Location of recently completed, current and proposed major ... · A12 A15 D7 D10 D9 D8 D13 D4 D71...
Transcript of Location of recently completed, current and proposed major ... · A12 A15 D7 D10 D9 D8 D13 D4 D71...
B1
COMPLETED SCHEMES (Jan 2012-Dec 2016)
SCHEMES CURRENTLY ON SITE
PROPOSED SCHEMES
WORLD HERITAGE SITE
WORLD HERITAGE SITE BUFFER ZONE
LIVERPOOL WATERS
Crown copyright and database rights 2017 Ordnance Survey
100018351.
Location of recently completed,
current and proposed major
development schemes in Liverpool’s World Heritage Zone
A1
C1
F1
F2
D2
F12 F10
C3
B2
C2
F11
C4
F6 F7
C16
B5
C15
A10
F27
C9
A31
C8
C14 B13 C10 A28 C13
B10
B4
B8
F28
A7
A30 B14 B9
C12
C17
B11 C11
B12
B6
A4
F39 E9
F24
F40
F13
F23 F22
C19
140 D23
C7 C6
F29 E10
E7
B7
E8
D11
B16
D33
F14
E3
F18 F16
F20
F31
F17 F15
F19 E6
E4 D20 D19
A23
A11 A12
A15
D5 D10
D9 D8
D4
D71
D70
D3
A36
A39
A38
E2
F25
F26 C5
F58 F57
E19 F61
E18
34
F66 E20
F64
F65
F63
F69
F70
F67
F60
F68
F59
D61
D65
D17 D18
E5
28
E17 D57
27
D40
D36
D42
C24
C21
F44
F56
C25 C23
F45
C22 D55
F48 F49 E15
F47
F51
F54
E14
F52
F46 C20
F42
F55
F55
E16
D51 F41
F53
F50
F43
D59
F38
F35 F36
F34
D39
D60
D72
A43 D53
D54 A44
D21 F21
A35
A24 A22
D6
A5
A9
A17 A25
A29 A33
D25 D24
D7
A26
A19 A20
D30 D46
D47
E11 F32
E12
D64
E13
F33
F30
F71
A45
B3
B17
E1
F37 D37
F62 D63 D62
Development Summary:
World Heritage Site
Buffer Zone
Combined total
Value of schemes completed since January 2012
£427m £704m £1,131m (£1.13bn)
Value of schemes on site
£113m £355m £468m
Value of proposed schemes
£132m £932m £1,064m (£1.06bn)
Value of Liverpool Waters developments
£5,500m - £5,500m (£5.5bn)
TOTALS: £6,172m (£6.17bn)
£1,991m (£1.99bn)
£8,163m (£8.16bn)
F3 F4
B15
D1
A21
A37
D22
A2
A27
D31 D49
D50
A46
A40
D56
D43
D67 D68 D67
D35
D38
D14
A34 C18
A8
D12 D13
A3 A6
A16 A18
A32
A13 A14
D28 D27 D29
D26
D48 D34
D44 D45
A47
D52 A41
A42
D58
D66
D69
D32
D15 D16
D41
F5
F8 F9
World Heritage Zone and Buffer Area
Development Schedule This schedule provides detailed information on schemes in the WHS and Buffer Zone, some
of which have been completed in the last 5 years, are on site, have a live planning
application submitted/pending or have received planning consent.
HER: 1 or 2 or 2* = Listed Buildings by grade = Other Unlisted Heritage Assets
WORLD HERITAGE SITE SCHEMES COMPLETED JANUARY 2012 – DECEMBER 2016
MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED
A1
2* Titanic Hotel &
Conference Centre,
Stanley Dock
Conversion to 150 bedroom 4 star hotel
with retail/leisure at ground floor and gym
in basement. Rum warehouse converted
to conference and banqueting centre.
Stanley Dock
Properties Ltd
£36m July 2014
A2 2* Central Library, William
Brown Street
Refurbishment of the city's main library,
including partial demolition and rebuilding
Liverpool City
Council
£50m April 2013
A3 Lime Street Station Refurbishment of underground station Merseyrail £5m August 2012
A4
“Shankly Hotel”,
Victoria Street
Conversion to mixed use leisure/gym,
ground floor offices, hotel (65 rooms),
apart-hotel (69 serviced apartments),
bar/restaurant, basement car park and
rooftop garden terrace.
Signature Living £20m December
2016
A5
Tinlings Building, and
Crosshall Buildings, 5-7
Crosshall Street
Conversion to 132 student bedrooms with
ground floor commercial units
VITA (Crosshall) Ltd £10m September
2014
A6
3a Crosshall Street Conversion of vacant building to 67
student bedrooms with rooftop extension
VITA (Chapel) Ltd £5m September
2013
A7 97-105 Dale Street Conversion of 1st to 3rd floors as 10
residential apartments
Garry Usherwood
Associates Ltd
£0.5m September
2016
A8 2 “The Richmond”, 24
Hatton Garden
To extend and convert existing office
building to 51 serviced apartments
Middle England
Developments Ltd
£10m April 2013
A9 2* “Jamworks – The
Bridewell”, Cheapside
Conversion to 86 bedroom student
accommodation
Jamworks/StayCity £5m March 2015
A10 37 Cheapside Conversion and extension to create 12
bedroom student bedrooms
BTE Limited £0.75m December
2016
A11 2 “Doubletree by
Hilton”, 6-14 Sir Thomas
Street
Conversion of former Municipal Annexe to
form 87 bedroom, 4 star hotel
Doubletree by Hilton £50m October
2015
A12 Stanley Court, 19-23
Stanley Street
Conversion of existing office building to 48
student apartments
Rich Link Investments
Ltd
£2m August 2016
A13
“Hoax Hostel”, 50-54
Stanley Street
Conversion to 240 bedspace (49 room)
hostel accommodation with bar and
restaurant
Satboard Hotels Ltd £3m July 2013
A14
Signature Hotel,
Stanley Street
Refurbishment of former flood damaged
Print Hotel as 6 serviced apartments
Signature Living £1.5m April 2013
A15 Apple Apartments, 2
Moorfields
Conversion of upper floors to 136 studio
apartments (35 of which are serviced
apartments)
Rich Link Investments
Ltd
£10.5m August 2016
A16
Ibis Styles Hotel,
Pioneer Buildings, 57-
67 Dale Street
Conversion of building to 122 bedroomed
hotel with ground floor Tesco Metro, and
new 288 space multi-storey car park to
the rear
Benmore Group £10m October
2013
A17 2* Aloft Liverpool, 1-9
North John Street
Conversion of former office building to 116
bedroom hotel with restaurant
Ashall Property Ltd £18m November
2014
A18 Z Hotel, State House,
22 Dale Street
Conversion from offices to 92 room
budget hotel with ground floor retail
Z Hotels Liverpool Ltd £2.5m April 2013
A19
18-20 Tithebarn Street Conversion of upper floors to 30 student
bedrooms
Stockton Properties Not
disclosed
September
2015
A20 “Tempest”, 12
Tithebarn Street
Conversion of ground floor to retail,
café/restaurant; refurbishment of vacant
offices on 6 floors above
Capital & Centric £6m August 2015
A21
Travelodge, 30-38
Exchange Street East
Conversion of office building to 125
bedroom Travelodge budget hotel
Aviva Investors £8m December
