Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04...
Transcript of Lockheed Martin Lifetime Support Operations...Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04...
Page-1
Lockheed MartinLifetime Support Operations
Page-2
�Primarily Performance Based Logistics ContractsToday to Support LM Weapon Systems andCommercial
�Includes Command and Control Systems for LogisticsProcesses
�Moving Towards Total Sustainment of Systems thatComprise Both LM and other OEM Components,Involving Automated Supply Chain Management,Maintenance Free Operating Period Design, DistanceSupport and Total Asset Visibility
Enterprise Logistics
Page-3
ConditionBased Maintenance
Process
Prognostics &Health Mgmt
Sensor Algorithms
“O” LevelMaint. Action
Creates demand
Intelligent Supply Chain Management ~ SCM Command Center1. Electronically accept requisition (MILSTRIP, EDI, …)2. Query CM data base to validate correct part is being ordered3. Validate software compatibility4. Determine Safe Stocking Level5. Contact 3PL for shipment and TAV6. Validate delivery and carcass return
Update Real-TimeDemand Forecast &
Adjust inventory buys& Schedules
Failure Analysis ~ SILC• trending• training related• engineering related• process related
10
CEE is the Backbone of the D2DCEE is the Backbone of the D2D System DescriptionOperational ConceptSpecification and Data ManagementFunctional DescriptionSoftware Requirements SpecificationsDesign Descriptions for HW & SWAs DesignedProduct Hierarchy for System InstanceAs BuiltAs TestedAs InstalledAs MaintainedSupport ProductsIETMTrainingMAMsOBRPsConfiguration ManagementBaseline ControlRelease Control
Life CycleGroundrulesPlatform Lifetime
Schedule / EffectivelyProgram Baseline PhasingTechnology Refreshment
Technology InsertionKits (Parts/SW/Documents)
Supply Support
ModelsPerformance Models
Resource ModelsReliability Models
Cost Models
Decision SupportCommon Requirements SetPOM Planning RequirementsBOM Generated from DevelopmentCAIV/DTA Trades (Acq vs Life Cycle)Fixed Period Cost ProjectionsFactory Cost Per SystemMapping to Total Ownership CostReliability ReportsModel Year PrescriptionKit DefinitionProduct CatalogPlatform Profile TrackingCommonality AssessmentCost Partitioning to Fleet, Acq Mgrs
The CollaborativeEngineering Environment:•Integrated Product Data Environment. Single,Integrated Database System for EngineeringDesign. Represents the Product, All of ItsAttributes, and All of Its Constructs. HierarchicalViews for Both Functional & Physical Structure .Coordinated Work Efforts Latest Views ofProduct to All Users. Management of Work Flowand Scheduling. Implements Effective BusinessProcesses. Manages System Baseline, Bills ofMaterial, and Support Products. AutomatedConfiguration Management of Documents andParts, Etc. Imbedded Change Management FleetSupport . Data Readily Available Interfaces MRPfor Production. Serves As Full DesignAuthentication System
Create Once,Update Once,Use Many !!!
