Long Bo FT and Flanges
April 12, 2012 talk
Hans Jostlein
04/21/23 Long Bo FT and Flanges 1
![Page 2: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/2.jpg)
Requested Design Changes from 4/4/2012
04/21/23 Long Bo FT and Flanges 2
Based on Comments and Requirements from the April 4 presentation:
1.Increase the distance between HV Feed and TPC
1.Increase the distance between central purity monitor and TPC / HV feed
2.Raise the HV FT flange above the insulation atop the big 33 ½”) flange
to diminish icing danger
![Page 3: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/3.jpg)
Implementation of new Design Requirements
04/21/23 Long Bo FT and Flanges 3
Move the TPC away from the Tank Center.This frees up radial space for the purity monitor and
the HV Feed
Raise the TPC to the same elevation as the central purity monitor,
maintaining the same minimum LAr depth.
![Page 4: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/4.jpg)
04/21/23 Long Bo FT and Flanges 4
![Page 5: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/5.jpg)
04/21/23 Long Bo FT and Flanges 5
![Page 6: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/6.jpg)
04/21/23 Long Bo FT and Flanges 6
![Page 7: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/7.jpg)
Additional Design Features: Bubbles
04/21/23 Long Bo FT and Flanges 7
Analyze bubble paths and Bubble Size Control
Add a tight fitting seal at the bottom of the PE sleeve. It will sea when cold
Conical bottom end of the PE sleeve to prevent bubble aggregation
Venting of the space surrounding the 7/8” center tube to its inside
Venting the 7/8 tube inside through tiny holes in the contact cup at the bottom. Hole size 0.2 mm requires 2 cm LAr head; we will use 0.5 mm or larger.
![Page 8: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/8.jpg)
04/21/23 Long Bo FT and Flanges 8
![Page 9: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/9.jpg)
Additional Design Features: Purging
04/21/23 Long Bo FT and Flanges 9
Purge the space surrounding the PE sleeve into the GAr space at the top.
Purge the GAr space near the top into an external purge line
Purge the GAr space near the TPC Signal Feedthrough into an external purge line
![Page 10: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/10.jpg)
New Feedthrough DesignNew Features:
1.Top Flange raised above the top insulation2.Bubble stop insert at bottom of PE Sleeve (See later slide)3.Inverted cup/ spring contact arrangement (see later slide)4.Extended to great depth to avoid having an insulated support5.Bubble and purge management (see later slide)
04/21/23 Long Bo FT and Flanges 10
![Page 11: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/11.jpg)
Additional Design Features: HV Contact Area
04/21/23 Long Bo FT and Flanges 11
In order to minimize the TPC assembly diameter, thus maximizing the stand-off distances of HV FT and Purity monitor,
We invert the usual arrangement:
The spring loaded finger is attached to the TPC cathode HV tubing, while the (inverted) cup is welded to the HV FT center tube.
This change turns out useful and effective for bubble control (see previous slide)
![Page 12: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/12.jpg)
04/21/23 Long Bo FT and Flanges 12
![Page 13: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/13.jpg)
Additional Design Features: Windows
04/21/23 Long Bo FT and Flanges 13
We will have two windows, both existing:
An 8” CF window and a 6” CF window.These will help during HV FT installation
![Page 14: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/14.jpg)
04/21/23 Long Bo FT and Flanges 14
![Page 15: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/15.jpg)
04/21/23 Long Bo FT and Flanges 15
![Page 16: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/16.jpg)
04/21/23 Long Bo FT and Flanges 16
![Page 17: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/17.jpg)
04/21/23 Long Bo FT and Flanges 17
Making the Long Bo High Voltage Fedthrough
Cutting grooves into the PE:
![Page 18: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/18.jpg)
04/21/23 Long Bo FT and Flanges 18
Making the Long Bo High Voltage Fedthrough
Cutting grooves into the PE:
![Page 19: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/19.jpg)
04/21/23 Long Bo FT and Flanges 19
Making the Long Bo High Voltage Fedthrough
Cutting grooves into the PE:
![Page 20: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/20.jpg)
04/21/23 Long Bo FT and Flanges 20
![Page 21: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/21.jpg)
04/21/23 Long Bo FT and Flanges 21
![Page 22: Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.](https://reader030.fdocuments.net/reader030/viewer/2022032710/5697bfc71a28abf838ca7d8e/html5/thumbnails/22.jpg)
04/21/23 Long Bo FT and Flanges 22