Llewellyn St Merewether Traffic Plan - Final November 2016
Transcript of Llewellyn St Merewether Traffic Plan - Final November 2016
B
B
48
35
44 42 40 38 36
39 30
32 32
SHOPS
58A
61 58
56
54A
54
52
50
48
46
46A
44
5747
49
51A
51
53
55
57
59
65
71
63
73
61 59 57 55 53 48
41 41 33 31 25-29
POSTOFFICE
ST AUGUSTINE'S ANGLICANCHURCH
FIRESTATION
SOUTH LEAGUESCLUB
GROCERYSTORE
CARPARKAND
LOADING
CARPARKAND
LOADING
EXISTINGINFORMAL
CARPARK ONPRIVATE LAND
NEW DEVELOPMENT SITEINCLUDING CHILDCARE CENTRE
MAIL ZONE
54
58
56
58
26
28
24
22
20
18
656361
BUS STOP
BUS STOP
D
D
DRIVETHRU
CARPARK
PO Box 489 Hunter Region Mail Centre Newcastle 2300
NORFOLK ISLAND PINEIn-road planting
KERB RAMPSONE -WAY TRAVEL DIRECTION
STREET FURNITUREIncluding seats, bike rack and garbage bins.
LEGEND
PROPERTY BOUNDARY LINES
TURF
MASS PLANTING
PROPOSED KERB ALIGNMENT
LARGE STREET TREE
SMALL-MEDIUM STREET TREE
EXISTING TREE
EXISTING CONCRETE PAVEMENT
RAISED PEDESTRIAN CROSSING
KERB RAMPS
RAISED THRESHOLD WITH ISLAND PLANTING NO STOPPING
D
B BUS STOP
CAFE
OUTDOOR DINING SPACE
ONE -WAY TRAVEL DIRECTION
STREET FURNITUREIncluding seats, bike rack and garbage bins.
REMOVE KERB
NEW CONCRETE ASHLAR PAVEMENT
SPEED CUSHIONTo slow traffic speed
SPEED CUSHIONTo slow traffic speed
Llewellyn Street - Traffic Plan
north
BERNER STREET
1st November 2016REV A - COLOUR
BUILDING IN CONSTRUCTION
DESIGN PROPOSAL
2
MO
RGAN
STR
EET
WIN
SOR
STRE
ET
LLEWELLYN STREET
DEN
T ST
REET
MER
EWET
HER
STR
EET
MER
EWET
HER
STR
EET
MER
EWET
HER
STR
EET 1 1 2
3
3
3
3
6
6
7
BUILDING IN CONSTRUCTION
DESIGN PROPOSAL
3
7
8
Raised Threshold to define the 40km/hr zone and the entrance to the 'Neighbourhood Centre'. One way on Merewether Street between
Berner and Llewellyn Streets.
1 40km/hr Zone between Morgan Street and Merewether Street.
2
4
5
3
Five minute parking for Childcare Centre during morning and afternoon drop-off and pick-up. Reverts to 2 hour parking outside these times.
Five minute parking for Childcare Centre during morning and afternoon drop-off and pick-up. Reverts to loading zone outside these times.
6
Redundant driveways to be removed.
Kerb-extension to reduce crossing distance.
NOTE: All existing car parking arrangements are retained unless shown on the plan.
Proposed pedestrian crossing. To improve access and slow traffic.
4
45 5
5
5
8
8