Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015...

31
Long-Term Bridge Performance Program An Overview

Transcript of Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015...

Page 1: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Long-Term Bridge Performance Program An Overview

Page 2: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

U.S. Department of Transportation (DOT) Strategic Plan, FY 2012–16

• The latest U.S. DOT Strategic Plan presents five strategic goals for America’s transportation system: • Safety • State of Good Repair •Economic Competitiveness • Livable Communities •Environmental Sustainability

Page 3: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

State of Good Repair

• Existing physical assets (Bridges, Pavements, Tunnels), both individually and as a system are: • functioning as designed within their useful service life, and • sustained through regular maintenance and replacement

programs

Page 4: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

What does it take? Performance Data Actionable Information State of

Good Repair

Data-Driven Decisions

Deterioration, forecasting, and life-

cycle models

Data fusion, interpretation, and visualization

Reliable, research-quality, long-term performance data

Protocols for data collection

Advanced practical NDE tools and SHM

Page 5: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data-Driven Decisions

Owners of Infrastructure Assets

Replacement Rehabilitation Do Nothing

Page 6: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

What is FHWA’s Research Role?

Conducts and manages R&D programs and projects and provides technologies and solutions to advance practices in highway infrastructure engineering LTPP and LTBP programs Non-destructive evaluation Tunnels and culverts Hydraulics and geotechnical

Page 7: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

FHWA LTBP Program

• Initiated in 2008

• Intended as a 20+ year long-term research effort to improve our knowledge of “Bridge Performance” • Funding was designated in “SAFETEA-LU” - surface transportation authorization legislation (August 2005)

• “MAP-21” - Moving Ahead for Progress in the 21st Century The first multi-year transportation authorization enacted since 2005

Page 8: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Improved Deterioration Models

Reliable Life-Cycle Cost and Forecasting Models

Help Improve Existing Design Procedures

Benefits of NDE Techniques

Means to Quantify Preservation Strategies

Data-Driven Decision Tools

Desired/Anticipated Outcomes

Testing and Detailed Evaluation of a Representative Sample of

the Most Common Bridges in the National Bridge Inventory

Long-Term Bridge Performance Program

Page 9: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Meetings with States - Status Update

Northeast: CT, MA, ME, NH, NY, RI, VT Mid-Atlantic: DC, DE, MD, NJ, PA, VA, WV East Central: IN, KY, OH, TN, NC Mid West (Central): IA, IL, MI, MN, WI Gulf Coast: AL, AR, FL, LA, MS, TX Rocky Mountains: CO, ID, MT, NE, SD, UT, WY NW: OR, WA SW: AZ, CA, NV Corridor: GA, KS, OK, MO, ND, NM, SC

SD (6/14/13)

OR (3/14/13)

CA (3/15/13)

NV (3/20/13) UT

(6/5/13)

AZ (3/19/13)

CO (6/6/13)

NM (3/7/14)

TX (2/28/13)

OK (7/12/13)

LA (2/25/13)

MO (7/8/13)

IL (7/25/13)

WI (7/26/13)

MN (3/20/14)

WA (3/13/13)

MI (3/21/14)

IN (4/25/

13)

OH (5/3/13)

PA (9/18/12)

NY (6/25/13)

TN 4/23/13)

MS (2/20/13)

AL (2/21/13)

GA (4/29/13)

SC (5/1/13)

FL (2/21/13)

NC (5/2/13)

VA (10/19/12) MD(10/10/12)

DC(10/18/12)

DE(10/17/12)

ME (4/9/14)

MA (4/4/14)

NH (4/8/14) VT

KY (4/24/13)

CT (4/2/14) IA (7/22/13)

WV (10/9/1

2)

ID (6/11/13)

ND (3/19/14)

NJ(10/16/12)

MT (6/12/13)

KS (7/10/13)

WY (6/4/13)

NE

AR (2/19/13)

RI (4/3/14)

AK

HI

States on-site meetings to be scheduled

Page 10: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Developmental & Execution Phases

Identify

Bridge Performance Issues

Identify Data Needs Protocols For Data Collection

Develop a Data Infrastructure

“Bridge Portal”

Pilot Study 7 Bridges

Focus Group Meetings

47 SHAs

Field Validation

2009 - 2011

Category Issue

Decks Untreated Concrete Bridge Decks

Decks Treated Concrete Bridge Decks

Joints Bridge Deck Joints

Bearings Bridge Bearings

Steel Bridges Coatings for Steel Superstructure Elements

Page 11: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection

Data Management

Data Analysis

Long-Term Bridge Performance Program

Products

Page 12: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection

Data Management

Data Analysis

Long-Term Bridge Performance Program

Products

Page 13: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Simple span steel stringer ~ 104,000

New Jersey

Continuous steel stringer ~ 47,000

Virginia

Simple span pre-stressed concrete stringer ~ 52,000

Utah

2-span prestressed post-tensioned continuous CIP box girder

California

Steel deck truss

Minnesota

Two simple spans of adjacent concrete box beams ~ 40,000

New York

Precast, segmental post-tensioned concrete box beams

Florida

Pilot Study Bridges

Page 14: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Bridge Types and Sample Size

