IL FUTURO DI SELI Condivisione di obiettivi e traguardi Ing. Remo Grandori THEIMPORTANCEOFLOGISTYCIN TBMTUNNELLING “ From the most remote sites to the crowded cities projects” “ From the most remote sites to the crowded cities projects”

description

ΤΒΜ

Transcript of Logystic in TBM Tunneling-Def1

Page 1: Logystic in TBM Tunneling-Def1

IL FUTURO DI SELI

Condivisione di obiettivi e traguardi

Ing. Remo Grandori

THE�IMPORTANCE�OF�LOGISTYC�IN�TBM�TUNNELLING��

“ From the most remote sites to the crowded cities projects”“ From the most remote sites to the crowded cities projects”

Page 2: Logystic in TBM Tunneling-Def1

2Ing. Remo Grandori

•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS

•TRANSPORT�TO/FROM�SITE•SITE�ASSEMBLY/DISASSEMBLY•SITE�INSTALLATIONS•TBM�OPERATION•EXTRAORDINARY�REPAIRS��AND�GEOLOGICAL�UNFORESEENS

WHEN LOGYSTIC COUNTS

Page 3: Logystic in TBM Tunneling-Def1

3Ing. Remo Grandori

TRANSPORTS��TO/FROM�SITE

•WEIGHT LIMITATIONS• SIZE LIMITATIONS•BRIDGES, TUNNELS, VILLAGES•SLOPE LIMITATIONS•NARROW CURVES•AUTHORIZATIONS

Page 4: Logystic in TBM Tunneling-Def1

4Ing. Remo Grandori

CRITICAL ACCESS ROADS

ACCESSING�THE�HYMALAYA�WITH�KISHANGANGA�TBM

Page 5: Logystic in TBM Tunneling-Def1

5Ing. Remo Grandori

REMOTE COUNTRIES

8�m�DSU/EPB�TBM�TRANSPORT�TO�BELES�(ETHIOPIA)

Page 6: Logystic in TBM Tunneling-Def1

6Ing. Remo Grandori

SPECIAL TRANSPORTS

TURIN�METRO�TBM��TRANSPORTED�TO�NEXT�STATION

Page 7: Logystic in TBM Tunneling-Def1

7Ing. Remo Grandori

CROSSING SMALL CITIES

������� �� ���������

Page 8: Logystic in TBM Tunneling-Def1

8Ing. Remo Grandori

TBM�ASSEMBLY

CRAINES�CAPACITYCRAINES�CAPACITY

SPACE�

RESTRI

CTIONSSPA

CE�

RESTRI

CTIONS

CRAINES�POSITIONING

CRAINES�POSITIONING

ASSEMBLY

SEQUENCEASSEMBLY

SEQUENCE

SAFETY

SAFETY

NOISELIMITSNOISELIMITS

Page 9: Logystic in TBM Tunneling-Def1

9Ing. Remo GrandoriLOS�BRONCHES�MINE�� CHILE

IN�CAVERN

Page 10: Logystic in TBM Tunneling-Def1

10Ing. Remo GrandoriCOLLAPSIBLE�TBM�� NEW�YORK

UNDERGROUND�WITH�NO�CAVERN

Page 11: Logystic in TBM Tunneling-Def1

11Ing. Remo Grandori

IN�LIMITED�OUTSIDE�SPACES�

S.FRANCISCO.�EQUADOR� ANDES

Page 12: Logystic in TBM Tunneling-Def1

12Ing. Remo Grandori

IN�SHAFTS�WITH�LIMITED�SPACES�

METRO�B1�� ROME

Page 13: Logystic in TBM Tunneling-Def1

13Ing. Remo Grandori

HEAVY�LITS�

ATHENS�METRO

Page 14: Logystic in TBM Tunneling-Def1

14Ing. Remo Grandori

TBM�DISASSEMBLY

���������������������������������������������

Page 15: Logystic in TBM Tunneling-Def1

15Ing. Rmo Grandori

LA�JOJACOSTARICA

DISMOUNTING�SEQUENCE�WITH�

LATERAL�DISPLACEMENT�OF�THE�TBM�

SHIELDS

IN�TRENCH�

Page 16: Logystic in TBM Tunneling-Def1

VANCOUVER METRO

TBM DISASSEMBLY IN THE CITY CENTER

VANCOUVER METRO

TBM DISASSEMBLY IN THE CITY CENTER

IN�CONGESTED�CITIES�

Page 17: Logystic in TBM Tunneling-Def1

17Ing. Remo Grandori

TBMS�SITE�INSTALLATIONSTBMS�SITE�INSTALLATIONS

CLIMATE

WORKSHOP

PORTAL�AREA

POWER�

MUCK�DISPOSAL

SPARES STORE

MATER.�STOCK

CAMP

WATERCRAINAGE

Page 18: Logystic in TBM Tunneling-Def1

18Ing. Remo Grandori

REMOTE SITES

KISHANGANGA� INDIA� HYMALAYA

Page 19: Logystic in TBM Tunneling-Def1

19Ing. Remo Grandori

SITES WITH RESTRICTED ACCESS

VAL�PASSIRIO�TUNNEL� ITALY

Page 20: Logystic in TBM Tunneling-Def1

20Ing. Remo GrandoriLOS�BRONCHES�MINE�– CHILE�� 3400�M�ALTITUDE

SITES IN COLD CLIMATES

Page 21: Logystic in TBM Tunneling-Def1

21Ing. Remo Grandori

TBM SITES OVER BRIDGES

BRENNER�BASIS�TUNNEL�� ITALY

Page 22: Logystic in TBM Tunneling-Def1

22Ing. Remo Grandori

TBM SITES IN CONGESTED CITIES

SELI�DSU�TBM�SITE�IN�HONG�KONG�– TSUEN�WAN�

Page 23: Logystic in TBM Tunneling-Def1

UMIRAY�ANGAT�TUNNELPHILIPPINES

SITE�INSTALLATIONS,�SEGMENTS�PRODUCTION�AND�TBM�OPERATION

ALL�SERVED�BY�HELICOPER

SITES WITH ONLY HELICOPTER ACCESS

Page 24: Logystic in TBM Tunneling-Def1

24Ing. Remo Grandori

SITES WITH MULTIPLE TBMS

2�DS�TBM�10�M�DIAMETER�– PERTUS�–SPAIN�

Page 25: Logystic in TBM Tunneling-Def1

25Ing. Remo Grandori

SPECIAL�REPAIRS/OVERHAULS

� GILGEL�GIBE�– ETHIOPIA�–TBM�DISMOUNTED�AND�TRANSPORTED�BACK�THROUGH�THE�

TUNNEL FOR REPAIR AND OVERHAUL

Page 26: Logystic in TBM Tunneling-Def1

26

GILBE�GIBE�ETHIOPIA

SPECIAL�REPAIRS/OVERHAULS

TBM�RE�ASSEMLED�INSIDE�THE�TUNNEL

Page 27: Logystic in TBM Tunneling-Def1

27Ing. Remo Grandori

STANDARD�TBM�DESIGN

�������

���������

�������

�����������������������

�������������������

��������������

�������������������

Page 28: Logystic in TBM Tunneling-Def1

28Ing. Remo Grandori

SPECIAL�TBM�SYSTEM�DESIGN

COLLAPSABLE�SHIELDS�TBM

CONTAINERIZED�BACK�UP�DECKS

VERTICAL�CONVEYOR�TOWER

COMPACT�TBM�SYSTEM�– CREVOLA�PROJECT�� ITALY�

CONTAINERIZED�SITE��

INSTALLATIONS