LOCAL SYSTEM PLAN - 2014 Presented at the ISO-NE Local System Plan Meeting October 22, 2014
The NU (Northeast Utilities) LSP (Local System Plan) has been revised to incorporate the latest proposed changes to the NU Local transmission system for CL&P, NSTAR, PSNH, and WMECO.
The LSP Project List is a cumulative listing of proposed
transmission solutions intended to meet local needs. This LSP-2014 supersedes NU’s LSP-2013.
Update to NU LSP for 2014
1
Per Attachment K – Local, the LSP:
Describes projected improvements to non-PTF (non-Pool Transmission Facilities) that are needed to maintain system reliability
Reflects:
Local Needs Assessments
Corresponding transmission system plans and future studies
Maps indicating project locations
Identifies:
Local Planning Process
Criteria, Data, and Assumptions used in the Local System Planning Process
Purpose of Local System Plan
2
ISO-NE posts the materials on the PAC web page prior to the meeting.
PAC, Transmission Customers, and other Stakeholders have 30 days after the meeting to provide any written comments for consideration by Northeast Utilities.
Comments to be directed to:
Robert P. Clarke Director, Transmission Business Operations Northeast Utilities One NSTAR Way, SE320 Westwood, MA 02090-9230 Phone: 781-441-8057 email: [email protected]
LSP Communication
3
Each PTO (Participating Transmission Owner) is individually responsible for publicly posting and updating the status of its respective LSP and transmission project list on their website in a format similar to the ISO-NE Regional System Plan Project List (RSP).
Northeast Utilities’ project lists are located at:
http://www.transmission-nu.com/business/ferc890postings.asp
… and on the NSTAR web site at:
http://www.nstar.com/business/rates tariffs/open access/
LSP Communication (cont.)
4
Local studies can result from:
Load growth
Area reliability assessments
Point of Delivery Requests from customers
Other efforts that may impact local facilities (e.g., elective transmission upgrades, reliability transmission upgrades, generator interconnections, short circuit or temporary overvoltage studies)
The Local System Plan:
Summarizes the needs
Summarizes the selection of preferred solution
Includes Local Projects that are related to projects listed in the RSP
Local System Planning Process
5
All Northeast Utilities local transmission facilities (69-kV and above) are part of the interconnected Northeast Utilities system and shall be designed in accordance with criteria described in the Northeast Utilities and NSTAR Transmission Reliability Guidelines.
Northeast Utilities complies with NERC, NPCC, and ISO-NE planning criteria.
The annual ISO-NE CELT Report forecasts for the New England area (90/10) load, with appropriate municipal customer forecasts and/or sub-area forecasts, are used.
Studies use the ISO-NE provided base cases and the ISO-NE short circuit database.
Criteria and Assumptions
6
This Local System Plan includes the following types of
Transmission System connections
NU has distribution connections and radial transmission connections.
Specific Transmission projects may be categorized as LSP or RSP, or may
contain both regional and local facilities.
PTF elements are included in the RSP.
Radial Connection
to PTF
Distribution
Connection to PTF
PTF
Non-PTF
Distribution 115-kV
bus
115-kV
Non-PTF
Substation
(illustrative examples)
7
Large-scale reliability assessments may ultimately have Local ramifications. Assessment studies are described in the ISO-NE RSP. Several longer-term assessments have been completed, and others are being conducted. Information about studies being conducted that may affect the local system can be found in the ISO-NE 2014 RSP:*
New Hampshire, RSP section 5.4.1
Connecticut, RSP section 5.4.2
Eastern Massachusetts, RSP section 5.4.2
Western Massachusetts, RSP section 5.4.2 * Public Meeting Draft 2014 Regional System Plan posted on August 29, 2014.
NH, MA, and CT Projects in Regional
System Plan
8
The LSP Project List is a cumulative listing of proposed transmission solutions intended to meet LSP needs.
The LSP Project List includes the status of each Non-Pool Transmission Facility (Non-PTF project). Non-PTF costs are provided for Proposed, Planned, Under Construction, and In Service categories of projects, using the same guidelines as the various stages of RSP projects. Some projects may have Non-PTF costs yet to be determined.
