Loads in SCED

22
Loads in SCED Comments submitted by Luminant Energy Company, LLC

description

Loads in SCED. Comments submitted by Luminant Energy Company, LLC. Objective:. Maximize opportunities for load participation from eligible existing and future load resources Create an economically efficient method for price formation associated with Load Real-time (RTM) energy bids. - PowerPoint PPT Presentation

Transcript of Loads in SCED

Page 1: Loads in SCED

Loads in SCEDComments submitted by Luminant Energy

Company, LLC

Page 2: Loads in SCED

Objective:

• Maximize opportunities for load participation from eligible existing and future load resources

• Create an economically efficient method for price formation associated with Load Real-time (RTM) energy bids

Page 3: Loads in SCED

Key Issues:

• The proposed five-minute response time to SCED instruction may discourage participation from existing load control programs

• All load resources should be treated equitability and comparable to traditional resources (where practical)

Page 4: Loads in SCED

Key Issues:

• Voluntary response from non-controllable load should retain its right to curtail as desired

• Performance metrics should be reasonable, repeatable, verifiable, and benchmarked at least seasonally.

Page 5: Loads in SCED

Equitable Treatment:

•Response expectations consistent with achievable current program standards

•All Load Resources must submit or accept a proxy RTM Energy Bid and be dispatched by SCED

•Restoration time for loads should be consistent with other products

Performance Stds, M&V

•No punishment for “over-performance” from energy products

•Capacity values should be tested and verified no less than seasonally

•Tested and qualified LRs should be benchmarked against metered or calculated capacity

EFFICIENT AND INCLUSIVE MARKET DESIGN FOR LOADS

For improved participation and price formation, focus on equitable treatment and achievable standards

Page 6: Loads in SCED

Detailed Approach: Response ExpectationsIssue:

Existing load response programs (e.g. interruptible thermostats, pool pumps, water heaters, etc) may take longer than 5-minutes to provide response.

Proposed Solution: Allow loads to submit their five-minute ramp rate to be achievable over ten-minutes.

Consequence of no action:Existing load control programs will likely not participate in Loads in SCED v.2

Page 7: Loads in SCED

Detailed Approach: Equitable Treatment RTM Energy Bids

Issue:Current protocols allow certain loads to be dispatched by out-of-market instructions, potentially dampening prices during times of scarcity.

Proposed Solution: All load resources should be required to submit or accept an ERCOT proxy assigned a Real-time Energy Bid.

Consequence of no action:Loads dispatched by an out of market instruction will continue to attenuate prices, potentially when the marginal benefit of an addition MW of resource is equal approaching VOLL

Page 8: Loads in SCED

Load Resources providing• RRS • RRS by High-set UFR• Offline/Online Non-Spin

May submit RTM Energy Bids consistent with existing floors and ceilings for generators, and retain dispatcher control / frequency response of ancillary services

Detailed Approach: Equitable Treatment RTM Energy Bids

Page 9: Loads in SCED

Example: Deployment of RRS with RTM Energy Bids, SCED Dispatch

•Upon EEA Level 1, release RRS to SCED.•RTM Energy Bids for RRS capacity released to SCED shall be consistent with the appropriate ceilings and floors•RTM Energy Bids will be slightly less than the SWOC, randomly separated by a penny, to ensure timely deployment of loads, as needed, by SCED, before RRS provided by generation resources

Page 10: Loads in SCED

Retaining Reliability Tools

• The ERCOT dispatcher will retain control of the release of RRS Capacity to SCED, and

• Loads providing RRS via high-set under-frequency relays will still deploy to a drop in system frequency, until such capacity is dispatched in an Energy Emergency Alert Level II.

Page 11: Loads in SCED

Equitable Treatment of Loads: Recovery after deployment

Current Nodal Protocols* allow loads separating from the system by high-set under-frequency relay up to three hours to return to service.