2012
A22 2* The Albany, Old Hall
Street
6 courtyard level apartments and 2
commercial units in the basement facing
Old Hall Street
Infinity (Albany)
Developments Ltd
£0.6m September
2014
A23
Cotton House, Old Hall
Street
Conversion of 5th floor from offices to
training suite; new restaurant and
refurbishment of commercial units on
ground floor
Bruntwood £3m November
2015
A24
Irwell Chambers, 5
Union Street
Conversion of basement to 14x1 and 1x2
bedroom serviced apartments
L3 Living £1m October
2014
A25 2 Walker House,
Exchange Buildings
Refurbishment/fit out of 16,000 sq ft office
space
Moorfields Corporate
Recovery
£0.5m December
2014
A26 2 “Tune Hotel”, 3-19
Castle Street
Conversion of former offices to 99
bedroom budget hotel
Hotel Land &
Development
£6.5m August 2015
A27 2 10-18 Castle Street Major refurbishment of upper floor office
space
Kilpatrick Property
Co
£0.5m April 2012
H
H
H
H
H
H
H
H
H
H
H
A1
A11
A17
A4
A26
A2
A16
MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED
A28 1 Oriel Chambers, 14
Water Street
Refurbishment of two neighbouring office
buildings
Bruntwood £0.5m October
2016
A29
Britannia Buildings, 36-
54 Fenwick Street
Conversion of upper floors to 21 bedroom
hotel
Mr Martin Smith £1.2m February
2015
A30
7 The Strand
(Wellington Buildings)
Conversion from offices to 96 apartments Seven Capital (The
Strand) Ltd
£6m September
2016
A31
Tom’s Tavern, 50
Brunswick Street
Refurbishment of vacant building to bar
and eaterie
C&G Holdings Ltd £0.5m September
2016
A32 James Street Station Refurbishment of underground railway
station
Merseyrail £5m April 2013
A33 2* 30 James Street –
Home of the Titanic
Conversion to 65 bedroom 4 star “Titanic
themed” apart-hotel
Signature Living £5.5m August 2014
A34 1 Royal Liver Building,
Pier Head
Refurbishment of 28,000 sq ft on 8th floor for
letting to Pershing, subsidiary of the Bank
of New York Mellon
Royal London Asset
Management
£1m July 2013
A35 2* Cunard Building Refurbishment of 4th and 5th floor offices
(60,000 sq ft)
Liverpool City
Council
Not
disclosed
November
2014
A36 2* Port of Liverpool
Building, Pier Head
Refurbishment of 5,100 sq ft offices on the
2nd floor
Rathbone
Investment
Management
£0.8m January
2016
A37 Mann Island Two residential buildings with 376
apartments, and one office building all
with ground floor restaurants/cafés,
basement parking, and public open
space.
Countryside
Neptune LLP
£120m June 2012
A38 1 Revolucion de Cuba,
Albert Dock
New Cuban bar and eaterie Cuba £1.5m June 2016
A39 1 Mattel Play, Albert
Dock
Conversion to “Mattel Play Liverpool”,
Mattel Toys family entertainment centre
Heritage Great
Britain
£1.5m April 2016
A40 2 25 Duke Street and 7
Campbell Street
Conversion with extension to create 4
serviced apartments and refurbishment of
ground floor shop
SAB Property &
Investment Ltd
£0.25m December
2012
A41
“Epsley Cort”, 12
Gradwell Street
Conversion of former warehouse to 54
student bedrooms
Middle England
Developments Ltd
£2m February
2013
A42
“The Paper Mill”, 28-30
Henry Street
To convert and extend existing building to
create 102 student rooms with communal
facilities
Middle England
Developments Ltd
£3m February
2013
A43
“Le Bateau”, 62 Duke
Street
Conversion of upper floors to 4 x 4
bedroom serviced apartments above
ground floor restaurant
Not disclosed £0.5m January
2015
A44
Epic Apart-Hotel, 75
Duke Street
Conversion of derelict office building to a
19 suite apart-hotel
Epic Hotels £1m April 2015
A45 Atlantic Container
Lines, 90 Duke Street
Partial demolition and 4 storey
redevelopment to provide offices with
basement car park
Langtree Group plc £8m April 2016
A46
“The Podworks”,
Dakota Building, 32-34
Henry Street
Partial conversion of lower
ground/basement levels to 19 bedroom
hotel, including hotel bar and restaurant.
Betterview Ltd £1m September
2012
A47
127-137 Duke Street
and 46-54 Parr Street
Refurbishment of six vacant former
townhouses as student accommodation
with 40 bedrooms
Athena Group £1m September
2013
H
H
H
H
H
H
H
H
H
A30 A31
A35 A36
A44
A45
A34
A40
A43
A37
WORLD HERITAGE SITE SCHEMES ON SITE MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST TO COMPLETE
B1 2 “Titanic Apartments”,
Stanley Dock, Regent Road
Conversion of Tobacco Warehouse to
create 538 residential apartments; new
13th floor level of single storey penthouse
apartments; 1750 sqm public exhibition
space; 4,175sqm offices; and 189 space
car park to existing basement level.
Stanley Dock
Properties Ltd
£50m March 2019
B2 2* Orleans House, Edmund
Street
Conversion of offices to 71 apartments
with basement parking
Bruntwood £5m Autumn 2017
B3 87-95 Dale Street/2-6
Cheapside
To rebuild as a four storey building with 6
ground floor commercial units and 18 flats
above
Jamworks £1.5m October 2017
B4 2 Princes Building, 81 Dale
Street, 11-13 Cheapside and
10 Hockenhall Alley
Conversion of buildings to form 41
apartments, including the
reconfiguration of ground floor
commercial units.
LAAB
Developments
Limited
£8m February 2017
B5 2 Bands Building, 8 Vernon
Street
To convert 1st, 2nd and 3rd floors to
provide 6 apartments.
Amber View
Estates Limited
£0.3m February 2017
B6 2 Union House, 19-21 Victoria
Street
Conversion/extensions to form 35 bed
hotel with bar or separate retail unit on
lower ground floor.
Pure
Management
Inc
£2m December
2017
B7 2 Produce Exchange, 8
Victoria Street
Refurbishment and conversion to 54 x 1, 2
and 3 bedroom luxury apartments
Foster Marlon
Group
£8m July 2017
B8 2 25-27 Castle Street Conversion of 1st to 3rd floors from office
space to 16 apartments
Highneal
Limited
Not
disclosed
Spring 2017
B9 Harrington House,
Harrington Street
Conversion of upper floors to 33
apartments. Refurbishment of ground floor
nightclubs/shopfronts.
