LiveSource Presentation for NTMA 2013
-
Upload
carey-glasscock -
Category
Business
-
view
197 -
download
1
description
Transcript of LiveSource Presentation for NTMA 2013
![Page 1: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/1.jpg)
NTMA Sourcing Fair Pre-Conference
![Page 2: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/2.jpg)
2
MFG.com Qualifications and Experience
50K Buyers
250K Suppliers
MFG.com Fast Facts
Founded 2000
200 Employees
Bezos Expeditions/Fidelity
CNBC Small Business Council
Department of DefenseMarketplace
$116B Sourced
MFG.com (2013)
![Page 3: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/3.jpg)
3
DoD Portal
![Page 4: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/4.jpg)
4
Over 50,000 Sourcing Professionals use MFG.com
![Page 5: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/5.jpg)
5
Roger Blumberg
Vice President, Global Business Development
Strategic Sourcing (15+ years)• IT• Chemical• Distribution• Retail
Enterprise Software Development & Consulting (10+ years)• General Electric• FreeMarkets• Ariba• A.T. Kearney• MFG.com/LiveSource
![Page 6: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/6.jpg)
6
Considerations: Supply Chain Opportunities & Threats
• 68% of global executives responded in a recent McKinsey survey that supply chain risk will increase in the coming 5 years
• 43,546 business bankruptcy filings in 2009 compared to 28,322 in 2008, and 19,322 in 2007
• A recent survey from the Assessment of Excellence in Procurement stated that managing risk is at the top of Chief Executives “value” expectations for procurement
• Single sourced supply and lack of contingency planning for critical parts/components has resulted in lost production and company revenues Japan Tsunami – Paint shortage – Ford F-150 Lightning strikes mobile phone microchip plant – Phone Manufacturer loses $400M Fire at auto parts factory of key supplier forced auto maker to temporarily shut down
productions at its Japanese plants
![Page 7: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/7.jpg)
7
Japan Tsunami
Sony, Panasonic, Toshiba, Canon, General Motors, Caterpillar, Boeing, Intel, Apple, Texas Instruments, Ford, Cisco, Hewlett-Packard, National Semi-conductor
![Page 8: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/8.jpg)
8
Japan Chemical Plant Fire
Nippon Shokubai is one of the world's biggest makers of acrylic acid, the main ingredient of a resin called SAP, which is used in diapers
![Page 9: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/9.jpg)
9
Thailand Floods
Toyota (reduced operating profit by $1.6 billion), Ford (lost production of 30,000 vehicles), Lenovo (shortage of hard disks), Canon and Sharp
![Page 10: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/10.jpg)
10
Hurricane Katrina
Shell Oil Company, ExxonMobile, Valero Energy, ConocoPhillips, Citgo, Colonial Pipeline, Dow, Pinnacle Polymers, Hercules Inc, GE Plastics
![Page 11: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/11.jpg)
11
Volcanic Ash Cloud
Airline Industry, Food Importers/Exporters, Nissan
![Page 12: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/12.jpg)
12
Supplier Risk – Protecting Your Brand
• Peanut Corporation of America 9 deaths and 714 people contracted salmonella Plant did not have a valid state health certificate
• Sony Laptop Batteries Damaged users laptops and caused small fires Impacted Apple, Dell and 8 million batteries
• Unsafe work conditions & child labor Nike – Implemented SHAPE (Safety, Health, Attitude,
People and Environment) Apple – Foxconn factories – unsafe work conditions
![Page 13: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/13.jpg)
13
Supply Chain Risk Categories
• Operational/Technological Machine Failure, component/material shortages, capacity constraints
• Social Strike, accidents, absenteeism, human error, union/labor relations
• Natural/Hazard Fire, wildfire, flood, monsoon, blizzard, ice storm, drought, heat wave,
tornado, hurricane, typhoon, earthquake, tsunami, epidemic
• Economy/Competition Interest rate fluctuation, exchange rate fluctuation, commodity price
fluctuation, bankruptcy, stock market collapse, global recession
• Legal/Political Law suites, new regulations, war, customs risk, political instability
![Page 14: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/14.jpg)
14
Mapping your Risk?