Concept - Project is under consideration as a possible solution but the needs assessment is not yet completed. Costs not known.
Proposed – Needs assessment completed and project proposed as the solution, but Proposed Plan Application (PPA) not yet filed.
Planned - PPA has been filed and approved by ISO-NE.
Under Construction - Final engineering and internal approvals completed and project being implemented.
In Service - Project completed.
LSP Project List
9
NU Service Territories
NU operates in three states:
NH, MA, and CT
10
Connecticut Projects
Norwalk
Transformer
Bulls Bridge
Transformer
Newtown
Substation
Greenwich
115/13.2
Substation
11
Local System Plan – Connecticut: CL&P
Status of project descriptors in blue have changed from previous LSP or are newly listed
* There are no Non-PTF costs for this project 12
Northeast Utilities Local Area Transmission Facilities Projects - CT (CL&P)
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
Load Growth May-14 *Norwalk/
Stamford
Norwalk substation - add a 3rd 115/13.2-kV
transformer (60 MVA) (Norwalk)In Service
Adding a third transformer to increase the capacity of the
substation.
Load Growth
and Reliability2017
Norwalk/
Stamford
Greenwich 115/13.2-kV Substation Project
(Greenwich) Planned
Add a new 115/13.2 kV bulk power substation in the
Greenwich area and two new 115-kV lines from Cos Cob to
Greenwich.
Load Growth 2017 * Southwest Newtown Substation (Newtown) PlannedReplace two existing transformers (28 & 30 MVA) with 60
MVA transformers.
Load Growth May-15 * SouthwestBulls Bridge substation – Add 27.6-kV Capacity
(New Milford)Proposed
Replace the existing 115/27.4 kV transformer with a new
dual voltage transformer
Load growth May-16 SouthwestCanal substation - add 115/23-kV transformer and
add a 115-kV breaker (Southington)Concept Add a second transformer of 47 MVA
Load growth Dec-16 EasternTracy substation - add 115/23-kV transformer and
add a 115-kV breaker (Putnam)Concept
Add a third transformer of 47 MVA and two 115-kV circuit
breakers.
Load Growth 2018Greater
HartfordScitico Substation (Enfield) Concept Add a third transformer (60 MVA) to the substation.
Load Growth
and Reliability2019 Northwest Burrville Substation (Torrington) Concept
Add a new 115/23-kV bulk power substation in the
Torrington area.
Eastern Massachusetts Projects
Hyannis Jct Falmouth
Acushnet – Pine
Street
Barnstable –
Harwich Tap
Harwich Tap –
Harwich Bulk
BOSTON SUB
AREA Hopkinton
Transformer
Canton
Transformer
Dover
Transformer
Wing Lane
Substation
Mashpee
Substation
Valley
Substation
Newton Highlands
Substation
and Reliability
Improvement
K-St to Dewar/
Andrew Sq
Somerville
Transformer
Saxonville
Mobile Station
Sudbury
Reactors
13
Local System Plan – NSTAR
Status of project descriptors in blue have changed from previous LSP or are newly listed
14
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
ReliabilityDec-13
$10.5MSEMA Replace Transformers at Canton Station 470 In Service
Replace transformers 110 A, 110B and 110C at Canton
Station 470
Load Growth
Reliability
June-14
$26.9M
NEMA/
Boston
Newton Transmission Reliability Improvement
ProjectIn Service
Install oil return line to increase cooling for two pipe type
cable circuits between Baker Street and Newton
Load GrowthJun-14
$5M
NEMA /
Boston Dover Transformer 110B upgrade In Service Upgrade transformer 110B to a 65.4 MVA unit
Load GrowthJun-14
$747K
NEMA
/BostonInstall Mobile Station at Saxonville Station 278 In Service
Tap line 342-507 at ROW 8-1 in Framingham, to connect a
mobile transformer and provide temporary local area
substation relief of 10 to 20 MVA
Load GrowthJan-14
$8.6MSEMA
Upgrade the 107W line from Falmouth Tap to
Falmouth Bulk SubstationsIn Service Upgrade ~5 miles of line to increased capacity.