Derwent Lodge
Estates Limited
£3m July 2017
B10 47 Castle Street Conversion from offices to 77 bedroom
budget hotel above existing ground floor
restaurant
EasyHotel £3m January 2017
B11 2 2 Castle Street and 1-3
Water Street
To convert upper floors to 8 self-
contained residential apartments
RSL Property
Management
Ltd
£1m July 2017
B12
Corn Exchange Building,
Fenwick Street
Conversion of lower ground floor and
floors 2-8 from offices to a 202 bedroom
apart-hotel.
BJ 201 Limited
and BJ 202
Limited
£10.5m March 2018
B13 2* Tower Buildings, Strand Conversion of 1st and 2nd floors to 32
apartments
HeadOffice3 £5m March 2017
B14
West Africa House, 25
Water Street
Conversion from offices to 42 residential
apartments
Signature Living £5.7m February 2017
B15 2* British Music Experience
Museum, Cunard Building,
Pier Head
Part ground floor conversion to museum
of popular music
British Music
Experience
£3.1m July 2017
B16 2 Chancery House, 96
Paradise Street
Conversion/extension to mixed use
scheme with 37 apartments, ground floor
retail unit and deli/café.
JCC Building
Services LLP
£5m February 2017
B17
11-13 Wolstenholme
Square, 67-73 Duke Street
Conversion of 11-13 Wolstenholme
Square to 2 ground floor retail/leisure
units with 15 serviced apartments on
upper floors; and redevelop Tunnage
Square and pedestrian underpass with a
4 to 5 storey building fronting Duke Street
with 2 ground floor retail units and 7
serviced apartments on upper floors
Hope Street
Properties
Limited
£2m April 2017
H
H
H
B1
B6
B3
B12
B16
B17
B2
WORLD HERITAGE SITE SCHEMES PROPOSED MAP
REF
HER ADDRESS DESCRIPTION DEVELOPER STATUS COST COMPLETION
C1 2 Southern
Warehouse,
Stanley Dock,
Regent Road
Conversion of warehouse to
provide 128 room hotel; 128
room apart-hotel, restaurants
and assembly/ leisure plus car
parking.
Stanley Dock
Properties Ltd
Permission granted
March 2014
Not
known
Not known
C2 2 Custom House, 7
Union Street
To change use of vacant office
space to 2 serviced
apartments.
Alexander Ware Application
16L/1891 submitted
August 2016
Not
known
Not known
C3
Irwell Chambers,
9 Union Street
To erect 2 storey roof extension
to provide 20 residential
apartments
RDI Property Application
16F/2012 submitted
Aug 2016
£2m Not known
C4 Silkhouse Court,
Tithebarn Street
Conversion from office tower to
create 193 self-contained flats.
Beaumont
Morgan
Developments Ltd
Permission granted
May 2016
Not
known
Not known
C5 2 Lime Street
Station
Reconfiguration of platforms
and upgrade of station
Merseyrail Detailed scheme
awaited
£15m Not known
C6
42-44 Stanley
Street
Conversion of 1st to 4th floors
from offices to 20 x 1 bed
apartments.
The Flanagan
Group
Permission granted
August 2016
£1.4m Not known
C7
1-3 Temple Court Conversion of first to fourth
floors of existing office premises
into 18 residential apartments.
Highneal Limited Permission granted
August 2016
£1.5m Not known
C8
Colonial
Chambers, 3-11
Temple Street
To convert ground floors and
floors 1-5 of offices to 94 x 1 bed
studio apartments.
Colonial
Chambers
Development
Company Limited
Permission granted
August 2016
£3m Not known
C9
14 Cook Street Conversion of former office
space to 18 apartments
Pierce &
Biersadorf
Permission granted
October 2014
£0.5m Not known
C10 2 19 Castle Street Conversion from retail/offices to
cafeteria with 8 self-contained
flats on the upper floors.
Mr John Lee Permission granted
July 2016
Not
known
Not known
C11 2* Martins Building,
Water Street
Conversion into 227 bedroom
potential 5 star hotel with bars,
restaurants, and spa
Principal Hayley
Group Hotels
Permission granted
August 2015
£50m Early 2018
C12 Norwich House, 8
Water Street
Conversion from offices to 96
apartments.
Sino Swan
Holdings
Application 16PO/
1938 submitted
August 2016
£8m Not known
C13
Reliance House,
20 Water Street
Conversion from offices to 100
apartments
Legacie Application 16PO/
1531 submitted
June 2016
£8m Not known
C14 New Zealand
House, 18 Water
Street
Conversion from office to 16 x 1
bed apartments
The Flanagan
Group
Permission granted
December 2015
£1m Not known
C15 2* India Buildings,
Water Street
To refurbish sixth floor (30,000 sq
ft) and part of 4th floor (20,000
sq ft)
Kish Eleven Permission granted
April 2014
£1m Not known
C16 “Strand Plaza”,
The Strand
Conversion of office block to
122 apartments (10 x bedroom,
56 x 2 bedroom, 56 x 1
bedroom)
Primesite
Developments
Permission granted
December 2013
£6m Summer 2017
C17
Crown House, 10-
12 James Street
Conversion of office building to
23 x 1 bedroom apartments
District and
Urban
Application
16F/2466 submitted
September 2016
Not
known
Not known
C18 2* 2nd floor, Cunard
Building, Pier
Head
To carry out internal alterations
to part of second floor (11,000 sq
ft).
Interserve
Investments Ltd
Application
16F/0776 submitted
April 2016
£0.5m Not known
C19 Hilton Hotel, 3
Thomas Steers
Way
New two storey extension to
provide extended first floor
ballroom/ conferencing
facilities above ground floor
commercial unit. Conversion of
7th floor to 6 additional hotel
bed-rooms and change use of
ground floor entrance
lobby/concierge to a new
executive lounge with main
hotel entrance relocated from
the west to north elevation
Ability Hotels
(Liverpool)
Limited
Permission granted
February 2015
£2.5m Not known
C20
Gostins Building,
32-36 Hanover
Street
Conversion from offices to hotel
on 2nd to 7th floors and retain
retail use to ground and 1st
floors.
E T S Holdings Permission
renewed October
2016
Not
known
Not known
C21 2 50a Duke Street Conversion of vacant former
club to a 14 bedroom student
HMO
Mr Y Chun Cao Permission granted
June 2015
£0.3m Not known
C22
65 Duke Street/14
Wolstenholme
Square
To erect 8 storey building
containing 111 student studio
apartments with communal
facilities.
Lady Mia Limited Application
15F/2579 re-
submitted January
2016
£5.5m Not known
C23
Bateson Building,
28-30 Henry
Street
Conversion from basement
parking to 15 bedroom budget
hotel
Yu Group Permission granted
April 2016
£1m Not known
C24 56 Parr Street To erect four storey seven
bedroom student town house
following demolition of existing
garage.