Know your risks and develop your contingency planSource: IBM Global Business Services
![Page 15: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/15.jpg)
15
How does Marketplace Sourcing Help?
• Readily available references and feedback from the buying community
• Better pricing – suppliers in a large marketplace know they need to be competitive
• Reduced research effort – find the right supplier with the right capability and capacity to handle your surge requirements
• Protect your brand – easily collect and maintain critical onboarding documentation such as certifications and classifications (socioeconomic)
• Speed to market – suppliers know they have a very short turnaround for pricing and delivery
![Page 16: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/16.jpg)
16
Rapidly Find Suppliers Who Can Handle Your Requirements
![Page 17: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/17.jpg)
17
Detailed Supplier Profiles Reduces Research Efforts
![Page 18: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/18.jpg)
18
All Certifications are Validated Within the LiveSource Platform
![Page 19: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/19.jpg)
19
Supplier References Readily Available
![Page 20: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/20.jpg)
20
Intellectual Property is Protected
![Page 21: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/21.jpg)
21
Quote Volume is Significant but Manageable
![Page 22: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/22.jpg)
22
Ability to Easily Evaluate Quotes
![Page 23: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/23.jpg)
Sourcing Fair Preparation
![Page 24: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/24.jpg)
24
Preparing for a Sourcing Fair
![Page 25: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/25.jpg)
Pace Yourself
• 345 minutes total Sourcing Fair time• 75 to 80 supplier attending (2:1 ratio)
• 4 minutes 6 seconds per supplier in order to speak with every supplier
• Be aware of the time you spend with an individual supplier. Don’t get drawn into an extended conversation• Utilize lunch as your opportunity to have extended conversations
25
![Page 26: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/26.jpg)
26
Table Top Preparation
![Page 27: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/27.jpg)
27
Establish a Check-List
Geography Certifications (Quality) Diversity Capacity Capability (machines, material, etc) References Company demographics
# of employees Years in businessIf possible, print out the check list and use it as a way to quickly grade the
suppliers and as a place to take notes
![Page 28: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/28.jpg)
28
What is Your Story?
• I am looking for a new supplier for a new product (projected annual volumes)
• I am looking for a new supplier for an existing product line (what is wrong with the current supplier?)
• We are looking to further diversify our supply base (reduce supplier risk)
• We are looking at brining spend back to North America from China (how much?)
Any Others Suggestions ?
![Page 29: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/29.jpg)
29
Survival Guide
• Give yourself 1 minute between suppliers to take notes on the checklist and catch your breath
• You don’t need to sell your opportunities, they need to sell their capabilities, let them do the talking and save your voice
• If someone is clearly not a fit, time is precious, move them along
• Be selective with the distribution of your business cards
• Hydrate and regular bathroom breaks
![Page 30: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/30.jpg)
30
Develop a Code
![Page 31: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/31.jpg)
31
Duckpin Bowling
Location Fountain Square Theater
1105 Prospect Street
Provided Food, Drinks and Duckpin Bowling provided
Networking Meet with buyers and manufacturers attending the NTMA Purchasing Fair
![Page 33: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/33.jpg)
33
Robert YohoRegional Director
Conflict Minerals
![Page 34: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/34.jpg)
34
Global Supply Base
![Page 35: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/35.jpg)
35
The LiveSource Solution
• e-Sourcing RFI, RFQs and reverse auctions 150,000 certified and rated
manufacturing suppliers Over 500 industry standard templates Project management
• Supplier Management Supplier discovery, scorecards, document
management and intelligence Supply chain health and risk mitigation Conflict mineral management
![Page 36: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/36.jpg)
Conflict Minerals
Title XV of the Dodd-Frank Wall Street Reform and Consumer Protection Act
“Section 1502 requires persons to disclose annually whether any conflict minerals that are necessary to the functionality or production of a product of the person, as defined in the provision, originated in the Democratic Republic of the Congo or an adjoining country and, if so, to provide a report describing, among other matters, the measures taken to exercise due diligence on the source and chain of custody of those minerals, which must include an independent private sector audit of the report that is certified by the person filing the report…”
36
