LONDON CITY AIRPORT CADP Marine Piling & Decking
London City Airport CADP Marine Piling & Decking Pre-Qualification Questionnaire (PQQ)
Ref: A400/PQQ/Piling/001 October 2016
Disclaimer: This PQQ and the associated Contract Notice are non-binding subject to contract. LCY is not subject to the Utilities Regulations and the PQQ and Contract Notice are for publicity purposes only.
CADP Marine Piling & Decking Page 1 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking Table of Contents 1.0 Introduction ............................................................................................................ 3 1.1 Abbreviations .......................................................................................................... 3 1.2 Our Business .......................................................................................................... 3 1.3 London City Airport – CADP Marine Piling & Decking ............................................. 3 1.3.1 The Programme ..................................................................................................... 4 1.3.2 Scope of the CADP Marine Piling & Decking Works ............................................... 4 1.3.3 Contractor Attributes ............................................................................................... 5 1.3.4 Programme ............................................................................................................ 6 1.4 PQQ Request ......................................................................................................... 6 1.5 Evaluation of PQQ Responses ............................................................................... 7 2.0 Instructions ............................................................................................................. 9 2.1 Requirements for Further Participation ................................................................... 9 2.2 Queries ................................................................................................................... 9 2.3 Next Steps .............................................................................................................. 9 2.4 Non-Reimbursement of Expenses .......................................................................... 9 2.5 Format of Response ............................................................................................. 10 2.6 Completeness of Response .................................................................................. 10 3.0 PQQ – Company Information ............................................................................... 11 3.1 Contact Details ..................................................................................................... 11 3.2 Company Information (Pass/Fail) .......................................... 12 4.0 PQQ – Fundamental Questions (Pass/Fail) .......................................... 15 4.1. Annual Turnover ................................................................................................... 15 4.2. Insurance ............................................................................................................. 15 4.3 Health & Safety Performance ............................................................................... 16 4.4 Environmental Qualification .................................................................................. 16 4.5 Quality & Quality Systems .................................................................................... 16 5.0 PQQ – Experience............................................................................................... 17 5.1 Previous Company experience and references .................................................... 17 5.2 Competency and Capability – Resources ............................................................. 18 5.3 Project and Construction Management ................................................................. 19 5.4 Commitment to Client Overarching Objectives ..................................................... 20 5.5 Added Value ......................................................................................................... 20
Appendices Appendix A Format for Client References
Appendix B Health and Safety, Environment & Quality Questionnaire
Appendix C Preliminary Layout and scope documents
CADP Marine Piling & Decking Page 2 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
1.0 Introduction 1.1 Abbreviations CADP City Airport Development Programme
CIP Capital Investment Programme
D&B Dunn & Bradstreet Report
EOI Expression of Interest
GMT Greenwich Meantime
LCY London City Airport
N/A Not Applicable
JV Joint Venture
PQQ Pre-Qualification Questionnaire
RIBA Royal Institute of British Architects
RFP Request for Proposal
1.2 Our Business London City Airport Limited (LCY) operates a single runway airport that is located a few
miles east of Canary Wharf, London.
The scope of our airport operations is broad, covering all aspects of terminal,
passenger and baggage management, as well as administering the property and retail
businesses. As such, the airport works closely with a broad group of stakeholders,
including but not limited to airlines, the civil aviation authority, retailers and public
transport operators, to ensure a seamless experience for our customers.
This PQQ is thus issued for publicity purposes only. LCY does not consider itself to be
a Utility for purposes of the Regulations nor bound by the timeframes set out in the
Regulations. LCY shall voluntarily use a Restricted Procedure pursuant to the Utilities
Regulations.
To find out more about our business, please view our website on
www.londoncityairport.com.
1.3 London City Airport – CADP Marine Piling & Decking LCY wishes to appoint either a single contractor or a selection of contractors depending
upon the responses to this PQQ and associated Contract Notice to support its work to
CADP Marine Piling & Decking Page 3 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
plan and execute the future development of London City Airport pursuant to the
planning approval of the City Airport Development Programme (CADP). The purpose of
this contract is to construct a concrete deck over a significant portion of King George V
Dock to enable the expansion of the airport terminal buildings eastward, additional
aircraft stands and a new taxi-way.
1.3.1 The Programme LCY has permission to proceed with a programme of major capital works over the next
6 years to expand the existing airport infrastructure including additional aircraft stands,
east passenger terminal extension, associated baggage handling, security and other
works. The first phase of the Programme (phasing is currently under review and subject
to change) broadly consists of:
1. Terminal Works (extension to the West Terminal and baggage handling area
along with reconfiguration of the existing Terminal, construction of a new East
Pier and its connection to the main terminal);
2. Airfield Works (new aircraft stands, reconfiguration of some existing stands,
demolition of existing dolphin structure, construct floating Rendezvous Point,
Vehicle Control Point and permanent noise barrier);
3. Dockside Works (to improve the access and parking);
4. Enabling Works; and
5. Supporting Infrastructure (Western and Eastern Energy Centres).
Currently construction works are planned to commence in March 2017.
1.3.2 Scope of the CADP Marine Piling & Decking Works The physical scope of this package includes all works necessary to design (from RIBA
stage 3 for piling and stage 4 for decking), supply, manufacture and construct a
concrete deck over King George V (KGV) Dock. This shall consist of:
• Pre-cast reinforced concrete planks with an in situ topping, spanning onto;
• Pre-cast concrete beams, supported on;
• Large diameter bored concrete piles with steel casings (typically spaced at 10m
centres) that are, in turn founded beneath the dock bed.
