Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income...

59
Economy Profile Lithuania Lithuania Doing Business 2019 Page 1

Transcript of Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income...

Page 1: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Economy Profile

Lithuania

LithuaniaDoing Business 2019

Page 1

Page 2: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Economy Profile of Lithuania

Doing Business 2019 Indicators(in order of appearance in the document)

Starting a business Procedures, time, cost and paid-in minimum capital to start a limited liability company

Dealing with construction permits Procedures, time and cost to complete all formalities to build a warehouse and the qualitycontrol and safety mechanisms in the construction permitting system

Getting electricity Procedures, time and cost to get connected to the electrical grid, and the reliability of theelectricity supply and the transparency of tariffs

Registering property Procedures, time and cost to transfer a property and the quality of the land administrationsystem

Getting credit Movable collateral laws and credit information systems

Protecting minority investors Minority shareholders’ rights in related-party transactions and in corporate governance

Paying taxes Payments, time, total tax and contribution rate for a firm to comply with all tax regulations aswell as post-filing processes

Trading across borders Time and cost to export the product of comparative advantage and import auto parts

Enforcing contracts Time and cost to resolve a commercial dispute and the quality of judicial processes

Resolving insolvency Time, cost, outcome and recovery rate for a commercial insolvency and the strength of thelegal framework for insolvency

Labor market regulation Flexibility in employment regulation and aspects of job quality

LithuaniaDoing Business 2019

Page 2

Page 3: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

About Doing Business

The project provides objective measures of business regulations and their enforcement across 190 economies and selectedcities at the subnational and regional level.

Doing Business

The project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applyingto them through their life cycle.

Doing Business

captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitativeindicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit,protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. alsomeasures features of labor market regulation. Although does not present rankings of economies on the labor marketregulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it doespresent the data for these indicators.

Doing Business

Doing BusinessDoing Business

By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time,encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves

as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy.Doing Business

In addition, offers detailed , which exhaustively cover business regulation and reform in different cities andregions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improveperformance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or regionand with the 190 economies that has ranked.

Doing Business subnational reports

Doing Business

The first report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator setsand 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies thathave a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, theRussian Federation and the United States) where also collected data for the second largest business city. The data for these11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback fromgovernments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improvingthe regulatory environment for business around the world.

Doing Business

Doing Business

More about (PDF, 5MB)Doing Business

LithuaniaDoing Business 2019

Page 3

Page 4: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Ease of Doing Business in

LithuaniaRegion OECD high income

Income Category High income

Population 2,827,721

City Covered Vilnius

DB 2019 Rank190 1

14

DB 2019 Ease of doing business score0 100

80.83

DB 2019 Ease of Doing Business Score

0 10084.64: Denmark (Rank: 3)

82.95: Norway (Rank: 7)

80.83: Lithuania (Rank: 14)

80.35: Finland (Rank: 17)

79.59: Latvia (Rank: 19)

77.80: Regional Average (OECD high income)

Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economiesin the sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100represents the best performance. The ease of doing business ranking ranges from 1 to 190.

Doing Business

Rankings on Doing Business topics - Lithuania

Startinga

Business

Dealingwith

ConstructionPermits

GettingElectricity

RegisteringProperty

GettingCredit

ProtectingMinorityInvestors

PayingTaxes

Tradingacross

Borders

EnforcingContracts

ResolvingInsolvency

1

28

55

82

109

136

163

190

Rank

31

7

26

3

44 38

18 197

85

Ease of Doing Business Score on Doing Business topics - Lithuania

Startinga

Business

Dealingwith

ConstructionPermits

GettingElectricity

RegisteringProperty

GettingCredit

ProtectingMinorityInvestors

PayingTaxes

Tradingacross

Borders

EnforcingContracts

ResolvingInsolvency

0

20

40

60

80

100

Scor

e

93.1884.86

88.4392.96

70.00 66.67

88.66

97.83

78.80

46.87

LithuaniaDoing Business 2019

Page 4

Page 5: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Starting a Business

This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limitedliability company to start up and formally operate in each economy’s largest business city.

To make the data comparable across 190 economies, uses a standardized business that is 100% domestically owned, hasstart-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers twotypes of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and theother by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting abusiness. These scores are the simple average of the scores for each of the component indicators.

