London Borough of Brent highways&[email protected] Roadworks/Events/Festivals 0208 937 5600 Network Management Team Wembley Event Premier League Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Champions League Tottenham Hotspur vs APOEL FC Kick off 19:45 06/12/2017 06/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com We,nley Event Premier League Tottenham Hotspur vs Stoke City Kick off 15:00 09/12/2017 09/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Tottenham Hotspur vs Brighton & Hove Albion kick off 20:00 13/12/2017 13/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Tottenham Hotspur vs Southampton Kick off 12:30 26/12/2017 26/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Tottenham Hotspur vs West Ham United Kick off 14:30 31/12/2017 31/12/2017 1 Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Spurs vs Everton Kick off 17:30 13/01/2018 13/01/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Spurs vs Manchester United kick off 20:00 31/01/2018 31/01/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Spurs vs Arsenal 9/10/11/12 February TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com Wembley Event Carabao Cup Final 25/02/2018 25/02/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Spurs vs Huddersfield Town 2/3/4/5/March TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com Wembley Event Premier League Spurs vs Newcastle United 16/17/18/19 March TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com ABBEY ROAD LONDON 48M NORTH WEST OF JUNC CORONATION ROAD ON TO 118M NORTH WEST OF JUNC CORONATION ROAD ON, ABBEY ROAD Install 50m of 2 poly ducts in Footway STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500250615800 202/00845 ABERDEEN ROAD LONDON FROM J/O BURNLEY ROAD TO O/S NO.33 IMGA192012 ABANDON 160M X 8' CI / 128M X 4' CI / 11M X 6' CI MAIN ANDINSERT 90 / 180MM PE AND RELAY OR TRANSFER APPROX 34 SERVICES. MAJOR 03/01/2018 14/02/2018 43 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000635963 202/02072 ABERDEEN ROAD LONDON BURNLEY ROAD - LANCASTER ROAD Carry out 40no Customer Service relays between the existing Water main and Property boundaries, as part of Thames Waters Lead Pipe Replacement Project MAJOR 05/02/2018 02/03/2018 26 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/050 202/02072 ACTON LANE LONDON SEC 58 N/A. O/S 62/60 TO OPP HALESDEN BAPTIST CHURCH., ACTON LANE Install 145m of 1 way poly duct in Footway STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500252204700 202/01443 AIRCO CLOSE LONDON Temporary entrance to rear of 399 Edgware Road Proposed Temporary Traffic Order to implement double yellow lines in a portion of free parking bays to allow delivery into Airco Close site entrance for 399 Edgware Road new development. Our ref: TTRO HIGHWAYS ACT PERMITS 20/02/2017 19/08/2018 546 Days PROPOSED WORKS SOME C/W INCURSION AW888-L-MAIN-00000697 202/04189 ALBERT ROAD LONDON WHOLE ROAD MAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) - 2017/18-ROAD CLOSURE MAJOR 20/02/2018 22/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257699 202/01431 ALDERTON CLOSE LONDON Outside No. 1-51 Press House Connect onto existing main in footway and lay approx 3.20m new gas paipe in f/w. Works to be carried out behind developer hoardings. STANDARD 29/11/2017 05/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION WY001-NSA00017101 202/00998 ALL SOULS AVENUE LONDON NEARSIDE FOOTWAY OUTSIDE 36 ALL SOULS AVENUE LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN FOOTWAY STANDARD 13/12/2017 19/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000655210 202/02012 ALL SOULS AVENUE LONDON 36 1x25mm MDPE mtrd Connection, works in the footway and in Carriageway.Our intention is to complete the Permanent Reinstatement in the samephase STANDARD 10/01/2018 15/01/2018 6 Days PROPOSED WORKS TWO-WAY SIGNALS MU307-000805648290110-001 202/02012 ALL SOULS AVENUE LONDON whole road WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER - NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS REPLACEMENT SCHEME MAJOR 01/03/2018 10/05/2018 71 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z004 202/02012 ALRIC AVENUE LONDON BRUCE ROAD - SELWYN ROAD Carry out 67no Customer Service relays between the existing Water main and Property boundaries, as part of Thames Waters Lead Pipe Replacement Project MAJOR 29/01/2018 19/03/2018 50 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/049 202/01184 ALVERSTONE ROAD LONDON WHOLE STREET FROM J/O BRONDESBURY TO J/O SYDMOUTH ROAD IMGA160045 ABANDON 490M X 4' CI MAIN AND INSERT 75MM PE AND RELAYORTRANSFER APPROX 23 SERVICES MAJOR 27/11/2017 09/01/2018 44 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000658136 202/02507 ANSON ROAD LONDON OS 37 ANSON ROAD, LONDON, NW2 3UY 130015364Lay 63mm PE to 2' ST riser feeding 5 port meter bank forcustomers new gas connection STANDARD 23/11/2017 28/11/2017 6 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648635 202/02561 ANSON ROAD LONDON o/s and opp 37 4x25mm MDPE new water meter supply in f/way and in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase STANDARD 19/12/2017 22/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000805402070100-001 202/02561 ASHFORD ROAD LONDON ASHFORD ROAD J/O PINE ROAD IMGA192008 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN PINE ROAD STANDARD 20/11/2017 01/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000653603 202/01110 ASHFORD ROAD LONDON ASHFORD ROAD J/O LARCH ROAD IMGA192008 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN LARCH ROAD STANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000654959 202/01110 BALNACRAIG AVENUE LONDON 53 B Box Exchange<33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase MINOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030982251-001 202/01797 PLEASE NOTE: WORKS THAT ARE SHOWN AS PROPOSED MAY BE RESCHEDULED TO COMMENCE BEFORE OR AFTER THE DATE SHOWN OR EVEN CANCELLED. WE ALSO RESERVE THE RIGHT TO AMEND START AND END DATES IN ACCORDANCE WITH PREVAILING CONDITIONS. Street Name Duration Location Text Description Contact details Estimated End Date For the Week Commencing 27th November 2017 Traffic Management Notes Works Status Start Date

Transcript of London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017...

Page 1: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Wembley EventPremier League

Tottenham Hotspur vs West Bromwich AlbionKick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventChampions League

Tottenham Hotspur vs APOEL FCKick off 19:45 06/12/2017 06/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

We,nley EventPremier League

Tottenham Hotspur vs Stoke CityKick off 15:00 09/12/2017 09/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Tottenham Hotspur vs Brighton & Hove Albionkick off 20:00 13/12/2017 13/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Tottenham Hotspur vs SouthamptonKick off 12:30 26/12/2017 26/12/2017 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Tottenham Hotspur vs West Ham United Kick off 14:30 31/12/2017 31/12/2017 1 Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Spurs vs EvertonKick off 17:30 13/01/2018 13/01/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Spurs vs Manchester Unitedkick off 20:00 31/01/2018 31/01/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Spurs vs Arsenal9/10/11/12 February TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com

Wembley Event Carabao Cup Final 25/02/2018 25/02/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Spurs vs Huddersfield Town2/3/4/5/March TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com

Wembley EventPremier League

Spurs vs Newcastle United16/17/18/19 March TBC TBC ####### Days Awaiting date confirmation Event Day Road Closures www.wembleystadium.com

ABBEY ROAD LONDON

48M NORTH WEST OF JUNC CORONATION ROAD ON TO

118M NORTH WEST OF JUNC CORONATION ROAD ON,

ABBEY ROAD

Install 50m of 2 poly ducts in Footway STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500250615800 202/00845

ABERDEEN ROAD LONDON FROM J/O BURNLEY ROAD TO O/S NO.33

IMGA192012 ABANDON 160M X 8' CI / 128M X 4' CI / 11M X 6' CI MAIN

ANDINSERT 90 / 180MM PE AND RELAY OR TRANSFER APPROX 34

SERVICES.

MAJOR 03/01/2018 14/02/2018 43 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000635963 202/02072

ABERDEEN ROAD LONDON BURNLEY ROAD - LANCASTER ROAD

Carry out 40no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 05/02/2018 02/03/2018 26 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/050 202/02072

ACTON LANE LONDONSEC 58 N/A. O/S 62/60 TO OPP HALESDEN BAPTIST

CHURCH., ACTON LANEInstall 145m of 1 way poly duct in Footway STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500252204700 202/01443

AIRCO CLOSE LONDON Temporary entrance to rear of 399 Edgware Road

Proposed Temporary Traffic Order to implement double yellow lines in a

portion of free parking bays to allow delivery into Airco Close site entrance for

399 Edgware Road new development. Our ref: TTRO

HIGHWAYS ACT PERMITS 20/02/2017 19/08/2018 546 Days PROPOSED WORKS SOME C/W INCURSION AW888-L-MAIN-00000697 202/04189

ALBERT ROAD LONDON WHOLE ROADMAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) -

2017/18-ROAD CLOSUREMAJOR 20/02/2018 22/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257699 202/01431

ALDERTON CLOSE LONDON Outside No. 1-51 Press HouseConnect onto existing main in footway and lay approx 3.20m new gas paipe in

f/w. Works to be carried out behind developer hoardings.STANDARD 29/11/2017 05/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION WY001-NSA00017101 202/00998

ALL SOULS AVENUE LONDON NEARSIDE FOOTWAY OUTSIDE 36 ALL SOULS AVENUE LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN FOOTWAY STANDARD 13/12/2017 19/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000655210 202/02012

ALL SOULS AVENUE LONDON 361x25mm MDPE mtrd Connection, works in the footway and in Carriageway.Our

intention is to complete the Permanent Reinstatement in the samephaseSTANDARD 10/01/2018 15/01/2018 6 Days PROPOSED WORKS TWO-WAY SIGNALS MU307-000805648290110-001 202/02012

ALL SOULS AVENUE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 01/03/2018 10/05/2018 71 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z004 202/02012

ALRIC AVENUE LONDON BRUCE ROAD - SELWYN ROAD

Carry out 67no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 29/01/2018 19/03/2018 50 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/049 202/01184

ALVERSTONE ROAD LONDONWHOLE STREET FROM J/O BRONDESBURY TO J/O

SYDMOUTH ROAD

IMGA160045 ABANDON 490M X 4' CI MAIN AND INSERT 75MM PE AND

RELAYORTRANSFER APPROX 23 SERVICESMAJOR 27/11/2017 09/01/2018 44 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000658136 202/02507

ANSON ROAD LONDON OS 37 ANSON ROAD, LONDON, NW2 3UY130015364Lay 63mm PE to 2' ST riser feeding 5 port meter bank forcustomers

new gas connectionSTANDARD 23/11/2017 28/11/2017 6 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648635 202/02561

ANSON ROAD LONDON o/s and opp 374x25mm MDPE new water meter supply in f/way and in Carriageway.

Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 19/12/2017 22/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000805402070100-001 202/02561

ASHFORD ROAD LONDON ASHFORD ROAD J/O PINE ROADIMGA192008 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN PINE

ROADSTANDARD 20/11/2017 01/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000653603 202/01110

ASHFORD ROAD LONDON ASHFORD ROAD J/O LARCH ROADIMGA192008 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN LARCH

ROADSTANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000654959 202/01110

BALNACRAIG AVENUE LONDON 53B Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030982251-001 202/01797

PLEASE NOTE: WORKS THAT ARE SHOWN AS PROPOSED MAY BE RESCHEDULED TO COMMENCE BEFORE OR AFTER THE DATE SHOWN OR EVEN CANCELLED. WE ALSO RESERVE THE RIGHT TO AMEND START AND END DATES IN ACCORDANCE WITH PREVAILING CONDITIONS.

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

Page 2: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

BANISTER ROAD LONDONOutside The Quadrant development, junction of Kings Holt

Mews

Following on from previous link box install, excavate an additional 10m trench

in FW for DNO LV cables. Joint bay required for UKPN testing and connection.STANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION VQ004-UKP5196/D 202/00802

BARN WAY WEMBLEY FROM BARN HILL TO BARN RISEFOOTWAY RELAY -FULL CLOSURE OF FOOTWAY-PEDESTRIAN SIGNING

AND GUARDING-CHAPTER 8MAJOR 08/01/2018 30/03/2018 82 Days PROPOSED WORKS SOME C/W INCURSION AW042-259288 202/01044

BEECHCROFT GARDENS WEMBLEY WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2017/18-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION

MAJOR 30/10/2017 30/03/2018 152 Days IN PROGRESS SOME C/W INCURSION AW042-203057 202/00098

BERESFORD AVENUE WEMBLEY BERESFORD AVENUE AT J/O HIGHCROFT AVENUEIMGA172034 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN

HIGHCROFT AVENUESTANDARD 08/11/2017 24/11/2017 17 Days IN PROGRESS SOME C/W INCURSION AZ007-1000649223 202/02264

BERESFORD AVENUE WEMBLEY FROM OPPOSITE NO.25 TO OPPOSITE NO.41IMGA172034 STORAGE / CONTAINER UNIT FOR ASSOCIATED WORKS IN

HEATHERPARKDRIVEMAJOR 16/05/2017 30/11/2017 199 Days IN PROGRESS SOME C/W INCURSION AZ007-1000601980 202/02264

BERESFORD AVENUE WEMBLEYFROM J/O KENMERE GARDENS TO J/O HEATHER PARK

DRIVE

IMGA192015 / ABANDON 376M X 6' CI MAIN AND INSERT

125MMPEANDRELAYORTRANSFER APPROX 40 SERVICES.MAJOR 20/11/2017 24/01/2018 66 Days IN PROGRESS SOME C/W INCURSION AZ007-1000638170 202/02264

BIRCHEN GROVE LONDON FROM C/O NO. 55 TO O/S 65IMGA192016 - ABANDON 20M X 6'MAIN AND INSERT 125MM PE AND RELAY

ORTRANSFER SERVICES.MAJOR 26/02/2018 12/03/2018 15 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000659663 202/01197

BLACKBIRD HILL LONDON outside 7 TO 9CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF

FOUND. FOOTWAY WORKS ONLYMINOR 23/11/2017 24/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/12977897J11 202/02250

BLACKBIRD HILL LONDON

FOOTWAY BETWEEN OUTSIDE 51 AND 45 AND

BETWEEN CLAYGATE COURT AND OUTSIDE 27 AND

BETWEEN OPPOSITE OLD

Locate and excavate 2 blockage in existing duct,Spend 1day clearing duct by

jetting/ cleaningMINOR 25/11/2017 28/11/2017 4 Days PROPOSED WORKS LANE CLOSURE BC006-CT003LC500246525807 202/02250

BLACKSTONE ROAD LONDON at s/o 88 Anson Road. f\w.Network Operations Distribution:INSTALL/REPLACE/REMOVE LINK

BOX:Replace a very high risk, poor condition link box in the footway.STANDARD 21/11/2017 28/11/2017 8 Days IN PROGRESS SOME C/W INCURSION EC400-10737907 202/00390

BLENHEIM GARDENS WEMBLEY S58 NOT AFFECTING, OS 18, BLENHEIM GARDENSInstall 3m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or

buildingMINOR 29/11/2017 01/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500252590300 202/00980

BLENHEIM GARDENS WEMBLEY WHOLE ROADMAJOR C/W RESURFACING WORKS ( RESERVE SCHEME) -2017/18-ROAD

CLOSUREMAJOR 05/02/2018 06/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW042-201974 202/00980

BRAEMAR AVENUE WEMBLEY 60, BRAEMAR AVENUE, WEMBLEY, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 3' CI; 1 OF 1 - working in

footway and carriagewayMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-281189400 202/00556

BRENTFIELD ROAD LONDON SWAMINARAYAN SCHOOL 260SEWER FAILURE--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT

REINSTATEMENT WITHIN SAME PHASESTANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-003156PPKC--000001 202/00365

BRENTHURST ROAD LONDON ADJACENT TO 402 HIGH ROAD LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 06/12/2017 12/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000653590 202/01292

BRIDGE ROAD LONDON Outside No. 109 To transfer services from the old column to the new. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030461 202/02640

BRIDGEWATER ROAD WEMBLEY 24, BRIDGEWATER ROAD, WEMBLEY, BRENTFRAME AND COVER - REPAIRCONCRETE APRON HYD COVER - working in

vergeMINOR 27/11/2017 29/11/2017 3 Days PROPOSED REMEDIAL SOME C/W INCURSION MX044-280350500 202/00329

BRIDGEWATER ROAD WEMBLEY OPP 210 BRIDGEWATER ROAD, WEMBLEYNC60700 - MAINS INSTALLATION FOR NEW DEVELOPMENT ON BEHALF OF

AFFINITY WATER - FW/CW/VER - SOME C/W INCURSION - PRECONESTANDARD 04/12/2017 14/12/2017 11 Days PROPOSED WORKS SOME C/W INCURSION MX043-215ND336 202/00329

BRONDESBURY PARK LONDONCORNER JUNC CHRITSCHURCH AVENUE ON,

BRONDESBURY PARKInstall 2m of 1 way poly duct in Footway MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION BC006-CT001LC500249133801 202/01215

BRONDESBURY PARK LONDON 207 and 207 opp6x25mm MDPE mtrd Supply Connection in footway and in Carriageway.

Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 18/11/2017 26/11/2017 9 Days PROPOSED WORKS MULTI-WAY SIGNALS MU307-000805439850045-002 202/02104

BRONDESBURY VILLAS LONDON 5Boundary Box Exchange No Excav in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MU301-000030981220-001 202/00076

BROOK ROAD LONDON 36 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 29/11/2017 01/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION MU356-003156QBQZ--000001 202/00722

BROOK ROAD LONDON J/W DAWPOOL ROAD

SITE COMPOUND FOR DAWPOOL ROAD- COMPOUND SITE 24 HOURS A DAY

FOR DURATION OF THE SCHEME-NCT04b-materials stored on site -

PEDESTRIAN SIGNING& GUARDING FOOTWAY/ CARRIGEWAY INCURSION

MAJOR 20/09/2017 31/01/2018 134 Days IN PROGRESS SOME C/W INCURSION AW041-249224 202/00722

BROOKSVILLE AVENUE LONDON 2Service Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 06/12/2017 08/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030982820-001 202/01527

BURNLEY ROAD LONDON 91 BURNLEY ROAD, NW10 1EEService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981810-001 202/01457

BURNLEY ROAD LONDON FOOTWAY OUTSIDE OF NO 87 BURNLEY ROAD LAY NEW DOMESTIC SERVICE 2.5M FROM MAIN IN THE FOOTWAY STANDARD 05/12/2017 08/12/2017 4 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000653413 202/01457

BURNLEY ROAD LONDON FROM J/O ABERDEEN ROAD TO J/O DUDDEN HILL LANEIMGA192012 ABANDON 76M X 8' CI MAIN AND INSERT 180MM PE AND RELAY

ORTRANSFER SERVICESMAJOR 03/01/2018 24/01/2018 22 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000635964 202/01457

CAIRNFIELD AVENUE LONDON 79Service Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030982072-001 202/01312

CALDER GARDENS EDGWARE Outside 2-4 To transfer services from the old column to new. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030463 202/00216

CANTERBURY ROAD LONDONCanterbury Road at it's junctions with Granville Road and

Princess Road,London NW6DIVERSIONDeep Excavation to remove and install an upgraded gas governor MAJOR 03/01/2018 22/03/2018 79 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-1000641566 202/00386

CAPITOL WAY LONDON Outside No.70 To transfer services from an old column to a new. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030459 202/01208

CAPITOL WAY LONDON O/S UNIT 24 TO S/O UNIT 34, CAPITOL WAYInstall 10m of 1 way poly duct in Entrance,Install 111m of 1 way poly duct in

FootwaySTANDARD 27/11/2017 08/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION BC006-CT001LC500251122400 202/01208

CARLYON ROAD WEMBLEYExisting rail bridge in Carlyon road approx. 309m from J/W

Hazel Grove

Skanska - To carryout various brick repairs to both bridge faces at either side

of bridge.STANDARD 14/11/2017 29/11/2017 16 Days IN PROGRESS TWO-WAY SIGNALS YG702-371513 202/00996

CARLYON ROAD WEMBLEYExisting rail bridge in Carlyon road approx. 309m from J/W

Hazel Grove

Skanska - To carryout various brick repairs to both bridge faces at either side

of bridge.MAJOR 25/01/2018 10/03/2018 45 Days PROPOSED WORKS TWO-WAY SIGNALS YG702-371185 202/00996

CARLYON ROAD WEMBLEY s/o 255 Ealing Road

Proposed Temporary Traffic Order for a footway closure in Carlyon Road o/s

new development 255 Ealing Road to allow construction to be carried out. Our

ref: TTRO/16/048

HIGHWAYS ACT PERMITS 20/03/2017 16/04/2018 393 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000709 202/00996

CASTLETON AVENUE WEMBLEY o/s 80 Castleton Avenue Install Cabinet in footway MINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/5676004MM 202/01017

CASTLETON AVENUE WEMBLEY o/s 66 Castleton Avenue Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676009MM 202/01017

CASTLETON AVENUE WEMBLEYCastleton Avenue, from Junction East Lane to junction

Clarendon Gardens430m of duct laying in footway STANDARD 16/11/2017 29/11/2017 14 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56736004G 202/01017

CASTLETON AVENUE WEMBLEY Junction Clarendon Gardens to Junction St Johns Road 750m of duct laying in footway and 30m of duct laying in carriageway STANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760007M 202/01017

Page 3: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

CECIL AVENUE WEMBLEY

(PCP27), NGA RELATED WORKS, (PCP27) OPPOSITE

SIDE OF 365 HIGH ROAD TO JUNCTION HIGH ROAD ON,

CECIL A

Install 17m of 1 way power duct in Footway,Performing an 1excavation to

expose existing power cable in FootwayMINOR 22/11/2017 23/11/2017 2 Days IN PROGRESS NO C/W INCURSION BC006-CT001LC500243270301 202/01107

CECIL AVENUE WEMBLEY Outside Copland Community College Cecil Avenue. Build chamber and lay duct in footway t connect new client. MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION NK100-/SCLJBU/83009/LNBAU 202/01107

CENTRAL WAY LONDON

OUTSIDE CENTRAL WAY CORNER OF NUCLEUS /

OPPOSITE ENTRANCE TO WEDMIDDLESEX HOSPITAL IN

CARRIAGEWAY AN

EXCAVATE CARRIAGEWAY AND FOOTWAY AND LAY NEW MAIN TO

REINFORCE EXISTING(LOW PRESSURE)STANDARD 04/12/2017 15/12/2017 12 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-1000659564 202/02789

CHAMBERLAYNE ROAD LONDON Opposite nos. 4 - 10

Excavate large joint bay in the FW/CW for installation of remaining HV/LV

cables. UKPN to carry out multiple connections for new supply to Moberley

Sports Centre.

STANDARD 21/11/2017 04/12/2017 14 Days IN PROGRESS SOME C/W INCURSION VQ004-UKP5196/E 202/02065

CHANDOS ROAD LONDONWHOLE STREET FROM J/O MELROSE AVENUE TO J/O

RIFFEL ROAD

IMGA192010 ABANDON 230M X 4' CI MAIN AND INSERT 75MM PE AND

RELAYORTRANSFER APPROX 30 SERVICESMAJOR 22/01/2018 16/02/2018 26 Days PROPOSED WORKS SOME C/W INCURSION AZ008-1000648491 202/02599

CHAPLIN ROAD WEMBLEY Front of 160a. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate& reinstate joint hole & 7m trench in footway for new service

TM - Standard SLG, Footway closure with temp walkway in carriage

STANDARD 20/11/2017 24/11/2017 5 Days IN PROGRESS SOME C/W INCURSION EC300-34777864 202/02398

CHAPMAN CRESCENT HARROW outside 57 to 61CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 25/11/2017 28/11/2017 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13071421J11 202/02442

CHAPTER ROAD LONDON 139Service Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981866-001 202/01486

CHARTERIS ROAD LONDON 92 CHARTERIS ROAD, LONDON, NW6 7EXService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979907-001 202/00647

CHARTERIS ROAD LONDON 35 CHARTEIS ROAD, LONDON, NW6 7EYService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979923-001 202/00647

CHELMSFORD SQUARE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 05/03/2018 03/04/2018 30 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z009 202/01091

CHEVENING ROAD LONDON 74 remedials in carriageway MINOR 27/11/2017 29/11/2017 3 Days PROPOSED REMEDIAL SOME C/W INCURSION MU301-000030631644-001 202/02579

CHEVENING ROAD LONDON O/S 741x32mm MDPE mtrd Supply in Carriageway. Our intention is to complete

thePermanent Reinstatement in the same phaseSTANDARD 05/12/2017 08/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000805677660045-001 202/02579

CHOLMONDELEY AVENUE LONDONIN THE NEARSIDE FOOTWAY OF CHOLMONDELEY

AVENUE ADJACENT TO134DWROTTESLEY ROADLAY NEW DOMESTIC SERVICE 3M FROM MAIN IN FOOTWAY STANDARD 27/11/2017 30/11/2017 4 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000649183 202/00799

CHRISTCHURCH AVENUE LONDONCORNER JUNC BRONDESBURY PARK TO OS 1 TO 34 ON,

CHRISTCHURCH AVENUEInstall 69m of 1 way poly duct in Footway STANDARD 20/11/2017 24/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION BC006-CT001LC500249133800 202/00432

CHRISTCHURCH AVENUE LONDON o/s tarranbrae. f\w.Network Operations Distribution:INSTALL/REPLACE/REMOVE LINK

BOX:REplace a very high risk, poor condition link box in the footway.STANDARD 17/11/2017 24/11/2017 8 Days IN PROGRESS SOME C/W INCURSION EC400-10737717 202/00432

CHRISTCHURCH AVENUE LONDON 50a Christchurch Ave, London

SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER

OPENING ONLY. WORKS TO TAKE PLACE ON 01/12/2017 BETWEEN 10:00

AND 15:00.

MINOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS PRIORITY WORKING MU600-CHB3728 202/00432

CHRISTCHURCH AVENUE LONDONIN THE FARSIDE FOOTWAY OPPOSITE 72

CHRISTCHURCH AVENUEDISCONNECT 1 X 32MM PE SERVICE FROM MAIN IN FOOTWAY STANDARD 18/12/2017 21/12/2017 4 Days PROPOSED WORKS TWO-WAY SIGNALS AZ007-1000658162 202/00432

CHURCH LANE LONDON FROM J/O QUEENS WALK TO C/O NO.29IMGA192016 ABANDON 82M X 4' CI MAIN AND INSERT MM PE AND

RELAYORTRANSFERAPPROX 5 SERVICES.MAJOR 20/10/2017 24/11/2017 36 Days IN PROGRESS SOME C/W INCURSION AZ007-1000625855 202/00700

CHURCHILL ROAD LONDONWHOLE STREET FROM THE J/O CHAPTER ROAD TO J/O

BALMORAL ROAD

IMGA192010 ABANDON 236M X 8' CI MAIN AND INSERT 125MM PE AND

RELAY ORTRANSFER APPROX 40 SERVICESMAJOR 22/01/2018 16/02/2018 26 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648429 202/01154

CLAREMONT AVENUE HARROW WHOLE STREET FROM J/O KENTON ROADIMGA182003 ABANDON 210M X 6' CI MAIN AND INSERT 90 / 125MM PE AND

RELAYOR TRANSFER APPROX 39 SERVICESMAJOR 20/11/2017 22/12/2017 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000629485 202/00411

CLAREMONT ROAD LONDON o/s 501x25mm BP new water meter supply in f/way and in Carriageway. Ourintention

is to complete the Permanent Reinstatement in the samephaseSTANDARD 29/01/2018 02/02/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU307-00080562740045-002 202/02165

CLARENDON GARDENS WEMBLEYROUNDABOUT OPP KINGSWAY, CLARENDON GARDENS,

WEMBLEY, BRENTSAMPLE POINT - INSTALL; MISC - working in verge MINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-281941300 202/02136

CLARENDON GARDENS WEMBLEYS/O 47 Pembroke Road to o/s 52 Clarendon Gardens, S/O

64 Llanover road to o/s 95 Clarendon Gardens440m of duct laying in footway STANDARD 31/10/2017 27/11/2017 28 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56736001G 202/02136

CLARENDON GARDENS WEMBLEY o/s 36 Clarendon Gardens Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676006MM 202/02136

CLARENDON GARDENS WEMBLEY o/s 59 Clarendon Gardens Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676007MM 202/02136

CLARENDON GARDENS WEMBLEY o/s 52 Clarendon Gardens Install Cabinet in footway MINOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676016MM 202/02136

CLARENDON GARDENS WEMBLEYClarendon Gardens from Junction The Dene to Junction

Queenscourt450m of duct laying in footway and 20m of duct laying in carriageway STANDARD 30/11/2017 13/12/2017 14 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760006M 202/02136

COLES GREEN ROAD LONDON O/S P/W 60/62, 30 M N OF HUMBER ROADW.R.P. - Installation of foundations in preparation for a Bus Stop Post, for and

on behalf of Transport For London . Bus Stop Number:- 16999MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00037818 202/01557

COMPTON ROAD LONDON NEARSIDE FOOTWAY OUSIDE 31A COMPTON ROAD LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN FOOTWAY STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000654644 202/01879

CONDUIT WAY LONDON at j/w Twybridge WayTM only for structural Inspection Works on Bridge on Twybridge Way (inc.

Corrosion Testing)MINOR 08/01/2018 10/01/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS AW042-262402 202/00347

CORINIUM CLOSE WEMBLEYOUTSIDE NO.2 AND TRENCHING TO CORNER OFF LEA

GARDENS. f\w. c\w. verge.

Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-

600mm):NEW ELECTRICAL SUPPLYSTANDARD 20/11/2017 28/11/2017 9 Days IN PROGRESS SOME C/W INCURSION EC300-34782011 202/00761

CRANHURST ROAD LONDON FROM J/O MELROSE AVENUE TO O/S NO.1IMGA192010 ABANDON 280M X 4' CI MAIN AND INSERT 75MM PE

ANDRELAYORTRANSFER APPROX 20 SERVICESMAJOR 20/11/2017 15/12/2017 26 Days IN PROGRESS SOME C/W INCURSION AZ007-1000646535 202/00218

CRAVEN ROAD LONDON jnc Craven Park

Technicians to carry out Remedial Works on a Telecoms Box. Traffic to be

managed with Road Narrowing with a Walkway in the carriageway for

Pedestrians to Pass.