CADP Marine Piling & Decking Page 4 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
The average water depth is approximately 10m with the piles potentially extending a
further 10m below the dock bed, averaging about 20m length per pile. The current
estimated pile quantity is a total of 1,029 with the diameter sizing as follows:
• 13 No. at 1,500mm Ø;
• 999 No. at 1,200mm Ø; and
• 17 No. piles at 1,000mm Ø
Up to date Geotechnical Information will be provided in the form of a report of a survey
of the dock bed (currently in progress).
Previous indications are that the substrata are made up of a 2m layer of silt, beneath
which lies a man-made dock bed, gravel and Thanet Sand. An indicative layout of the
piles is attached as Appendix C.
The works will be performed within an airport environment subject to various
restrictions such as piling rig height in proximity to the taxiway, operational hours’
restrictions, security and access constraints.
1.3.3 Contractor Attributes The contractors are expected to have the following attributes which LCY considers
necessary to successfully provide the work:
Relevant Experience – Demonstrable experience of the provision of major
construction works including works substantially similar to the major elements of,
and undertaken in a similar environment to, the proposed Marine Piling & Decking
works;
Financial Strength – Contractors must be of sufficient size, have relevant
resources and the financial status to be classed as capable to reliably deliver major
works similar to those required in performance of the CADP Marine Piling &
Decking works;
Competency and Capability – Contractors must possess the necessary resources
and relevant skills to complement their history of experience in the successful
delivery of major works similar to those required in performance of the CADP
Marine Piling & Decking works;
Excellent Health, Safety & Environmental Record; and
CADP Marine Piling & Decking Page 5 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Interest & Commitment – Contractors must be able to demonstrate both ability
and a history of commitment to supporting client overarching objectives and policy
goals.
LCY Key Objectives are:
1. Safety as a primary value – target of zero accidents;
2. Execution methodologies that minimise adverse impacts to LCY’s customers
using the airport but that deliver the requirements of airport operations and
stakeholders as planned;
3. Delivery of high quality, technically compliant works;
4. Delivery to programme and in accordance with contract terms;
5. Delivery on or below budget; and
6. Fostering integrated collaborative teamwork, open communication and early
and fair resolution of issues in delivering capital projects.
1.3.4 Programme Set out below is the proposed procurement programme. This is intended as an
indicative guide only. It is anticipated that the Marine Piling & Decking works will be
awarded by April 2017. Planned dates for key stages are as follows:
Pre-Qualification Questionnaire (PQQ) / Expression of Interest (EOI) – 21 October
2016;
Requests for clarifications deadline – 9 November 2016;
Deadline for submission of completed PQQ – 14 November 2016;
Tenderers advised of results of PQQ evaluation – 21 November 2016;
Request for Proposal (RFP) to be issued – 28 November 2016; and
RFP closure date – 2 February 2017.
1.4 PQQ Request LCY, through the OJEU Contract Notice mechanism has approached the marketplace
to seek Expressions of Interest (EOI) from appropriate organisations with the intention
of developing a short list of Contractors to respond to the planned RFP for the CADP
Marine Piling & Decking works. CADP Marine Piling & Decking Page 6 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
In order to participate in the selection process, contractors are invited to complete the
PQQ as detailed within this document. The information to be provided is intended to
enable LCY to evaluate the eligibility, economic and financial standing and technical
and professional ability of candidate contractors that have responded to the Contract
Notice. Qualifying candidates may be taken to the next stage of the process and
invited to reply to the RFP.
Contractors are required to complete all questions of the PQQ.
In the event that a question is not relevant to the contractor’s organisation and/or the
contractor is unable to provide a response; then the contractor must clearly state that
the answer is Not Applicable (N/A) with a statement explaining why the question is not
relevant to the contractor’s organisation.
Contractors should contact LCY Document Control by email at
[email protected] at least one day prior to the deadline for
submission requesting a secure file location and access code to which the completed
PQQ along with supporting documents can be uploaded. Only submissions to the said
secure folder will be accepted.
LCY will be using the NEC3 Engineering and Construction Contract, Main Option A or B
with amendments. LCY reserves the right to change the proposed contract or any of its
terms should a different basis be decided prior to award.
1.5 Evaluation of PQQ Responses For the purposes of the PQQ, contractors are to demonstrate their creditworthiness,
capability and experience by answering the questions and providing required
information in the following sections:
Section 3 – Company Information including financial information;
Section 4 – Fundamentals including Health and Safety information; and
Section 5 – Experience.
Not all questions contained in this PQQ will be marked numerically, but the information
provided will form part of the selection criteria used for the assessment of contractors.
Requirements in Section 3 are intended to demonstrate a contractor’s financial strength
and capability to perform the services. Section 3 is marked on a “Pass” or “Fail” basis.
CADP Marine Piling & Decking Page 7 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Submission of the required information/documentation equates to a “Pass” whereas
submission of inadequate material or no material equates to a “Fail”. Submissions that
receive a “Fail” will be disqualified from further participation.
Responses to questions in Section 4 will also be assessed on a “Pass” or “Fail” basis.
Any submissions that receive a “Fail” will be disqualified from further participation.
Submission of the required information/documentation equates to a “Pass” whereas
submission of inadequate material or no material equates to a “Fail”.
Each question in Section 5 will be marked on a scale of 0 to 10 based upon the
completeness, relevance and clarity of the response, including the breadth, depth and
value of a contractor’s capabilities to LCY as evidenced by the submission.
Marks are allocated as follows:
0 No information provided or what is provided is irrelevant;
1 – 2 Minimum information provided, statements vague or unclear as to
relevance;
3 – 4 Information substantial but incomplete, of limited relevance and
unsatisfactory;
5 – 6 Information incomplete but generally relevant and satisfactory;
7 – 8 Information generally complete, comprehensive, relevant and
satisfactory; and
9 – 10 Answered fully with information being relevant, comprehensive and
completely satisfactory.
