29CFR1910.147Control of Hazardous Energy
(Lockout/Tagout) LO/TO
Jon Nakapalau, CPO, CHSO
For Securit
yOfficer
s
![Page 2: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/2.jpg)
As a security professional:You should be able to understand what LO/TO means when you encounter it.
LO/TO is the means by which potentially hazardous energy sources are secured before work begins.
This is NOT a LO/TO training program.
The purpose of this presentation is to familiarize Security Officers (S/O’s) with LO/TO principles.
Always check with the Facilities Manager or Engineers if you encounter LO/TO on site.
Document any LO/TO placards you may find in your Daily Activity Report (DAR).
LO/TO?
![Page 3: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/3.jpg)
You may wonder…
Why do I need to know about
LO/TO? Because it never hurts to
be informed
!
![Page 4: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/4.jpg)
LO/TOLocks out power flow by
tagging systems that are powered down so that they can be worked on safely.
![Page 5: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/5.jpg)
When contractors come on site to work on electrical systems:You should have a LO/TO permit signed by the Facilities Manager or one of the Facilities Engineers:
Company name and phone # Electricians name Location of work System that will be worked on Possible outage of power to a critical system Any other contractor working in the same area Phone # of electrician (cellphone) Escorted/unescorted access to area Inform EH&S manager Inform HR (if work will be disruptive to employees) Start/finish time
![Page 6: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/6.jpg)
LO/TO Means the following:
Do not touch! Power is turned off!
Check your Post Orders (PO) for any additional information.
![Page 7: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/7.jpg)
You should have a Point of Contact (POC) in the facilities department:
Call me if you have any
problems Bill. The Facilities manager is attending a meeting off site all day.
Will do Steve.
![Page 8: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/8.jpg)
In your passdown:
Make sure the next S/O is
aware of the fact that there is LO/TO work being done on
site
Hey Paul…just want to let you
know that there is LO/TO work being done in electrical room #2 in the 1000building.
Should have things wrapped up in about 2 more hours.
OK!
![Page 9: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/9.jpg)
Close the information loop…
Steve, the contractor just
left. Thanks for letting me know Paul.
![Page 10: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/10.jpg)
LO/TO
![Page 11: Lockout tagout](https://reader036.fdocuments.net/reader036/viewer/2022062319/55866b1ed8b42a45488b47b5/html5/thumbnails/11.jpg)
This is one LO/TO you can Win!
Stay safe!