MINOR 23/11/2017 23/11/2017 1 Days IN PROGRESS LANE CLOSURE YN110-60837-COBRA-JC-R 202/02375

CREDITON ROAD LONDONOn Crediton Road from the junction of Wrentham Avenue

to the junctionofOkehamptonExcavate and replace 243meters of 30inch Spun Iron with 630mm P.E. MAJOR 08/11/2017 22/12/2017 45 Days IN PROGRESS SOME C/W INCURSION AZ007-1000652288 202/00674

CREDITON ROAD LONDONCredtion Road - From opposite number 53 Crediton Road

to the junction ofOkehampton Road

Replace approx 624M of 30inch of Spun Iron Medium Pressure Main

with630mm PE by way of insertion with connection hole in CreditonRoadMAJOR 19/02/2018 03/04/2018 44 Days PROPOSED WORKS ROAD CLOSURE AZ007-1000643972 202/00674

CREST ROAD LONDON Outside 88 Crest Road. f\w.Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Installation of 2 new 100amp sing phase supplySTANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS SOME C/W INCURSION EC400-10738428 202/02221

Page 4: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

CRICKLEWOOD BROADWAY LONDON OPP. 182Valve Exchange 6 to 12' Cway in Carriageway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseIMMEDIATE (EMERGENCY) 22/11/2017 28/11/2017 7 Days IN PROGRESS LANE CLOSURE MU301-000030982473-001 202/00487

CRICKLEWOOD BROADWAY LONDON 2154x25mm MDPE mtrd Supply, work in the in Footway. Our intention is

tocomplete the Permanent Reinstatement in the same phaseSTANDARD 11/01/2018 16/01/2018 6 Days PROPOSED WORKS NO C/W INCURSION MU307-000805499300045-001 202/00487

CULLINGWORTH ROAD LONDON J/W BURNLEY RD - J/W KENDAL RD (WHOLE ROAD)

Carry out 24no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 15/02/2018 02/03/2018 16 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/132 202/00968

CUMBERLAND AVENUE LONDON whole road major c/w resurfacing works (reserve scheme)2017/18-night works MAJOR 28/02/2018 03/03/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW042-201802 202/00625

CURZON CRESCENT LONDON Opposite George Lansbury House To transfer services from the old column to the new. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030462 202/01187

DAGMAR AVENUE WEMBLEY o/s 1 - o/s 6 Roskild Court Dag Avenue Install Cabinet in footway MINOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676014MM 202/00339

DANETHORPE ROAD WEMBLEY whole roadMAJOR RESURFACING WORKS(RESERVE SCHEME)-ROAD CLOSURE-2017-

18MAJOR 12/02/2018 13/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW042-201535 202/02474

DAWPOOL ROAD LONDON WHOLE ROADFOOTWAY RECONSTRUCTION WORKS 2017/18-PEDESTRIAN SIGNING AND

GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 04/09/2017 30/01/2018 149 Days IN PROGRESS SOME C/W INCURSION AW042-202511 202/00330

DICEY AVENUE LONDON FROM OLIVE ROAD TO J/W ANSON ROAD PRINCIPAL SCHEME-C/W RESURFACING -2200 TO 0500- ROAD CLOSURE MAJOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS ROAD CLOSURE AW042-243368 202/01906

DISTRICT ROAD WEMBLEY 32, DISTRICT ROAD, WEMBLEY, BRENTCUSTOMER CANNOT TURN OFF WATER - STOP TAP - INSTALL; 25MM MDPE;

- WORKING IN THE FWIMMEDIATE (URGENT) 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282067900 202/02088

DISTRICT ROAD WEMBLEY 32, DISTRICT ROAD, WEMBLEY, BRENT STOP TAP - INSTALL; 25MM MDPE; 1 OF 1 - working in footway IMMEDIATE (URGENT) 21/11/2017 24/11/2017 4 Days IN PROGRESS SOME C/W INCURSION MX044-282138300 202/02088

DOLLIS HILL AVENUE LONDON Junction of Edgware Road Section 278, development entrance TM 24hr 7 days a week MAJOR 18/04/2017 12/12/2017 239 Days IN PROGRESS ROAD CLOSURE YG432-178651 202/02073

DOLLIS HILL AVENUE LONDON Junction with Mount RoadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS Surface location: footway and carriagewayMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-C939/MBIW04/Z002 202/02073

DOLLIS HILL AVENUE LONDONJunction with Dollis Hill Road, Dollis Hill Lane and Geron

Way

Development Entrance works (Higgins/FMC) Lane Closures, temp lights, Road

closures.MAJOR 26/06/2017 06/02/2018 226 Days IN PROGRESS ROAD CLOSURE YG432-230521 202/02073

DOLLIS HILL AVENUE LONDON From junction with Edgware Road to ParksideWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS WORKING IN THE FOOTWAY AND CARRIAGE WAYMAJOR 15/01/2018 16/04/2018 92 Days PROPOSED WORKS SOME C/W INCURSION MU821-C939/MBIW04/Z001 202/02073

DOLLIS HILL LANE LONDON j/w Edgware Road

Proposed temporary traffic order for a road closures in Dollis Hill Lane, Dollis

Hill Avenue and Oxgate Gardens j/w Edgware Road (A5) including banned left

and right turns, too or from the above locat

HIGHWAYS ACT PERMITS 30/05/2017 24/11/2017 179 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000727 202/00168

DOLLIS HILL LANE LONDON O/S NUMBER 34028/157 - 102075 - INSTALLATION OF MAGNETOMETER SD4, 20:00 - 23:59,

LANE 1 - EASTBOUNDMINOR 27/11/2017 27/11/2017 1 Days PROPOSED WORKS GIVE & TAKE YG515-S000000001832 202/00168

DOLLIS HILL LANE LONDON Junction of Edgware Road to 30m South of junctionSection 278, development entrance 24 hour TM Monday to Sunday 7 days a

weekMAJOR 18/04/2017 12/12/2017 239 Days IN PROGRESS ROAD CLOSURE YG432-178650 202/00168

DOLLIS HILL LANE LONDONJunction with Dollis Hill Road, Dollis Hill Lane and Geron

Way

Development Entrance works (Higgins/FMC) Lane Closures, temp lights, Road

closures.MAJOR 26/06/2017 06/02/2018 226 Days IN PROGRESS LANE CLOSURE YG432-230515 202/00168

DONNINGTON ROAD LONDON WHOLE ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 06/11/2017 23/01/2018 79 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MBIW07/Z001 202/01539

DONNINGTON ROAD LONDON FROM J/W PETER AVENUE TO HARLESDEN ROADMAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) -

2017/18-ROAD CLOSUREMAJOR 14/02/2018 16/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257691 202/01539

DOROTHY AVENUE WEMBLEY MILFORD, DOROTHY AVENUE, , WEMBLEY, BRENT COMMUNICATION PIPE - REPAIR ;OTHER IN THE FOOTWAY IMMEDIATE (URGENT) 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282134900 202/01293

DOYLE GARDENS LONDON COLLEGE ROAD TO HARLESDEN ROAD

Carry out 150no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 04/09/2017 31/01/2018 150 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/112 202/01769

DOYLE GARDENS LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 14/11/2017 06/02/2018 85 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MBIW07/Z003 202/01769

DRAYTON ROAD LONDON FROM O/S NO.31 TO J/O LONGSTONE AVENUEIMGA192014 / ABANDON 395M X 4' CI MAIN AND INSERT 75 / 125MM PE

ANDRELAY OR TRANSFER APPROX 130 SERVICES.MAJOR 27/11/2017 02/01/2018 37 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000604008 202/01395

DRAYTON ROAD LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS(RESERVE SCHEME)2017-18-

ROAD CLOSUREMAJOR 06/02/2018 08/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-201538 202/01395

DUDDEN HILL LANE LONDON 119 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156QCXR--000001 202/00017

DUDDEN HILL LANE LONDONJUNCTION OF 7 SOUTHVIEW AVENUE, DUDDEN HILL

LANE, LONDON, NW10 1BY

Main Clamp in Footway. Our intention is to complete the

PermanentReinstatement in the same phaseMINOR 25/11/2017 29/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030974776-001 202/00017

DUDDEN HILL LANE LONDON OPP 24, 10M S/O MEYRICK ROADW.R.P. - Installation of 3 Bay Non Ad Bus Shelter, Back of Path, for and on

behalf of Transport For London 0105/0300 2720303MINOR 14/12/2017 16/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00037810 202/00017

EALING ROAD WEMBLEY o/s 406 Ealing Road clear footway blockage MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION NK100-/SCLJPL/18258/PLN 202/00486

EALING ROAD WEMBLEY opposite 406 Ealing road clear blockage MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS NO C/W INCURSION NK100-/SCLJPL/18258/PLN1 202/00486

EALING ROAD WEMBLEY opp 406 ealing rd jct of burns road clear footway blockage MINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/NEMJPL/18258/PLN 202/00486

EALING ROAD WEMBLEY EALING ROAD FW FROM O/S AINSLEY COURT TO OS 287 LAY 20M OF DUCT TO CONNECT NEW CUSTOMERS MINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJPL/18258PLS 202/00486

EALING ROAD WEMBLEY 225 Ealing Road Lay 3No New gas connections STANDARD 27/11/2017 01/12/2017 5 Days PROPOSED REMEDIAL NO C/W INCURSION AW999-S000000000316 202/00486

EALING ROAD WEMBLEY OUTSIDE 98 - 100 CLEAR BLOCKED OR COLLASPED DUCTING IN THE CARRIAGEWAY MINOR 05/12/2017 07/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJDA/35392LBAU 202/00486

EALING ROAD WEMBLEY Outside 414 in Footway Repair Thames Water Leak on 48' High Pressure Main in Footway STANDARD 27/11/2017 08/12/2017 12 Days PROPOSED WORKS NO C/W INCURSION MU277-PTML175008/01 202/00486

EAST LANE WEMBLEYOPP. VALE FARM (SUDBURY COURT SPORTS CLUB), 100

M W OF WOODFIELD AVE.

W.R.P. - Installation of foundations in preparation for a Bus Stop Post, for and

on behalf of Transport For London . Bus Stop Number:- 17021MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS NO C/W INCURSION RK001-00037746 202/02525

EAST LANE WEMBLEY OUTSIDE 257A LAY FOOTWAY DUCT MINOR 23/11/2017 25/11/2017 3 Days IN PROGRESS SOME C/W INCURSION NK100-/SCLJFI/83981/LSME 202/02525

EAST LANE WEMBLEY O?S 143. f\w. verge.

Connections Small Service:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-

600mm):Supply and install 32mm duct. Excavate and backfill trench. Excavate

and backfill joint hole. Joint new service to existing main

STANDARD 07/12/2017 13/12/2017 7 Days PROPOSED WORKS NO C/W INCURSION EC300-34782514 202/02525

EDGWARE ROAD LONDON O/S NUMBER 35728/157 - 102075 - INSTALLATION OF MAGNETOMETER SD2 AND SD3, 20:00 -

23:59, LANE 1 SWAPPING TO LANE 2 - NORTHWEST BOUNDMINOR 27/11/2017 27/11/2017 1 Days PROPOSED WORKS LANE CLOSURE YG515-S000000001831 202/00225

EDGWARE ROAD LONDON OUTSIDE 329 Outage/joint repair MINOR 29/11/2017 30/11/2017 2 Days PROPOSED WORKS CONTRA-FLOW NK100-/SCLJBU/VM30281A 202/00225

EDGWARE ROAD LONDON 10m North of Oxgate Gardens to Gladstone Park GardensSection 278, development entrance 24 Hour TM Monday to Sunday 7 days a

weekMAJOR 26/06/2017 19/02/2018 239 Days PROPOSED WORKS LANE CLOSURE YG432-178648 202/00225

EDGWARE ROAD LONDON BOTH SIDES OF WINDOVER AVENUE IMGA150327 - TO UNDERTAKE CAMERA SURVEYS STANDARD 06/12/2017 19/12/2017 14 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000662483 202/01631

Page 5: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

EDGWARE ROAD LONDONFrom junction with Gladstone Park Gardens to Junction

with Dollis Hill Road, Dollis Hill Lane and Ge

Development Entrance works (Higgins/FMC) Lane Closures, temp lights, Road

closures.MAJOR 26/06/2017 06/02/2018 226 Days IN PROGRESS LANE CLOSURE YG432-230509 202/00225

EDGWARE ROAD LONDONFrom o/s 223 to j/o Springfield Mount, Edgware Road,

Brent, London. f\w.

Network Operations Distribution:INSTALL LV CABLES:Excavation of joint

holes in footway to enable the transfer of multiple existing electric services on

to newly installed low voltage cable.

MAJOR 29/01/2018 02/03/2018 33 Days PROPOSED WORKS SOME C/W INCURSION EC300-34781136 202/01631

EDGWARE ROAD LONDON FROM O/S 24-50 EDGWARE ROAD TO J/O HAYE LANE IMGA150327 ABANDON 524.0M X 12' CI AND REPLACE WITH 250MM PE MAJOR 22/01/2018 13/04/2018 82 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648566 202/01631

EGERTON GARDENS LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 05/02/2018 09/02/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z007 202/00874

ELDON WAY LONDON Whole road CARRYING OUT MAINS RENEWAL ON BEHALF OF THAMES WATER MAJOR 04/01/2018 31/03/2018 87 Days POTENTIAL WORKS MU821-H208/MKET08/C002 202/02369

ELLESMERE ROAD LONDONFRM J/W PARK AVENUE NORTH TO CULLINGWORTH

ROAD

MAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) -

2017/18-ROAD CLOSUREMAJOR 21/02/2018 23/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257714 202/01822

ELTHORNE WAY LONDON FOOTWAY OUTSIDE NO. 34A, ELTHORNE WAY LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN FOOTWAY STANDARD 30/11/2017 06/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000657219 202/02124

ENGINEERS WAY WEMBLEY Stadium Spurs v West Bromwich Albion HIGHWAYS ACT PERMITS 25/11/2017 25/11/2017 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000759 202/01887

ENGINEERS WAY WEMBLEY Stadium Champions League - Spurs v APOEL FC HIGHWAYS ACT PERMITS 06/12/2017 06/12/2017 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000760 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Stoke City HIGHWAYS ACT PERMITS 09/12/2017 09/12/2017 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000761 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Brighton & Hove Albion HIGHWAYS ACT PERMITS 13/12/2017 13/12/2017 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000762 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Southampton HIGHWAYS ACT PERMITS 26/12/2017 26/12/2017 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000764 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v West Ham United HIGHWAYS ACT PERMITS 29/12/2017 01/01/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000765 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 05/01/2018 08/01/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000788 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Everton HIGHWAYS ACT PERMITS 13/01/2018 13/01/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000789 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 16/01/2018 17/01/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000790 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 26/01/2018 29/01/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000791 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Man Utd HIGHWAYS ACT PERMITS 31/01/2018 31/01/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000792 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 06/02/2018 07/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000793 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Arsenal HIGHWAYS ACT PERMITS 09/02/2018 12/02/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000794 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 13/02/2018 14/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000795 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 16/02/2018 19/02/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000796 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 20/02/2018 21/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000797 202/01887

ENGINEERS WAY WEMBLEY Stadium Carabao Cup Final HIGHWAYS ACT PERMITS 25/02/2018 25/02/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000798 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 27/02/2018 28/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000799 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Huddersfield Town HIGHWAYS ACT PERMITS 02/03/2018 05/03/2018 4 Days POTENTIAL WORKS ROAD CLOSURE AW888-L-MAIN-00000800 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 06/03/2018 07/03/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000801 202/01887

ENGINEERS WAY WEMBLEY Stadium Provisional Event HIGHWAYS ACT PERMITS 13/03/2018 14/03/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000802 202/01887

ENGINEERS WAY WEMBLEY Stadium Spurs v Newcastle Utd HIGHWAYS ACT PERMITS 16/03/2018 19/03/2018 4 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000803 202/01887

ENGINEERS WAY WEMBLEY Stadium England v Italy HIGHWAYS ACT PERMITS 27/03/2018 27/03/2018 1 Days PROPOSED WORKS PRIORITY WORKING AW888-L-MAIN-00000804 202/01887

ESMOND ROAD LONDON 7Service Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979812-001 202/00607

ESMOND ROAD LONDON 17Service Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979792-001 202/00607

ESMOND ROAD LONDON 16 ESMOND ROAD, NW6 7HEService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979939-001 202/00607

ESMOND ROAD LONDON 2 ESMOND ROADService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979967-001 202/00607

ESMOND ROAD LONDON 23 ESMOND ROAD, NW6 7HEService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030980019-001 202/00607

EVELYN AVENUE LONDON Junction with Hay Lane. c\w.Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Permit for TM purposes only - linked to 34780864 TM - 3-way lightsSTANDARD 28/11/2017 04/12/2017 7 Days PROPOSED WORKS MULTI-WAY SIGNALS EC300-34780868 202/01865

FAIRWAY AVENUE LONDON WHOLE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 30/10/2017 30/03/2018 152 Days IN PROGRESS SOME C/W INCURSION AW042-202546 202/01225

FAWCETT ROAD LONDON (Fortunegate Road to St Marys Road)MAJOR PREVENTATIVE C/W RESURFACING SCHEME(RESERVE

SCHEME)2017-18MAJOR 08/02/2018 09/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW042-201541 202/00449

FIRST WAY WEMBLEY Gate 5 - Side of Green Car ParkLane drop to create a safe working area for Hoarding instalation - 09:30 -

15:30, not working on event days.HIGHWAYS ACT PERMITS 04/12/2017 24/12/2017 21 Days PROPOSED WORKS LANE CLOSURE AW888-L-MAIN-00000827 202/01018