Signature Living Permission granted
November 2015
£2m Not known
C25
118-124 Duke
Street
To convert of existing buildings
and erect a 4-8 storey new
building to create 151
residential units with ground
floor communal use
Henry Space
Development
Limited
Permission granted
June 2016
£12m Not known H
H
H
H
H
H
H
H
H
H
H
C4
C8
C11
C13
C22
C25
C16
C3
BUFFER ZONE SCHEMES COMPLETED JANUARY 2012 – DECEMBER 2016
MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED
D1 United Utilities, Wellington
Dock
Infilling of dock and creation of
secondary water treatment plans
United Utilities £193m May 2015
D2 JR Webster, Great Howard
Street
New 2 storey retail warehouse for
storage and sale of engineering
supplies
JR Webster & Co Ltd £1m October
2015
D3 Crowne Plaza Hotel, Princes
Dock
Refurbishment of existing
bedrooms
Crowne Plaza
Liverpool Hotel
£1.8m May 2016
D4 The Plaza, Old Hall Street Refurbishment of 65,000 sq ft
office floorspace on 3rd and 4th
floors
Bruntwood £3m September
2015
D5
51-55 Highfield Street Conversion and extension to for 8
student flats (34 bedrooms)
JD Estates £1m January 2015
D6
Caber House, 10-12 Pall Mall Conversion of offices to 5
apartments containing 25 self-
contained en-suite studio
bedrooms
Bold Spirit Ltd £1.5m June 2014
D7 Moorfields Station Refurbishment of underground
railway station
Merseyrail £13m July 2016
D8
“Vauxhall Vaults”, 29-31
Vauxhall Road
To erect a 3 to 5 storey building
with 25 student bedrooms and 2
ground floor retail units
Vauxhall Vaults £1m September
2015
D9 “The Glass Works”, 36
Vauxhall Road
To erect 3 to 8 storey student
accommodation with 323
bedrooms
Dreamport £20m September
2015
D10 “Ablett House”, Hatton
Garden/ Great Crosshall
Street
New part 7/part 9 storey building
with 396 student bedrooms, gym
and ground floor Tesco Express
Knightsbridge
Student Housing Ltd
£25m September
2015
D11 “Byrom Point”, Land at Great
Crosshall Street/ Fontenoy
Street
New 14 storey building with
ground floor commercial unit and
398 student bedrooms above
Gipsy International £12m September
2016
D12 Byrom Street Campus, LJMU To erect single storey building to
house concrete lab
Liverpool John
Moores University
£2m August 2013
D13 Byrom Street Campus, LJMU Refurbishment of buildings and
construction of a new cafe
Liverpool John
Moores University
£1m March 2013
D14
3-7 Camden Street Conversion of 3 buildings to 12
bedroom student
accommodation
Hope Street
Developments Ltd
£0.5m September
2012
D15 Arndale House, 91-103
London Road
Conversion of 1st and 2nd floors to
160 student bedrooms and gym
X1 Developments
Ltd
£4.5m September
2013
D16 “Islington Court”, Gildart
Street
New 6 storey building with 47
student bedrooms
Nexgate
Developments
£4m September
2013
D17 “X1 – The Edge”, Seymour
Street/St Vincent Street
New 5/7 storey building with 231
student bedrooms and ground
floor commercial space
X1 Developments
Ltd
£12.9m September
2015
D18 “Plato House”, 7-21 Greek
Street
New 6 storey development with
86 student studio bedrooms
Pinnacle Student
Developments
£4.3m December
2015
D19
Post Office Public House, 2
Great Newton Street
Conversion from pub to shop with
6 self-contained student flats
above
Stockton Properties £0.3m September
2016
D20 “The Lightbox”, 3-5 Lower Gill
Street
To erect 5 storey block containing
34 student bedrooms and flats
Mr Barry Ramm £2.5m September
2016
D21 66-68 Lime Street Conversion of upper floors from
disused offices to 10 x 2 bedroom
student flats
Mr Sobil Vargeuse £0.25m September
2015
D22 Queen Square Genting Club Major refurbishment including
new 360-degree bar on
mezzanine, and new dance floor.
Genting £2m August 2012
D23 St John’s Market, St John’s
Centre
Refurbishment of indoor market Liverpool City
Council
£2m October 2016
D24 Parker Street, Elliot Street and
Houghton Street
Repaving works Liverpool City
Council
£3m November
2016
D25 Clayton Square Shopping
Centre
Internal reconfiguration and
remodelling of shops and
floorspace
InfraRed UK £3.5m December
2014
D26 21-25 Williamson Square New 4/5 storey building to be
used for retail use
Marks & Spencer £5m August 2013
D27 “Forever 21”, 1-5 Church
Street
New 3/4 storey retail unit Royal London Mutual
Assurance
£25m October 2013
D28 McDonalds Restaurant, 80-86
Church Street
Refurbishment McDonalds £3m July 2013
D29
River Island, 10-12 Church
Street
Refurbishment and extension of
existing floorspace
River Island £5m June 2013
D30 Graeme House, Derby
Square
Refurbishment of 12,500 sq ft
office space and conversion of
3,500 sq ft to training space
Downing
Developments
£0.6m July 2015
H
H
H
H
H
H
D10
D6 D11
D2
D18
D19
D27
D29
MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED
D31 Travelodge Hotel, Strand
Street/Red Cross Street
New 10 storey, 141 bedroom
Travelodge hotel with separate
ground floor unit (Tesco Express)
FT Patten (Holdings)
Ltd /Travelodge
Hotels
£10m February 2012
D32 LJMU Redmonds Building,
Clarence Street/Brownlow Hill
New educational building to
house a new Centre for the
Faculty of Business & Law, the
Liverpool Screen School, and the
university’s new Professional
Centre
Liverpool John
Moores University
£37.6m August 2012
D33 City of Liverpool College,
Clarence Street
New science laboratory City of Liverpool
College
£3m September
2016
D34
46-48 Mount Pleasant Rebuild and conversion to retail/
bar/café/restaurant uses at ground
floor, with 54 student bedrooms
above
Faith Pharmacy Ltd £2m May 2013
D35 2* St Andrews Church of
Scotland, Rodney Street
Conversion to student
accommodation (100 rooms) and
make repairs to former Sunday
School building.
Middle England
Developments
£6m August 2012
D36 2 28 Hope Street/10 Maryland
Street
Conversion to 3 student flats
and 6 student studios
Mr B Ungi £0.3m September
2015
D37
4 Hardman Street Conversion of upper floors to 3
bedroomed hotel above existing
bar
Sean Gleeson £0.25m November
2016
D38 2 64 Rodney Street Conversion into 6 x 1 and 2 bed
apartments.
Mr Norman Cowley £1m July 2012
D39 2 Hahnemann Building, Hope
Street
Conversion to 98 student
bedrooms
Maghull
Developments
£8m November
2016
D40 Liverpool Institute for
Performing Arts, Mount St
To erect 2/3 storey extension to
provide a sixth form college in its
Hope Street wing.
