Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi, Dennis Coyne, Riccardo DeSalvo, Michael Forte, Carlo Galli, Yumei Huang, David Ottaway, Virginio Sannnibale, Alberto Stochino, Chiara Vanni, LIGO Gravitational Wave Observatories California Institute of Technology Massachusetts Institute of Technology

Transcript of Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System...

Page 1: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

HAM SAS Passive Seismic Attenuation System

Fabrication, Assembly, Installation

Ben Abbott, Valerio Boschi, Dennis Coyne, Riccardo DeSalvo, Michael Forte, Carlo Galli, Yumei Huang, David Ottaway,

Virginio Sannnibale, Alberto Stochino, Chiara Vanni,

LIGO Gravitational Wave ObservatoriesCalifornia Institute of Technology

Massachusetts Institute of Technology

Page 2: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Building a seismically isolated optical bench for the HAM chambers

(replacing both ISI and HEPI)

Page 3: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Construction statusa summary

• All SAS parts have been manufactured• Problem encountered with welding,

this generated substantial delay• Dirty state assembly/testing ongoing @ G&M• Built clean chamber for clean assembly• Developing cleaning procedure• Building oven for final clean gas bake-out• Additional delay from complexity of task

Page 4: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Weldments Substantial problems encountered

in production of base structure

• Aluminum weldments shrunk MUCH more than expected

• Problems in producing UHV class welds• Solutions:• Honeycomb structure strain relaxed in oven• New techniques for present and further productions• Bottom plate of structure bolted instead of welded• Now back on track

Page 5: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Base structure partsPart shaping to reduce heat loss during welding => UHV class welds

Constraining honeycomb during final welding

Page 6: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Some weld quality controlshaping parts worked well

Page 7: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Weldments details

Cross pipe supports

Weld shrinkage effect

Page 8: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Base structure final machining and

bottom plate assembly

Page 9: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Assembly philosophy

• Dirty assembly and some testing

• Disassemble and UHV cleaning

• Clean room assembly and factory tuning– Minimize use of LIGO manpower

• Shipping clean assembly

• Install in HAM as a unit

Page 10: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

GAS filter assembly theory

• Pull the blade over a form

•Mount the base in the filter•Transfer the load and tune

Page 11: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Actual GAS filter assembly

Page 12: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Assemblying GAS filters

Page 13: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

• Use screws for radial compression tuning

• Add mass to change working point

• Best mechanical working point

0,2850,290,2950,3

0,3050,310,3150,320,325

-600-400-200 0 200 400 600

Frequency [Hz]

LVDT voltage [V]

Y = M0 + M1*x + ... M8*x8 + M9*x90,28775M0

-5,7998e-06M11,2562e-07M2

0,99568R

Tuning the GAS filter

Page 14: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Mounting the spring box

Page 15: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Mounting the IP flex joints

Page 16: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Assemblying the IP legs

Page 17: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Dirty state assembly ongoing @ G&M

Page 18: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

NEXT: IPFrequency/Load tuning

00.511.522.533.5

0 100200300400500600700800

frequency [Hz]

mass[kg]00.10.20.30.40.5

500550600650700750

frequency [Hz]

mass[kg]

y = m2 * sqrt(m1-M0)ErrorValue1.3757741.47m1 0.000414020.028992m2 NA0.00062295Chisq NA0.99751R

Page 19: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Next steps

• Mounting the LVDT sensor/coil actuator units

• Test cabling

• Disassemble for cleaning

• Clean assembly

Page 20: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Clean room construction

• Clean room filters being installed, clean ass.y stands, crane, shelving in fabrication

Page 21: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Cleaning tests

• Basic (NaOH) etch cleans surface and exposes weld residues (probably organic)

Page 22: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Cleaning tests

• Acid etch and rinsing eliminate residues

Page 23: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Cleaned test structure

Page 24: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Cleaning plant

• now finished, being commissioned

Page 25: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Further UHV processing

• Building 3 m diameter clean air/Argon atmosphere bakeout oven – for individual part bakeout– for final assembly bakeout

Page 26: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Cleaning quality control

• Provided in house FTIR testing– Better control– Faster turn around– Direct monitoring of absorption @1064 of

possible contaminants

Page 27: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Installing SAS in the HAMs

• Movement carts ready

Page 28: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Installing SAS in the HAMs

Installation/lifting carts being manufactured

Page 29: Livingston 16 th August 2006 LIGO-G060419-00-E HAM SAS Passive Seismic Attenuation System Fabrication, Assembly, Installation Ben Abbott, Valerio Boschi,

Livingston 16th August 2006 LIGO-G060419-00-E

Summary• We are going slower that we expected but

by next Hanford LSC meeting we will have a first class seismic attenuator:

1. Single stage including the functionality of HEPI2. Passive attenuation:

• No active components in vacuum (only coils) – No chance of electronics failures in vacuum ! ! ! – Virtually no power dissipation under vacuum ! !

– (From elimination of active components and from Low Frequency mechanics)

• No sealed gas volumes in vacuum– No chance of crippling virtual leaks ! ! !

• Immunity from power failures• Earthquake protection ! !