Doing Business

The most recent round of data collection for the project was completed in May 2018. .See the methodology for more information

What the indicators measure

Procedures to legally start and formally operatea company (number)

Preregistration (for example, name verification orreservation, notarization)

Registration in the economy’s largest businesscity

Postregistration (for example, social securityregistration, company seal)

Obtaining approval from spouse to start abusiness or to leave the home to register thecompany

Obtaining any gender specific document forcompany registration and operation or nationalidentification card

Time required to complete each procedure(calendar days)

Does not include time spent gatheringinformation

Each procedure starts on a separate day (2procedures cannot start on the same day)

Procedures fully completed online are recordedas ½ day

Procedure is considered completed once finaldocument is received

No prior contact with officials•Cost required to complete each procedure (% ofincome per capita)

Official costs only, no bribes•No professional fees unless services required bylaw or commonly used in practice

Paid-in minimum capital (% of income percapita)

• Funds deposited in a bank or with third partybefore registration or up to 3 months afterincorporation

Case study assumptions

To make the data comparable across economies, several assumptions about thebusiness and the procedures are used. It is assumed that any required information isreadily available and that the entrepreneur will pay no bribes.

The business:

- Is a limited liability company (or its legal equivalent). If there is more than one typeof limited liability company in the economy, the most common among domestic firmsis chosen. Information on the most common form is obtained from incorporationlawyers or the statistical office.- Operates in the economy’s largest business city. For 11 economies the data arealso collected for the second largest business city.- The entire office space is approximately 929 square meters (10,000 square feet).- Is 100% domestically owned and has five owners, none of whom is a legal entity;has a start-up capital of 10 times income per capita and has a turnover of at least100 times income per capita.- Performs general industrial or commercial activities, such as the production or saleof goods or services to the public. The business does not perform foreign tradeactivities and does not handle products subject to a special tax regime, for example,liquor or tobacco. It does not use heavily polluting production processes.- Leases the commercial plant or offices and is not a proprietor of real estate and theamount of the annual lease for the office space is equivalent to the income percapita.- Does not qualify for investment incentives or any special benefits.- Has at least 10 and up to 50 employees one month after the commencement ofoperations, all of whom are domestic nationals.- Has a company deed that is 10 pages long.

The owners:

- Have reached the legal age of majority. If there is no legal age of majority, they areassumed to be 30 years old.- Are sane, competent, in good health and have no criminal record.- Are married and the marriage is monogamous and registered with the authorities.- Where the answer differs according to the legal system applicable to the woman orman in question (as may be the case in economies where there is legal plurality), theanswer used will be the one that applies to the majority of the population.

LithuaniaDoing Business 2019

Page 5

Page 6: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Starting a Business - Lithuania

Figure – Starting a Business in Lithuania and comparator economies – Ranking and Score

DB 2019 Starting a Business Score

0 100

94.31: Norway (Rank: 22)

94.13: Latvia (Rank: 24)

93.18: Lithuania (Rank: 31)

92.52: Denmark (Rank: 42)

92.43: Finland (Rank: 43)

91.19: Regional Average (OECD high income)

Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scoresare the simple average of the scores for each of the component indicators.

Standardized Company

Legal form Private Limited Liability Company (UAB)

Paid-in minimum capital requirement EUR 2,500

City Covered Vilnius

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Procedure – Men (number) 4 4.9 1 (New Zealand)

Time – Men (days) 5.5 9.3 0.5 (New Zealand)

Cost – Men (% of income per capita) 0.5 3.1 0.0 (Slovenia)

Procedure – Women (number) 4 4.9 1 (New Zealand)

Time – Women (days) 5.5 9.3 0.5 (New Zealand)

Cost – Women (% of income per capita) 0.5 3.1 0.0 (Slovenia)

Paid-in min. capital (% of income per capita) 17.5 8.6 0.0 (117 Economies)

LithuaniaDoing Business 2019

Page 6

Page 7: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Starting a Business in Lithuania – Procedure, Time and Cost

This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.*

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men andwomen, the graph shows the time for women. For more information on methodology, see the website( ). For details on the procedures reflected here, see the summary below.

Doing Businesshttp://doingbusiness.org/en/methodology

Procedures (number)1 2 3 4

0

1

2

3

4

5Ti

me

(day

s)

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

Cost

(% o

f inc

ome

per c

apita

)

Time (days) Cost (% of income per capita)

LithuaniaDoing Business 2019

Page 7

Page 8: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Starting a Business in Lithuania – Procedure, Time and Cost

Takes place simultaneously with previous procedure.