Liverpool Institute for
Performing Arts
£5.4m September
2016
D41 2 72a-74 Rodney Street Conversion to 2 HMO apartments
with a total of 8 bedrooms
Voisin £0.5m December
2015
D42
37-43 Berry Street Refurbishment of derelict building
as hot food takeaway on ground
floor, restaurant on first floor, and
new shop
Frenson Ltd £0.2m May 2015
D43
Four Seasons Restaurant, 78-82
Renshaw Street
Conversion from retail to mixed
use café/restaurant/pub and
takeaway. Conversion of first floor
to 21 student bedrooms
Mei-Mei Restaurant £2m September
2014
D44 Central Village: Multi-storey
car park to rear of Renshaw
Street
New 11 storey building with
ground floor restaurant and multi-
storey car parking above
Central
Regeneration Ltd
Partnership/Merepark
£7m October
2012
D45 2 75 Bold Street Conversion from offices to 16 self
contained student apartments on
upper floors
Mr Wayne Lynch £1m September
2013
D46 2 Watson Building, and building
at 28-32 Renshaw Street
New 8 storey extension to Watson
Building and conversion to 40,000
sq ft Grade A offices with
underground car parking
West Nile
Developments Ltd
£16.5m November
2015
D47 2 “The Department”, former
Lewis’s Building,
Conversion of upper floors to
75,000 sq ft offices
Merepark £10m February
2016
D48 2 Adagio Apart-Hotel, 1
Fairclough Street
Conversion of part of former Lewis’
Building to 129 room apart-hotel
Central
Regeneration/
Merepark
£10m March 2013
D49 Central Station Refurbishment of underground
station platforms, entrance
concourse and passenger tunnels
Merseyrail £20m October 2012
D50 Premier Inn Hotel, Hanover
Street
To erect five storey building
containing 183 bed hotel, three
retail units and four restaurants
Premier Inn Hotels
Ltd/ Liverpool PSDA
Ltd
£10m December
2012
D51 “X1 Liverpool 1”, Seel Street New 6/9 storey development
with 331 student bedrooms
above ground floor
retail/commercial.
X1 Developments Ltd £18m September
2016
D52 “Epic Apart-hotel”, 25-27 Seel
Street
Conversion from nightclub to 14
serviced apartments
Epic Liverpool Ltd £1m September
2013
D53 2 “The Watchmakers”, 58-60
Seel Street/30 Slater Street,
and 48 to 56 Seel Street
Conversion to 50 bedroom
student accommodation
Seel Street Estates
LLP
£3.5m June 2016
D54
38-40 Slater Street Conversion from residential to
enlarge ground floor
bar/restaurant, upper floors to 3
x 1 bedroom flats
Rose Ten Ltd £1m April 2016
D55
1 Arthouse Square, 61-69 Seel
Street
Conversion from offices to 39
bedroom apart-hotel
Signature Living
Arthouse Square Ltd
£10.7m December
2016
D56
28 - 30 Berry Street and 87
Seel Street
Conversion of basement and first
floor to office/retail use, with two
apartments on second floor.
Heathcourse £0.25m August 2012
H
H
H
H
H
H
H
D39
D34
D35
D41
D54
D57
D53
MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST COMPLETED
D57
“The Arch”, former
Scandinavian Hotel, Nelson
Street
To convert building to 241 student
accommodation with
ground/lower ground commercial
space, new roof level extension.
GMD Investments
Ltd
£15m September
2014
D58 “Cosmopolitan Liverpool”,
Grenville Street
New part 4, part 7 storey building
with 261 student bedrooms
Illiad & The Liverpool
Diocesan Board of
Finance
£20m September
2013
D59 Land at Duncan Street 12 x 2 and 3 bedroom houses Liverpool Mutual
Homes
£1.5m January
2016
D60 “Libertas”, 4-50 St James
Street
New mixed use building with
ground floor retail and 62 student
bedrooms above
Baltic Properties NW £3.1m September
2014
D61
3-9 Bridgewater Street Conversions and rebuilds to
create 122 bedroom student
accommodation, 118 studio
apartments, 7 x 3 bedroom
apartments
Baltic Properties NW £15.5m September
2016
D62 “The Artesian”, 10-14
Jamaica Street
New 6/7 storey mixed use building
with 99 x 1 bedroom student
apartments and ground floor
commercial units
Lawless
Developments Ltd
£3m September
2015
D63
24 Kitchen Street Conversion of warehouse to
mixed use public event space,
including café/restaurant, public
house, theatre
space/nightclub/art studio with
eating terrace on roof and
garden nursery.
Windle & Roberts £1m December
2016
D64 “Norfolk House – Phase 1”,
70-78 Norfolk Street
To erect 5 to 9 storey apartment
building containing 156 studio
apartments.
Baltic Developments
Limited
£15m September
2016
D65 “Norfolk House – Phase 2”,
Norfolk Street/ Watkinson
Street
To erect 9 storey apartment
building containing 100 studio
apartments with ground floor
foyer, flexible lounge space,
cycle, plant and bin storage.
The Elliot Group £5m December
2016
D66 59 Norfolk Street/54-58 Brick
Street
New car showroom & MOT
garage in place of existing
warehouse
Stanley Auto
Engineers
£0.5m April 2013
D67 Baltic Creative, 18-20 and 43-
59 Jordan Street
Change of 10 industrial units to
mixed uses including offices/light
industrial, storage/distribution,
retail, cafes/restaurant/bar and
auction rooms
Baltic Creative CIC £2m September
2012
D68 22 Jordan Street To refurbish to provide 7 individual
office units with independent
access doors fronting Jamaica
Street.
Baltic Creatives CIC £0.5m September
2016
D69 2 North Liverpool Life Sciences
UTC, 41-51 Greenland Street
Conversion of former
Contemporary Urban Centre to
education centre
Mott McDonald £4.25m August 2013
D70 Pullman Hotel, Kings
Waterfront
New 216 bedroom, 4 star hotel Liverpool City
Council
£26m January 2016
D71 Exhibition Centre Liverpool,
Kings Waterfront
New exhibition and events centre Liverpool City
Council
£40m September
2015
D72 “The Keel”, Phase 1, Queens
Parade, Kings Dock
Conversion of former offices to
240 private rented sector
apartments
Glenbrook QD Ltd
and Mapeley Steps
Ltd
£30m September
2015
H
H
H
D61
D62
D67
D59
D64
D71 D70
D72
BUFFER ZONE SCHEMES ON SITE MAP
REF
HER SCHEME/ADDRESS DESCRIPTION DEVELOPER COST TO COMPLETE
E1 Ralli House, 60 Old Hall Street Conversion from offices to create 115
residential apartments with roof-top
gym
Signature Living £17m March 2017
E2
“Exchange Station”,
Tithebarn Street
Phased refurbishment of existing
office building providing 175,700 sq ft
Commercial Estates
Group
£7m October 2017
E3 “The Paramount”, Pudsey
Street/28 London Road
488 bedroom student
accommodation in 7 to 11 storey
building
Pinnacle Student
Developments
Limited
£35m Spring 2017
E4 “Pembroke Studios”, 4-10
Pembroke Place
New six-storey building comprising 94
student studios and ground floor
retail
Yu Property Group £6.5m July 2017
E5 Sensor City Incubator, site
bounded by Russell Street
and Warren Street
To erect 3-4 storey incubator facility
comprising incubator units,
laboratories, breakout spaces and
meeting rooms with, car and cycle
parking.