FLEETWOOD ROAD LONDONFROM J/O LANCASTER ROAD TO S/O NO.39 HAMILTON

ROAD

IMGA192011 ABANDON 254M X 6' CI / 194M X 4' CI MAIN AND INSERT 90

/125MM PE AND RELAY OR TRANSFER APPROX 57 SERVICESMAJOR 03/01/2018 28/02/2018 57 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000635986 202/02586

FULTON ROAD WEMBLEY opp Fountain Studio's S278 works to rectify fall on entry treatment on to private street STANDARD 16/11/2017 24/11/2017 9 Days PROPOSED WORKS NO C/W INCURSION AW001-SANS278022 202/02364

FULTON ROAD WEMBLEY corner of Albion Way. f\w.Connections Highway Services:NEW INDIVIDUAL SUPPLY::New supply to

CCTV cameraSTANDARD 27/11/2017 01/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION AW012-70010138 202/02364

GARDINER AVENUE LONDON 6 - ANSON ROAD (WHOLE STREET)

Carry out 11no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 31/01/2018 07/02/2018 8 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/128 202/02074

GEARY ROAD LONDON 76 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156QFKM--000001 202/00189

GEARY ROAD LONDON 64 GEARY ROAD NW10 - FOOTWAYSERVICE RELAY CONDITION - EXCAVATE IN FOOTWAY AND RELAY

SERVICE .STANDARD 04/12/2017 08/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000658730 202/00189

GEARY ROAD LONDONWHOLE STREET FROM J/O LANCASTER ROAD TO C/O

NO.55 HAMILTON ROAD

IMGA192011 ABANDON 296M X 4' CI / 6' CI MAIN AND INSERT 90 / 125MM

PEAND RELAY OR TRANSFER APPROX 35 SERVICES.MAJOR 08/01/2018 09/02/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000637869 202/00189

GIRTON AVENUE LONDON Outside 38/40 To transfer services from old column to the new. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030465 202/02512

GLENGALL ROAD LONDON 81 GLENGALL ROAD, LONDON, NW6 7ESService Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MU301-000030980846-001 202/01848

GLENGALL ROAD LONDON 98 GLENGALL ROAD, LONDON, NW6 7HHService Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MU301-000030980745-001 202/01848

GOWAN ROAD LONDON HIGH ROAD - END

Carry out 59no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 18/12/2017 12/02/2018 57 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/046 202/02173

Page 6: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

GRANGE ROAD LONDONGrange Road from the junction of Cornwall Gardens to o/s

number 22GrangeRoad.

Excavation for stopple at valve to allow us to complete mainsreplacementon

medium pressure gas main in Hanover Road.MAJOR 20/11/2017 27/12/2017 38 Days IN PROGRESS SOME C/W INCURSION AZ007-1000654473 202/02648

GREAT CENTRAL WAY WEMBLEY bus stop approx 50m West of Hannah Close junction

Excavation works - full chapter 8 signs and barriers to be installed maintaining

2 way traffic so that upgrade works can take place in telecoms cabinets (bus

stop to be suspended)

STANDARD 20/11/2017 24/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MG021-71518/STM/IW/CABS 202/04160

GREAT CENTRAL WAY LONDONGreat Central Way at the junction with North Circular Road

from the traffic island to near entrance

Traffic management required to provide safe access to existing underground

BT carriageway box for fibre cabling and jointing works. Required for new

customer connection

MAJOR 09/01/2018 10/01/2018 2 Days PROPOSED WORKS ROAD CLOSURE BC005-CC7W00ONEA34231701A 202/01658

GREYSTONE GARDENS HARROW WHOLE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 30/10/2017 23/03/2018 145 Days IN PROGRESS SOME C/W INCURSION AW042-203025 202/02126

GRITTLETON AVENUE WEMBLEY 8, GRITTLETON AVENUE, WEMBLEY, BRENT STOP TAP - INSTALL; 25MM MDPE; - WORKING IN THE FW IMMEDIATE (URGENT) 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282014400 202/02152

HAMILTON ROAD LONDON 1cB Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU301-000030981366-001 202/00012

HANOVER ROAD LONDONHanover road from J/w Sidmouth Road to J/w Okehampton

Road in c/w only

Replace approx 624M of 30inch of Spun Iron Medium Pressure

Mainwith630mmPE by way of insertionMAJOR 30/10/2017 08/12/2017 40 Days IN PROGRESS SOME C/W INCURSION AZ007-1000643918 202/00577

HANOVER ROAD LONDON J/w Sidmouth Road to J/w Okehampton RoadIMGA182256 Excavation for open cut and insertion of approx 624m of

630mmPE with 2 connections and abandonment of 624m of 24'CIMAJOR 08/01/2018 02/03/2018 54 Days PROPOSED WORKS PRIORITY WORKING AZ007-1000635899 202/00577

HARDINGE ROAD LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 05/02/2018 25/04/2018 80 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z005 202/01382

HARLESDEN ROAD LONDON 219Valve Locate in Carriageway. Our intention is to complete the

PermanentReinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS TWO-WAY SIGNALS MU301-000030870712-003 202/01352

HARLESDEN ROAD LONDON 369B Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU301-000030979570-001 202/01352

HARLESDEN ROAD LONDONAdjacent to No. 223 Harlesden Road in HARLESDEN

ROADin carriageway

Excavate& connect to CADENT GAS Gas Main providing gas supply to new

housing development. Approx dimensions: 4m x 0.5m nearside carriageway.

Depth: 0.8m. 1st Time Permanent reinstatement

MINOR 30/11/2017 01/12/2017 2 Days PROPOSED WORKS GIVE & TAKE ZP010-17911-1/EPLR 202/01352

HARLESDEN ROAD LONDON O/S P/W 379/380, 34 M N OF DOYLE GARDENSW.R.P. - Installation of foundations in preparation for a Bus Stop Post, for and

on behalf of Transport For London . Bus Stop Number:- 26953MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00037824 202/01352

HARLESDEN ROAD LONDON FROM O/S NO.1F TO J/O DONNINGTON ROADIMGA172391 ABANDON 236M X 4' CI / 181M X 6' CI MAIN AND INSERT 125MM

PEAND RELAY OR TRANSFER APPROX 30 SERVICES.MAJOR 20/11/2017 19/01/2018 61 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000630057 202/01352

HARLESDEN ROAD LONDON DONNINGTON ROAD TO ROBSON AVENUEMAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) -

2017/18-ROAD CLOSUREMAJOR 13/02/2018 15/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257690 202/01352

HARROW ROAD WEMBLEY MONKS PARK TO NORTH CIRCULAR ROADMAJOR RESURFACING (PRINCIPAL ROAD) NIGHT WORKS-2200 TO 0500

PARTIAL CLOSURE / TEMP TRAFFIC CONTROL 2 WAY LIGHTS 2200 TO 0500MAJOR 20/11/2017 24/11/2017 5 Days IN PROGRESS TWO-WAY SIGNALS AW042-242027 202/02039

HARROW ROAD WEMBLEYEAST S/O JCN WITH MAYBANK AVENUE, HARROW

ROADInstall 2m of 1 way poly duct in Footway MINOR 11/12/2017 13/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500251155601 202/02039

HARROW ROAD WEMBLEY From O/S No.203 to J/O Tring AvenueExcavation of carraigeway in Harrow Rd j/o Tring Ave to undertake trial hole

for future construction worksSTANDARD 11/12/2017 17/12/2017 7 Days PROPOSED WORKS LANE CLOSURE MU302-KCD-STANDARD-H456 202/02039

HARROW ROAD WEMBLEY FOOTWAY OUTSIDE OF NO. 76A HARROW ROAD LAY NEW DOMESTIC SERVICE 3M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 15/12/2017 20/12/2017 6 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000662198 202/02039

HARROW ROAD WEMBLEYVICTORIA AVENUE TO MONKS PARK-NORTH EAST SIDE

ONLY

FOOTWAY RECONSTRUCTION PROGRAMME- 2017/18-PEDESTRIAN

SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 18/09/2017 22/12/2017 96 Days IN PROGRESS SOME C/W INCURSION AW042-203085 202/02039

HARROW ROAD LONDON Opposite no.810 Repair defective chamber on behalf of Vodafone MINOR 09/01/2018 10/01/2018 2 Days PROPOSED WORKS TWO-WAY SIGNALS NX502-17JHG2551 202/01241

HARROWDENE ROAD WEMBLEY OUTSIDE 12 CIRCLE COURT IN FOOTWAY LAY NEW PE DOMESTIC GAS CONNECTION 2M FROM MAIN IN FOOTWAY STANDARD 06/12/2017 12/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000652306 202/00651

HARROWDENE ROAD WEMBLEYJunction with HARROWDENE ROAD leading into

RAYNERS CLOSE

Excavate& connect to CGL Gas Main providing gas supply to new housing

development. Approx dimensions: .2M x 0.5 footway, .1m....x..1m..

carriageway. Depth: 0.8m.

MINOR 13/12/2017 15/12/2017 3 Days PROPOSED WORKS GIVE & TAKE ZP007-67849/EPLR 202/00651

HARVIST ROAD LONDON SALUSBURY ROAD TO J/W KINGSWOOD AVENUEFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 17/07/2017 30/11/2017 137 Days IN PROGRESS SOME C/W INCURSION AW042-202528 202/01304

HAVENWOOD WEMBLEY Off of Peace Grove side of A to H on Footpath Permanent Disconnection of Feeder Pillar MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AW014-00030466 202/02644

HAY LANE LONDON Front of 86. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate& reinstate joint hole & 3m trench in footway for new service

TM - 3-way lights

STANDARD 28/11/2017 04/12/2017 7 Days PROPOSED WORKS MULTI-WAY SIGNALS EC300-34780864 202/01185

HAY LANE LONDON NEARSIDE CARRIAGEWAY OUTSIDE 86B HAY LANE LAY NEW DOMESTIC SERVICE 4M FROM MAIN IN STANDARD 18/12/2017 22/12/2017 5 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-1000658137 202/01185

HEBER ROAD LONDON ANSON ROAD - OLIVE ROAD

Carry out 75no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 20/11/2017 02/02/2018 75 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/001 202/00882

HENLEY ROAD LONDON Henley Road at junction of Hanover Road,

Welfare unit and plant storage for Works in Hanover Road. (Excavationfor

open cut and insertion of approx 624m of 630mm PE with 2connections and

abandonment of 624m of 24'CI) No Excavating

MAJOR 01/11/2017 12/12/2017 42 Days IN PROGRESS SOME C/W INCURSION AZ007-1000652046 202/02635

HENSON AVENUE LONDON 6 - ANSON ROAD (WHOLE STREET)

Carry out 12no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 02/02/2018 09/02/2018 8 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/130 202/02216

HERNE CLOSE LONDON o/s 9. f\w.Network Operations Faults:STREETLIGHT FAULT: (APPROX DEPTH

450mm):repair street light fault foot way closed this is a Cul-de-sac.IMMEDIATE (URGENT) 22/11/2017 28/11/2017 7 Days IN PROGRESS NO C/W INCURSION EC400-10738686 202/00726

HIGH ROAD WEMBLEY(PCP27), NGA RELATED WORKS, (PCP27) JUNCTION

CECIL AVENUE ON, HIGH ROADInstall 1m of 1 way power duct in Footway MINOR 22/11/2017 23/11/2017 2 Days IN PROGRESS NO C/W INCURSION BC006-CT001LC500243270302 202/00165

HIGH ROAD WEMBLEY O/S #326TRIAL HOLE TO CONFIRM TEE& VALVES CAN BE CUT IN ON EXITING 12'

MAINMINOR 23/11/2017 24/11/2017 2 Days PROPOSED WORKS SOME C/W INCURSION MX049-THWM15 202/00165

HIGH ROAD WEMBLEY CARRIAGEWAY OUTSIDE OF NUMBER 546 LAY NEW DOMESTIC SERVICE 3M FROM MAIN IN NEARSIDE CARRIAGEWAY STANDARD 27/11/2017 01/12/2017 5 Days PROPOSED WORKS TWO-WAY SIGNALS AZ007-1000646906 202/00165

HIGH ROAD WEMBLEY o/s 356-358 in Ecclestone Place vehicle crossover-pedestrian signing and guarding MINOR 20/11/2017 25/11/2017 6 Days IN PROGRESS NO C/W INCURSION AW041-262461 202/00165

Page 7: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

HIGH ROAD LONDON outside 59 to 63CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY and CLEAR

BLOCKAGES IF FOUND. FOOTWAY WORKS ONLYMINOR 24/11/2017 27/11/2017 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13051632J11 202/00934

HIGH ROAD WEMBLEY In the f/w os 497Virgin media - New connection, connect from existing f/w duct and excavate

back to the property and install a f/w teeMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJBU/80023/FS 202/00165

HIGH ROAD WEMBLEY BRENT HOUSE ANNEXE 356-3SWR FAIL - CRITICAL RECHARGE--WORKS INTENDED TO INCLUDE FIRST

TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEIMMEDIATE (EMERGENCY) 02/11/2017 30/11/2017 29 Days IN PROGRESS LANE CLOSURE MU026-008107GXPP--000004 202/00165

HIGH ROAD WEMBLEY o/s 416-418. f\w.Connections Highway Services:NEW INDIVIDUAL SUPPLY::Installation and

new supply to cabinetSTANDARD 27/11/2017 01/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION AW012-70010143 202/00165

HIGH ROAD LONDON 18-20SEWER FAILURE--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT

REINSTATEMENT WITHIN SAME PHASEIMMEDIATE (EMERGENCY) 13/11/2017 01/12/2017 19 Days IN PROGRESS TWO-WAY SIGNALS MU026-003156PRDS--000007 202/00934

HIGH ROAD WEMBLEY Outside 349 High Road. Build chamber and lay duct in footway to connect new client. MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJBU/80872LNBAU 202/00165

HIGH ROAD LONDON NEARSIDE CARRIAGEWAY OUTSIDE 156 HIGH ROAD LAY NEW DOMESTIC SERVICE 4M FROM MAIN IN CARRIAGWAY STANDARD 05/12/2017 11/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000657743 202/00934

HIGH ROAD LONDON HUDDERSFIELD ROAD TO STRODE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 30/10/2017 28/02/2018 122 Days IN PROGRESS SOME C/W INCURSION AW042-202496 202/00934

HIGH ROAD WEMBLEY Steps from High Road to Station Grove

Proposed temporary traffic order for a footpath/steps closure from High Road

leading down to Station Grove to allow construction of a new development on

Montrose Crescent car park plot. Our ref: TTRO

HIGHWAYS ACT PERMITS 05/07/2017 05/01/2019 550 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000726 202/00165

HIGH STREET LONDON 135-137Boundary Box Exchange Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 17/11/2017 23/11/2017 7 Days IN PROGRESS SOME C/W INCURSION MU301-000030980010-001 202/01328

HIGH STREET LONDON outside 160 to 168CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 27/11/2017 28/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/12946227J1A 202/01328

HIGH STREET LONDON 2ND FLOOR FLAT 208B REPAIR LEAK IN FOOTWAY MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156PJQQ--000002 202/01328

HIGH STREET LONDON Opp 234District Meter Exchange - in the Carriageway and Footway - 1st time

Permanent reinstatement.MINOR 27/01/2018 28/01/2018 2 Days PROPOSED WORKS LANE CLOSURE MU288-DM18408 202/01328

HIGHCROFT AVENUE WEMBLEYWHOLE STREET FROM O/S COMMUNITY CENTRE TO J/O

BERESFORD AVENUE

IMGA172034 / ABANDON 296M X 4' CI MAIN AND INSERT 75 / 90MM PE

ANDRELAYOR TRANSFER SERVICES.MAJOR 01/09/2017 30/11/2017 91 Days IN PROGRESS SOME C/W INCURSION AZ007-1000581513 202/00132

HIGHMEAD CRESCENT WEMBLEY 65, HIGHMEAD CRESCENT, WEMBLEY, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 3' CI; 1 OF 1 - workingin

footway and carriagewayMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS GIVE & TAKE MX044-281629900 202/02326