Each question in Section 5 has a weighting as indicated which is applied to the mark
for that question. The weighted mark for each question is then totalled to give an
overall mark.
The overall pass mark to progress to the next stage will be 70% but this may be
adjusted as determined by LCY should circumstances warrant it. LCY may select a
short list of qualified contractors with reference to their respective ranking based on the
weighted total scores.
CADP Marine Piling & Decking Page 8 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
2.0 Instructions Interested contractors must submit responses to this PQQ by 10.00 GMT Friday, 14th November 2016. Responses shall be submitted electronically to a nominated folder as
per section 1.4 above.
No responses will be accepted by LCY after the time and date as set out above.
2.1 Requirements for Further Participation To be considered for further participation, candidate contractors must complete and
return the required information as detailed in this PQQ.
Registering interest in this project and/or submitting a completed response does not
guarantee inclusion of the candidate into the tender enquiry list.
2.2 Queries Any queries or questions concerning this stage of the process or document must be
referred directly to LCY Contact Officer:
Rory Haylett (email: [email protected])
All communication and correspondence must be in the English Language.
2.3 Next Steps The responses to the PQQ will be marked individually and scored as per the marking
scheme set out herein.
On the basis of the score, LCY intends to shortlist a number of selected contractors for
the next stage of the evaluation. A detailed tender timetable will be provided to the
contractors short listed for this initiative.
Following the PQQ evaluation process, LCY will notify all responsive contractors
whether or not they will proceed to the next phase.
2.4 Non-Reimbursement of Expenses LCY will not reimburse any expenses incurred by any respondents as a result of their
involvement with responding to this document, attending interviews and/or any other
aspects of the process
CADP Marine Piling & Decking Page 9 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
2.5 Format of Response Each question must be read carefully and an appropriate answer provided. A separate
answer must be provided in the space or format detailed for each question. Answers
must be concise and not exceed the permitted limit. Answers over the prescribed limit
will not be evaluated and scored at zero.
Responses to the questions must be specific to this PQQ. The submission of generic
information, general brochures, marketing information and general information is not required.
Responses must be submitted in Adobe Acrobat PDF electronic format to the location
and using the code specified in the Contract Notice to which this PQQ is attached as
single documents or as otherwise requested, or detailed in this PQQ.
2.6 Completeness of Response An incomplete or inadequate response to any question may result in disqualification
from further consideration as described in Section 1.5.
CADP Marine Piling & Decking Page 10 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
3.0 PQQ – Company Information 3.1 Contact Details
Contractor is to provide complete contact details as per the table format provided below
for two representatives for the purposes of this process.
These individuals should ideally be:
A Director or equivalent; or
Bid Manager.
A. Primary Contact (Senior Manager)
Name:
Title:
Address:
Telephone:
Fax:
Mobile:
Email:
B. Alternate Contact
Name:
Title:
Address:
Telephone:
Fax:
Mobile:
Email:
CADP Marine Piling & Decking Page 11 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
3.2 Company Information (Pass/Fail) 3.2.1 Organisation
Contractor is to provide a Company summary, including:
a) Name, head office address, company number and other key details;
b) Brief history of the Company, including details of any changes of ownership
over the last 5 years;
c) An organisational chart defining close parent, sister and subsidiary companies,
and the relevant division of the company; and
d) Details of any significant pending developments, changes in financial structure
or ownership, prospective takeover bids, buyouts and closures, etc., which are
currently in the public domain.
This section can be submitted via a separate attachment of no more than two
single sided A4 pages of 1.5 spaced lines using Arial typeface size 11 for text.
With specific reference to the requirements of the required works, provide an
organisation chart for the Company, detailing the number of staff and their role (e.g.
technical, non-technical, managerial, specialist) in each group, department, location
etc.
Contractor to restrict its response to no more than two single sided A4 pages of
1.5 spaced lines using Arial typeface size 11 for text.
If contractor’s intended proposal will comprise an existing or proposed Joint Venture
(JV) or consortium arrangement, provide the above information for all members of the
JV or consortium, as well as the following details of the JV or consortium arrangement:
a) The relationship between the companies; and
b) The proposed breakdown of the workload (which company will be responsible
for which activities including nomination of the lead JV partner).
CADP Marine Piling & Decking Page 12 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Contractor to restrict its response to no more than one single sided A4 page of
1.5 spaced lines using Arial typeface size 11 for text.
a)
b)
3.2.2 Financial
Contractor to submit:
a) A full Dunn & Bradstreet (D&B) company report, obtained in the last month. If
the contractor, or the relevant division of the contractor, is a subsidiary, part of
another organisation, or any other type of entity which results in a D&B report
being of little or no value, then the contractor is to explain why;
b) Full financial accounts for the past 3 years; and
c) Details of the contractor’s projected turnover and operating profits for the
upcoming 3 years.
d) Has your company or any of its Directors and Executive Officers been the
subject of criminal or civil court action (including for bankruptcy or insolvency) in
respect of the business activities currently engaged in, for which the outcome
was a judgement against you or them?
Please provide details of any such action. Responses will be taken into account
in assessing the outcome of this prequalification application where the
circumstances of the judgement are pertinent to anticipated future projects or
services. They will not necessarily constitute a reason for rejection.
e) If your company or any of its Directors and/ or Executive Officers are the subject
of ongoing or pending criminal or civil court action (including for bankruptcy or
insolvency) in respect of the business activities currently engaged in, have all
claims been properly notified in accordance with the suppliers Product Liability
Insurance policy requirements and been accepted by insurers?
CADP Marine Piling & Decking Page 13 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Please provide details of action and confirmation, with references of the
relevant notification and insurer acceptance. Responses will be taken into
account as part of the assessment process.
f) Has your company or any of its Directors and Executive Officers been in receipt
of enforcement/remedial orders that are still unresolved (such as those in
relation to: Environment Agency or Office of Rail Regulation enforcement), in
the last three years?