![Page 37: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/37.jpg)
Solving Conflict Minerals Gap The LiveSource Solution
37
• LiveSource Allows for the collection of your suppliers as well as their
suppliers’ documentation, verifying they are not sourcing from countries that are on the banned supply list
Notifies you and your supply chain organization when any signed or verified document or certification is due to expire, protecting against the use of non-compliant suppliers
Acts as your single supplier communication vehicle to easily communicate your company’s policies regarding Conflict Minerals with acknowledgement records by individual
Provides on-demand reports detailing which suppliers are and are not in compliance with your enforcement of the Conflict Minerals policy
![Page 38: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/38.jpg)
Conflict Minerals Tracking Within LiveSource
38
![Page 39: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/39.jpg)
39
Conflict Minerals Supplier Certifications
![Page 40: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/40.jpg)
40
Discussion
![Page 41: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/41.jpg)
How Kimberly-Clark bridges the gap between engineering and sourcing
![Page 42: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/42.jpg)
42
Patrick Nahm
• Education B.S. Mechanical Engineering from Marquette U.
• K-C Experience Plant Engineer (Baby Care) Global Staff Engineer (Corporate) Plant Project Manager (Child Care) Plant Operations Team Leader (Adult Care) Procurement Consultant (Corporate)
![Page 43: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/43.jpg)
Lead the World in Essentials for a Better Life
57,000 employees worldwide
$21.1 Billion in Net Sales in 2012
Well-known global brands HUGGIES® KLEENEX® SCOTT®
KOTEX® PULL-UPS® DEPEND®
#1 or #2 position in more than 80 countries
1.3 billion consumersuse our products daily
![Page 44: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/44.jpg)
Our Businesses
Personal Care
Health Care
Consumer Tissue
K-C Professional
![Page 45: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/45.jpg)
Our Brands
![Page 46: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/46.jpg)
K-C’s World Class Manufacturing Program delivers bottom-line results through operations in more than 100 manufacturing facilities located in 38 countries worldwide
United States 27
Canada 1
Europe 20
Asia, S. Asia, MEA 24
Latin America
32
Other 8
Manufacturing Facilities
United StatesCanadaEuropeAsia, S. Asia, MEALatin AmericaOther
Source: K-C 2009 Annual Report
World Class Manufacturing Program
![Page 47: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/47.jpg)
Machinery & Equipment Team
47
M&E Director
Parts Supply (30 people)• Provides spare parts to K-C
plants globally
Manufacturing (50 people)• Fabricate and assemble
machines to support global projects and development
Buyers (12 people)• Procurement of machinery,
equipment, and engineering
![Page 48: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/48.jpg)
48
Opportunities/Challenges
• Need to supply the “best value” equipment anywhere in the world to support businesses Primarily used local suppliers Mix of simple and complex machining processes In House vs. Outsource challenges Intellectual Property concerns Hundreds of RFQ’s per year
![Page 49: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/49.jpg)
49
Example – Converting Machine Module
![Page 50: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/50.jpg)
50
Results
• Created a new Machinery & Equipment organization Link Manufacturing, Parts Supply, and Buyer teams Strong ties to engineering organization/project teams Global accountability for machinery purchases
• Utilized MFG.com supplier marketplace and technology Developed new suppliers Used LEAN to optimize and standardize processes Leverage supplier capability – “right part to right shop”
![Page 51: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/51.jpg)
51
Part of the Journey
• We did NOT lose our core capability to manufacture machines
• Learned that suppliers will build per the spec • Communicated to our suppliers what we were
doing• Sourcing example – machine frames
![Page 52: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/52.jpg)
52
Conclusion
• Challenge the status quo• Align objectives with engineers/project teams• Continue to challenge your current suppliers• Constantly test the global markets to
determine best value• Leverage technology when appropriate to
speed up the RFQ/Supplier management process
![Page 53: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/53.jpg)
Purchasing and Supply Chain Management
“Global Purchasing in an Ever Changing World”
![Page 54: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/54.jpg)
Procurement Strategies achieve:
Long-term objectives of the organization Provide geographic localization where applicable Review constraints and policies that restrict, or bog down
activities Action plans and goals expected to help achieve financial
objectives Transparent operational alignment
Define your Purchasing Strategy
![Page 55: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/55.jpg)
Strategy Levels
Departmental Strategies
Functional Strategies
Business Unit Strategies
Strategies require horizontal
and vertical alignment!