Load Growth/
Reliability
Dec-14
$2.7MSEMA
Upgrade the capacity of the 119 line from Harwich
Tap to Harwich Bulk Substations
Under
ConstructionUpgrade ~4.5 miles of line to increase capacity.
Load GrowthJun-15
$16.2MSEMA Hyannis Junction Substation Upgrade
Under
Construction
Triple-End Hyannis Junction with 3rd 115/23kV 30/40/50
MVA transformer bank and reconductor line 123
Load Growth/
Reliability
Jun-15
$7MSEMA Wing Lane Substation Double Ending
Under
Construction
Double-End Wing Lane Substation with 2nd 24/32/40 MVA
115/13.2kV bank. Reconfigure lateral #112 line to Arsene
Street with a ABB Pass MO 2-breaker auto throw over
scheme.
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (NSTAR)
Local System Plan – NSTAR (continued)
Status of project descriptors in blue have changed from previous LSP or are newly listed
* There are no Non-PTF costs for this project 15
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
ReliabilityDec-15
$15.9MSEMA Acushnet - Pine St Upgrades
Under
Construction
Add breakers and reconfigure both Acushnet and Pine
Street Substations.
ReliabilityDec-15
$3.6MSEMA Pine St. upgrade
Under
ConstructionAdd 2 (10 MVAR) Reactors at Pine St.
Load Growth
Reliability
Jun-15
$7.9MSEMA Mashpee Substation Double Ending Planned
Double-End Mashpee Substation with 2nd 30/40/50 MVA
115/23-kV transformer bank.
Load Growth/
Reliability
Dec-15
$20.2M
NEMA
/BostonK-St to Dewar/ Andrew Sq Cable Project Planned
Install two 1-mile HPFF UG cables from K St to manhole on
Day Blvd and split wye splices. Reconfigure K St bus.
Load Growth/
Reliability
Dec-17
$19MSEMA New 115-kV Line from Barnstable to Harwich Tap Planned
Build a new 7.8 mile 115-kV line from Barnstable to Harwich
Tap, remove one line from the DCT to increase the capacity
of both transmission lines.
Load GrowthJun-15
$1.73MSEMA Install 3rd Transformer at Hopkinton Station 126 Proposed
Add prefab 115 kV breaker/switch assembly and 3rd
Transformer
Load GrowthJun-15
$1.44M
NEMA
/BostonSomerville Transformer 110A upgrade Proposed Upgrade transformer 110A to a 65.4 MVA unit
ReliabilityJun -15
$4.5M
NEMA
/BostonSudbury Reactors Proposed
Add 2 (20MVAR) 115kV reactors at Sudbury for light load
voltage control
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (NSTAR)
Local System Plan – NSTAR (continued)
Status of project descriptors in blue have changed from previous LSP or are newly listed
16
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
Load
Growth/Reliability/
Generation
Interconnection
Jun-15 *-
June-16SEMA Valley Substation Upgrade (2 year project) Proposed
Upgrade Valley Substation to two (2) 115/23kV 30/40/50
MVA transformer banks
Load Growth
Reliability
Jun-19
$30M
NEMA/
Boston
New Substation proposed to improve Newton
Highlands CapacityProposed
Construct a new substation, with new transmission line
supplies in the area.
Reliability Dec-16 SEMA 230/115-kV Transformer at Medway Substation ConceptAdd a 115/230-kV auto transformer at Medway Substation
for use under extreme operating conditions
Load Growth
ReliabilityDec-16 SEMA 2nd 115-kV Line from Duxbury to Marshfield Concept
Install 2nd 115-kV transmission line running 2.3 miles from
Duxbury substation to Marshfield Substation
Load Growth Dec-16NEMA
/BostonMaynard - Concord Supply Upgrade Concept
1) Install a third cable from Sudbury to Maynard.
2) Install oil return piping and cooling equipment for
increased capacity from the existing cables.
