Logistical Management Presentation - breakbulk.com Semi-submersible heavy-lift vessels Carrying...

22
\ 1 BREAKBULK MIDDLE EAST ABU DHABI, UAE HEIN HEYSTER OCTOBER 28, 2015 LOGISTICAL MANAGEMENT

Transcript of Logistical Management Presentation - breakbulk.com Semi-submersible heavy-lift vessels Carrying...

SLIDE NAME IN TEMPLATE:

\

1

02 TITLE - BLUE NAME

BOSKALIS COLORS:

RGB values:

R 255, G 255, B 255

R 0, G 0, B 0

R 255, G 247, B 25

R 0, G 38, B 99

R 0, G 81, B 158

R 127, G 127, B 127

R 191, G 191, B 191

R 49, G 128, B 255

SET UP GRIDS AND GUIDES:

Grids and guides make it easier to align shapes and objects

(index, chart, table etc.). Grids and guides can be shown or

hidden.

Right-click on an empty area of the slide and then click Grid

and Guides.

Check under Guide settings → the button Display drawing

guides on screen.

If you want the current settings in the Grid and Guide dialog box

to be the default settings for all presentations, rather than just

this one, click Set as Default.

Drawing guides are not visible during a slide show and do not

show on prints or handouts.

SLIDE EXAMPLE:

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and double-

click on it

3. Right-click on the picture and Send to Back to place

it in the background behind your text

BREAKBULK MIDDLE EAST

ABU DHABI, UAE

HEIN HEYSTER

OCTOBER 28, 2015

LOGISTICAL MANAGEMENT

SLIDE NAME IN TEMPLATE:

\

4

07 PICTURE FULL SCREEN

SLIDE EXAMPLE:

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and double-

click on it

3. Right-click on the picture and Send to Back to place

it in the background behind your text

BOSKALIS

COMPANY INTRO

SLIDE NAME IN TEMPLATE:

\

5

07 PICTURE FULL SCREEN

SLIDE EXAMPLE:

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and double-

click on it

3. Right-click on the picture and Send to Back to place

it in the background behind your text

BOSKALIS OVERVIEW

SLIDE NAME IN TEMPLATE:

\

6

18 EMPTY

SLIDE EXAMPLE:

OUR FLEET

3 Multi Purpose / cable lay vessel

23 Semi-submersible heavy-lift vessels

Carrying capacity up to 117,000 MT

Free deck space ≤ 70 m x 275 MT

2 Fall Pipe Vessels

Capacity from 18,000 to 24,000 MT

10 Floating sheerlegs

Capacity from 400 to 5,000 MT

165 Barges

Hopper barges, capacity 50 to 3,800 MT

Oceangoing semi, capacity 21,000 MT

Oceangoing flat top, capacity from 1,000 to 14,000 MT

Inland barges, capacity from 100 to 2,000 MT

424 Tugs

Anchor handling , capacity > 2,239 kW

Coastal / Harbor, capacity from 358 to 5,224 kW

Harbor / River (pusher), capacity from 75 to 2,089 kW

151 Support Vessels

Diving support vessels

Launches

Work / Supply vessels

107 Dredgers

Trailing suction hopper dredgers

Cutter suction dredgers

Backhoes

Floating grab cranes

SLIDE NAME IN TEMPLATE:

\

7

Logistical Management Solutions

Turnkey logistical

services for onshore

industrial projects.

SLIDE NAME IN TEMPLATE:

\

8

08 TEXT & PICTURE 80/20

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

LOGISTICAL MANAGEMENT:

THE ‘ONE-STOP SHOP’ SOLUTION

• Single interface management partner • Heavy transportation vessels

• Tug and barge

• Dock type ships

• Self geared ships

• Complete project management solution • Grillage & sea-fastening design, fabrication and installation

• Engineering studies

• Management of risk

• Partnering with SPMT providers, freight forwarding, civil

engineering

• Scope outside of transportation • MOF design and construction

• Land reclamation

• Dredging

• Environmental monitoring

• Offshore installation

SLIDE NAME IN TEMPLATE:

\

9

18 EMPTY

SLIDE EXAMPLE:

LOGISTICAL MANAGEMENT SOLUTIONS:

HYBRID SOLUTION

• Complete and robust logistics solutions

• Supplementing our vessels with 3rd party

tonnage

• Source most suitable vessel for the solution

• One contract – one interface

• Flexible contracting approach

• Ability to offer services outside of core

business

SLIDE NAME IN TEMPLATE:

\

10

LOGISTICAL MANAGEMENT SOLUTIONS:

Direct on-deck stowage

SLIDE NAME IN TEMPLATE:

\

11

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

LOGISTICAL MANAGEMENT PROJECT:

KONIAMBO

CLIENT: Hatch / Technip

PERIOD: 2010

LOCATION: Qingdao, China to New Caledonia

SCOPE:

− Transport 18 nickel plant modules in 4

voyages.

− Scope of work included detailed engineering of

grillage and sea fastening to ensure safe

transport of the modules across the swells of

the Pacific Ocean.

KEY ASSETS INVOLVED:

− m/v Trustee

SLIDE NAME IN TEMPLATE:

\

14

STERN OR SIDE LOAD-OUT / IN

STERN LOAD-OUT

• More compact on the quay, single trailer

path

• Less compact in harbor area

• Long distance to final positon

• More ballast / weight capacity

SIDE LOAD-OUT

• Large quay length / space required

• Cargo length limitation due to parallel trailer

paths

• Short distance to final position

• Less ballast / weight capacity

SLIDE NAME IN TEMPLATE:

\

15

TYPICAL LOAD-OUT / IN PROCEDURES

1. Mooring alongside

2. Outfitting – grillage installation

3. Mooring stern to quay

4. Ballasting

5. Ramp installation

6. Module roll-on

7. Sea-fastening

8. Voyage

SLIDE NAME IN TEMPLATE:

\

24

LOGISTICAL MANAGEMENT SOLUTIONS:

Piggy-back concept

SLIDE NAME IN TEMPLATE:

\

25

18 EMPTY

SLIDE EXAMPLE:

INTRODUCTION – PIGGY-BACK

1. Mobilization 2. Module loading 3. Float-on

4. Voyage 5. Float-off 6. Module discharge

SLIDE NAME IN TEMPLATE:

\

28

ADVANTAGES OF PIGGY BACK SOLUTION

• Shallow draft coastal and estuarial sites accessible without major modifications

• Can be used as floating storage at the loading and discharge locations

• Increased vessel utilization with approx. 40% leading to cost efficiency and lower overall cost

• Reduces the dependency on constricted ‘open-stern’ market

• Provides a solution for environmental / regulatory challenges

• Increase stowage / voyage performance by adding deck space

Roll-on module Float-on barge Voyage Float-off barge Roll-off module

- Vessel Utilization - Barge Utilization

SLIDE NAME IN TEMPLATE:

\

29

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

• CLIENT: Bechtel / Chevron

• PERIOD: 2014 - 2015

• LOCATION: Lumut, Malaysia / Tianjin,

China to Onlsow, Australia

• SCOPE:

− Transportation of 119 modules for the

fabrication of the onshore LNG facilities at

Onslow in Australia.

− Transport methods:

− Direct on-deck of the HTV

− Piggy-back

− Tug & Barge

LOGISTICAL MANAGEMENT PROJECT:

WHEATSTONE LNG

• KEY ASSETS:

− Semi-submersible heavy lift vessels

(Fjord, Fjell, T-class vessels and Super

Servant 3).

− Giant 5, Giant 6 and other barges (3rd

party)

SLIDE NAME IN TEMPLATE:

\

30

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

• CLIENT: Mammoet / Methanex Corp.

• PERIOD: 2013

• LOCATION: Punta Arenas, Chile to

Geismar, LA U.S.

• SCOPE:

− Transportation of 19 modules in 2

consecutive voyages.