Sensor City Liverpool
Limited
£15m July 2017
E6 Lime Street Gateway: 45-77
Lime Street and 20-22 Bolton
Street
Mixed use development with ground
floor commercial, retail and leisure
uses, 90 bedroom hotel and student
accommodation.
Regeneration
Liverpool/Neptune
£39m July 2018
E7
Royal Court Theatre, Roe
Street
Major refurbishment of theatre Royal Court
Liverpool Trust
£10.6m June 2017
E8 11-17 Parker Street Conversion of 2nd to 7th floors to 91 x 1
bed apartments
Property Frontiers £5m August 2017
E9 2 Central Village: Lewis's, 40
Ranelagh Street
Refurbishment/conversion of ground
floors to 100,000 sq ft leisure/
restaurant units.
Merepark £15m Summer 2017
E10 “The Ascent”, Renshaw Street New 13 storey building with 196
student apartments
IconInk £24m September
2017
E11 2 “The Dome”, Central Hall, 35
Renshaw St
To convert upper floors of building to
41 bed student accommodation
OBG - NEXTDOM £2.2m April 2017
E12 “Tara House”, 4-14 Oldham
Street
To erect max 12 storey building with
772 student bedrooms, communal
areas and ground floor retail
Unite Group Plc £35m August 2017
E13 2* St Luke’s Church, Leece Street Repairs to bombed out church to
safeguard the structure and prepare
it for use as a venue for events
Liverpool City
Council
£0.5m Spring 2017
E14
30-40 Seel Street Conversion to 33 x 1 bedroom
serviced apartments and 4 retail units
at ground and basement levels.
Hope Street
Properties Limited
£2.5m Spring 2017
E15 “One Wolstenholme Square”,
5 Parr Street & Wolstenholme
Square plus land/premises
between northern edge of
Wolstenholme Square and
Seel Street
Mixed use development comprising
four blocks of between 3 and 10
storeys to accommodate
replacement nightclub over two
basement levels, commercial units
and 333 studio apartments on upper
floors, and change of use of existing
warehouse to mix of commercial
uses, nightclub and 114 studio
apartments above, together with re-
landscaping of Wolstenholme
Square.
Wolstenholme
Square
Developments
Limited
£40m March 2018
E16 “Baltic Place”, New
Chinatown – Phase 1
To erect a 6 storey mixed use
building comprising 6 townhouses,
115 apartments, public events space
commercial space and
underground car parking
China Town
Development
Company Limited
£38m December
2017
E17 “Baltic Village”, Wapping 3 new buildings (13, 10 and 8 storeys)
to include retail/ commercial space
and 308 apartments, residents-only
gym, public square, underground
car park.
Neptune Baltic
Limited
£32m March 2017
E18 “Kings Dock Mill – Phase 2”,
Land at Hurst Street
To erect 11/12 storey block
containing 204 apartments
YPG Developments
Limited
£15m September
2017
E19
Land bordering Bridgewater
Street and Watkinson Street
To partially convert existing vacant
warehouse into 5 town houses, erect
4 x 4 storey town houses and erect
commercial unit for use as office.
HUP (BALTIC) £1.7m February 2017
E20 “Baltic House – Phase 1”,
Norfolk Street/Brick Street
New 9-11 storey building with 150
student bedrooms communal
facilities, and office/creative
workshop space at ground and first
floor level.
Pinnacle Student
Developments
Limited
£14m September
2017
H
H
H
H
E5
E3
E1 E10
E6
E15
E16
E20
E14
BUFFER ZONE SCHEMES PROPOSED MAP
REF
HER ADDRESS DESCRIPTION DEVELOPER STATUS COST COMPLETION
F1 285–289 Vauxhall
Road
To erect 3 apartment blocks with a
total 74 x 1 and 2 beds.
WFB Properties
Ltd
Permission granted
October 2015
£7m Not known
F2
143-145 Great
Howard Street
To convert public house to form
hotel (13 bedrooms) with
restaurant/cafe at ground floor.
William Riley Permission granted
April 2015
£0.5m Not known
F3 50-52 Waterloo
Road
To erect 5 storey office/industrial/
warehouse building
Ms Esther McVey Outline permission
granted January
2015
Not
known
Not known
F4 56-60 Waterloo
Road
To erect 6 storey office building Ms Esther McVey Outline permission
granted January
2014
Not
known
Not known
F5 “The Hive”,
William Jessop
Way, Princes
Dock
30 storey tower with 276 private
rental apartments, “premium
restaurant and bistro facilities”, with
24-hour concierge service
Your Housing
Group
Planning
application
anticipated
£48m September
2019
F6 “The Lexington,
Liverpool”, William
Jessop Way
34 storey residential block with 304
private rented sector apartments
Moda Living Permission granted
September 2016
£82m 2019
F7 “William Jessop
House”, William
Jessop Way
To erect 8 storey office building with
ground floor commercial retail
Peel Holdings
(Land and
Property) Ltd
Application
15F/0560 awaiting
signing of legal
agreement
£20m Not known
F8 “Ovatus 1” Prospect Capital
and Wilcocks &
Wilcocks
Application
anticipated
£35m Not known
F9 “Ovatus 2” Prospect Capital
and Wilcocks &
Wilcocks
Application
anticipated
£40m Not known
F10 Pall Mall
Exchange -
Phase 1
To erect new Grade A 400,000 sq ft
office building
LCC and partner Application
awaited.
Development
partner sought.
£20m 2018
F11 Pall Mall
Exchange -
Phases 2 & 3
Major new mixed-use development
to provide offices,
retail/restaurants, residential units,
car parking
To be
determined
Supplementary
Planning
Document
approved.
£150m 3-15 years
F12 30-36 Pall Mall Residential tower 21 storey with 342
apartments and garden terrace
Anwyl
Construction
Application
16F/2634
submitted October
2016
£50m 2018
F13 “Studio 200”, 11
Fontenoy Street
To erect nine storey building with
200 student bedrooms.
Key Design LLP Permission granted
April 2015
£10m August 2018
F14 9-11 Camden
Street
To erect 5 storey student block with
5 cluster units (44 bedrooms)
following demolition of existing
terraced properties.
Mr Tony Shirley Permission granted
January 2014
£2.5m Not known
F15 Land at Norton
Street/ Islington
(former National
Coach Station)
To erect two blocks of student
accommodation in two blocks of
10 and 16 storeys, including
erection of cycle and bin store
(566 beds in total) with ground
floor commercial units.
Anwyl
Construction
Limited
Application
16F/0235
submitted
February 2016
£25m Not known
F16 Site at the corner
of Islington and
Norton Street,
To erect 3 blocks of student
accommodation of 8, 11 and 15
storeys providing 738 bedrooms with
ground floor communal welfare,
leisure and management facilities,
ground floor commercial space.