No. Procedures Time to Complete Associated Costs

1 Open bank account and deposit minimum capital requirement: Commercial BankAgency

Some banks apply charges for issuing a bank certificate, which evidencespayment of share capital. Accumulation bank account can be opened online inmost large banks of Lithuania, for example, DNB bank, Dankske bank, Citadele,Šiaulių bank, Swedbank and Seb bank. However, it requires e-signature, andthus is not widely used. In order to transform it to a regular one, the ManagingDirector (the MD) of the company shall visit the respective bank division in-person (the MD shall fill in questionnaires regarding the UBOs of the companyand sign the contract directly).

1 day no charge

2 Obtain a confirmed electronic signature: Center of Registers, Mobile operator, Migration Department, BanksAgency

In order to check and reserve company name online as well as registeremployees with SODRA, a company must have electronic signature.Electronic signature in USB form costs about EUR 43.33 plus about EUR 7.00annual fee. Almost all mobile operators provide electronic key for price in amountfrom EUR 0.30 to 10.00 plus monthly fee in the amount of EUR 0.29 - 0.87. Atthis moment in Lithuania are three types of electronic signatures.1) Electronic signature issued by state Center of Registers. Costs – EUR 43.33.Certificate of electronic signature is valid for 2 years. After 2 years certificatemust be updated. Costs – EUR 8.23.2) Electronic signature issued by mobile operators. Cost depends on mobileoperator and range from EUR 0.30 to EUR 10. The monthly fee is about EUR0.30 - EUR 0.90.3) Electronic signature issued by Migration Board with the personal identity card.Electronic signature does not cost anything but costs of personal identity cardrange from 8.6 EUR to 31.6 EUR.

1 day EUR 0.5

3 Check and reserve the name of the company (limited liability company): Register of Legal Entities and State Commission of Lithuanian

LanguageAgency

Reservation of the new company name is compulsory for registration ofbusiness. Checking of the name is free of charge, and reservation costs EUR16.22.As of May 2013, the changes of the Regulations of the Register of legal personscame into effect. Now the State Commission of the Lithuanian Language mustcheck every new company name and give its consent on the use of a particularname.

Lithuanian Government by decision No. 1292 adopted on 09 12 2015 amendedRegulations of the Register of Legal Entities. Nothing has changed how is relatedwith reservation of company name, just new wording of Regulation has beenadopted. https://www.e-tar.lt/portal/legalAct.html?documentId=a02cbd30a40011e58fd1fc0b9bba68a7

Less than one day(online procedure)

EUR 16.22

4 Register at the Company Register, including registration with State TaxInspectorate (the Lithuanian Revenue Authority) for corporate tax, VAT, andState Social Insurance Fund Board (SODRA)

: Register of Legal EntitiesAgencyAccording to Article 44 and 45 of the Regulations of the Register of Legal Entities(updated on October 11, 2017), before the application for registration of acompany is submitted to the Register of Legal Entities, notary public must verifythe correctness of the particulars entered into the application, the compliance ofthe statutes with the statutory requirements and the fact that the company iseligible for registration. Article 46 of the Regulations provides a possibility tosubmit the documents electronically directly to the Register of Legal Entities,without verification of a notary (certain conditions apply, such as using onlystandard forms of incorporation documents, using electronic signatures, etc.).The following documents must be submitted when incorporating a private limitedliability company:1. Application for registration;2. Founding act/Founding agreement;3. Articles of association;4. Consent use of address (if the founder is not an owner of premises).

Article 128 of the Regulations provides that after on-line filling in required data,documents for company incorporation and registration, listed above, aregenerated automatically on-line. On-line registration grows up increasingly. Whendocuments of legal entities are submitted directly to the Registrar electronically,incorporation is performed in one working day, except for the cases when otherterms of registration are set in the Regulations. The Registrar shall check thatthere are no obstacles to register or enter the object, instruments of incorporationof the Register into the Register, and register or enter the data of the Register.

3 days EUR 57.34

LithuaniaDoing Business 2019

Page 8

Page 9: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Dealing with Construction Permits

This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting allrequired notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing withConstruction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength ofquality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round ofdata collection was completed in May 2018. See the methodology for more information

What the indicators measure

Procedures to legally build a warehouse(number)

Submitting all relevant documents and obtainingall necessary clearances, licenses, permits andcertificates

Submitting all required notifications and receivingall necessary inspections

Obtaining utility connections for water andsewerage

Registering and selling the warehouse after itscompletion

Time required to complete each procedure(calendar days)

Does not include time spent gatheringinformation

Each procedure starts on a separate day—though procedures that can be fully completedonline are an exception to this rule

Procedure is considered completed once finaldocument is received

No prior contact with officials•Cost required to complete each procedure (% ofincome per capita)

Official costs only, no bribes•Building quality control index (0-15)

Quality of building regulations (0-2)•Quality control before construction (0-1)•Quality control during construction (0-3)•Quality control after construction (0-3)•Liability and insurance regimes (0-2)•Professional certifications (0-4)•

Case study assumptions

To make the data comparable across economies, several assumptions about theconstruction company, the warehouse project and the utility connections are used.