Optimization ofSupport Elements& Supply Chain
ConsistentSystem Viewto Designers,Op Support,
& Fleet
CEEInstalled Asset Base
Op SupportCustomers
Suppliers
Engineering
CAIV
DTA
OPERATIONAL
PHYSICAL
SCHEDULE
INFRASTRUCTURE
FUNCTIONAL
e-Business Portal
•Single problem or trend•Root cause analysis•Correct IETM•Hardware/Software ECP•Process Change
Maintenance Assist•Web-enabled distance support ~ NavalSupport.com•Field rep maint. Ass’t application ~ eLert•Distance training ~ IETM
Autonomous & Intelligent Design to Disposal Management & Control ofMaintenance, Engineering, CM, Training, Field & Distance Support, Supplier/Repair,
Warehouse, Inventory, Transportation, PHM, Government Interfaces & Portals
Design to Disposal™™ Intelligent Logistics Architecture
Page-4
Lifetime Support Command Center (LSCC)Lifetime Support Command Center (LSCC)
Our Command Center is in use TODAYOur Command Center is in use TODAY
Page-5
PBL Performance in OEF/OIF
100.0 100.0
95.7
88.3
100.0 99.0
93.492.1
86.6
100.098.2
100.0
75
80
85
90
95
100
F-04 M-04 A-04 M-04 J-04 J-04 A-04 S-04 O-04 N-04 D-04 J-05
SMA
Cum
99.01%98.61%
99.30%
98.21%
99.81%
97.83%
98.82%
97.18%
98.94%99.48%
97.43%
99.61%
90.00%
91.00%
92.00%
93.00%
94.00%
95.00%
96.00%
97.00%
98.00%
99.00%
100.00%
Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05
PE
RCE
NT
OF
RE
QU
ISIT
ION
S
45,109 casings for45,109 casings forretreading sinceretreading since
start upstart up
Call 1Call 1--866866--686686--00600060
From anywhere in theFrom anywhere in theWORLDWORLD
ReverseReverse LogisticsLogistics
Page-8
Combining the Best Commercial and DODCombining the Best Commercial and DODProcessesProcesses
General Aviation
Space shuttle
CommercialRegional
Military
Page-9
Total System Support ResponsibilityFrom Systems to “Systems of Systems”
Base of In-Place System Level Lifetime Support& Performance Based Logistics Contracts
------------------------------------------------Surface Combat System Related• AEGIS Lifetime Support ~ MS2
Moorestown• MK-41 VLS ~ MS2 Baltimore• MK-92 FCS ~ LMIS Huntsville/Moorestown• USQ-70 ~ MS2-Eagan-------------------------------------------------Naval Aviation Related• S-3 PVS ~ Aero Marietta• CASS ~ LMSTS Orlando• LANTIRN PBL ~ M&FC, Orlando• Navy Aircraft Tires ~ MS2
Moorestown• H-60 ~ LMSI / Sikorsky JV--------------------------------------------------Submarine Related• BSY2 POSS ~ MS2 Syracuse• ARCI PBL ~ MS2 Manassas--------------------------------------------------Army• JAVELIN ~ M&FC• HIMARS ~ M&FC
Total SystemSupport Responsibility
Ultimate Goal:Maintenance Free
Operating Design &Autonomous
Support
System of SystemsTotal Platform
Support
• F-117 TSPR ~ Aero• F-35 TSPIR ~ JSF• Deepwater ~ MS2• THAAD ~ Space
New Major SystemProgram Pursuits• Littoral Command Ship
~ MS2• MUOS ~ Space• SBR ~ Space
D2D/ALISfor Autonomic Logistics
Page-10
Cumulative Life-Cycle CostsIncurred by the Program/System
$
Conceptual/Preliminary
Design
DetailDesign/
Development
Production/Construction
System Use/Support/Phase-out
Maintenance Free Operating Period (MFOP)Maintenance Free Operating Period (MFOP) --Wedge of OpportunityWedge of Opportunity
Traditional source ofthe lion’s share ofsystem cost
Traditional source ofthe lion’s share ofsystem cost
Impact of COTS• Less Design• Less Schedule• Modularity &
Scalability
Impact of COTS• Less Design• Less Schedule• Modularity &
Scalability
MFOPSavings Opportunity
MFOPSavings Opportunity
LogisticsLogisticsSavingsSavings
• Tech Refresh• Training• Maintenance• Supply Support
20-35 Years
••MFOPMFOP -- Eliminates maintenance and the need for associated support whilEliminates maintenance and the need for associated support while aligninge aligninglogistics actions with preplanned COTS Technology Refresh and Inlogistics actions with preplanned COTS Technology Refresh and Insertion for improvedsertion for improvedOperational Availability.Operational Availability.
Page-11