DESIGNINGANDDEVELOPING
PROJECTS (PART. I)Through
Logical Frame-work Approach (LFA)
-
7/29/2019 Logical Framework Approach for project development
2/14
GENERAL OBJECTIVE
To improve our skills in designing and developing
projects for our NGOs
-
7/29/2019 Logical Framework Approach for project development
3/14
ESPECIPHIC OBJECTIVE(S)
To introduce the basic steps of the Logical
Framework Approach (LFA) for:
Understanding our environment and the elements
involved with our work
Finding Problems/Issues/Conflicts and the best way
they can be addressed with our capacities (Strategy).
Helping us (and others) clearly identify the Objectives,Justifications and Beneficiaries of our projects/solutions.
Evaluating our progress and correcting our mistakes
-
7/29/2019 Logical Framework Approach for project development
4/14
STAGESOFA PROJECT
1. Identification
2. Feasibility Study
3. Project Design
4. Detailed Planification
5. Development / Follow Up
6. Project Revision
7. Evaluation
-
7/29/2019 Logical Framework Approach for project development
5/14
WHEREAREWESTANDING (CRITERIA)?
Who are us? (Individuals, Collectives, NGOs,
Institutions, etc.)
What (and why) are we doing here (background,
responsabilities, interests, expectations)?
What is my/our availability (time, initial resources,
skills)
-
7/29/2019 Logical Framework Approach for project development
6/14
UNDERSTANDINGOURENVIRONMENT
Finding the Stakeholders (Participants)
Which (group of interest) are related to the situation we want to
engage?
What are their problems, interests (orneeds) and points of view.
How do they relate to each other?
What is their potential in a foreseeable future (both Positive,
Negative)
Which group needs support?
Which interests and points of view are we going to prioritize?
-
7/29/2019 Logical Framework Approach for project development
7/14
UNDERSTANDINGOURENVIRONMENT
Identifying the problem we want to address
State only the existing problems (no the future/possible
ones).
A problem is a negative state not the lack of
something. (i.e. The education is deficient)
Identify the main problems (observation and brainstorm)
Select a Focal problem
-
7/29/2019 Logical Framework Approach for project development
8/14
THETWOTREES
The youngpopulation is
migrating
There are poor jobopportunities after
school
The youngpopulation is not
educated enough toaccess the jobopportunities
There is noequipment in theeducation centers
High education isnot accessible
The teachers arenot prepared
There is a lack ofsocial services and
leisure spaces
The is very fewavailable budget in
the publicinstitutions
Focal Problem
Effects
Causes
There is a reductionin the rate of
migration amongthe young people
There are enoughsocial and leisure
services
The youngpopulation is findinga job after finishing
their studies
The youngpopulation is well
educated andtrained
The educationcenters are well
equipped
There is availableaccess to good
education
The teachers arewell prepared and
updated
Problems Objectives
-
7/29/2019 Logical Framework Approach for project development
9/14
CHOOSINGA STRATEGY (WHATAREOUR
OPTIONS?)
Which options do we have in order to transform
each part of the problems tree into the objectives
tree?
Can we organize this options by areas (i.e.
Budget, Training, Counseling, Art and Culture,
etc.)?
In which of this areas we have the best chance of
success according to our criteria?
-
7/29/2019 Logical Framework Approach for project development
10/14
DESIGNINGOURPROJECT
The Project Matrix
The PM will be the result of our planification process.
It will be a useful reference during the implementation
and evaluation of our project.
Keeps the objectives, strategies and tasks visible.
-
7/29/2019 Logical Framework Approach for project development
11/14
DESIGNINGOURPROJECT
The matrix is a double-entry chart with four columns andfour lines. The columns are (left to right):
1) Logic of intervention.
2) Indicators;
3) Sources of verification. (Methods and sources to beused while analyzing the Indicators); 4) Hypothesis and external factors. (Out of our control,
stated in a positive way) The lines are (Top to down)
General Objective (GO)
Especiphic Objective (EO) Results (Clear and visible facts enough to reach the EO, it
is possible to reach them through the project activities)Activities and inputs. (Tasks that the people working in the
project will have to do.)
-
7/29/2019 Logical Framework Approach for project development
12/14
THE PROJECT MATRIX
Logic ofIntervention
Indicators(Direct/Indirect/Behavior/E
nvironment/etc.)
Sources ofverification(External)
Hypothesis/ExternalFactors
General
Objective
(From the focal
problem)
(How are we
going to
objectively
measure our
advance?)
From which
sources we can
validate our
indicators?
Especiphic
Objective
(Time +
Beneficiaries)
(How are we
going to
objectively
measure our
advance?)
From which
sources we can
validate our
indicators
(beneficiary
related)?
Which external
conditions will
allow our results
reflect in the
achievement of the
objective?
ResultsR.1,R.2,R.3,
Etc
(How are we
going to
objectively
measure our
advance?)
From which
sources we canvalidate our
indicators
(evaluation
activities)?
On which external
factors we dependto achieve this
results?
Activities-
Inputs
R.1, R.2, R.3,
Etc (stated as
process)
(Inputs and
needed
resources)
Costs Which pre-conditions have to
be met in order tostart the project?
-
7/29/2019 Logical Framework Approach for project development
13/14
HOWTOREADTHE PM?
IFTHEINPUTSAREAVAILABLE,
THEN, THEACTIVITIESWILLBE
DONE.
IFTHEACTIVITIESAREDONE,
THENTHERESULTSWILLBE
PRODUCED.
IFTHERESULTSARE
PRODUCED, THENTHE
ESPECIPHICOBJECTIVE
WILL
BEMET.
IFTHEESPECIPHIC
OBJECTIVEISMET, THENIT
WILLCONTRIBUTETOTHE
GENERAL OBJECTIVE.
Global
Objective
EspeciphicObjective
Results
Activities
Available
Resources
ExternalFactors
External
Factors
ExternalFactors
Pre-existing
conditions
-
7/29/2019 Logical Framework Approach for project development
14/14
THANKYOU!End of the Planification Stage