Please provide details, including the status of the required action. Responses
will be taken into account as part of the assessment process.
a)
b)
c)
d)
e)
f)
CADP Marine Piling & Decking Page 14 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
4.0 PQQ – Fundamental Questions (Pass/Fail)
A satisfactory response to all of the questions in this section must be provided in
order for the responses to Section 5 (following) to be considered.
The information requested in this section must be provided for all proposed members
of a JV or consortium.
4.1. Annual Turnover For the CADP Marine Piling and Decking contract LCY requires contractors to have
an annual turnover in non-residential Construction in excess of £60 million per
annum over the last 3 years. If contractor responds as a consortium or joint venture
the total annual turnover of the consortium or joint venture will apply.
The contractor is to confirm its annual turnover over the last 3 years meets this
criterion
Answer YES or NO
Turnover for 2015/2016: (If available)
Turnover for 2014/2015:
Turnover for 2013/2014:
Turnover for 2012/2013: (If 2015/2015 figures not available)
4.2. Insurance
The contractor is to provide insurance details, with particular reference to:
a) Employer’s Liability (EL);
b) Public Liability (PL);
c) Professional Indemnity Insurance (PII);
d) If currently available, Airside Indemnity Insurance (as endorsement to Public
Liability or separately)
CADP Marine Piling & Decking Page 15 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Provide the insurer, policy number, expiry date, limit of cover, policy excess and any
exclusions and confirm minimum PII and PL cover.
Contractor to restrict its response to no more than two single sided A4 pages of 1.5
spaced lines using Arial typeface size 11 for text.
a)
b)
c)
d)
4.3 Health & Safety Performance
The contractor is to provide a complete response to the Health and Safety
Questionnaire attached hereto marked as Appendix B.
Contractor is to restrict its response to no more than the completed Health & Safety
Questionnaire and requested supporting documentation
4.4 Environmental Qualification The contractor is to provide complete response to the Environmental Questionnaire
attached hereto marked as Appendix B
Contractor is to restrict its response to completed Environmental Questionnaire and
supporting documents
4.5 Quality & Quality Systems
The contractor is to provide a complete response to the Quality Questionnaire attached
hereto marked as Appendix B
Contractor is to restrict its response to completed Quality Questionnaire and
supporting documents
CADP Marine Piling & Decking Page 16 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
5.0 PQQ – Experience The information required by this Section 5 must be provided for all proposed members
of a JV or consortium. Certain words and phrases have been identified in bold type is
to assist the contractor to focus on identifying and responding to those areas important to LCY.
5.1 Previous Company experience and references (Weighting 50%)
The contractor is to provide:
a) A summary of specific experience as a contractor with responsibility for the
delivery of Marine Piling and Decking, with particular reference to commissions
carried out for major projects. Where possible, provide evidence of working on
a range of different types of Marine Piling, Large Diameter bored piling, pre-cast
concrete decking projects that demonstrates the breadth of the contractor’s experience with examples of how this has been deployed to the benefit of other clients. Where possible include examples of projects undertaken in an
operating environment (e.g. at airports or marine ports). (10%)
b) Three examples of each specific area of experience (Piling and decking/precast
concrete construction) (30%). Each of the examples is to provide a synopsis of
the works and services provided which should include the following:
A short description stating:
o the name and location of the works;
o project scope description including the size and value of the works;
o the year completed;
o details of your role on the project, approximate overall project value and the value of the contractor’s element;
o the type of contract; and
o an indication of out-turn against budget and programme.
For piling experience examples, large diameter bored concrete piles
For piling experience examples, piling or similar works in a marine
environment
CADP Marine Piling & Decking Page 17 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
For decking/pre-cast concrete construction examples, construction where
pre-cast concrete elements have been incorporated as part of the delivery
methodology.
Examples of risk identification / mitigation in connection with similarly
scoped work and/or examples of instances where innovation or proprietary
technology were used to your client’s advantage.
Description of equipment including, as appropriate, marine support
equipment highlighting any safety and environmental aspects that might
be relevant to the LCY scope.
c) References (10%)
Note: All references should be within the last 5 years.
In the event of consortia or JVs, the specific experience of each member must
be clearly detailed.
Client’s reference details for each of the projects listed above are to be provided
in the format shown in Appendix A.
Contractor is to restrict its response to no more than the below stated limits for single
sided A4 pages for each section above of 1.5 spaced lines using Arial typeface size 11
for text.
a) two pages
b) three pages per example
c) completed reference form
5.2 Competency and Capability – Resources
(Weighting 20%) (a) The contractor is to provide information on the extent and range of skills that it
has available in its organization including provision of a breakdown of managerial
and supervisory manpower available, specifically identifying capacity and
availability of the type of key resource required to perform the proposed Piling &
Decking contract. The contractor should identify the key positions necessary to
CADP Marine Piling & Decking Page 18 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
safely and effectively provide the Piling and Decking works along with the expected
level of experience and qualifications of people assigned to such key positions. For
identified key positions the contractor may provide details in the form of short
sample CVs for individuals considered appropriate.
(b) The contractor is to provide information on the number and type of Equipment appropriate to the scope that it has available in its organization, including piling
and marine support equipment. The contractor should identify equipment that it
owns, that it would hire, and equipment that would be provided under
subcontracted scope. The contractor should identify any specialist Equipment and
any constraints on availability of which the contractor might currently be aware.
(a) Contractor is to restrict its response to no more than two single sided A4
pages of 1.5 spaced lines using Arial typeface size 11 for text to summarise
organizational resources and individual CVs are to be concise and specific and
comprise no more than two single sided A4 pages.