Corporate Level Strategies
![Page 56: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/56.jpg)
Resources
• Internet Searches www.transportlink.com www.thomasregister.com www.fabricating.com
• Applied internet global sourcing www.mfg.com• Prior Purchase Files/Assessments• Professional 3rd party sources• Professional industrial affiliations ASTM/SAE/SEMA/SME/MAPP• Discussions with end user, customers, net-
working, commodity leaders• Financial reviews
![Page 57: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/57.jpg)
Portfolio Analysis
Strategic Leverage
Acquisition Multiple
Number of Capable Suppliers
Value toBuyer
Few Many
Low
High
![Page 58: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/58.jpg)
• Insource or outsource?• Cost-vs. market-based approach• Type of suppliers?
High or low technology Full service Niche or distributor
• Local or global supplier?• Single, dual or multiple source?• Percentage of buy to each supplier?• Can the supplier help improve your organization?• What is the true value of the product?
Key Commodity Strategy Questions
![Page 59: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/59.jpg)
Portfolio Analysis
Acquisition Phase Suppliers within a region Priority items Total dollars spent Amount of time and dollars to acquire Developed quality and technology Able to move easily between suppliers--low cost to switch Focus on removing effort and transactions Focus on Value Analysis (Cost Breakdown)
![Page 60: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/60.jpg)
Value Purchasing
• Value in Purchasing
Strategic Leverage
Acquisition Multiple
Number of Capable Suppliers
Value toBuyer
Few Many
Low
High
![Page 61: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/61.jpg)
Value Proposition
Does the supplier provide a strategic deployment plan that reflects a quality product at the lowest
landed price?
Does the supplier provide a strategic deployment plan that reflects a quality product at the lowest
landed price?
![Page 62: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/62.jpg)
Portfolio Analysis
• Portfolio Analysis Quadrant Characteristics: Multiple Greater number of suppliers Low to medium annual dollars Able to move easily between suppliers--low
switching costs Developed quality and technology Focus on price analysis to gain benefit
![Page 63: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/63.jpg)
Portfolio Analysis
• Portfolio Analysis Quadrant Characteristics: Leverage Greater number of suppliers Medium to high annual dollars Focused commodity families Combining contracts across units yields savings Developed quality and technology Able to move easily between suppliers Focus on cost and price analysis
![Page 64: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/64.jpg)
Portfolio Analysis
• Strategy emphasis: Leverage Combine volumes for lower cost May use a longer-term agreement Use target costing Probe for efficiencies or improvements
![Page 65: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/65.jpg)
Portfolio Analysis
• Portfolio Analysis Quadrant Characteristics: Strategic Few capable suppliers Items or services critical to success Unique or customized items Collaborative or interdependent relationships Unable to move between suppliers easily Practice reverse marketing Develop collaborative relationships Pursue annual cost/price/quality/cycle time improvement
goals Use of longer-term agreements
![Page 66: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/66.jpg)
• What are past expenditures by commodity and by supplier?
