Stormwater Gates $2 million

Morrissey Boulevard Storm Drain $18 million

Pleasure Bay Stormwater Diversion $3 million

Reserved Channel sewer separation $48 million

Estimated cost of recommended plan $257 million

Total program cost with inflationbut not site acquisition costs $285 million

Page 40: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

40

North Dorchester Bay CSO and Stormwater Discharges Over an Typical 5-Year Period

531

1

105

00

100

200

300

400

500

600

Now Recommended Plan

Day

s

Stormwater CSO

Page 41: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

41

Conclusion

• Highest level of control of any Boston Harbor beaches

• Eliminate CSO discharges – no human waste on the beaches

• Reduce volume of stormwater discharges to North Dorchester Bay by over 96% and eliminate stormwater discharges to Pleasure Bay

• Reduce CSO discharges to Reserved Channel from 37 to 3 in a typical year

• No large permanent facilities

• Build tunnel with a tunnel boring machine to minimize construction impacts

Page 42: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of

42

Next Steps

• The MWRA Board of Directors will be asked to approve the submittal to MEPA by March 31, 2004 of Supplemental Facilities Plan and Environmental Impact Report

• A 60-day comment period will follow for public and agency review

• In the meantime, DEP and EPA conduct their review of the project’s compliance with the Clean Water Act and national and state CSO policies

• MWRA will continue coordination with interested parties and hold an additional public meeting in May

• Once MEPA review is successfully completed, MWRA will renegotiate design and construction schedules with Court Parties for incorporation into Federal Court Order

Page 43: Long-Term CSO Control Plan for North Dorchester Bay and ...Annual CSO Volume Has Been Reduced Dramatically Untreated Treated 0 0.5 1 1.5 2 2.5 3 3.5 1988 1992 2003 2008 Billions of