− Modules were transported via piggy-back

method, utilizing a S-class type vessel

and two barges (FSPs).

LOGISTICAL MANAGEMENT PROJECT:

METHANOL PLANT RELOCATION

• KEY ASSETS:

− m/v Swan

− (2) Barges / Floating Super Pallets

SLIDE NAME IN TEMPLATE:

\

32

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

ENGINEERING PHASE

• Voyage plan – optimal route will be determined

• Environmental conditions determined by global wave statistics

database

• Motions will be calculated in cog of cargo and system input for

grillage design

• Extreme design forces will be calculated input for sea-fastening

design.

ACTUAL VOYAGE

• Continuous route monitoring – changes upon Captain’s discretion

• Receive weather forecast via SPOS (ship performance optimization

system) continuously

• Acceleration monitoring system: Octopus

VOYAGE

32

2. Voyage

SLIDE NAME IN TEMPLATE:

\

33

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

DELIVERABLES INCLUDE

• Maximum cargo dimensions for transportation

• Vessel and barge capacity needed for the project

• Transhipment needs and locations

• Temporary intermediate storage

• SPMT operations/arrangements

• Provisional schedule for deliveries from fabrication yard

to construction site

• Risk assessment

• Local content requirements

• Seafastening and grillage design

• Budgetary price information

• Partnerships with SPMT and geared vessel owners

TRANSPORTATION STUDY

SLIDE NAME IN TEMPLATE:

\

34

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

IDEA BEHIND THE SIMULATION TOOL

• Reduce the time required to develop a

logistical planning

• Enhance possibility to evaluate multiple

scenarios, including competitors

• Improve insight into bottle necks

• Monitor asset utilization

• Include disturbances: weather, module

delivery, MOF availability, restricted

voyages, seasonal leg availability

• Evaluate scenario reliability

SIMULATION FLEET PLANNING TOOL

SLIDE NAME IN TEMPLATE:

\

35

09 TEXT & PICTURE 60/40

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

CLIENT: KJV / Chevron

PERIOD: 2012 – 2014

LOCATION: Korea / Indonesia / China

to Barrow Island, Australia

SCOPE:

− Transportation of 50+ modules from various

fabrication yards in a long term time charter

contract.

− Prior to voyage, all vessels were prepared to

meet Australia’s stringent environmental and

quarantine requirements.

LOGISTICAL MANAGEMENT PROJECT:

GORGON LNG

KEY ASSETS INVOLVED:

− m/v Mighty Servant 3

− m/v Forte

− m/v Fjell

− m/v Fjord

SLIDE NAME IN TEMPLATE:

\

44

08 TEXT & PICTURE 80/20

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

CONCLUSIONS LOGISTICAL MANAGEMENT

• Single interface management partner • Heavy transportation vessels

• Tug and barge

• Dock type ships

• Self geared ships

• Complete project management solution • Grillage & sea-fastening design, fabrication and installation

• Engineering studies

• Management of risk

• Partnering with SPMT providers, freight forwarding, civil

engineering

• Scope outside of transportation • MOF design and construction

• Land reclamation

• Dredging

• Environmental monitoring

• Offshore installation

SLIDE NAME IN TEMPLATE:

\

45

08 PICTURE & PICTURE 70/30

SLIDE EXAMPLE:

BULLET LEVELS

(INCREASE OR DECREASE)

By using List Levels, you can organize bullets and numbering

into categories. Complete the following steps to adjust the

List Level:

To promote the text line UP one list level, go to the Home

command tab and click in the Paragraph box on:

INCREASE LIST LEVEL

To bring the text line DOWN one list level, go to the Home

command tab and click in the Paragraph box on :

DECREASE LIST LEVEL

INSERT A PICTURE:

1. Click icon to add a picture:

2. Locate the picture you wish to insert and

double-click on it

3. The picture is centered automatically. If the

main focus of the picture is not visible, please

use another picture

4. Right-click on the picture and Send to Back to

place it in the background behind your text

NEW HORIZONS

THANK YOU FOR YOUR ATTENTION!