HIGHMEADOW CRESCENT LONDON outside 22 TO 24CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLYMINOR 23/11/2017 24/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/1304494J11 202/02429

HILL CLOSE LONDON From Junction with Dollis Hill Avenue to end of the roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS SURFACE LOCATION: FOOTWAY AND CARRIAGEWAYMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-C939/MBIW04/Z006 202/01754

HILLSIDE LONDON Stonebridge Evangeical Church CPP Atplas Exchange in the footway - 1st time permanent reinstatement MINOR 24/11/2017 24/11/2017 1 Days PROPOSED WORKS SOME C/W INCURSION MU288-CPP0296-3 202/00364

HILLSIDE LONDON O/S 173Main Cut Out 0 to 6' Cway in Carriageway. Our intention is to completethe

Permanent Reinstatement in the same phaseIMMEDIATE (URGENT) 21/11/2017 27/11/2017 7 Days IN PROGRESS CONTRA-FLOW MU301-000030981671-001 202/00364

HILLVIEW AVENUE HARROW10, HILLVIEW HARROW (BRENT) - FOOTWAY AND

CARIAGEWAY

SERVICE RELAY CONDITION - EXCAVATE IN FOOTWAY AND CARIAGEWAY

AND RELAYSERVICE DUE TO CONDITION.STANDARD 04/12/2017 08/12/2017 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000657166 202/00400

HOLLAND ROAD LONDON NEARSIDE FOOTWAY OUTSIDE 157A HOLLAND ROAD ALTER AND RELAY DOMESTIC SERVICE 1M FROM MAIN IN STANDARD 21/11/2017 27/11/2017 7 Days IN PROGRESS SOME C/W INCURSION AZ007-1000648230 202/01676

HOLMSTALL AVENUE EDGWAREAt side Entrance of Symal house number 423 Edgware

RoadVirgin Media -small works in footway to drill into existing chamber MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS NO C/W INCURSION NK100-/SCLJBU/83618/FS 202/01198

HOMEFIELD CLOSE LONDON MEADOW GARTH - END

Carry out 20no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 20/02/2018 06/03/2018 15 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/002 202/01603

HONEYPOT LANE STANMORE 450 HONEY POT LANE Stump grinding MINOR 23/11/2017 23/11/2017 1 Days PROPOSED WORKS NO C/W INCURSION FH005-S00000669 202/00084

HOPEFIELD AVENUE LONDON 7 CUSTOMER SIDE LEAKAGE REPAIR MINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156PZLX--000001 202/00295

HUDDLESTONE ROAD LONDON BALMORAL ROAD - HIGH ROAD

Carry out 112no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 06/11/2017 15/12/2017 40 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/126 202/01704

IVY ROAD LONDON TO S/O NO.47 IVY ROAD IMGA192008 - STORAGE / CONTAINER UNIT MAJOR 16/11/2017 13/12/2017 28 Days IN PROGRESS SOME C/W INCURSION AZ007-1000655591 202/00759

JAMES AVENUE LONDON 19 - ANSON ROAD (WHOLE STREET)

Carry out 42no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 31/01/2018 20/02/2018 21 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/127 202/01652

JEYMER AVENUE LONDON FROM J/O PARK AVENUE NORTH TO J/O RIFFEL ROADIMGA192010 ABANDON 242M X 4' CI MAIN AND INSERT 90MM PE AND RELAY

ORTRANSFER APPROX 15 SERVICESMAJOR 22/01/2018 16/02/2018 26 Days PROPOSED WORKS SOME C/W INCURSION AZ008-1000648493 202/01393

KATHLEEN AVENUE WEMBLEY outside 47 kathleen ave ha0 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/11/2017 27/11/2017 11 Days IN PROGRESS SOME C/W INCURSION AZ007-1000658962 202/01691

KEMPE ROAD LONDONold BAKERY HOUSE, PEPLOE ROAD/KEMPE ROAD,

LONDON, NW6 6EB130015271Lay 33m 63mm Pe STANDARD 27/11/2017 01/12/2017 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648631 202/01040

KENDAL ROAD LONDON SEC 81 REF ON-F01157940. O/S 9, KENDAL ROAD Replace 1 jointbox frame and cover(s) (725mm x 225mm) in Footway MINOR 29/11/2017 30/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500252576300 202/00221

KENMERE GARDENS WEMBLEY KENMERE GARDENS AT J/O HIGHCROFT AVENUEIMGA172034 MAINS CONNECTIONS FOR ASSOCIATED WORKS IN

HIGHCROFT AVENUESTANDARD 16/11/2017 29/11/2017 14 Days IN PROGRESS SOME C/W INCURSION AZ007-1000647432 202/00175

KENMERE GARDENS WEMBLEY KENMERE GARDENS J/O BERESFORD AVENUEIMGA172034 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN

BERESFORD AVENUESTANDARD 27/11/2017 08/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000656271 202/00175

KENTON ROAD HARROW AT JCN WITH NORTHWICK AVENUE, KENTON ROAD Replace 1 jointbox frame and cover(s) (1220mm x 680mm) in Carriageway IMMEDIATE (EMERGENCY) 21/11/2017 23/11/2017 3 Days IN PROGRESS LANE CLOSURE BC006-CT001LC500252591200 202/01823

KENTON ROAD HARROW 311-297 rhino patching- 2way lights MINOR 23/11/2017 25/11/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-262154 202/01823

KENTON ROAD HARROW O/S 289-283 RHINO PATCHING-2 WAY LIGHTS MINOR 24/11/2017 26/11/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-262155 202/01823

KENTON ROAD HARROW O/S 279 TO 275 RHINO PATCHING-2 WAY LIGHTS MINOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-262157 202/01823

KENTON ROAD HARROW O/S 273 TO 271 RHINO PATCHING -2 WAY LIGHTS MINOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-262158 202/01823

KENTON ROAD HARROW j\w woodcock hill to j/w wood grange avenue RHINO PATCHING -4 WAY LIGHTS MINOR 29/11/2017 01/12/2017 3 Days PROPOSED WORKS MULTI-WAY SIGNALS AW041-263784 202/01823

KENTON ROAD HARROW opp 734 rhino patching -2 way lights MINOR 30/11/2017 02/12/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-263790 202/01823

KENTON ROAD HARROW O/S 298. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate 1m of Paved Footway& 1 x Joint Hole TM - Footway closure,

temp W/W

STANDARD 28/11/2017 04/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION EC300-34781368 202/01823

Page 8: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

KENTON ROAD HARROW CARRIAGEWAY OUTSIDE OF NO. 298 KENTON ROADLAY NEW DOMESTIC SERVICE 2M FROM MAIN IN EDGE OF FOOTWAY AND

CARRIAGEWAYSTANDARD 04/12/2017 08/12/2017 5 Days PROPOSED WORKS LANE CLOSURE AZ007-1000658182 202/01823

KENTON ROAD HARROW os Kenton CourtInstall 3 new footway chambers in the footpath and ducting to the flats at

Kenton CourtSTANDARD 12/12/2017 22/12/2017 11 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSE2PL/KENTON 202/01823

KENTON ROAD HARROW 265SEWER S81 PLANNED--WORKS INTENDED TO INCLUDE FIRST TIME

PERMANENT REINSTATEMENT WITHIN SAME PHASEMAJOR 05/01/2018 05/01/2018 1 Days PROPOSED WORKS GIVE & TAKE MU026-008106DQJS--000004 202/01823

KENWYN DRIVE LONDON 106 KENWYN DRIVE, LONDON, NW2 7NUService Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030982066-001 202/00240

KESWICK GARDENS WEMBLEY Keswick Gardens, all of Keswick Gardens 300m of duct laying in footway and 10m of duct laying in carriageway STANDARD 24/11/2017 07/12/2017 14 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760009M 202/00151

KILBURN HIGH ROAD LONDON Outside No. 4 New service connection 1.40m in f/w STANDARD 19/01/2018 24/01/2018 6 Days PROPOSED WORKS NO C/W INCURSION WY002-NSA00017437 202/02523

KILBURN HIGH ROAD LONDON J/W LOVERIDGE ROADMAJOR C/W REURFACING WORKS(BUS STOP)2 WAY LIGHTS, ROAD

CLOSURE-NIGHT WORKS 2200 TO 0500MAJOR 07/02/2018 09/02/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW042-260378 202/02523

KILBURN LANE LONDON Opposite 102 Kilburn Lane, Excavate Footway or Verge to Install Earthing Coil MINOR 22/11/2017 24/11/2017 3 Days IN PROGRESS NO C/W INCURSION NK100-/SCLDRE/3K24D05 202/01243

KILBURN LANE LONDON 203- junction allington road SECTION 81- To reset surface box in Carriageway MINOR 24/11/2017 24/11/2017 1 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-157596NL/01 202/02035

KILBURN LANE LONDON 191A SECTION 81- To reset surface box in Carriageway MINOR 24/11/2017 24/11/2017 1 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-155996NL/02 202/02035

KILBURN LANE LONDON 58 INSTALL NEW OUTSIDE STOP VALVE IN FOOTWAY MINOR 08/12/2017 12/12/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156PZGN--000001 202/01243

KINGS ROAD LONDON 19 S/O This permit is for Thames Water to carry out remedial works in the footway MINOR 27/11/2017 28/11/2017 2 Days PROPOSED REMEDIAL NO C/W INCURSION MU307-000804309520055-001 202/02255

KINGSBURY ROAD LONDONWILLIAM HILL, 540, KINGSBURY ROAD, , LONDON,

BRENTCOMMUNICATION PIPE - REPAIR ;OTHER - working in footway IMMEDIATE (URGENT) 20/11/2017 23/11/2017 4 Days IN PROGRESS SOME C/W INCURSION MX044-281522500 202/01608

KINGSBURY ROAD LONDON FROM J/W VALLEY DRIVE TO FRYENT WAY

KINGSBURY TOWN CENTRE -FOOTWAY WORKS BOTH SIDES-ALL SIGNING

LIGHTING AND GUARDING CONTAINED TO THE FOOTWAY NO C/WAY

INCURSION.

MAJOR 08/02/2018 09/03/2018 30 Days PROPOSED WORKS NO C/W INCURSION AW042-260642 202/01608

KINGSWAY WEMBLEY Kingsway, all of Kingsway 685m of duct laying in footway STANDARD 21/11/2017 04/12/2017 14 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56760001M 202/02489

KINGSWOOD AVENUE LONDON J/W HARVIST ROAD

SITE COMPOUND FOR HARVIST ROAD- COMPOUND SITE 24 HOURS A DAY 7

DAYS A WEEK FOR DURATION OF THE SCHEME-NCT04b-materials stored on

site

MAJOR 20/09/2017 30/11/2017 72 Days IN PROGRESS SOME C/W INCURSION AW041-249211 202/02545

KNATCHBULL ROAD LONDON Opposite 66-71 New service fitted 1.70m footway STANDARD 15/01/2018 19/01/2018 5 Days PROPOSED WORKS GIVE & TAKE WY002-NSA00017241 202/01914

LANE CLOSE LONDON From Junction with Dollis Hill Avenue to end of the roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS Surface location: footway and carriagewayMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-C939/MBIW04/Z004 202/02399

LANGHAM GARDENS WEMBLEY WHOLE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 18/09/2017 08/12/2017 82 Days PROPOSED WORKS SOME C/W INCURSION AW042-203012 202/00195

LANSDOWNE GROVE LONDON Junction with Neasden LaneRoad Safety Improvement - Relay New Footway - New Kerbs - Tactile Paving -

Removal of two guard rails - build entry treatmentMAJOR 22/01/2018 10/02/2018 20 Days PROPOSED WORKS SOME C/W INCURSION AW042-262794 202/00553

LANSDOWNE GROVE LONDON Junction with Neasden LaneRoad Safety Improvement - Relay New Footway - New Kerbs - Tactile Paving -

Removal of two guard rails - build entry treatmentMAJOR 22/02/2018 13/03/2018 20 Days PROPOSED WORKS SOME C/W INCURSION AW042-263624 202/00553

LANSDOWNE GROVE LONDON JW NEASDEN LANE

SITE COMPOUND FOR NEASDEN LANE---PERMIT NUMBER- AW042263606

NEASDEN LANE-AW042263646,PROUT GROVE -AW042262786 AND

AW042263624 LANSDOWNE GROVE- COMPOUND SITE 24 HOURS A DAY 7

DAYS A WEEK FOR DURATION

MAJOR 22/02/2018 09/05/2018 77 Days PROPOSED WORKS SOME C/W INCURSION AW042-263710 202/00553

LARCH ROAD LONDONWHOLE STREET FROM J/O MORA ROAD TO J/O

ASHFORD ROAD

IMGA192008 ABANDON 293M X 4' CI MAIN AND INSERT 90MM PE AND RELAY

ORTRANSFER APPROX 30 SERVICESMAJOR 22/01/2018 23/02/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648229 202/02382

LEIGH GARDENS LONDON 53Service Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 01/12/2017 05/12/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030974520-001 202/02265

LLANOVER ROAD WEMBLEYFrom Junction Clarendon Gardens to Junction Pembroke

Road on Llanover Road ( both footways )600m of duct laying in footway STANDARD 07/11/2017 25/11/2017 19 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56736005M 202/02580

LODORE GARDENS LONDON WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2017/18-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION

MAJOR 08/01/2018 30/03/2018 82 Days PROPOSED WORKS SOME C/W INCURSION AW042-203059 202/00387

LONDON ROAD WEMBLEYCARRIAGEWAY OUTSIDE OF NO 1 SEVENEX PARADE,

LONDON ROADLAY NEW DOMESTIC SERVICE 3M FROM MAIN IN THE CARRIAGEWAY STANDARD 12/12/2017 15/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING AZ007-1000654991 202/01907

LONGLEY AVENUE WEMBLEYWHOLE STREET FROM J/O CARLYON ROAD TO J/O

QUEENSBURY ROAD

IMGA192015 / ABANDON 303M X 4' CI MAIN AND INSERT 90MM PE AND

RELAY ORTRANSFER APPROX 43 SERVICES.MAJOR 15/01/2018 16/02/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000645099 202/00470

LUSHINGTON ROAD LONDON 27 remedials in carriageway MINOR 23/11/2017 24/11/2017 2 Days PROPOSED REMEDIAL SOME C/W INCURSION MU301-000030644690-001 202/00077

LUSHINGTON ROAD LONDON 20B Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981650-001 202/00077

LUSHINGTON ROAD LONDON WROTTESLEY ROAD - HOLLAND ROAD

Carry out 41no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 26/02/2018 27/03/2018 30 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/051 202/00077

MANOR DRIVE WEMBLEY o/s 27 Manor Drive Install Cabinet in footway MINOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676015MM 202/00739

MANOR FARM ROAD WEMBLEY Opposite 70 - 72 New Cable Installation STANDARD 20/11/2017 23/11/2017 4 Days IN PROGRESS TWO-WAY SIGNALS AW999-S000000000324 202/01563

MARIAN WAY LONDONWHOLE STREET FROM J/O OLDFIELD ROAD TO J/O

FAWCETT ROAD

IMGA192013 ABANDON 253M X 4' CI MAIN AND INSERT 90MM PE AND RELAY

ORTRANSFER APPROX 30 SERVICESMAJOR 08/01/2018 02/02/2018 26 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000639906 202/00900

MAYBANK AVENUE WEMBLEY

S/O 871 HARROW ROAD TO O/S NOS 1 TO 6 OAKLEY

COURT& O/S 126 TO WEST S/O JCN WITH THE RISE,

MAYBANK A

Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Install

128m of 1 way poly duct in Footway,Install 21m of 1 way poly duct in

Carriageway

STANDARD 11/12/2017 20/12/2017 10 Days PROPOSED WORKS MULTI-WAY SIGNALS BC006-CT001LC500251155600 202/00048

MEADOW GARTH LONDON 1 - BRENTFIELD ROAD (whole street)

Carry out 67no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 08/01/2018 09/03/2018 61 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/016 202/01144

MEADOW WAY WEMBLEY Meadow Way, all of Meadow Way 320m of duct laying in footway STANDARD 01/11/2017 28/11/2017 28 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56736002G 202/00520