(b) Contractor is to restrict its response to no more than two single sided A4s
5.3 Project and Construction Management
(Weighting 20%) The contractor is to provide a summary of its project and construction management
processes used to deliver scopes broadly equivalent to the CADP Piling & Decking
works. The contractor is also to provide a summary Project Execution Plan from a
previous Piling & Decking contract (or for previous contract demonstrably involving
similar construction elements) which is sufficiently comprehensive to demonstrate how it plans to deliver the works. The contractor may provide separate such
Execution Plan summaries for Piling and for Decking if desired.
Contractor is to restrict its response to no more than four single sided A4 pages of
1.5 spaced lines using Arial typeface size 11 for text plus a summary execution
plan(s) of no more than ten single sided A4 pages of 1.5 spaced lines using Arial
typeface size 11 for text
CADP Marine Piling & Decking Page 19 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
5.4 Commitment to Client Overarching Objectives (Weighting 5%) The contractor is to provide a summary of its understanding of, and an explanation of
how it will commit to adopt and deliver in line with LCY’s key objectives. The
summary must be precise and comprehensive enough to demonstrate in factual terms how the contractor will embed its commitment into its CADP Piling & Decking
activities.
Contractor is to restrict its response to no more than 500 words (word count to be
shown).
5.5 Added Value
(Weighting 5%) The contractor is to describe how it will bring added value to LCY in the delivery of
CADP Piling & Decking works, giving examples of how this has been successfully achieved on other contracts. Particular areas which the contractor’s submission
should address are: continuous improvement, applying lessons learned, developing
and applying creative solutions and the use of best practice.
Contractor is to restrict its response to no more than 500 words (word count to be
shown).
CADP Marine Piling & Decking Page 20 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking Appendix A Format for Client References (Q5) Question 5.1 part c): Client References for each project example Project Title: …………………………………………………………….…………………………………………………….
Tender Value: …………………………………………………………….
Final Account Value: …………………………………………………………….
Value of Works Undertaken by your Company: …………………………………
Procurement Route: ………………………………………………………………… (State whether design and construct or employer design)
Role under CDM (if any)……………………………………………………………….
Awards Received: ………………………………………………………………….….
Form of Contract: …………………………………………………………………..….
a) Client Reference
Name of Organisation: ……………………………………………………….
Name of Contact: ………………………………………………………….….
Address: …………………………………………………………………….….
…………………………………………………………………….….
Telephone Number: ……………………………………………………….….
Email Address: ………………………………………………………..………
b) Client Project Manager/Contract Administrator
Name of organisation: ……………………………………………………….
Name of Contact: …………………………………………………………….
Address: …………………………………………………………….…...…….
……………………………………………………………………….
Telephone Number: ………………………………………………………….
Email Address: ………………………………….……………………………
c) Client’s Cost Manager
Name of Organisation: ……………………………………………………….
Name of Contact: ………………………………………………………….….
Address: …………………………………………………………………….….
…………………………………………………………………….….
Telephone Number: …………………………………………………….…….
Email Address: …………………………..……………………………………
CADP Marine Piling & Decking Page 21 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking Appendix B Health & Safety Questionnaire (Q4.3)
1 Yes No
2 Yes No
3 Yes No
4 Yes No
5 Yes No
6
4.3. HEALTH & SAFETY STATEMENT
Describe your firm’s program to Motivate, Encourage, and Monitor safe work performance.
Have you been inspected by the HSE or received any HSE citations in the past 5 years? If yes, provide an attachment describing the outcome of the inspection along with copies of citations received. Provide a description of the actions taken to abate the citations as an attachment to this application.
Has your Companies Health and Safety Management System been accredited by an external accreditation body? If yes, provide copy of your certification.
Does your Company have Health and Safety Management System Procedures that comply with UK Legislative requirements? If yes, provide a copy of your Procedures Index.
Does your Company have a written Drug/Substance Abuse Policy with Testing? If yes, provide a copy. What type? Pre-employment Post Accident Just Cause Random
Does your company use Activity Hazard Analysis (AHAs), Job Safety Analysis (JSAs), Job Hazard Analysis (JHAs), or the like to identify and mitigate or eliminate hazards prior to performing high risk or none routine activities? If so provide examples.
CADP Marine Piling & Decking Page 22 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
1 2 3 Year Hours (B)1 2 3
Year Rate
123
Policy Year EMR123
Yes No Monthly Annually
C. CDM 2015 Competencies
Yes No
Provide copies of investigation reports from the last 3 injuries or Workers’ Compensation claims, not including any fatality or lost time injury.
The Applicant shall maintain records of such evaluations and make them available for review and approval of London City Airport's representatives at all reasonable times should Applicant be awarded a contract based on this application.
Does the company have a CDM 2015 policy? (If 'yes' please attach)
YearNumber of lost/restricted workday cases
Number of recordable cases + without restricted activity or lost workdays.
Recordable Injury Frequency RateMultiply total for each year (A) x 200,000 and divide by total employee hours for that year (B)A x 200,000/B
Number of fatalities.
Total
Experience Modification Rate (EMR)
Are the following accident records and accident summaries kept? How often are they recorded?
Accidents totaled for the entire companyAccidents totaled by project
Provide a description and root cause analysis for each fatality or lost time injury for the past 3 years.
B. Accident Information
Fil l in the number of injuries and i l lnesses for the last 3 years
Total employee hours worked in the last 3 years (do not include any non-work time, even though paid)
CADP Marine Piling & Decking Page 23 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking
Appendix B Environmental Questionnaire (Q4.4)
1 Yes No
2 Yes No
3 Yes No
4.5 - ENVIRONMENT
Evaluation of the environmental culture and capabilities of a company can be difficult. No single repository or source is available to indicate whether a company has experienced previous environmental citations or fines as most of these records are developed and maintained at the Environmental Agency level. The evaluation of the company has to be based upon documentation provided by the company, to include discussions with references provided, review of records, and contact of regulatory personnel. A qualitative assessment of the company capabilities and experience shall be used to provide an overall assessment of the company's culture and possible benefit to London City Airport.