• What are expenditures as percent of total?• What are the scores for each supplier related to
Q/D/C?• What is the technology roadmap for each
supplier?• What are current & future volume requirements? • Are there opportunities to leverage commodity
expenditures with similar commodities?
Are You Able to Answer the Following Questions?
![Page 67: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/67.jpg)
• Long-term or short-term agreements?• Escape clause?• Degree of risk?• Bailment agreements related to tooling?• Electronic on-line or manual ordering?• Supplier development - degree of difficulty?• Use full-service provider?• Supplier’s ability to support design?• Supplier’s ability to provide cost down
improvement plans?
Key Product Strategy Questions
![Page 68: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/68.jpg)
Translating Objectives into Purchasing Goals
CompanyObjectivesCompanyObjectives
PerformanceMeasurement
Review
PerformanceMeasurement
Review
ContinuousImprovementContinuous
Improvement
Purchasing & Supply Chain
Goals
Purchasing & Supply Chain
Goals
Cross-FunctionalBusiness
Objectives
Cross-FunctionalBusiness
Objectives
Purchasing &Supply Chain
Strategies
Purchasing &Supply Chain
Strategies
PerformanceMeasurement
System
PerformanceMeasurement
System
![Page 69: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/69.jpg)
Purchasing and Supply Chain Management
What single piece of technology has changed the way we do business today?
![Page 70: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/70.jpg)
Purchasing and Supply Chain Management
![Page 71: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/71.jpg)
World Wide Web (Benefits)
Generates interaction globally! Creates a global community!
Facilitates communication!
Provides information!
![Page 72: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/72.jpg)
What the WEB Says
Advantages– Availability of free information– Low cost of initial connection– The same protocol of communication can be used for several services – Facilitates rapid interactive communication– Facilitates the exchange of huge volumes of data– Facilitates professional contacts– Facilitates access to different sources of information– Facilitates management of companies information system– lt is accessible from anywhere– It has become the global media
![Page 73: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/73.jpg)
What the WEB Says
Disadvantages– Danger of overload and excess information– Requires an efficient information search strategy– The search can be slow– It is difficult to filter and prioritize information– No guarantee of finding what your looking for– Misdirection– No regulation – No quality control over available data– Validity of findings
![Page 74: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/74.jpg)
www.mfg.com
As you choose your supply base consider technology to assist in your efforts.
I. Provide bench-marking II. Deploy geographic boundariesIII. Set Non-disclosure boundariesIV. Provide price boundaries V. Tabulate your results VI. Expand your supplier intelligence
![Page 75: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/75.jpg)
www.mfg.comI. Deploy geographic boundariesII. Set Non-disclosure boundariesIII. Provide price boundaries IV. Tabulate your results
RFQ # 688970
Quote Download Date 2013-04-22 10:08 RFQ Status Open
RFQ Information RFQ # 688970
Buyer Company Strong Solutions LLC RFQ Name Probe Tube, PressureBuyer Name John Strong Reference Number
Address 8906 Cobbler Lane RFQ Description Production of a Probe Tube, Pressure. Approximately 0.156 inch OD x 12.7 inch long.City Lafayette
Country United States of America Project
RFQ Creation Date 04/15/2013 10:28 Category FabricationRFQ Closing Date 04/29/2013 23:59 Question 1 RFQ Award Date 05/13/2013 23:59
Currency US Dollars Question 2
Shipping Terms DDP - Delivered Duty Paid / Supplier Pays
Payment Terms Net 45 days Question 3 Special Logistics
Item Information
Item Pos. # Item # Item Name Quantity 1 Quantity 2 Quantity 3 Estimated Annual Use (EAU) Unit
01 1366036086296 Probe Tube, Pressure 75 300 3600 3600 Pieces
![Page 76: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/76.jpg)
www.mfg.com
Supplier Name
Liaocheng Golden Empire Group
Co.,Ltd
Yixin Precision Metal & Plastic
Ltd.
Shanxi Fuding International Trade Co.,Ltd.