MELROSE AVENUE LONDON 134 MELROSE AVEB Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030979098-001 202/02232

MELROSE AVENUE LONDON 153Boundary Box Exchange in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030976011-001 202/02232

MELROSE AVENUE LONDON 131 MELROSE AVENUE, NW2 4LYService Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981853-001 202/02232

MELROSE AVENUE LONDON MELROSE AVENUE AT J/O CRANHURST ROADIMGA192010 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN

CRANHURST ROADSTANDARD 20/11/2017 01/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000647967 202/02232

Page 9: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

MELROSE AVENUE LONDON s/o 14-24, o/s and opp1x32mm BP new water meter supply in f/way and in Carriageway. Ourintention

is to complete the Permanent Reinstatement in the samephaseSTANDARD 29/11/2017 05/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION MU307-000805731540045-001 202/02232

MELROSE AVENUE LONDON MELROSE AVENUE TO CHANDOS ROADIMGA192010 MAINS CONNECTIONS FOR ASSOCIATED WORKS IN CHANDOS

ROADSTANDARD 23/11/2017 06/12/2017 14 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000655338 202/02232

MILVERTON ROAD LONDON BRONDESBURY PARK - SIDMOUTH ROAD

Carry out 38no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 26/02/2018 23/03/2018 26 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/060 202/00331

MINET AVENUE LONDON Outside 36 Minet Avenue. f\w.Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Installing a new 100amp three phase serviceSTANDARD 20/11/2017 24/11/2017 5 Days IN PROGRESS SOME C/W INCURSION EC400-10737017 202/01376

MINET AVENUE LONDON O/S 362x25mm MDPE mtrd Supply in F/W in Carriageway. Our intention is tocomplete

the Permanent Reinstatement in the same phaseSTANDARD 28/11/2017 01/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000806217760045-001 202/01376

MITCHELL WAY LONDON 28 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN MINOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS NO C/W INCURSION MU356-003156MZKY--000001 202/01957

MONTPELIER RISE WEMBLEYIN THE NEARSIDE FOOTWAY OUTSIDE 68 MONTPELIER

RISELAY NEW DOMESTIC SERVICE 6M FROM MAIN IN FOOTWAY STANDARD 29/11/2017 04/12/2017 6 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000649575 202/02046

MORA ROAD LONDON MORA ROAD J/O LARCH ROADIMGA192008 - MAINS CONNECTIONS FOR ASSOCIATED WORKS IN LARCH

ROADSTANDARD 27/11/2017 08/12/2017 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000654958 202/02288

MORTIMER ROAD LONDON 36 MORTIMER ROAD, LONDON, NW10 5QPService Pipe Repair<33mm Cway in Carriageway. Our intention is tocomplete

the Permanent Reinstatement in the same phaseMAJOR 13/01/2018 18/01/2018 6 Days PROPOSED WORKS ROAD CLOSURE MU301-000030952594-001 202/01070

MOUNT PLEASANT WEMBLEY FOOTWAY OUTSIDE DELTA CENTRE DISCONNECT 1 X 2' SERVICE FROM MAIN IN FOOTWAY STANDARD 13/11/2017 24/11/2017 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000645473 202/02568

MOUNT PLEASANT WEMBLEY FOOTWAY OUTSIDE NO. 154, NEXT TO DELTA CENTRE DISCONNECT 1 X 2' SERVICE FROM MAIN IN FOOTWAY STANDARD 13/11/2017 24/11/2017 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000645475 202/02568

MOUNT PLEASANT WEMBLEYLYON PARK PRIMARY SCHOOL, MOUNT PLEASANT -

FOOTWAY AND CARRIAGEWAY

SERVICE RELAY CONDITION - EXCAVATE IN FOOTWAY AND CARIAGEWAY

AND RELAYSERVICE DUE TO CONDITION.STANDARD 20/12/2017 28/12/2017 9 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000657164 202/02568

MOUNT ROAD LONDON Junction with Dollis Hill AvenueWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS Surface location: footway and carriagewayMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-C939/MBIW04/Z003 202/01207

MULGRAVE ROAD HARROW 32, MULGRAVE ROAD, HARROW, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 3' CI; 1 OF 1 - workingin

footway carriageway and vergeMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-281506900 202/00912

NEASDEN LANE LONDON5-10 BERKELEY COURT, NEASDEN LANE, LONDON,

NW10 1PX

Main Clamp 0 to 6' Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 21/11/2017 27/11/2017 7 Days IN PROGRESS SOME C/W INCURSION MU301-000030979174-001 202/00873

NEASDEN LANE LONDON 127 INSTALL NEW OUTSIDE STOP VALVE IN FOOTWAY MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION MU356-003156QDDY--000001 202/00873

NEASDEN LANE LONDON Junction with Dudden Hill LaneRoad Safety Improvement Works - New Raised Table - 2 x New Gullies -

Conservation Kerbs - Extension of Central IslandMAJOR 28/11/2017 22/12/2017 25 Days PROPOSED WORKS SOME C/W INCURSION AW042-262778 202/00873

NEASDEN LANE LONDON75 metres south of Neasden Station - O/S Entrance to

Power Skips

Road Safety Improvement - Construct new flat top traffic island - replace

tactile paving - relay footway - install new keep left bollards - replace road

markings

MAJOR 05/02/2018 09/02/2018 5 Days PROPOSED WORKS SOME C/W INCURSION AW042-262801 202/00873

NEASDEN LANE LONDON75 metres south of Neasden Station - O/S Entrance to

Power Skips

Road Safety Improvement - Construct new flat top traffic island - replace

tactile paving - relay footway - install new keep left bollards - replace road

markings

MAJOR 22/02/2018 26/02/2018 5 Days PROPOSED WORKS SOME C/W INCURSION AW042-263646 202/00873

NEASDEN LANE LONDON Junction with Dudden Hill LaneRoad Safety Improvement Works - New Raised Table - 2 x New Gullies -

Conservation Kerbs - Extension of Central IslandMAJOR 22/02/2018 18/03/2018 25 Days PROPOSED WORKS SOME C/W INCURSION AW042-263606 202/00873

NEASDEN LANE NORTH LONDON

FOOTWAY BETWEEN EAST SIDE OF RIVER AND 37M

SOUTH EAST AND DESILT EAST S/O RIVER TO JNC

BIRCHEN GROVE

Locate and excavate 2 blockage in existing duct,Spend 1day clearing duct by

jetting/ cleaningMINOR 25/11/2017 28/11/2017 4 Days PROPOSED WORKS LANE CLOSURE BC006-CT003LC500246525806 202/02443

NEASDEN LANE NORTH LONDONJUNCTION WITH BRAEMAR AVENUE AND QUAINTON

STREETEXCAVATION- 1M X 1M TRIAL DIG MINOR 15/12/2017 15/12/2017 1 Days PROPOSED WORKS NO C/W INCURSION MG074-79029B-PGN/MW 202/02443

NEASDEN LANE NORTH LONDONjust after WB offslip to A406 North Circular Road to end off

onslip from A406 North Circular RoadCarriageway Resurfacing Lane 1 closure TMAN: N1701130 MAJOR 19/02/2018 21/02/2018 3 Days PROPOSED WORKS LANE CLOSURE YG430-262037 202/02443

NEWTON ROAD LONDONWHOLE STREET FROM J/O WOTTON ROAD TO J/O

TEMPLE ROAD

IMGA192008 ABANDON 131M X 6' CI MAIN AND INSERT 125MM PE AND

RELAYORTRANSFER APPROX 15 SERVICESMAJOR 27/11/2017 15/12/2017 19 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000648174 202/00537

NORTH CIRCULAR ROAD LONDON From Garden Way to Jackman mewsEvent for Wembley Lane 1 C/W F/W N/B Lane Drop for Wembley Event time

1515-1945STANDARD 25/11/2017 25/11/2017 1 Days PROPOSED WORKS LANE CLOSURE YG450-373506 202/01638

NORTH CIRCULAR ROAD LONDON approach to drury way and after drury wayEvent for Wembley Lane 1 C/W F/W N/B Lane Drop for Wembley Event time

1515-1945STANDARD 25/11/2017 25/11/2017 1 Days PROPOSED WORKS LANE CLOSURE YG450-373507 202/01638

NORTH CIRCULAR ROAD LONDON S/o 2 ARDLEY CLOSE, NORTH CIRCULAR ROADMain Clamp in Footway. Our intention is to complete the

PermanentReinstatement in the same phaseMINOR 25/11/2017 26/11/2017 2 Days PROPOSED WORKS LANE CLOSURE MU301-000030948568-004 202/00296

NORTH CIRCULAR ROAD LONDON CHARTLEY AVENUE TO WATERLOO ROAD

BLOCK CLOSURE# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE,

SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS

CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS LANE CLOSURE YG431-239597 202/00296

NORTH CIRCULAR ROAD LONDON WATERLOO ROAD TO CHARTLEY AVENUE

BLOCK CLOSURE# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE,

SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS

CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS LANE CLOSURE YG431-239600 202/00296

NORTH CIRCULAR ROAD LONDON JW DRURY WAY TO CHARTLEY AVENUE

BLOCK CLOSURE# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE,

SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS

CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS LANE CLOSURE YG431-239598 202/01638

NORTH CIRCULAR ROAD LONDON CHARTLEY AVENUE TO JW DRURY WAY

BLOCK CLOSURE# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE,

SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS

CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS LANE CLOSURE YG431-239603 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) WATERLOO ROAD TO CHARTLEY AVENUE

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 02/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-256046 202/00296

NORTH CIRCULAR ROAD LONDON (eastbound) CHARTLEY AVENUE TO WATERLOO ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 02/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-256047 202/00296

NORTH CIRCULAR ROAD LONDON (eastbound) JW DRURY WAY TO CHARTLEY AVENUE

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 02/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249132 202/01638

Page 10: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

NORTH CIRCULAR ROAD LONDON(westbound) CHARTLEY AVENUE TO JW DRURY WAY

WAY

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 01/12/2017 02/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249136 202/01638

NORTH CIRCULAR ROAD LONDONR/O 1 Woodheyes Road to R/O Beacon House, on North

Circular Road, LondonLay duct - 98m in footway, with tees STANDARD 28/11/2017 07/12/2017 10 Days PROPOSED WORKS LANE CLOSURE NK100-/SSEMBU/100197509 202/01638

NORTH CIRCULAR ROAD LONDON (eastbound) ABBEY ROAD TO GREAT CENTRAL WAY

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 04/12/2017 05/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249142 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) JW GREAT CENTRAL WAY TO ABBEY ROAD

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 04/12/2017 05/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249152 202/01638

NORTH CIRCULAR ROAD LONDON (eastbound) ABBEY ROAD TO JW GREAT CENTRAL WAY

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/12/2017 06/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249231 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) JW GREAT CENTRAL WAY TO ABBEY ROAD

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/12/2017 06/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249232 202/01638

NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 06/12/2017 07/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249235 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) ABBEY ROAD TO THE AQUADUCT FLYOVER

BLOCK CLOSURE WB# - TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 06/12/2017 07/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249237 202/01638

NORTH CIRCULAR ROAD LONDONOPP S/O 1 Woodheyes Road on North Circular Road,

LondonInstall tee in footway STANDARD 28/11/2017 07/12/2017 10 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSEMBU/100197510 202/01638

NORTH CIRCULAR ROAD LONDON From Garden Way to Jackman mewsEvent for Wembley Lane 1 C/W F/W N/B Lane Drop for Wembley Event time

2000-0030STANDARD 06/12/2017 07/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG450-373994 202/01638

NORTH CIRCULAR ROAD LONDON approach to drury way and after drury wayEvent for Wembley Lane 1 C/W F/W N/B Lane Drop for Wembley Event time

2000-0030STANDARD 06/12/2017 07/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG450-373995 202/01638

NORTH CIRCULAR ROAD LONDON approach to drury way and after drury wayEvent for Wembley Lane 1 C/W F/W N/B Lane Drop for Wembley Event time

2000-0030STANDARD 06/12/2017 07/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG450-373997 202/01638

NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 07/12/2017 08/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249244 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) ABBEY ROAD TO THE AQUADUCT FLYOVER

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER

WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 07/12/2017 08/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG431-249246 202/01638

NORTH CIRCULAR ROAD LONDON near ardley close.. f\w.Network Operations Distribution:INSTALL/REPLACE/REMOVE LINK

BOX:REMEDIAL TO REPAIR DEFECTMINOR 09/12/2017 09/12/2017 1 Days PROPOSED REMEDIAL LANE CLOSURE EC400-10730406 202/00296

NORTH CIRCULAR ROAD LONDON(westbound) from 200m north to 250m south of Abbey

Road flyoverGrass cutting Lane 1 safety zone MINOR 09/12/2017 09/12/2017 1 Days PROPOSED WORKS LANE CLOSURE YG430-263856 202/01638

NORTH CIRCULAR ROAD LONDON 513 SEWER FAILURE MINOR 11/12/2017 12/12/2017 2 Days PROPOSED WORKS LANE CLOSURE MU026-003156PWFD--001001 202/00296

NORTH CIRCULAR ROAD LONDON 778 North Circular Rd, NW2Serv Pipe Relay Inc Fitting Sz P Fway in Footway. Our intention is tocomplete

the Permanent Reinstatement in the same phaseMINOR 15/12/2017 17/12/2017 3 Days PROPOSED WORKS LANE CLOSURE MU301-000030870494-005 202/00296

NORTH CIRCULAR ROAD LONDONNORTH CIRCULAR ROAD SOS phone in Harrow road

underpass 100 yds before bridge

CUBIC rolling maintenance NIL EXCAVATION Check clean and maintain SOS

phones in underpass this is CUBIC'S CONTRACTUAL OBLIGATION,,

Eastbound lane 1 Work times 23:00 - 05:00 1 x night only . Works on

MINOR 19/12/2017 20/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG519-EL002041B 202/01638

NORTH CIRCULAR ROAD LONDON 36 North circular Rd to Abbey Rd bridge westbound

CUBIC rolling maintenance NIL EXCAVATION Check clean and maintain SOS

phones in underpass this is CUBIC'S CONTRACTUAL OBLIGATION .