Has your Company's Environment Management System been accredited by an external accreditation body? If yes, provide copy of your certification.
Has your Company undertaken 5 projects within the last 5 years that included Environmental Responsibilities in your scope of work?
Do you have any Notice of Violations (NOVs), incidents, releases causing environmental damage? Describe each of these NOVs, incidents, and releases.
CADP Marine Piling & Decking Page 24 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking Appendix B Quality Questionnaire (Q4.5)
1 Yes No
2 Yes No
3 Yes No
Does your company have a process in place for the Pre-Qualification of potential Subcontractors? If Yes provide a copy of your process.
Does your Company have a Continual Improvement Process and Plan? If yes, provide your Process and Plan
4.5 QUALITY SYSTEM
Has your Company Quality Management System been accredited by an external accreditation body? If yes, provide copy of your certification.
CADP Marine Piling & Decking Page 25 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
LONDON CITY AIRPORT CADP Marine Piling & Decking Appendix C General Project Information
Drawing: Piling Zones - March 2016
CADP Marine Piling & Decking Page 26 of 26 Status: USE Document Number: A400/PQQ/Piling/001 Date: October 2016 Reason for Issue – IFU – Issued for Use Revision: 00 Document Uncontrolled When Printed
Project
Drawing Title
Originating Office
TPS Job Manager
QA System - Checks
Drawn By:
Checked:
Authorised:
Signature Date
TPS Project No. Drawing Status Scale (at A1) (at A3)
RevisionDrawing No. Displ Bldg Level Type CiSfb Element Code Seq. No.
Copyright in all documents and drawings prepared by TPS Consult Ltd. and inany works executed from those documents and drawings shall remain theproperty of TPS Consult Ltd. unless otherwise agreed at project inception.
Birmingham : Croydon : Edinburgh : Sheffield : Wolverhampton
TPS Croydon - Centre TowerWhitgift Centre
CROYDONCR9 0AU
Tel 020 8256 4000Fax 020 8256 4116
Fax Architects 4166 Fax M&E Eng 4082Fax Struct Eng 4082 Fax Civil Eng 4122
CITY AIRPORTDEVELOPMENT PROGRAMME
R.MOORE
112406
CA0L-900
R.WOOD 19/02/2013
5.14 PROPOSED DECK STRUCTUREAND FOUNDATIONSGENERAL ARRANGEMENT
1:1000APPROVAL
W.HELLYER 11/03/2013
R.MOORE 11/03/2013
E
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESSOTHERWISE STATED.
2. ALL LEVELS ARE IN METRES ABOVE ORDNANCESURVEY DATUM.
3. FOR SECTIONS REFER TO Dwg.Nos. CA0L-910,CA0L-911 AND CA0D-921.
4. PILE POSITIONS MAY BE SUBJECT TOADJUSTMENT AT DETAIL DESIGN STAGE
CU
T LI
NE
- CO
NTI
NU
ED B
ELO
W
CU
T LI
NE
- CO
NTI
NU
ED
AB
OVE
Royal Docks London E16 2PB
AR.WOOD
11/03/2013W.HELLYER
11/03/2013
PRELIMINARY PLANNING SET
BR.WOOD
22/03/2013W.HELLYER
22/03/2013
ISSUED FOR PLANNING
For Approval
CR.WOOD
04/04/2013W.HELLYER
04/04/2013
ISSUED FOR PLANNING. REVISED TO LCY COMMENTS
DR.WOOD
13/06/2013W.HELLYER
13/06/2013
ISSUED FOR PLANNING. REVISED TO LCY COMMENTS
ER.WOOD
02/07/2013W.HELLYER
02/07/2013
ISSUED FOR PLANNING. REVISED TO LCY COMMENTS
CU
T LI
NE
- CO
NTI
NC
UT
LIN
E - C
ON
TIN
CU
TT
Seq
Query Response
61Is this the package procurement construct only or design and build (i.e. do we
need a designer in our team or if you already have one employed)?
The contract is intended as a Design & Build. Piling will be developed by
the Contractor from a RIBA stage 3 design supplied by LCY. The beams
and deck will be designed to RIBA stage 4 by LCY. LCY's designer will
work closely with the contractor in developing the design.
62
Section 2.0 Instructions: This section states a return date of Friday 14th
November 2016 @ 10.00am. However 14th November is a Monday. Could you
please confirm the return date and time?
The return date is Monday 14th November at GMT 10:00
63
Section 5.1 Previous Company Experience and References: Could you please
confirm should the three example projects be for each of the three specific
areas i.e. piling large diameter, piling in a marine environment and decking /
precast construction therefore giving 9 example projects at three pages per
example. Or do we provide three example projects covering the three specific
areas giving a page count of 9 in total?
It is intended that there are 6 example projects, 3 focussed on the piling
element and 3 focussed on the projects with a decking/pre-cast
concrete construction element
64Section 5.1 Previous Company Experience and References: Could you please
confirm whether reference projects have to be substantially completed?
If the information available for the subject project is sufficient to
answer the question posed in section 5.1 LCY will not reject the
example becaue the project is not substantially completed.
65 Not Used
66To allow us to adequately answer 5.2 (b) could you please confirm the
anticipated construction programme for the marine piling and decking works?
There is a provisional duration of around 100 weeks in the Programme
for the works. This is an extremely outline duration at this stage.