Load Growth 2016-2017NEMA
/BostonSherborn - Transformer & Switchgear upgrades Concept
Upgrade both 40 MVA transformers to 65.4 MVA
transformers
Load Growth/
ReliabilityJun-17 SEMA Falmouth Tap Switching Station Upgrade Concept
Upgrade Falmouth Tap Switching Station from a 1-breaker
series bus arrangement to a 115kV breaker and a half
scheme. Install a 115/23kV bulk distribution station with one
30/40/50 MVA transformer to address area load growth
Load Growth/
ReliabilityDec-17 SEMA 115-kV line from Orleans to Wellfleet Concept
1) Install a 2nd 115-kV transmission line.
2) Construct additional distribution circuit backup.
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (NSTAR)
Local System Plan – NSTAR (continued)
Status of project descriptors in blue have changed from previous LSP or are newly listed
17
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
Load Growth/
ReliabilityDec-17 SEMA
Fisher Road Supply Upgrade, 115-kV 4.4 miles
line from Cross Road to Fisher Road.Concept
1) Install a 2nd 115-kV transmission line.
2) Construct additional distribution circuit backup.
Load Growth 2017 SEMA Wellfleet - Transformer upgrades ConceptReplace 16/21/26 MVA transformers with 30/40/50 MVA
transformers
Load Growth 2018 SEMA Rochester Substation - Transformer upgrade ConceptReplace #114 10/12.5 MVA transformer with 12/16/20 MVA
transformer using spare transformer
Load Growth 2018 SEMA Tremont Substation - Transformer upgrade ConceptReplace #114 12/16/20 MVA transformer with 15/20/25 [28]
transformer using the spare removed from Valley Substation
Load Growth 2019-2020 SEMA Double Ending Oak Street Substation ConceptDouble Ending Oak Street Substation with 2nd 30/40/50
MVA bank and 23-kV bus section
Load Growth TBD NEMA Framingham - Install 3rd Transformer Concept Install a 3rd 65.4 MVA transformer
Load Growth TBD NEMA Maynard - Transformer upgrades Concept Upgrade both transformers to 65.4 MVA
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (NSTAR)
Western Massachusetts Projects
Southwick
Transformer
UMass/Amherst
Orchard
Transformer
18
Local System Plan – Massachusetts: WMECo
Status of project descriptors in blue have changed from previous LSP or are newly listed
* There are no Non-PTF costs for this project 19
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (WMECo)
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
Load Growth
and ReliabilityJun-15 * Springfield Southwick Substation transformer (Southwick)
Under
Construction
Replace the second transformer as part of the Southwick
transformer (1X) replacement project.
Load Growth
and ReliabilityApr-15 * Springfield Orchard Substation third transformer (Springfield) Planned Install third 115/13.8-kV 30MVA transformer in existing bay
Load Growth
and Reliability
Sep-15
$14.5MHadley UMASS-Amherst new substation (Tilson Farm) Planned
UMASS-Amherst will be constructing/owning/operating a new
115/13.8-kv substation with two 55 MVA transformers and a
circuit switcher at Amherst.