Westbound lane 1 Work times 23:00 - 05:00 1 x night only . Works

MINOR 20/12/2017 21/12/2017 2 Days PROPOSED WORKS LANE CLOSURE YG519-EL002042B 202/01638

NORTH CIRCULAR ROAD LONDONe/b from apprx 96m w of ftbrdg to apprx 252m w aquaduct

w/b-apprx 148 NCR to just before abbey rd oninstallation of digital visual display unit MAJOR 14/12/2017 25/01/2018 43 Days PROPOSED WORKS ROAD CLOSURE YG820-3266-NCR- 202/01638

NORTH CIRCULAR ROAD LONDON (westbound) from beginning of off-slip to Abbey Road Structural inspections along slip roads MAJOR 30/01/2018 31/01/2018 2 Days PROPOSED WORKS ROAD CLOSURE YG431-256955 202/01638

NORTH CIRCULAR ROAD LONDON (eastbound) from Abbey Road to end of EB on-slip CPP Structural inspections along slip roads MAJOR 30/01/2018 31/01/2018 2 Days PROPOSED WORKS ROAD CLOSURE YG431-256956 202/01638

NORTH CIRCULAR ROAD LONDON EB, 500m before offslip to A4088 to jct Neaden Lane NorthCarriageway Resurfacing Full closure off EB offslip to A4088. Lane 1 & 2

closures on A406 NCR. TMAN: N1701130MAJOR 19/02/2018 21/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE YG430-262027 202/01638

NORTH CIRCULAR ROAD LONDON verge, access road,North Circular Road near footbridge Lift off existing kiosk and install new together with associated civils MAJOR 08/03/2018 08/03/2018 1 Days PROPOSED WORKS ROAD CLOSURE AZ014-NL0134 202/01638

NORTHWICK AVENUE HARROW Front of 72. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate& reinstate joint hole in footway for new service TM -

Standard SLG, 2x bus stop suspensions

STANDARD 15/11/2017 23/11/2017 9 Days IN PROGRESS NO C/W INCURSION EC300-34780192 202/00307

NORTHWICK AVENUE HARROWCARRIAGEWAY OUTSIDE OF NO 72 NORTHWICK

AVENUELAY NEW DOMESTIC SERVICE 3M FROM MAIN IN THE CARRIAGEWAY STANDARD 29/11/2017 05/12/2017 7 Days PROPOSED WORKS GIVE & TAKE AZ007-1000656090 202/00307

NORVAL ROAD WEMBLEY outside 54 to 58CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 25/11/2017 28/11/2017 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13059635J11 202/00977

Page 11: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

OAKLANDS ROAD LONDON 99 - CRICKLEWOOD BROADWAY

Carry out 171no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 18/10/2017 14/03/2018 148 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP5/BRE/021 202/01172

OLD CHURCH LANE LONDON OLD CHURCH LANE O/S NO.1-5 IMGA192016 - STORAGE / CONTAINER UNIT MAJOR 12/10/2017 01/12/2017 51 Days IN PROGRESS SOME C/W INCURSION AZ007-1000630120 202/01093

OLDFIELD ROAD LONDONWHOLE STREET FROM J/O ESSEX ROAD TO J/O

CURZON CRESCENT

IMGA192013 / ABANDON 463M X 6' CI / 4M X 4' CI MAIN AND INSERT 63

/125MM PE AND RELAY OR TRANSFER APPROX 43 SERVICES.MAJOR 03/01/2018 20/03/2018 77 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000607254 202/00145

OXENPARK AVENUE WEMBLEY 6, OXENPARK AVENUE, WEMBLEY, BRENT STOP TAP - REPLACE; 25MM working in footway IMMEDIATE (URGENT) 22/11/2017 27/11/2017 6 Days IN PROGRESS SOME C/W INCURSION MX044-281922300 202/01604

OXFORD ROAD LONDONThe works are located outside No.48 in the parking

bay/carriageway.

Thames Water need to carry out works on the water valve. Stop& Go boards

will be installed to allow these works to be carried out. Minor Works, No

Excavation.

MINOR 01/12/2017 01/12/2017 1 Days PROPOSED WORKS STOP/GO BOARDS MU150-WO-23325725/TW 202/00758

OXGATE GARDENS LONDON Junction of Edgware Road Section 278, development entrance 24hr 7 days a week MAJOR 18/04/2017 12/12/2017 239 Days IN PROGRESS ROAD CLOSURE YG432-178649 202/00078

OXGATE GARDENS LONDONJunction with Dollis Hill Road, Dollis Hill Lane and Geron

Way

Development Entrance works (Higgins/FMC) Lane Closures, temp lights, Road

closures.MAJOR 26/06/2017 06/02/2018 226 Days IN PROGRESS ROAD CLOSURE YG432-230530 202/00078

OXGATE LANE LONDONBLOCKAGES FROM OUTSIDE 1 TO SIDE OF COLES

GREEN ROAD ON , OXGATE LANE

Locate and excavate 1 blockage in existing duct,locate and excavate 2

subsequent blockage in existing ductMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS NO C/W INCURSION BC006-CT001LC500250264500 202/01616

PARK AVENUE LONDON At the railway bridge (rail over road)Removing dead pigeons from the underside of the railway bridge following

complaints from the public. 22:00 - 06:00.MINOR 24/11/2017 25/11/2017 2 Days PROPOSED WORKS TWO-WAY SIGNALS KL337-5133-MCJ1-16 202/01538

PARK AVENUE LONDON FOOTWAY OUTSIDE OF NO 18 PARK AVENUE LAY NEW DOMESTIC SERVICE 1M FROM MAIN IN THE FOOTWAY STANDARD 02/01/2018 08/01/2018 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000662361 202/01538

PARK CLOSE LONDON From Junction with Dollis Hill Avenue to end of the roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS SURFACE LOCATION: FOOTWAY AND CARRIAGEWAYMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-C939/MBIW04/Z007 202/02243

PARK LANE WEMBLEY o/s 127, 163, 221 Park Lane Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSE5PL/5676012MM 202/00535

PARK LANE WEMBLEY o/s 67-89 South Meadows Install Cabinet in footway MINOR 25/11/2017 29/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676011MM 202/00535

PARK VIEW ROAD LONDON O/S 1 - DOLLIS HILL LANE (WHOLE ROAD)

Carry out 33no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 14/11/2017 06/12/2017 23 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/134 202/02456

PETER AVENUE LONDON(PCP46) SIDE OF 2 ACROSS CARRAIGEWAY TO

OPPOSITE SIDE OF 2 ON, PETER AVENUE

PROVIDE DUCT D54 1WAY OF 1M IN FOOTWAY AND 17M IN CARRIAGEWAY

FROM JF6 TO JF6MAJOR 28/11/2017 30/11/2017 3 Days PROPOSED WORKS ROAD CLOSURE BC006-CT001LC500233962500 202/01550

PHILLIMORE GARDENS LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 12/02/2018 02/03/2018 19 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z008 202/02042

PINE ROAD LONDONWHOLE STREET FROM J/O MORA ROAD TO J/O

ASHFORD ROAD

IMGA192008 ABANDON 280M X 4' CI MAIN AND INSERT 90MM PE AND

RELAYORTRANSFER APPROX 40 SERVICESMAJOR 15/11/2017 19/12/2017 35 Days IN PROGRESS SOME C/W INCURSION AZ007-1000648172 202/01707

PRESS ROAD LONDON Press House Hoarding - Footway closure HIGHWAYS ACT PERMITS 23/06/2017 31/03/2018 282 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000767 202/02470

PRESTON ROAD WEMBLEY O/S 143 TO 137 RHINO PATCHING-2 WAY LIGHTS MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS TWO-WAY SIGNALS AW041-260896 202/02144

PRESTON ROAD WEMBLEY O/S 74 RHINO PATCHING-2 WAY LIGHTS MINOR 22/11/2017 24/11/2017 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-260899 202/02144

PRESTON ROAD WEMBLEY OPP. 249. 60 M S OF UXENDEN CRESCENTW.R.P. - Installation of foundations in preparation for a Bus Stop Post, for and

on behalf of Transport For London . Bus Stop Number:- 17055MINOR 04/12/2017 06/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00037816 202/02144

PRINCES COURT WEMBLEY o/s 35 Princes Court Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676010MM 202/00644

PRINCESS ROAD LONDON WHOLE ROADMAJOR C/W RESURFACING WORKS ( UNCLASSSIFIED BOROUGH ROAD) -

2017/18-ROAD CLOSUREMAJOR 19/02/2018 21/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-257698 202/00109

PRIORY HILL WEMBLEY 5, PRIORY HILL, WEMBLEY, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 125 MDPE; 1 OF 1 - working in

footway and carriagewayMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE MX044-281944700 202/02277

PROUT GROVE LONDON junction with Neasden LaneRoad Safety Improvement Works - New Raised Table - 2 x New Gullies -

Conservation Kerbs - Extension of Central IslandMAJOR 08/01/2018 22/01/2018 15 Days PROPOSED WORKS SOME C/W INCURSION AW042-262786 202/00826

QUEENSCOURT WEMBLEY Queenscourt, all of Queenscourt 650m of duct laying in footway STANDARD 20/11/2017 01/12/2017 12 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56760003M 202/00699

RADCLIFFE AVENUE LONDON 19 CUSTOMER SIDE LEAKAGE REPAIR MINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS NO C/W INCURSION MU356-003156PPPC--000001 202/00985

RAINHAM ROAD LONDON BERENS ROAD - WAKEMAN ROAD

Carry out 100no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 18/10/2017 22/12/2017 66 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/006 202/01324

RANELAGH ROAD WEMBLEYJCN OF 551 HIGH ROAD AND, RANELAGH ROAD, ,

WEMBLEY, BRENTCOMMUNICATION PIPE - REPAIR ;OTHER - working in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-282110400 202/02627

RANNOCK AVENUE LONDON 9, RANNOCK AVENUE, LONDON, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 3' CI; 1 OF 1 - working in

footwayIMMEDIATE (URGENT) 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282065600 202/00392

REGAL WAY HARROW FROM 110 TO 92 SEWER LINING NON EXCAVATION WORKS MAJOR 22/01/2018 24/01/2018 3 Days PROPOSED WORKS ROAD CLOSURE MU026-008107GCHR 202/00841

RIDLEY ROAD LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 04/12/2017 05/01/2018 33 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL20/Z005 202/00426

RIFFEL ROAD LONDONJ/W MELROSE AVE - J/W CRANHURST ROAD (WHOLE

ROAD)

Carry out 85no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 13/11/2017 14/01/2018 63 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/133 202/01961

ROSSLYN CRESCENT WEMBLEY o/s 47 Rosslyn Crescent Install Cabinet in footway MINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/5676005MM 202/00270

ROSSLYN CRESCENT WEMBLEYRosslyn Crescent, from junction East Lane to Junction

Clarendon Gardens380m of duct laying in footway STANDARD 15/11/2017 28/11/2017 14 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56736003G 202/00270

ROSSLYN CRESCENT WEMBLEY Rosslyn Crescent, all of Rosslyn Crescent 380m of duct laying in footway STANDARD 22/01/2018 02/02/2018 12 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760004M 202/00270

RUCKLIDGE AVENUE LONDON 31SEWER FAILURE--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT

REINSTATEMENT WITHIN SAME PHASEMAJOR 19/02/2018 08/03/2018 18 Days PROPOSED WORKS ROAD CLOSURE MU026-003156PDDG--000003 202/02016

RUGBY AVENUE WEMBLEY Front of 3/5. f\w. c\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate& reinstate joint hole & 3.5m trench in footway and 5m road

crossing for new service TM - Road closure

MAJOR 17/01/2018 23/01/2018 7 Days PROPOSED WORKS ROAD CLOSURE EC300-34779497 202/01602

RUGBY ROAD LONDON WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2017/18-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION

MAJOR 15/11/2017 02/04/2018 139 Days IN PROGRESS SOME C/W INCURSION AW042-203035 202/02081

SALUSBURY ROAD LONDON outside 79 to 83CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 25/11/2017 28/11/2017 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13068114J11 202/01933

SELWYN ROAD LONDON BRUCE ROAD - ALRIC AVENUE

Carry out 27no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 15/01/2018 16/02/2018 33 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/048 202/02594

Page 12: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

SHOOT UP HILL LONDONFLAT 1,MAPESBURY COURT 59-61 , SHOOT UP HILL IN

FOOTWAY

Supply new gas service to property due to poor condition of Cadent Gasplant

to prevent loss of supplyIMMEDIATE (URGENT) 19/11/2017 24/11/2017 6 Days IN PROGRESS NO C/W INCURSION AZ007-1000659315 202/02001

SHOOT UP HILL LONDON J/W MILL LANEMAJOR C/W REURFACING WORKS(BUS STOP)2 WAY LIGHTS, ROAD

CLOSURE-NIGHT WORKS 2200 TO 0500MAJOR 07/02/2018 09/02/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW042-260390 202/02001

SIDMOUTH ROAD LONDONoutside 1 to 12 Stanley Court Chamberlayne Road on

SIDMOUTH ROAD

CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 24/11/2017 27/11/2017 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13065251J11 202/01521

SNEYD ROAD LONDON IN SNEYD ROAD (SIDE OF 82 OLIVE ROAD)

ZONAL METER SERVICE. NO EXCAVATION, CHAMBER OPENING ONLY.

WORKS TO TAKE PLACE FOR 2 DAYS BETWEEN 08/01/18 - 09/01/18,

BETWEEN THE HOURS OF 10:00 - 14:00 ON EACH DAY

MINOR 08/01/2018 09/01/2018 2 Days PROPOSED WORKS PRIORITY WORKING MU600-ZM13119/20-2 202/01290

SONIA GARDENS LONDON 21Service Pipe Repair<33mm Cway+ in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030980838-001 202/01162

SONIA GARDENS LONDONJ/W DUDDEN HILL LANE - J/W PARK VIEW ROAD

(WHOLE ROAD)

Carry out 34no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 31/01/2018 22/02/2018 23 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/135 202/01162

SOUTHVIEW AVENUE LONDON DUDDEN HILL LANE - 85 (WHOLE STREET)

Carry out 62no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 18/10/2017 20/12/2017 64 Days IN PROGRESS PRIORITY WORKING MU276-IA/AMP6/BRE/052 202/00130

SPENCER ROAD WEMBLEYOutside Byron Court primary School, between No. 28 and

26New service connection 1m in f/w STANDARD 11/12/2017 15/12/2017 5 Days PROPOSED WORKS GIVE & TAKE WY002-NSA00016972 202/01755

ST ANDREWS CLOSE LONDON From Junction with Dollis Hill Avenue to end of the roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT RENEWAL OF

WATER MAINS SURFACE LOCATION: FOOTWAY AND CARRIAGEWAYMAJOR 15/01/2018 05/02/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-C939/MBIW04/Z005 202/02492

ST ANDREWS ROAD LONDON junction with High Road Willesden Stores Compound - Welfare and storage facilities MAJOR 31/10/2017 01/02/2018 94 Days IN PROGRESS SOME C/W INCURSION AW042-258885 202/02392

ST JOHNS ROAD WEMBLEY o/s 68 St Johns Road Install Cabinet in footway MINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/5676002MM 202/00697

ST JOHNS ROAD WEMBLEY o/s 90 St Johns Road Install Cabinet in footway MINOR 23/11/2017 27/11/2017 5 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/5676003MM 202/00697

ST JOHNS ROAD WEMBLEY St Johns Road, junction Meadow Way to St Johns Close 950m of duct laying in footway and 40m of duct laying in carriageway STANDARD 15/01/2018 26/01/2018 12 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760008M 202/00697

ST MARYS ROAD LONDONFROM J/O CRAVEN PARK ROAD TO J/O ST JOHN'S

AVENUE

IMGA192014 / ABANDON 362M X 6' DI MAIN AND INSERT 125MM PE AND

RELAYORTRANSFER APPROX 65 SERVICES.MAJOR 27/11/2017 02/01/2018 37 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000603939 202/02537

STAG LANE LONDONKINGSBURY SERVICES CLUB, 247, STAG LANE,

LONDON, BRENTCOMMUNICATION PIPE - REPAIR; 25MM PE IN THE FOOTWA\Y IMMEDIATE (URGENT) 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282063700 202/00905

STANLEY AVENUE WEMBLEY 25, STANLEY AVENUE, , WEMBLEY, BRENT COMMUNICATION PIPE - REPAIR ;OTHER working in footway IMMEDIATE (URGENT) 22/11/2017 27/11/2017 6 Days IN PROGRESS SOME C/W INCURSION MX044-282168800 202/01921

STATION GROVE WEMBLEYOUTSIDE FLATS 1-12, 65, STATION GROVE, WEMBLEY,

BRENTCOMMUNICATION PIPE - REPAIR; 1/2' LEAD - working in footway IMMEDIATE (URGENT) 22/11/2017 27/11/2017 6 Days IN PROGRESS SOME C/W INCURSION MX044-281978000 202/02471

STATION ROAD LONDON HONEYWOOD ROADS81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE

FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 28/11/2017 28/11/2017 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-003156PTMP--000002 202/00584

STILECROFT GARDENS WEMBLEY WHOLE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 04/09/2017 30/11/2017 88 Days IN PROGRESS SOME C/W INCURSION AW042-202992 202/02103

SUDBURY AVENUE WEMBLEY Sudbury Avenue, jct of Rustic Placenon excavation works. 2 way lights to be installed to allow access to telecoms

mast for maintenance works.MINOR 12/12/2017 12/12/2017 1 Days PROPOSED WORKS TWO-WAY SIGNALS MG015-78607-BAB-RTS-CW1 202/02048

SUDBURY COURT DRIVE HARROW outside 86 to 90CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY and CLEAR

BLOCKAGES IF FOUND. FOOTWAY WORKS ONLYMINOR 27/11/2017 28/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13069227J11 202/02308

SUDBURY CRESCENT WEMBLEY Rear of 773Harrow Road. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate and backfill trench, supply and install duct joint new service

to existing main

STANDARD 13/12/2017 20/12/2017 8 Days PROPOSED WORKS SOME C/W INCURSION EC300-34782812 202/00951

SWINDERBY ROAD WEMBLEY O/S 80 IN F/W.. f\w. Network Operations Faults:LV Mains Fault:REPAIRS TO A MAINS FAULT. IMMEDIATE (URGENT) 22/11/2017 28/11/2017 7 Days IN PROGRESS NO C/W INCURSION EC300-34782949 202/00829

TALBOT ROAD WEMBLEYO/S 13 TO WEST S/O JCN WITH HARROW ROAD, TALBOT

ROAD

Build 1 concrete chamber 915mm x 445mm x 965mm deep in

Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 100m of 1

way poly duct in Footway

STANDARD 10/11/2017 23/11/2017 14 Days IN PROGRESS SOME C/W INCURSION BC006-CT001LC500246460500 202/02290

TEIGNMOUTH ROAD LONDON 31 - 31 opp1x25mm MDPE mtrd Supply, works in the footway and in Carriageway.

Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 18/12/2017 21/12/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000806173100250-001 202/01460

TENNYSON ROAD LONDON 35Service Pipe Repair Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981510-001 202/02240

TENNYSON ROAD LONDON 70 TENNYSON ROAD, NW6 7SBService Pipe Repair Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981521-001 202/02240

THE AVENUE WEMBLEY 12A, THE AVENUE, WEMBLEY, BRENT FERRULE - REPAIR; OTHER - working in verge IMMEDIATE (URGENT) 22/11/2017 24/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282110300 202/02189

THE AVENUE LONDON O/S 8 TO OPP 8, THE AVENUE Locate and excavate 1 blockage in existing duct MINOR 29/11/2017 30/11/2017 2 Days PROPOSED WORKS NO C/W INCURSION BC006-CT001LC500252472900 202/02254

THE AVENUE WEMBLEY FROM O/S NO.1 TO J/O FORTY AVENUEIMGA182093 ABANDON 1158M X 6' CI MAIN AND INSERT 125MM PE

ANDRELAYORTRANSFER APPROX 200 SERVICESMAJOR 13/10/2017 18/01/2018 98 Days IN PROGRESS SOME C/W INCURSION AZ007-1000629484 202/02189

THE AVENUE WEMBLEY O/S NO.76IMGA182093 - STORAGE / CONTAINER / WELFARE / MUCK AND SPOIL AREA

FORASSOCIATED WORKS IN THE AVENUEMAJOR 08/01/2018 30/03/2018 82 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000642264 202/02189

THE DENE WEMBLEY o/s 25 The Dene Install Cabinet in footway MINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/5676008MM 202/00345

THE DENE WEMBLEY The Dene from junction Clarendon Gardens 300m of duct laying in footway and 20m of duct laying in carriageway STANDARD 24/11/2017 07/12/2017 14 Days PROPOSED WORKS GIVE & TAKE NK100-/SSE5PL/56760005M 202/00345

THE GLEN WEMBLEY The Glen, all of The Glen 270m of duct laying in footway STANDARD 22/11/2017 05/12/2017 14 Days IN PROGRESS GIVE & TAKE NK100-/SSE5PL/56760002M 202/00378

THE RIDGEWAY HARROW 54, THE RIDGEWAY, HARROW, BRENTCOMMUNICATION PIPE - REPLACE; 25 MDPE; 3' CI; 1 OF 1 - working in

footway and carriagewayMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS GIVE & TAKE MX044-281798900 202/01021

THE RISE GREENFORD UNDERNEATH THE TRAIN BRIDGEIMGA182206 ABANDON 80M X 8' SI MAIN AND INSERT 180MM PE AND RELAY

ORTRANSFER 0 SERVICESMAJOR 22/01/2018 16/02/2018 26 Days PROPOSED WORKS ROAD CLOSURE AZ007-1000646530 202/01950

TIVERTON ROAD LONDONThe side of the gardens at 98 Wrentham Avenue on

Tiverton Road. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Installation of a new 100a Singe phase supplySTANDARD 23/11/2017 29/11/2017 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10737508 202/00926

TIVERTON ROAD LONDONFOOTWAY ADJACENT TO THE CHAPEL, WRENTHAM

AVENUELAY NEW DOMESTIC SERVICE 2M FROM MAIN IN FOOTWAY STANDARD 05/02/2018 09/02/2018 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000658637 202/00926

TORBAY ROAD LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS (RESERVE SCHEME)-2017-

18-ROAD CLOSUREMAJOR 27/02/2018 28/02/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW042-201542 202/01876

TOWNSEND LANE LONDON 157, TOWNSEND LANE, , LONDON, BRENT STOP TAP - REPAIR ; OTHER IN THE FOOTWAY MINOR 28/11/2017 30/11/2017 3 Days PROPOSED PERMANENT NO C/W INCURSION MX044-281310300 202/01708

Page 13: London Borough of Brent...Tottenham Hotspur vs West Bromwich Albion Kick off 15:00 25/11/2017 25/11/2017 1 Days Confirmed Event Day Road Closures Wembley Event Tottenham Hotspur vs

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Street Name DurationLocation Text Description Contact detailsEstimated End

Date

For the Week Commencing 27th November 2017

Traffic Management NotesWorks StatusStart Date

TRACEY AVENUE LONDON 5 - ANSON ROAD (WHOLE STREET)

Carry out 9no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 09/02/2018 15/02/2018 7 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/131 202/01824

TUDOR CLOSE LONDON WHOLE STREET FROM J/O TUDOR GARDENSIMGA192016 ABANDON 149M X 4' CI MAIN AND INSERT 90MM

PEANDRELAYORTRANSFER APPROX SERVICES.MAJOR 02/11/2017 29/11/2017 28 Days IN PROGRESS SOME C/W INCURSION AZ007-1000625890 202/00894

TUDOR GARDENS LONDON 8, TUDOR GARDENS, , LONDON, BRENT COMMUNICATION PIPE - REPAIR ;OTHER IN THE FOOTWAY IMMEDIATE (URGENT) 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-282127900 202/00253

TUDOR GARDENS LONDON 8, TUDOR GARDENS, , LONDON, BRENTCOMMUNICATION PIPE - REPLACE ; 25 MDPE; 125 MDPE; WORKING IN THE

FWIMMEDIATE (URGENT) 23/11/2017 27/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MX044-282183100 202/00253

TWYBRIDGE WAY LONDON from o/s 12 to o/s 13 Structural Inspection Works on Bridge (inc. Corrosion Testing) MINOR 08/01/2018 10/01/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS AW042-262395 202/01159

TWYBRIDGE WAY LONDON from Twybridge North Bridge to j/w Conduit Way Structural Inspection Works on Bridge (inc. Corrosion Testing) MINOR 08/01/2018 10/01/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS AW042-262396 202/01159

UFFINGTON ROAD LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 13/11/2017 11/12/2017 29 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MBIW07/Z002 202/01263

UFFINGTON ROAD LONDON o/s 1-40 ROSEMARY HOUSE WATER METER INSTALLATION IN FOOTWAY MINOR 11/12/2017 13/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION MU039-MGJV/BULK/179362 202/01263

UNION ROAD WEMBLEY 14 UNION ROAD, WEMBLEY, BRENT FRAME AND COVER REPLACE - WORKING IN FOOTWAY IMMEDIATE (URGENT) 22/11/2017 27/11/2017 6 Days IN PROGRESS SOME C/W INCURSION MX044-282181000 202/00033

VALLEY GARDENS WEMBLEY FROM O/S NO.16 TO O/S NO.23IMGA182097 / ABANDON 72M X 4' CI MAIN AND INSERT 75MM PE AND RELAY

ORTRANSFER SERVICES.MAJOR 12/02/2018 02/03/2018 19 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000651565 202/01202

VICTOR ROAD LONDON HARROW ROAD - 3

Carry out 100no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 08/01/2018 16/03/2018 68 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/005 202/02181

VICTORIA AVENUE WEMBLEY from Harrow Road to Vivian Avenue Carriageway resurfacing- Road Closure MAJOR 26/02/2018 28/02/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-188712 202/01790

VICTORIA ROAD LONDON 102 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 23/11/2017 27/11/2017 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156NYYV--000002 202/00883

VILLAGE WAY LONDON 60B Box Repair< in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 24/11/2017 28/11/2017 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000030981552-001 202/02335

WALM LANE LONDON Side of 2 Grosvenor Gardens in Walm Lane. f\w.

Connections Projects:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Discon of existing supply& install new 100A TPN. 1 x permit bay to

suspend on Grosvenor Gardens

STANDARD 30/11/2017 06/12/2017 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10738403 202/02085

WATFORD ROAD WEMBLEY OS 78, WATFORD ROAD Replace 1 jointbox frame and cover(s) (2315mm x 737mm) in Footway MINOR 22/11/2017 23/11/2017 2 Days IN PROGRESS NO C/W INCURSION BC006-CT001LC500252373300 202/01588

WATFORD ROAD WEMBLEY 14SEWER MAINTENANCE--WORKS INTENDED TO INCLUDE FIRST TIME

PERMANENT REINSTATEMENT WITHIN SAME PHASEIMMEDIATE (EMERGENCY) 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU026-008107JDYN--000001 202/01588

WATFORD ROAD WEMBLEY o/s 96 Urgent work due to possible loss of gas supply IMMEDIATE (URGENT) 22/11/2017 30/11/2017 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000662533 202/01588

WEMBLEY HILL ROAD WEMBLEY JCTN WEMBLEY HIGH ROADTRIAL HOLE TO CONFIRM TEE AND VALVES CAN BE CUT IN ON EXISTING 12'

MAINMINOR 23/11/2017 24/11/2017 2 Days PROPOSED WORKS SOME C/W INCURSION MX049-THWM16 202/02076

WEMBLEY HILL ROAD WEMBLEY o/s 86, 143, 159 Wembley Hill Road Install Cabinet in footway MINOR 27/11/2017 29/11/2017 3 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSE5PL/5676013MM 202/02076

WEMBLEY HILL ROAD WEMBLEY ADJ to 13. f\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):EXCAVATE AND REINSTATE JOINT HOLE, 4M OF TRENCHING IN

TARMAC& 15M IN UNMADE FOR NEW SERVICE TM - Footway to be

maintained, loading bay

MINOR 02/12/2017 04/12/2017 3 Days PROPOSED WORKS SOME C/W INCURSION EC300-34774973 202/02076

WEMBLEY HILL ROAD WEMBLEY From outside no 5 to outside no 23WORKING ON BEHALF OF THAMES WATER TO CARRY OUT CCTV, HIGH

PRESSURE JETTING AND SONDEMINOR 04/12/2017 05/12/2017 2 Days PROPOSED WORKS LANE CLOSURE MU820-C951/RRSCR/G100 202/02076

WHITBY AVENUE LONDON Whole Road CARRYING OUT MAINS RENEWAL ON BEHALF OF THAMES WATER MAJOR 04/01/2018 31/03/2018 87 Days POTENTIAL WORKS MU821-H208/MKET08/C001 202/02257

WILLEN FIELD ROAD LONDON o/s 4-6, 1x32mm BP mtrd Supply in F/W and in Carriageway. Our intention is

tocomplete the Permanent Reinstatement in the same phaseSTANDARD 20/11/2017 23/11/2017 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000805186510045-001 202/02791

WILLEN FIELD ROAD LONDONIN THE FOOTWAY OUTSIDE 4-6 WILLEN FIELD ROAD,

LONDON, NW10 7AQ

DR4 SURVEY - 'GAS PLANT LOCATION WITH EXCAVATION UNDER OUR

MANDATORYOBLIGATION TO COMPLY WITH THE GAS SAFETY

REGULATION 1994. EXCAVATE AND TRACE LINE OF GAS APPARATUS.

MINOR 06/12/2017 08/12/2017 3 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000651487 202/02791

WILLESDEN LANE LONDON OPPOSITE 14228/261 TEL0158664 - RECUT OF MAGNETOMETER SD1, 10:00 - 15:00, LANE 1 -

NORTHWEST BOUNDMINOR 27/11/2017 27/11/2017 1 Days PROPOSED WORKS STOP/GO BOARDS YG516-S000000003257 202/01346

WILLESDEN LANE LONDON 17-24Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME

PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 30/11/2017 30/11/2017 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-003156PTTS--000002 202/01346

WINCHESTER AVENUE LONDON in the footpath outside 47 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/11/2017 23/11/2017 7 Days IN PROGRESS NO C/W INCURSION AZ007-1000658909 202/01918

WOODCOCK DELL AVENUE HARROW WOODCOCK DELL AVENUE WHOLE STREETIMGA182091 - ABANDON 695M X 4' MAIN AND INSERT 90MM

PEANDRELAYORTRANSFERSERVICES.MAJOR 16/10/2017 12/12/2017 58 Days IN PROGRESS SOME C/W INCURSION AZ007-1000625595 202/01255

WOODCOCK HILL HARROW Opposite No. 32 - 29 New service 4m in c/w MAJOR 12/02/2018 15/02/2018 4 Days PROPOSED WORKS ROAD CLOSURE WY002-NSA00017342 202/01423

WOODFIELD AVENUE WEMBLEY 16, WOODFIELD AVENUE, , WEMBLEY, BRENTFIRE HYDRANT - REPLACE RAISE HYD AND REPLACE WITH NEW - working

in footwayMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MX044-281833200 202/00923

WOODGRANGE AVENUE HARROW WHOLE ROADFOOTWAY RECONSTRUCTION PROGRAMME 2017/18-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 27/07/2017 22/12/2017 149 Days IN PROGRESS SOME C/W INCURSION AW042-202550 202/01026

WOODHEYES ROAD LONDON 119 - NORTH CIRCULAR ROAD

Carry out 127no Customer Service relays between the existing Water main and

Property boundaries, as part of Thames Waters Lead Pipe Replacement

Project

MAJOR 27/02/2018 17/04/2018 50 Days PROPOSED WORKS PRIORITY WORKING MU276-IA/AMP6/BRE/003 202/01868

WOODSTOCK ROAD WEMBLEY 38, WOODSTOCK ROAD, , WEMBLEY, BRENT COMMUNICATION PIPE - REPAIR ;OTHER - WORKING IN CARRIAGEWAY MINOR 17/11/2017 23/11/2017 7 Days IN PROGRESS GIVE & TAKE MX044-281248600 202/02424

WOODSTOCK ROAD WEMBLEY DIG OUTSIDE NUMBER 93 WOODSTOCK ROAD. f\w.

Connections Small Works:SERVICE ALTERATION: (APPROX DEPTH

450mm):DIG JOINT HOLE IN PUBLIC FOOTPATH OUTSIDE NUMBER 93

WOODSTOCK ROAD FOR CUT OUT CHANGE

STANDARD 09/01/2018 15/01/2018 7 Days PROPOSED WORKS NO C/W INCURSION EC300-34782355 202/02424

WROTTESLEY ROAD LONDONFOOTWAY OUTSIDE OF NO. 110& 110A WROTTESLEY

ROADLAY X2 NEW DOMESTIC SERVICE 1M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 20/11/2017 24/11/2017 5 Days IN PROGRESS SOME C/W INCURSION AZ007-1000646435 202/00182

WROTTESLEY ROAD LONDON Outside 55Service Pipe Repair in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 20/11/2017 24/11/2017 5 Days IN PROGRESS SOME C/W INCURSION MU301-000030974431-001 202/00182

WYLD WAY WEMBLEY Front of 10. f\w. c\w.

Connections Small Service:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):Excavate& reinstate joint hole in footway, 6m road crossing and 13m

trench in private driveway for new service TM - Road closure

MAJOR 19/12/2017 22/12/2017 4 Days PROPOSED WORKS ROAD CLOSURE EC300-34778430 202/01890

YEATS CLOSE LONDON 28Boundary Box Exchange Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseMINOR 21/11/2017 23/11/2017 3 Days IN PROGRESS SOME C/W INCURSION MU301-000030978175-002 202/02813