The construction company (BuildCo):

- Is a limited liability company (or its legal equivalent) and operates in the economy’slargest business city. For 11 economies the data are also collected for the secondlargest business city.- Is 100% domestically and privately owned; has five owners, none of whom is alegal entity. Has a licensed architect and a licensed engineer, both registered withthe local association of architects or engineers. BuildCo is not assumed to have anyother employees who are technical or licensed experts, such as geological ortopographical experts.- Owns the land on which the warehouse will be built and will sell the warehouseupon its completion.

The warehouse:

- Will be used for general storage activities, such as storage of books or stationery.- Will have two stories, both above ground, with a total constructed area ofapproximately 1,300.6 square meters (14,000 square feet). Each floor will be 3meters (9 feet, 10 inches) high and will be located on a land plot of approximately929 square meters (10,000 square feet) that is 100% owned by BuildCo, and thewarehouse is valued at 50 times income per capita.- Will have complete architectural and technical plans prepared by a licensedarchitect. If preparation of the plans requires such steps as obtaining furtherdocumentation or getting prior approvals from external agencies, these are countedas procedures.- Will take 30 weeks to construct (excluding all delays due to administrative andregulatory requirements).

The water and sewerage connections:

- Will be 150 meters (492 feet) from the existing water source and sewer tap. If thereis no water delivery infrastructure in the economy, a borehole will be dug. If there isno sewerage infrastructure, a septic tank in the smallest size available will beinstalled or built.- Will have an average water use of 662 liters (175 gallons) a day and an averagewastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300gallons) a day.- Will have a constant level of water demand and wastewater flow throughout theyear; will be 1 inch in diameter for the water connection and 4 inches in diameter forthe sewerage connection.

LithuaniaDoing Business 2019

Page 9

Page 10: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Dealing with Construction Permits - Lithuania

Figure – Dealing with Construction Permits in Lithuania and comparator economies – Ranking and Score

DB 2019 Dealing with Construction Permits Score

0 100

86.94: Denmark (Rank: 4)

84.86: Lithuania (Rank: 7)

78.86: Norway (Rank: 22)

75.79: Finland (Rank: 34)

75.41: Regional Average (OECD high income)

73.46: Latvia (Rank: 56)

Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing withconstruction permits. These scores are the simple average of the scores for each of the component indicators.

Figure – Dealing with Construction Permits in Lithuania – Procedure, Time and Cost

This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.*

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men andwomen, the graph shows the time for women. For more information on methodology, see the website( ). For details on the procedures reflected here, see the summary below.

Doing Businesshttp://doingbusiness.org/en/methodology

Procedures (number)1 2 * 3 * 4 5 6 7 8 9 10 11 12 13

0

10

20

30

40

50

60

70

Tim

e (d

ays)

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

Cost

(% o

f war

ehou

se v

alue

)

Time (days) Cost (% of warehouse value)

Standardized Warehouse

Estimated value of warehouse EUR 715,697.10

City Covered Vilnius

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Procedures (number) 13 12.7 None in 2017/18

Time (days) 74 153.1 None in 2017/18

Cost (% of warehouse value) 0.3 1.5 None in 2017/18

Building quality control index (0-15) 13.0 11.5 15.0 (3 Economies)

LithuaniaDoing Business 2019

Page 10

Page 11: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Dealing with Construction Permits in Lithuania and comparator economies – Measure of Quality

Lithuania Denmark Finland Latvia Norway OECD high income

0

5

10

15

Inde

x sc

ore

13.0

11.010.0

12.0

10.011.5

Details – Dealing with Construction Permits in Lithuania – Procedure, Time and Cost

No. Procedures Time to Complete Associated Costs

1 Request and obtain certificate of ownership of the land plot: Center of RegistersAgency

Documents evidencing ownership or any other right allowing constructionactivities on the land plot should be requested from the Center of Registers, Landand Real Property Registry. The Extract from the Register of Immovable Propertyproving the ownership of the land plot should be submitted to the Municipality inorder to obtain a set of design conditions for the construction works.