Load Growth
and ReliabilityDec-15 Springfield Clinton Substation 2X transformer (Springfield) Proposed
Replace existing Clinton 115/13.8 kV 2X transformer with
larger transformer
Load Growth
and ReliabilityDec-16 Springfield
Breckwood Substation transformer and
switchgear upgrade (Springfield)Concept
Replace existing Breckwood 115/13.8 kV 1X transformer with
larger transformer
Load Growth
and ReliabilityDec-16 Hadley
Gunn Substation transformer upgrade
(Easthampton)Concept
Replace existing Gunn 115/13.8 kV 2X transformer with larger
transformer
Load Growth
and ReliabilityJun-17 Springfield
Breckwood Substation transformer and
switchgear upgrade (Springfield)Concept
Replace existing Breckwood 115/13.8 kV 2X transformer with
larger transformer
Reliability Jun-17 SpringfieldWest Springfield 8C Substation transmission
asset replacement (West Springfield)Concept Evaluation on-going
Local System Plan – WMECo (continued)
Status of project descriptors in blue have changed from previous LSP or are newly listed
20
Northeast Utilities Local Area Transmission Facilities Project Listing - MA (WMECo)
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost Project Area Project Status Solutions
Load Growth
and ReliabilityJun-17 Greenfield
Montague Substation transformer upgrade
(Montague)Concept
Replace the existing Montague 115/13.8 kV 4X transformer
with a larger transformer
Load Growth
and ReliabilityDec-17 Springfield
Breckwood Substation transformer upgrade
(Springfield)Concept
Replace existing Breckwood 115/13.8 kV 3X transformer with
larger transformer
Load Growth
and ReliabilityDec-17 Greenfield
Montague Substation transformer upgrade
(Montague)Concept
Replace the existing Montague 115/13.8 kV 3X transformer
with a larger transformer
Load Growth
and ReliabilityDec-18 Springfield
Clinton Substation 1X transformer upgrade
(Springfield)Concept
Replace existing Clinton 115/13.8 kV 1X transformer with
larger transformer
Load Growth
and ReliabilityDec-18 Greenfield
Cumberland Substation transformer upgrade
(Greenfield)Concept
Replace existing Cumberland 2X transformer with larger
transformer
Load Growth
and ReliabilityDec-18 Pittsfield
Doreen Substation transformer upgrade
(Pittsfield)Concept
Replace exisitng Doreen 1X transformer with larger
transformer
Load Growth
and ReliabilityDec-19 Springfield
Clinton Substation 3X transformer and switchgear
upgrade (Springfield)Concept
Replace existing Clinton 115/13.8 kV 3X transformer with
larger transformer
Load Growth
and ReliabilityDec-19 Hadley
Gunn Substation transformer upgrade
(Easthampton)Concept
Replace existing Gunn 115/13.8 kV 1X transformer with larger
transformer
New Hampshire Projects
Rochester/Eastport
Kingston Area Peaslee
Switching Station
Tasker Farm
Mill Pond Substation
(Portsmouth)
21
Local System Plan – New Hampshire: PSNH
Status of project descriptors in blue have changed from previous LSP or are newly listed
22
Northeast Utilities Local Area Transmission Facilities Project Listing - NH (PSNH)
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost
Project
Area
division Project Status Solutions
Load Growth
Jun-14
$12.6M Seacoast
Construct a new 115/34.5 kV substation (Tasker
Farm Substation) with a 44.5 MVA transformer in
North Rochester.
In Service
The new distribution substation will be supplied by a new
Transmission line. Distribution infrastructure upgrades will
serve local load growth and provide reliability of service.
Load Growth
and Reliability
Jun-16
$0.1M Western
Build a new distribution substation in the North
Keene area which taps an existing transmission
line
Proposed
Install a 115/12.47-kV transformer at a new distribution
substation, to be supplied by an existing Transmission line.
Distribution infrastructure upgrades will serve local load
growth and provide reliability of service.
Load Growth
and Reliability
Jun-16Southern
Install a second 115/34.5-kV transformer at the
existing Rimmon substationConcept
The existing distribution substation is supplied directly from
the Transmission line (J114). Addition of a 2nd distribution
transformer will require construction of a Transmission
substation. Infrastructure upgrades will serve local load
growth and provide reliability of service
Obsolete
EquipmentJun-17 Southern
Retire existing 115/34.5 kV transformer at Greggs
substationConcept
Remove the 115/34.5-kV transformer and associated 34.5-
kV equipment at the existing Greggs substation. The 115-
kV substation will remain in service
Local System Plan – PSNH (continued)
Status of project descriptors in blue have changed from previous LSP or are newly listed
23
Northeast Utilities Local Area Transmission Facilities Project Listing - NH (PSNH)
Need
Projected ISD
Month/Year;
Non-PTF Est.
Cost
Project
Area
division Project Status Solutions
Load GrowthJun-17
SouthernBuild a new Broken Ground/Curtisville Substation
(Concord)Concept
The new Unitil distribution substation (Broken Ground) will
be supplied by existing 115-kV Transmission lines (P145
and V182), Curtisville. The project will offload PSNH's
Garvins and Oak Hill substations.