Islington
Regeneration
Company
Permission granted
February 2016
£50m Not known
F17 43-47 Stafford
Street
Conversion from shop to community
centre with 1 x 3 bed flat on 1st floor.
Mr Joseph Aiello Permission granted
December 2015
Not
known
Not known
F18 Gildart Street/
Devon Street
3 new 6/8 storey blocks of student
accommodation (580 bedrooms)
with ground floor communal space
and retail/leisure.
Islington
Regeneration
Company
Permission granted
February 2016
£40m Not known
F19 LJMU Campus,
Copperas Hill/
Brownlow Hill
Extension of LJMU campus LJMU Revised scheme
anticipated
£100m Not known
F20 Land bounded
by Skelhorne
Street, Bolton
Street, Hilbre
Street
Mixed use development on land at
Skelhorne Street/Bolton Street
comprising 2 blocks for ground floor
commercial uses with 1,027 student
bedrooms on upper floors
Unite Application
16F/1539
submitted July
2016
£70m September
2019
F21 2 Former ABC
Cinema, Lime St
Conversion to a 1,500-seat leisure
venue with a TV studio
Liverpool City
Council/Neptune
Application
awaited
£11m Not known
F22 2 21-23 Ranelagh
Street
Conversion of ground and lower
ground floor into restaurant and
1st-3rd floors above into 9
apartments
Rathbone Trust
Company Ltd
Permission granted
March 2015
£0.5m Not known
F23
13-17 Ranelagh
Street
Conversion of existing ground floor
unit to fast food restaurant and 1st
and 3rd floors into 7 bed HMO
Poseidon
Investments
Permission granted
September 2015
£0.5m Not known
F24
George Henry
Lee Building,
Church Street
Conversion of upper floors to 114
bedroomed 4 star apart-hotel or 100
room apart-hotel with restaurant
Gethar Ventures Permission granted
January 2014
£15m Not known
F25
13-17 Tarleton
Street
Conversion of upper storeys to 6
studio duplex apartments (retail
retained at ground floor).
Miller Brook
Properties
Limited
Permission granted
November 2015
£0.3m Not known
F26
58 Whitechapel Conversion of basement and
ground floors to restaurant, first
floor to taxi offices, and second
and third floors to 6 student flats.
M J Services
Limited
Application
15F/3024
submitted May
2016
£0.5m Not known H
H
H
H
H
F7
F11 F10
F13
F20
F18
F21
F28
F6 F12
MAP
REF
HER ADDRESS DESCRIPTION DEVELOPER STATUS COST COMPLETION
F27 Victoria House, 7-
11 James Street
Conversion of office building to 71
x 1 bedroom studio apartments
Pinnacle
Developments
Permission granted
April 2014
Not
known
Not known
F28 Strand House, 21
Strand Street
Replacement 16/19 storey mixed
use development comprising 395
apartments with residents gym,
cinema, roof terrace), and two
ground floor commercial units
FT Patten
Properties
(Liverpool) Ltd &
Panacea
Property
Development
Application
16F/1826 submitted
July 2016
£40m Not known
F29
58-72 Church
Street
To convert second, third and fourth
floors to student accommodation
and erect two storey roof extension
Study Inn Ltd Application
16F/1444
submitted June
2016
£5m Not known
F30
10 Mount
Pleasant
To convert upper floors into 7
bedroom hotel.
Original NW
Limited
Permission granted
August 2016
Not
known
Not known
F31
113 Mount
Pleasant
Extension to neighbouring Feathers
Hotel (17 additional bedrooms).
Topland Group Permission granted
January 2016
Not
known
Not known
F32 Renshaw Hall,
Benson Street
Redevelop with 292 student
bedrooms and 56 bedroom apart-
hotel
NR Capricornus Application 16F/
0437 submitted
February 2016
£20m Not known
F33 3 Oldham Place New 6 storey building with 117
student bedrooms and retail unit
Oldham Place
Limited
Permission granted
March 2016
£8m Not known
F34 2 3-5 Rodney Street Conversion of former NHS Centre to
25 bed HMO for young professionals
Metis
Developments
Permission granted
November 2015
£0.5m Not known
F35
2 Maryland Street Conversion to 2 Homes in Multiple
Occupation (12 bedrooms)
Oliver Andrew
Property Limited
Permission granted
August 2016
Not
known
Not known
F36
19 Rodney Street Conversion to 5 apartments Ian Marlowe Application 16F/
1329 submitted
June 2016
Not
known
Not known
F37 “Ropemaker
Place”, 89-99
Renshaw Street
To erect 8 storey building
comprising 77 residential units
above ground floor commercial
space
Citylife
Developments
Limited
Application
15F/2521 submitted
March 2016
£7m Not known
F38 2 Hope Street Hotel
and former
School for the
Blind, Hope Street
/Hardman Street
Refurbishment and extension to
existing hotel into former School for
the Blind to create 12 additional
hotel rooms and 26 aparthotel
suites
Hope Street
Hotel
Application
16F/2287 submitted
September 2016
Not
known
Not known
F39 Central Village:
Central Station
3 storey extension at the rear to
provide additional retail space
and new linkages to Central
Village.
Central
Regeneration
Limited/Merepark
Permission
renewed May
2013
£20m Not known
F40 Central Village:
“Boardwalk”, site
bounded by
Back Bold Street,
Cropper Street,
Newington and
Lawton Street
New mixed development
comprising 214 x 1 and 2 bedroom
apartments, cinema, commercial
space, parking for 100 cars, and
the creation of a new pedestrian
plaza level across Cropper Street).
Central
Regeneration
Limited/Merepark
Permission
renewed May
2013
£26.4m Not known
F41 9-19 Bold Street Conversion of 1st and 2nd floors
from office to 10 flats
AEW UK Application 16PO/
1990 submitted
August 16
£0.5m Not known
F42 21-25 Bold Street Conversion of 1st and 2nd floors
from office to 10 flats
AEW UK Permission granted
June 2016
£0.5m Not known
F43 48-54 Renshaw
Street
To demolish part of existing
building and erect 11 storey
building, creating 90 x 1 bed studio
apartments, apart-hotel with 75
units and commercial space at
basement and ground floor levels.
YPG Renshaw
Street Limited
Application
16F/2022
submitted August
2016
Not
known
Not known
F44 16 Fleet Street To erect seven storey block of 52
student bedrooms with ground
floor commercial uses
Hope Street
Properties Limited
Permission granted
April 2015
Not
known
Not known
F45
13-23 Seel Street Conversion of second and third
floors to offices and education
uses
Hope Street
Properties Limited
Permission granted
April 2015
£3m Not known
F46 “Vincent Hotel”,
42-46 Seel Street
To erect 5-7 storey apart-hotel with
42 suites, ground floor restaurant
and commercial unit
Wolstenhome
Square Develop-
ments Limited
Application
16F/0636 submitted
March 2016
Not
known
Not known
F47
Holmes Building,
46 Wood Street
Conversion of upper floors to 8
bedroom boutique hotel
JSM Bar & Leisure
Group
Permission granted
September 2015
Not
known
Not known
F48
66 Bold Street Conversion of former pub to hotel
(17 bedrooms and 6 suites)
Zoe Antonis
Limited
Permission granted
May 2015
Not
known
Not known
F49
84 Bold Street Conversion of first and second
floors 6 self-contained apartments
Zoe Antonis
Limited
Permission granted
May 2015
£0.15m Not known
F50 84-86 Seel Street To demolish existing garage and
erect new bar/restaurant with 4
studio apartments above
Mr Gleeson Application
16F/1130 submitted
May 2016
Not
known
Not known
F51
Havelock Building
139-141 Wood
Street, 2-6 Berry St
To change use of 2nd and 3rd
floors to 7 residential apartments.