0.5 days EUR 3

2 Obtain topographic survey of land plot: Private companyAgency

Before developing the architectural plans of the warehouse, BuildCo must obtaina topographic survey of the land plot. The cost is defined by each privatelicensed company, with the average being around EUR 175. The time it takes tocomplete the survey is three weeks.

21 days EUR 175

3 Request and obtain special architectural requirements for constructionworks

: MunicipalityAgencyBuildCo must obtain special architectural requirements from the municipaladministration. The Municipality shall issue these Requirements within 15working days from the receipt of builder's request. These Requirements shall befollowed while preparing the Design Documentation.

14 days no charge

4 Request and obtain design requirements for water and sewage connection: Vilnius Water (“Vilniaus vandenys”)Agency

BuildCo shall submit an application together with a certificate proving itsownership of the land to Lithuania Water Company personally or via e-mail [email protected]. Lithuania Water Company will issue the requirements for water andsewage connection within 15 days from the submission of the request. AfterRequirements for water and sewage are issued, the builder should startpreparing a project for water and sewage connection under the issuedRequirements. This project is submitted together with Design Documents.

14 days no charge

5 Request and obtain approval of the design documentation and obtain thebuilding permit

: Architectural and Engineering Commissions of the City DevelopmentDepartmentAgency

The builder shall submit Design Documentation and other supplementarydocuments, which are necessary for obtaining construction permit, by submittinghard copy or via internet using "Infostatyba" (www.planuojustatyti.lt). Competentagencies, as prescribed by laws, shall verify and approve the DesignDocumentation and other supplementary documents. After that, the constructionpermit is issued. The entire process shall take 10 working days.

14 days EUR 78

6 Request and obtain water and sewerage connection approval and signcontract

: Vilnius Water (“Vilniaus vandenys”)AgencyAfter the construction permit is issued, the construction company shall installwater and sewerage connection according to the project prepared and approvedearlier. After that, the builder shall submit the request for signing a contract withLithuanian Water Company.

7 days EUR 348

7 Request and obtain deeds of inspection and testing of engineeringnetworks for water and sewage connection

: Operators of Engineering Networks and SystemsAgencyThe inspection and test are performed by operators of the correspondingengineering networks and systems. The inspection verifies that the engineeringnetworks for water and sewage connections are connected appropriately andissues a certificate confirming the proper connection.

5 days no charge

8 Connect to water services: Vilnius Water (“Vilniaus vandenys”)Agency

5 days no charge

LithuaniaDoing Business 2019

Page 11

Page 12: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Takes place simultaneously with previous procedure.

9 Hire private cadastre company and obtain cadastral measurement of thestructure

: Private CompanyAgencyThe file is prepared by private companies licensed to carry out cadastralmeasurements and approved by the SE Center of Registers. This procedure isnecessary for registering with the Land and Real Property Registry.

5 days EUR 579

10 Request certificate of completion of construction: State Territorial Planning and Construction Inspectorate under the

Ministry of EnvironmentAgency

BuildCo must submit the request along with other supplementary documentsnecessary to obtain the certificate of completion of construction from thesubdivision of The State Territorial Planning and Construction Inspectorate underThe Ministry of Environment of the Republic of Lithuania. BuildCo can submit ahard copy of the request or via internet using “Infostatyba”(www.planuojustatyti.lt). A Commission of Completion of Construction is thenformed to carry out an on-site inspection.

0.5 days no charge

11 Receive final inspection: State Territorial Planning and Construction Inspectorate under the

Ministry of EnvironmentAgency

After the successful completion of the final inspection, the Commission issuesthe approval.

1 day no charge

12 Obtain the certificate of completion of construction: State Territorial Planning and Construction Inspectorate under the

Ministry of EnvironmentAgency

The Certificate of Completion of Construction shall be issued within 10 workingdays from the submission of the request and other supplementary documents.

14 days no charge

13 Register with the Land and Real Property Registry: Land and Real Property RegistryAgency

Upon completion and approval of construction, the building must be registeredwith the Land and Real Property Registry. The general term for the registering ofwarehouse is 10 working days, but it is possible to register it in 1 working day if asupplementary fee is paid. The price for the building registration depends onwhether natural or legal person registers the building and on the average marketvalue of the building.

The terms and conditions of payment for the registering services were settled bythe 2007-06-06 Legal Act of the Government of the Republic of Lithuania, whichcame into force on June 17, 2007.

