LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors...

12
LN2 filling system 1. Filling the buffer tank 2. Filling the collector tube 3. Filling the detectors 4. Venting the collector tube 5. Monitoring then go to 1 or 2

Transcript of LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors...

Page 1: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

LN2 filling system

1. Filling the buffer tank2. Filling the collector tube3. Filling the detectors4. Venting the collector tube5. Monitoring then go to 1 or 2

Page 2: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

1. Filling the buffer tank

• Automatic?• Alarm on the buffer tank to alert operators?

Page 3: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

2. Filling the collector tube

• Logic sequence:– Open VP – Open VIN– While FP wait for TP to get to LN2 value– Close VP

Page 4: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

3. Filling the detectors

• Logic sequence:– (VIN already open, VP closed)– Open VDi– Wait until TVi is at LN2 temp– Close VDi

Page 5: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

4. Venting the collector tube

• Logic sequence:– Close VIN– Open VP

Page 6: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

5. Monitoring

• Logic sequence:– Check P,V against alarm threshold ->Step 1: Fill the buffer– Check Tdi against limit value ->Step 2: Fill all the detectors– Check time since last fill ->Step 2: Fill all the detectors

Page 7: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Implementation – collector

VIN

24V

NI 9476

VP

24V

NI 9476

NI 9217 NI 9425

10 – 40 V DC

NI 9217

Collector

SafetyValve(s)

NI 9476 1 + 1/column

NI 9425 1 /column

NI 9217 1 +1

24 V AC 1 +1/column

10-40 VDC 1/column

Page 8: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Implementation - detector

VDi

24V

NI 9476

NI 9217

Collector

SafetyValve(s)

NI 9476 1/detector

NI 9217 1

24 V AC 1 /detector

Dewar TDi

Page 9: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Implementation – monitoring

V

Collector

P

NI 9217NI 9425?

NI 9217NI 9425?

Dewar

Crystal

NI 9

217

NI 9

217

Page 10: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Custom modules

To NI 9217

To NI 9217

PTi From N

I 9476

12 V

Power On/Off

Open / Close

Opened / Closed

Powered Y/N

To NI 9425

Read PT100 Distribute valve signal Command one valve

10-40 V DC

Read flux sensors

M1 M2 M3 M4

12V

Page 11: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

M3 working principle

12 V

Power On/Off

Open / Close

Opened / Closed

Powered Y/N

M3

12V

NI 9476

Valve

12 V

Page 12: LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Connection diagramCompact Rio Crate (6 x NI 9217, 1 x NI 9476, 1 x NI 9425)

PT100

PT100

Prox

M1

12V

Prox

M2 M3

Valve

12V?

12V?

M4