LOCATION Barr Na Claise, Church Hill, Innishannon, Cork CUSTOMER Ernst & Young (Site in Receivership) Case Study Requirements:: A new housing development consisting of 48 potential new builds required a new effluent treatment system to cope with the percolation. With 25 houses currently built – phase 1 of the project - the Cork County Council Storm Sewer couldn’t handle the volumes and the site needed a new solution. FEBRUARY 2016 Commercial Wastewater Treatment Plant with Tertiary Filters & SAF

Transcript of LOCATION Barr Na Claise, Church Hill, Innishannon, Cork · 2017. 1. 26. · Case Study...

Page 1: LOCATION Barr Na Claise, Church Hill, Innishannon, Cork · 2017. 1. 26. · Case Study Requirements:: A new housing development consisting of 48 potential new builds required a new

LOCATIONBarr Na Claise, Church Hill, Innishannon, Cork CUSTOMERErnst & Young (Site in Receivership)

Case Study

Requirements::A new housing development consisting of 48 potential new builds required a new effl uent treatment system to cope with the percolation. With 25 houses currently built – phase 1 of the project - the Cork County Council Storm Sewer couldn’t handle the volumes and the site needed a new solution.

FEBRUARY 2016Commercial Wastewater Treatment Plant with Tertiary Filters

& SAF

Page 2: LOCATION Barr Na Claise, Church Hill, Innishannon, Cork · 2017. 1. 26. · Case Study Requirements:: A new housing development consisting of 48 potential new builds required a new

Design Target:

To install an environmentally friendly, economical and low maintenance solution to phase 1 of the project accommodating the output of 5 people per dwelling (18.75m3/day).

Solution:

Conder SAF 125N5 with 3 banks of 4 x Eco� o 4EH Tertiary Filters.

Any other information:

The site is on a hill and the sewage � ows downhill to the lowest point to a pump station with 40m3 storage. The output is � ow balanced over 24hrs and pumps for 1 minute out of every 15. The end of life costs are very low as the material only needs changing every 15-20yrs. The waste material can be composted as it’s an organic; they are factory built in a controlled environment which maintains the highest of standards.