Hecasa USA Corporation
Qingdao Huameier
Metalwork Products Co.,Ltd
青岛华美尔金属制品有限公司
Compare quote totals based on Quantity 1 Quantity 1 Quantity 1
Using the quoted prices for Quantity 1 Quantity 1
Quote Summary [US Dollars]
Item Total 730.80 20,880.00 1,800.00 5,112.00 4,500.00Tooling Total 0.00 0.00 0.00 0.00 0.00Engineering Total 0.00 0.00 0.00 0.00 0.00Material Total 0.00 0.00 0.00 0.00 0.00Miscellaneous Total 0.00 0.00 0.00 0.00 0.00Quote Sub-Total [US Dollars] 730.80 20,880.00 1,800.00 5,112.00 4,500.00Shipping Total 0.00 0.00 0.00 0.00 30.00Quote Total [US Dollars] 730.80 20,880.00 1,800.00 5,112.00 4,530.00
Quote Comparison [US Dollars]
Prices Based on
My Total Baseline Price for These Items 0.00 0.00 0.00 0.00 0.00Over/Under for This Quote (730.80) (20,880.00) (1,800.00) (5,112.00) (4,500.00)Average Over/Under for Competing Quotes (6,604.56) (6,604.56) (6,604.56) (6,604.56) (6,604.56)
My Total Target Price for These Items 0.00 0.00 0.00 0.00 0.00Over/Under for This Quote (730.80) (20,880.00) (1,800.00) (5,112.00) (4,500.00)Average Over/Under for Competing Quotes (6,604.56) (6,604.56) (6,604.56) (6,604.56) (6,604.56)
Price Rank vs. Competing Quotes 1 5 2 4 3
Item Details [US Dollars]
Prices Based on
Item # 1366036086296Item Name Probe Tube, PressureEstimated Annual Use (EAU) 3600 3600 3600 3600 3600Item Unit Pieces Pieces Pieces Pieces PiecesPrice Per Unit 0.203 5.80 0.50 1.42 1.25Tooling 0.00 0.00 0.00 0.00 0.00Rolled Up Price Per Unit 0.203 5.80 0.50 1.42 1.25Baseline Price 0.00 0.00 0.00 0.00 0.00
Over/Under (730.80) (20,880.00) (1,800.00) (5,112.00) (4,500.00)Target Price 72.00 72.00 72.00 72.00 72.00
Over/Under (658.80) (20,808.00) (1,728.00) (5,040.00) (4,428.00)Price Rank vs. Competing Quotes 1 5 2 4 3Item Total [US Dollars] 730.80 20,880.00 1,800.00 5,112.00 4,500.00
Unit Prices only (not including any one-time cost)
Estimated Annual Use (EAU)
Quantity 1
Unit Prices only (not including any one-time cost)
![Page 77: LiveSource Presentation for NTMA 2013](https://reader033.fdocuments.net/reader033/viewer/2022061221/54bccd634a7959ae418b4587/html5/thumbnails/77.jpg)
www.mfg.com
Tabulate your results
Delivery Date
Quantity 1 Unit
Unit Price Qty
1
Unit Price Qty
2
Unit Price Qty
3EAU Qty 1
CostEAU Qty 2
CostEAU Qty 3
Cost Suppliers Payment Terms
2013-06-27 75 Pieces 1.42 0.892 0.791 5,112.00 3,211.20 2,847.60 Net 45 days
2013-06-27 75 Pieces 0.50 0.24 0.12 1,800.00 864.00 432.00 Net 45 days
2013-06-27 75 Pieces 1.25 0.75 0.50 4,500.00 2,700.00 1,800.00 50% on placement of order and 50% on completion, after inspection and prior to shipping
2013-06-27 75 Pieces 5.80 2.80 1.50 20,880.00 10,080.00 5,400.00 To be negociated.
2013-06-27 75 Pieces 0.203 0.203 0.203 730.80 730.80 730.80 Net 45 days