Load Growth /
Obsolete
Equipment
Jun-17Northern
Webster substation - replace all transformers with
2, 115/34.5, 44.8 MVA transformersConcept
Replace the existing three 115/34.5-kV, 20 MVA
transformers at Webster substation with two 115/34.5-kV,
44.8 MVA transformers.
Load GrowthJun-17
Northern
White Lake substation - Replace one of the
existing 28 MVA transformer with a 44.8 MVA
transformer
Concept
Replace one of the existing 115/34.5-kV, 28 MVA
transformer at White Lake substation with a new 115/34.5-
kV, 44.8 MVA transformer.
The projects listed below are associated with PTF projects listed in the ISO-NE RSP project list. The RSP Project ID is shown in parentheses.
Local Projects Included in the Regional System Plan
24
Northeast Utilities Local Area Transmission Facilities Project Listing - Projects in Regional System Plan
Need
Projected ISD
Month/Year
Project
Area Project Status Needs Assessment Solutions
Load Growth May-14Southwest
(CL&P)
Add 4th transformer at South End
SubstationIn Service
Fourth step-down transformer required to
support load
Expand South End Substation to handle customer
demands in downtown Stamford. This project is
associated with a PTF project listed in the ISO-NE
RSP project list. (1227).
Load Growth Jun-14Seacoast
(PSNH)Rochester Area Project (Eastport) In Service
The Dover/Rochester area has projected load
growth. (Part of Deerfield Autotransformer
project)
Build a new 6.9 mile radial 115-kV line from
Rochester/Eastport to new Tasker Farm
Distribution Substation. This project is associated
with a PTF project listed in the ISO-NE RSP project
list. (1141).
Load Growth Jun-15Seacoast
(PSNH)
Construct a new 115/12.5-kV distribution
substation (Mill Pond Substation) in the
Portsmouth area.
Under
Construction
Potential overloads in the Portsmouth area of
New Hampshire and provide operational
flexibility to the distribution system
The new Distribution substation transformer will be
supplied by tapping existing Transmission lines.
Distribution infrastructure upgrades will serve local
load growth and provide reliability of service.This
project is associated with a PTF project listed in the
ISO-NE RSP project list. (1557)
Load Growth Jun-16Seacoast
(PSNH)
New 115-kV Switching Station, to be
called Peaslee. From Peaslee construct
new 115-kV lines.
PlannedNeeded for Unitil 34.5-kV system load growth
and PSNH design criteria.
Construct a new 115-kV Switching Station.
Construct a new 5.5-mile 115-kV line from existing
Kingston Tap to the new switching station.
Construct two lines to Unitil 115/34.5-kV Substation
(two 60 MVA transformers). This project is
associated with a PTF project listed in the ISO-NE
RSP project list. (1183).
Load growth may require a third transformer (60 MVA) at the North Bloomfield Substation
Load growth may require a second transformer at the Carmel Hill Substation
Future Studies: Connecticut
25
Future Studies: Massachusetts
Load growth and reliability needs may require voltage
conversion of Midway 19B from 13.8 kV delta to 13.8 kV
grounded wye, or 23 kV grounded wye
Load growth and reliability needs may require Transmission to
be extended into Hannon (a new substation) in the City of
Springfield
Load growth and reliability needs may require adding a 13.8
kV transformer for distribution at South Agawam 42E
26
Future Studies: New Hampshire
Load growth may require a second transformer at Portsmouth
Substation
Load growth may require replacing the Pemigewasset
transformer with a larger transformer
Load growth may require a new substation in the
Dover/Madbury area
27
Please provide any written comments for consideration by
November 22, 2014 (as defined in the ISO-NE Open
Access Transmission Tariff Section II – Attachment K
Appendix 1 [Attachment K – Local], section 1.4).
Robert P. Clarke
Director, Transmission Business Operations
Northeast Utilities
One NSTAR Way, SE320
Westwood, MA 02090-9230
Phone: 781-441-8057
email: [email protected]