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
67With reference to the response to Question 3.2.1, c), please confirm that the
organisation chart is outside the 2 page limit?The Organisation Chart is outside of the Two Page limit for this section
68With reference to the response to Question 3.2.1, would you permit 1 x A3 page
to show the Organisation Chart for the company instead of 2 x A4 sides?A single A3 page for the Organisation Chart is acceptable
69
With reference to the response to Question 4.2, would you please clarify what
limit of cover is expected for Professional Indemnity and Airside Indemnity
Insurance?
LCY will require levels of insurance appropriate to the works. PI levels
have yet to be determined but your usual policy should be disclosed.
Airside Indemnity cover is usually required up to £25m for major
projects and £5m for minor works airside when the contractor is working
airside, unaccompanied by LCY personnel and with their own
Equipment. Respondent should indicate current available insurance, if
any.
70
With reference to the response to Question 4.4 Environmental Questionnaire,
part 2, would you please confirm if you require details of the 5 projects or just a
confirmation at this stage?
Only confirmation is required. LCY will request evidence at a later stage
should it be required.
71
With reference to the response to Question 5.1 b), would you please confirm if
you require 3 example projects in total, or 3 example projects for each element
of the works, e.g. 3 examples for piling plus 3 examples for precast deck
construction?
It is intended that there are 6 example projects, 3 focussed on the piling
element and 3 focussed on the projects with a decking/pre-cast
concrete construction element
72With reference to the response to Question 5.2 a), would you permit inclusion
of 1 additional A3 page to demonstrate proposed project team structure?An additional single A3 page for the Project Team is acceptable
73
With reference to the response to Question 5.3, would you please confirm what
you expect to see in the contents of the example Project Execution Plan? From
our experience, documents such as Quality Management Plans and works
method statements with associated risk assessments often exceed 10 pages.
The request is for a summary of such example Project Execution Plan
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
74
With regard to the 3.2.2A requiring a Dunn and Bradstreet credit report to be
submitted would a credit report from an alternative credit rating agency (Such
as Creditsafe) be acceptable.
A credit report from a credit rating agency of simillar standing to Dunn &
Bradstreet is acceptable. Nevertheless please supply your D&B
reference number if known.
75
With regard to question 5.1b please confirm if we are to provide three
examples of previous projects in total or 3 examples of large diameter marine
piling and 3 examples of pre-cast decking i.e a total of 6 project. Our 3 proposed
projects would each cover both of these aspects.
It is intended that there are 6 example projects, 3 focussed on the piling
element and 3 focussed on the projects with a decking/pre-cast
concrete construction element. Each could contain elements of the
other.
76 Is it possible to receive the PQQ document in an editable format (*.doc)? Unfortunately a copy of the PQQ cannot be made available in word.
77 Not Used
78
Q5.1 A – Please confirm whether additional supporting information on projects
listed in response can be supplied in an appendix – i.e photos and additional
information?
Please comply with the stated limits. Additional Information will not be
evaluated.
79Q5.1b – Please confirm if at least one of the reference jobs provided can be that
of a nominated sub-contractor?Confirmed
80Q5.1b – Please confirm if additional photos/drawings can be provided as an
appendix?
Please comply with the stated limits. Additional Information will not be
evaluated.
81Can you please advise if LCY would accept an Experian credit rating rather than
Dunn & Bradstreet company report?
A credit report from a credit rating agency of similar standing to Dunn &
Bradstreet is acceptable. Nevertheless please supply your D&B
reference number if known.
81a Are you able to provide an editable version of Appendix A & B? These are attached
82 Not Used
83 Not Used
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
84
• If we were to propose a Joint Venture or Consortium for this project could you
please confirm the following:
- 3.0 PQQ – Company Information to be completed by both parties in JV?
- 4.0 PQQ – Fundamental Questions to be completed by both parties in JV?
- 5.0 PQQ Experience to be completed as a joint answer?
- 3.0 PQQ: Confirmed -See question 3.2 "If contractor's intended
proposal will comprise an existing or proposed joint venture (JV) or
consortium arrangement , provide information for all members of the
JV or consortium.."
- 4.0 PQQ: Confirmed - See question 4.0 "The information in this section
must be provided for all proposed members of a JV or consortium."
- 5.0 PQQ: Separate suitable relavant company experience is
acceptable.
85 Not Used
86Do you require the information to be within the PQQ document or as a separate
document?
Please see attached the editable versions of the appendices to the PQQ
document. Please provide all other information separately.
87
1. Please could you confirm if we are required to respond directly into the
boxes provided in PQQ questionnaire and appendices and if so, please could
you provide a word version of the PQQ document?
2. Question 5.1 b) – Please could you confirm that you are expecting to see a
total of six examples of specific experience? i.e three for piling experience and
three for decking/pre-cast concrete construction examples.
1. We are able to attach Appendix A & B for your completion. The
remainder of the document will not be issued in editable format.
2. Confirmed as correct; it is intended that there are 6 example
projects, 3 focussed on the piling element and 3 focussed on the
projects with a decking/pre-cast concrete construction element. Each
could contain elements of the other.
88 Not Used Not Used
89 Not Used Not Used
90 Not Used Not Used
91 Not Used Not Used
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
92
As part of the Health & Safety submission we are being asked for our
“Experience Modification Rate (EMR)” for the last three years.
We understand this is a number used by insurance companies to gauge both
past cost of injuries and future chances of risk. Our insurers have not heard of
such a figure and therefore are not able to provide the EMR for our business. It
doesn’t seem to be a UK rate and is potentially more aligned to a Workmen’s
Compensation type of insurance which is more the norm outside of the UK.
Can you therefore please advise if it is acceptable to leave this section blank?
It is acceptable to leave this section blank if it does not apply.