(Most Common Bridges)

Page 15: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Bridge Types and Sample Size

(Most Common Bridges)

Page 16: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Bridge Types and Sample Size

(Most Common Bridges)

Page 17: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

North-South I-95, I-35, I-29, I-15, I-5

East-West I-40, I-70, I-80, I-90, I-94

Corridors

Clusters

Prestressed/Post Tensioned Boxes

Steel Multi-Girder

Prestressed Multi-Girder

Page 18: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

LTBP Contractors and Tasks • Rutgers University

Bridge Sampling, Data Collection, Analysis, Protocols, Data Management Arora and Associates (visual)

• Pennoni Associates, Inc. Data Collection, Validation, Protocols, Technical Support

• Parsons Brinckerhoff, Inc. Data Collection, Validation

• Michael Baker Jr., Inc. Data Collection, Validation

• Professional Service Industries, Inc. (PSI) Legacy Data, Bridge Sampling, Validation

Page 19: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection: Untreated Bridge Decks, Joints, and Bearings

Contractor Cluster States

Rutgers Mid-Atlantic Steel; Mid-Atlantic Prestressed Concrete (Vis/NDE + Doc)

DE, NJ, MD, PA, VA, WV (+ Doc)

Michael Baker

Gulf Steel; Gulf Prestressed Concrete (Vis)

AL, AR, FL, LA, MS, TX

PSI

Mid-Atlantic Steel, Mid-Atlantic Prestressed Concrete; Mid-Atlantic Concrete Box; NE Steel (Doc)

CT, DC, DE, MA, MD, ME, NH, NJ, NY, OH, PA, RI, VA, VT, WV

PB NW Prestressed Concrete; SW Concrete Box (Vis)

AZ, CA, NV, OR, WA

Page 20: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Robot Assisted Bridge Assessment Tool

Page 21: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection

Data Management

Data Analysis

Long-Term Bridge Performance Program

Products

Page 22: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

LTBP Program – Bridge Portal Update

• IRB Process Complete • Transfer to FHWA Server underway • Additional Security-Related Code Development Completed and

Undergoing Testing • Security Assessment to be Initiated (June 2015) – FINAL STEP Prior

to DEPLOYMENT • Concurrently – Beta Testing Version 1.0 Underway

Version 1.0 Currently Available to LTBP State Coordinators, ETGs, and BCOM (and select

others) – Beta Test Period Ends June 30

Page 23: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

LTBP Program – Bridge Portal Update Data Sources

Tools

NBI Element Level Data

Traffic and WIM Data

Environment Data

Maintenance Bridge Documents

Visual Inspection NDT/NDE

Advanced Security

Advanced Search Reporting Map

Visualization

Multi dimensional

Charts Map charts

Bridge Historical

data

Deterioration Model

Future Development

More Statistical features

Performance Comparison

Bridge Timeline

Advanced Deterioration

Model

Android App iPad App Custom Groups

Features available in V 1.0 Highlighted

Page 24: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection

Data Management

Data Analysis

Long-Term Bridge Performance Program

Products

Page 25: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

5

2 1 4 3 Objectives

Questions to be answered • “Practical” • “Fundamental” Hypotheses

What causal factors that may govern the performance of

Interest

Solution Design of Experiment

Sampling Paper Study

Field Data Collection

Data Analysis

Outcomes

Strategic Performance Matrix -- Untreated Bridge Decks

Data

Ana

lysis

De

terio

ratio

n M

odel

ing

Page 26: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Untreated Decks – Solution 1. Design an appropriate experiment for addressing the practical and

fundamental questions 2. Select a network of bridges (reference and clusters) as the primary

population source 3. Conduct paper study (tacit/legacy data collection) 4. If the paper study proves inconclusive, conduct field data collection using

the appropriate LTBP data collection protocols 5. Handle all data management through the LTBP Portal 6. Conduct data analysis

a) Develop deterioration models b) Develop life-cycle cost models

7. Address the question

Specific details provided

within an

“Operational Matrix”

Let’s Discuss

Data

Ana

lysis

De

terio

ratio

n M

odel

ing

Page 27: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Data Collection

Data Management

Data Analysis

Long-Term Bridge Performance Program

Products

Page 28: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Protocols Established over 150 protocols for bridge infrastructure

field assessment and evaluation Bridge Portal (A Data-Driven Decision Tool) Developed an advanced web-based centralized data

storage and retrieval application Deterioration and Forecasting Model Developed methodology for a data-driven deterioration

and forecasting model to be used within the LTBP Bridge Portal

Page 29: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

NDE Technologies Developed, deployed, and validated a number of

automated and semi-automated bridge deck assessment tools

Bridge Performance Index Developing, testing, and validating a data-driven bridge

performance index

Page 30: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Collaboration • Protocols • NDE tools and Technology • Deterioration Model • International Test Beds

Page 31: Long-Term Bridge Performance Programsp.maintenance.transportation.org/Documents/2015 Meeting...Management Data Analysis Long-Term Bridge Performance Program Products Protocols Established

Drew Noel Photography, copyright 2011. All rights reserved

Thank you !