Mr Mark Rea Permission granted
August 2015
Not
known
Not known
F52 2 The Black-E,
Nelson Street
Refurbishment of community
facility
Liverpool City
Council
Awaiting funding
approval
£0.6m 2017
F53 8 Upper Pitt Street To erect 7 storey building
containing 52 studio apartments
with residents’ gym
HDCO EPL1
Limited
Application
15F/2734 submitted
November 2015
£2.5m Not known
F54 “St Michaels
Phase 2” - Land
at Grenville
Street/Upper Pitt
Street/Grenville
Street
To replace former community
building with 2 blocks (max 7
storey) creating 120 apartments,
233 sqm of commercial and
community uses with parking and
new link road.
Iliad Cosgrove Ltd Application
16F/2343 submitted
September 2016
£10m Not known
H
H
H
H
H
H
H
H
H
H
F32
F46
F40
F43
F38
F37
F54
MAP
REF
HER ADDRESS DESCRIPTION DEVELOPER STATUS COST COMPLETION
F55 “New
Chinatown”,
Great George
Street
Redevelopment in 3 phases with
800 new homes, ground floor
commercial space, 140 bedroom
hotel, restaurants, gymnasium,
Chinese market, food court,
hospitality facilities, landscaped
gardens and underground parking.
China Town
Development
Company Limited
Outline
application
15O/1998
submitted
September 2015.
£100m 2018
F56 Land adjacent
to 20 Lady
Chapel Close/
opposite St.
James House, St
James Road
To erect a two storey building to
provide training and educational
facilities in association with
Liverpool Cathedral.
Liverpool
Cathedral
Permission granted
October 2014
Not
known
Not known
F57 “One Park
Lane”, Land
bounded by
Park Lane,
Pownall Street,
Liver Street and
Beckwith Street
Two new 10 to 20 storey buildings
with 284 apartments (34 x 3 bed,
136 x 2 bed, 54 x 1 bed and 60
studios); four commercial units,
gymnasium, cafes, basement
parking
One Park Lane
Limited
Permission granted
August 2015
£50m June 2018
F58 2 “Baltic Square”,
Park Lane,
Beckwith Street,
Carpenters Row
and Cornhill
(former Heap's
Rice Mill)
Conversion of former mill into 134
apartments; to redevelop adjacent
land with three blocks, 10, 11 and
14 storeys with 194 apartments and
200 serviced apartments, together
with commercial floorspace.
Inhabit Permission granted
November 2014
£80m June 2018
F59 King’s Dock Mill –
Phase 3, land at
Hurst Street,
Sparling Street,
Tabley Street,
Wapping
Mixed use development with 180
bedroom hotel, 100 apartments,
220 bed YHA building, ground floor
retail, car parking; and outline
application for 95 bedroom care
home.
Fountain Trustees
& Hurst Street Ltd
Permission granted
March 2015
£50m Not known
F60 “The Art
Apartments”,
vacant land at
Tabley Street
To erect 10/11 storey residential
apartment block to provide 45
flats.
Baltic Cool
Limited
Application
16F/0649
submitted May
2016
£5m Not known
F61 66-68 Kitchen
Street
Hybrid application for mixed use
development comprising retention
of existing commercial uses on
ground, first, second and third
floors and conversion/extension of
fourth floor to create new
restaurant/ cafe; and outline
application to erect 8 storeys of
additional residential
accommodation above
warehouse to create 30 self-
contained flats.
Waterfront
Holdings
Application
15F/0827
submitted April
2015
£2m Not known
F62 Land bounded
by Blundell
Street, Kitchen
Street and
Simpson Street
To erect 2 blocks of 7-9 storeys
creating 200 apartments, ground
floor commercial floorspace and
basement car parking.
Songbird Ltd Permission granted
December 2016
Not
stated
Not known
F63
62-64
Bridgewater
Street
To convert existing industrial
premises to craft brewery,
including beer production,
distillery, visitor centre, retail sales
unit, sampling hall and ancillary
facilities.
Higsons Brewery
Limited
Permission granted
May 2016
Not
stated
Not known
F64
Land between
Bridgewater St/
Simpson Street/
Watkinson Street
Conversion of ground floor to
retail/commercial space with 25
apartments on upper floors (with
two storey extension).
Tesni Properties
Ltd
Permission granted
December 2015
£1.5m Not known
F65 “Norfolk House –
Phase 3”, Land
between Norfolk
Street,
Watkinson Street
To erect part 20, part 13 storey
mixed use development
comprising 257 apartments with
associated residents gym, outdoor
spa, ground floor Entrepreneurial
Hub and basement parking
The Elliot Group Application
15F/2944
submitted
December 2015
£50m Not known
F66
5-7 Watkinson
Street
To convert warehouse to 12,500 sq
ft of offices
Mr Duncan Birch Application
16F/2319 submitted
Sept 2016
£1m Not known
F67 “Vienna House”,
Jamaica Street/
Norfolk
Street/Brick
Street
To demolish all existing structures
and erect 9 storey building,
comprising 89 studio apartments, 8
ground floor commercial units and
conversion of 43 Jamaica Street to
self-contained offices (Phase 3).
North Point
Global
Application
16F/0809
submitted April
2016
£9m Not known
F68 “Berry House
Gallery+”, Land
between Norfolk
Street and Brick
Street
To redevelop with 9 storey building
comprising 147 apartments , 11
ground floor commercial units, first
floor restaurant and basement car
parking.
North Point
Global
Application
16F/0825
submitted April
2016
£10m Summer 2018
F69 “St James Court”,
Greenland Street/
New Bird Street
and St James
Court
Rebuild 10 storey mixed use
scheme consisting 4 commercial
units on ground floor and 157
apartments on 1st-9th floors.
Hillmore
Developments
Limited
Permission granted
May 2016
£30m Summer 2018
F70 “The Keel” –
Phase 2
To erect 2 x 8 storey buildings of
257 PRS apartments
Queens Dock
Liverpool Property
Application
16F/0776 submitted
April 2016
£45m Not known
F71 Kings Dock
Development
Mixed use scheme
(leisure/retail/assembly/residential)
Development
Partner sought
Applications
awaited
£50m Not known
H
H
H
F55
F58
F57
F60
F62
F65
F69
F70