93Thank you for sending the link to the PQQ, is it possible to have a word editable
version so we can start filling in the necessary sections?
Following on from my previous email, please see attached Appendix A
and B in an editable format.
94
1. The OJEU notice states a deadline date of the 4th November, and the PQQ
document states the 14th November - for the avoidance of doubt please can
you clarify which date is correct?
2. Please can you clarify whether the case studies provided for 5.1b have to be
within 5 years?
3. In question 5.1b you request that we provide ‘three examples for each
specific area of experience’. Can you confirm that the specific areas are ‘large
diameter bored piles’, ‘piling in a marine environment’ and ‘pre-cast concrete’?
Furthermore the final two bullets of 5.1b (risk and equipment), are these
required within the three previously mentioned examples or as separate
example areas?
4. Depending on the outcome of your response to the clarification above, we
assume that the ‘three pages per example’ relates to the three ‘specific areas of
experience’, which would mean a total of 9 pages is available to respond to
5.1b, is this assumption correct?
1. The return date is Monday 14th November at GMT 10:00 which is local
time in London.
2. Case studies outside of 5 years are acceptable.
3. It is intended that there are 6 example projects, 3 focussed on the
piling element and 3 focussed on the projects with a decking/pre-cast
concrete construction element.
4. See above. 6 pages maximum.
95
In completing our PQQ can we utilise the experience of our nominated
specialist sub-contractor?
We do not intend to form a JV or consortium with this party.
Experience obtained by a potential sub-contractor is acceptable in the
absence of relevant suitable company experience.
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
96 Not Used
97 Not Used
98
I note that the PQQ instructions state that a more detailed timetable will be
provided to those selected to participate in the tender process, but I was
hoping you may be able to provide some dates when you anticipate awarding a
contract, a start on site and completion of the works.
Indicative programme dates are:
Contract award: 13-Apr-17
Start on site: 12-Jul-17
Completion of works: Q1 2019
99Would it be possible to send the full PQQ document in a format that we are
able to edit?
Please find attached Appendix A and B. The remainder of the document
will not be provided in editable format.
100
• With reference to your response to 5.1b, is it acceptable to use the same
project more than once if it covers both elements of the work?
• Further to your clarification regarding page numbers on 5.1b and for the
avoidance of doubt; in your document you make a distinction between pages
and sides of A4 – as you’ve stated 6 pages below does this in fact mean 12
sides?
- It is acceptable to use the same project to demonstrate experience of
undertaking different elements of the work.
- For clarity, for 'pages' in previous clarification, read as 'sides'. Single
side of A4 paper.
101
Section 5.0 We note that this section ‘must be provided for all proposed
members of a JV or consortium’.
Could you please clarify if this means that each JV member must complete the
5no. questions individually in their entirety? Or if a combined response is
acceptable? We note that 5.2 in particular would benefit from a combined
response showing the resources of both JV members as a team.
Section 5.0 Question 5.1 – Should the reference projects at part (c) be fully
complete, or would a substantially complete project be acceptable?
We would also appreciate if you could forward a Microsoft word version of the
PQ document to allow us to insert our responses.
Section 5.0.
A combined response is acceptable
Question 5.1
If the project is ongoing a suitable current reference should suffice.
Please find attached Appendix A and B. The remainder of the document
will not be provided in editable format.
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
102
1. Can you please confirm what are the minimum levels of cover London City
Airport require for PL and PI Insurances?
2. Can you please advise if it would be acceptable to London City Airport
that, where a JV is assembled to consolidate varying types of skill and
expertise, the example PEP can be submitted from the lead JV partner only, or
at least not required from each JV member?
1. LCY will require levels of insurance appropriate to the works. PI levels
have yet to be determined but your usual policy should be disclosed.
Minimum levels of PL cover are still to be determined but will be
appropriate to suit the level of risk.
2. A relevant and suitable PEP from the either JV partner will suffice.
103
With respect to the Experience Modification Rate (EMR) please could you
confirm what you mean by this. Our understanding is that the EMR is an
American term applying specifically to workers compensation insurance. As a
UK company we do not carry insurance in this format. We do have Employers
Liability Insurance but this is not with American insurers, therefore we cannot
provide an answer to this question at this point.
It is acceptable to leave this section blank if it does not apply.
104Would you also please confirm if there is a maximum permitted file size for
uploading? At present our PQQ submission is around 40MB.
The maximum file size for uploads is 10GB
105Would you please confirm if the PQQ deadline is now extended to 14th
November 2016?……...the closing date is 14th November 2016. ………
106 Not Used
107
Section 3 & 4
Further to our clarification regarding a joint response for section 5, we would be
grateful if you could confirm that all JV partners need to provide separate
information for sections 3 and 4.
If this is the case, we would appreciate if you clarify if the page limits apply to
each JV member separately – ie. where two pages is stated, this means two
pages per JV member.
All JV partners should provide the requested information for Sections 3
and 4.
Correct. Two single A4 sides per JV partner.
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0
Seq
Query Response
108
Q 5.1
Can you please confirm if you expect to receive a maximum of 9no. projects
(3no. for each bullet point):
(3no. project examples)
environment
(3no. project examples)
cast concrete elements have been incorporated as part of the delivery
methodology.
(3no. project examples)
scoped work and/or examples of instances where innovation or proprietary
technology were used to your client’s advantage.
(Examples in relation to above projects)
equipment highlighting any safety and environmental aspects that might be
relevant to the LCY scope.
(Relevant to above projects)
It is intended that there are 6 example projects, 3 focussed on the piling
element and 3 focussed on the projects with a decking/pre-cast
concrete construction element. Each could contain elements of the
other.
Piling & Decking PQQ Clarifications
A400-05-P-PQQ-00002 Rev 1.0