Luminant’s proposal retains this restoration time, but further stipulates that the deployed load should contribute to price formation as if it were any other deployed resource in the RT offer stack. (Deployed load added back to GTDB)

*Section 8.1.1.4.2 Paragraph (1) (d)

Page 12: Loads in SCED

Update to Generation to be Dispatched (GTBD)

A decrease in load associated with a successful deployment of a load resource (analogous to a decrease in system demand) will decrease GTDB, and move the System Lambda down the System incremental cost curve.

Luminant proposes adding back deployed load resources to the GTBD calculation to ensure efficient price formation.

Page 13: Loads in SCED

Performance Standards / M&V

For Energy Bids:Luminant agrees that failure to curtail consumption beyond the stated willingness to buy creates adequate economic incentive to perform.

However, repeated instances of non-performance to qualified controllable resources should be penalized by disqualification.

Page 14: Loads in SCED

Performance Standards / M&V

For Ancillary Service Resource Responsibilities:Luminant agrees that more stringent penalties are necessary to ensure adequate response.

However, to accommodate “blocky” loads and Controllable Load Resources not independently metered from passive load on the same meter, Luminant suggests eliminating penalties for “over-performance.”

Page 15: Loads in SCED

Total Metered Load, = Net Power Flow, = Powertelem, = C

Total Available Load Resource Capacity, = MPC-LPC, determined by algorithm

Passive, non-controllable load, calculated as C-B

A

B MPC

LPC Total Metered Load, = Net Power Flow, = Powertelem, = C

MPC

LPC

B

A

Passive Load Decreases

Performance Standards: Example 1

In this example, if passive load curtails consumption coincident with a deployment of a Controllable Load Resource (CLR), the metered response may suggest that the CLR “over-performed” to a SCED instruction.

Page 16: Loads in SCED

Total Metered Load, = Net Power Flow, = Powertelem, = C

Total Available Load Resource Capacity, = MPC-LPC, determined by algorithm

Passive, non-controllable load, calculated as C-B

A

B

LPC

Base Point

MPC

Performance Standards: Example 2

In this example, if a load over-performs to its Base Point, Luminant suggests that this load is not subject to Base Point Deviation Charges. Luminant believes that absent this change, “blocky” loads will be discouraged from participating in Loads in SCED.

A

B

MPC

LPC

Curtailment achieved

Page 17: Loads in SCED

Measurement and Verification

Numerous existing aggregations of residential controllable load are not independently metered.

Interruptible thermostats, pool pumps, and other aggregated residential loads depend on a time of day / seasonal algorithm to determine available and achieved capacity in real-time.

Page 18: Loads in SCED

Measurement and VerificationTo attract participation from existing load control programs, Luminant suggests that:– Controllable loads providing Ancillary Services not independently metered

from passive loads behind the same meter qualify based upon a seasonal demonstration of the efficacy of the calculated capacity values.

– Qualified controllable loads providing Ancillary Services are accountable for satisfying Controllable Load Resource Energy Deployment Performance (CLREDP*). Failure to meet CLREDP standards shall disqualify a CLR.

* Consistent with the recommendations in this presentation, Luminant proposed modifying the CLREDP standards to only penalize under-response

Page 19: Loads in SCED

Summary:

Luminant’s proposal, as presented, is designed to

• Maximize participation of existing load aggregations, while

• Actively contributing to efficient price formation.

Page 20: Loads in SCED

Summary

Specifically, to create an equitable market for loads, Luminant suggests:– Establish performance expectations and

verification requirements such that existing programs can participate

• Allow M&V by algorithm, and seasonal verification• Remove penalties for over-performance for loads providing

RRS• Assume that, for energy-only RTM Energy bids, exceeding

one’s own willingness to buy is sufficient economic incentive for adequate performance

Page 21: Loads in SCED

Summary

Specifically, to create an equitable market for loads, Luminant suggests:– Require all controllable load resources either submit

or accept by proxy a RTM Energy bid and be dispatched by SCED.

• Allow dispatcher deployment, and SCED dispatch of all Loads providing Ancillary Services

• Retain restoration time for CLRs providing RRS, while counting that deployed load as a dispatched resource in GTDB

Page 22: Loads in SCED

Questions?