1 day EUR 825

LithuaniaDoing Business 2019

Page 12

Page 13: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Dealing with Construction Permits in Lithuania – Measure of Quality

Answer Score

Building quality control index (0-15) 13.0

Quality of building regulations index (0-2) 2.0

How accessible are building laws and regulations in your economy? (0-1) Available online;Free of charge.

1.0

Which requirements for obtaining a building permit are clearly specified in the buildingregulations or on any accessible website, brochure or pamphlet? (0-1)

List of requireddocuments; Feesto be paid;Requiredpreapprovals.

1.0

Quality control before construction index (0-1) 1.0

Which third-party entities are required by law to verify that the building plans are incompliance with existing building regulations? (0-1)

Licensedarchitect;Licensedengineer.

1.0

Quality control during construction index (0-3) 2.0

What types of inspections (if any) are required by law to be carried out during construction?(0-2)

Inspections by in-house engineer.

1.0

Do legally mandated inspections occur in practice during construction? (0-1) Mandatoryinspections arealways done inpractice.

1.0

Quality control after construction index (0-3) 3.0

Is there a final inspection required by law to verify that the building was built in accordancewith the approved plans and regulations? (0-2)

Yes, finalinspection isdone bygovernmentagency.

2.0

Do legally mandated final inspections occur in practice? (0-1) Final inspectionalways occurs inpractice.

1.0

Liability and insurance regimes index (0-2) 1.0

Which parties (if any) are held liable by law for structural flaws or problems in the buildingonce it is in use (Latent Defect Liability or Decennial Liability)? (0-1)

Architect orengineer;Professional incharge of thesupervision;Constructioncompany.

1.0

Which parties (if any) are required by law to obtain an insurance policy to cover possiblestructural flaws or problems in the building once it is in use (Latent Defect Liability Insuranceor Decennial Insurance)? (0-1)

No party isrequired by lawto obtaininsurance .

0.0

Professional certifications index (0-4) 4.0

What are the qualification requirements for the professional responsible for verifying that thearchitectural plans or drawings are in compliance with existing building regulations? (0-2)

Minimum numberof years ofexperience;University degreein architecture orengineering;Passing acertificationexam.

2.0

LithuaniaDoing Business 2019

Page 13

Page 14: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

What are the qualification requirements for the professional who supervises the constructionon the ground? (0-2)

Minimum numberof years ofexperience;University degreein engineering,construction orconstructionmanagement;Passing acertificationexam.

2.0

LithuaniaDoing Business 2019

Page 14

Page 15: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Getting Electricity

This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newlyconstructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency oftariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018.

.See the methodology

for more information

What the indicators measure

Procedures to obtain an electricity connection(number)

Submitting all relevant documents and obtainingall necessary clearances and permits

Completing all required notifications andreceiving all necessary inspections

Obtaining external installation works and possiblypurchasing material for these works

Concluding any necessary supply contract andobtaining final supply

Time required to complete each procedure(calendar days)

Is at least 1 calendar day•Each procedure starts on a separate day•Does not include time spent gatheringinformation

Reflects the time spent in practice, with littlefollow-up and no prior contact with officials

Cost required to complete each procedure (% ofincome per capita)

Official costs only, no bribes•Value added tax excluded•

The reliability of supply and transparency oftariffs index (0-8)

Duration and frequency of power outages (0–3)•Tools to monitor power outages (0–1)•Tools to restore power supply (0–1)•Regulatory monitoring of utilities’ performance(0–1)

Financial deterrents limiting outages (0–1)•Transparency and accessibility of tariffs (0–1)•

Price of electricity (cents per kilowatt-hour)*

Price based on monthly bill for commercialwarehouse in case study

*Note: measures the price ofelectricity, but it is not included in the ease of doingbusiness score nor the ranking on the ease ofgetting electricity.

Doing Business

Case study assumptions

To make the data comparable across economies, several assumptions about thewarehouse, the electricity connection and the monthly consumption are used.

The warehouse:

- Is owned by a local entrepreneur and is used for storage of goods.- Is located in the economy’s largest business city. For 11 economies the data arealso collected for the second largest business city.- Is located in an area where similar warehouses are typically located and is in anarea with no physical constraints. For example, the property is not near a railway.- Is a new construction and is being connected to electricity for the first time.- Has two stories with a total surface area of approximately 1,300.6 square meters(14,000 square feet). The plot of land on which it is built is 929 square meters(10,000 square feet).

The electricity connection:

- Is a permanent one with a three-phase, four-wire Y connection with a subscribedcapacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1kilowatt (kW).- Has a length of 150 meters. The connection is to either the low- or medium-voltagedistribution network and is either overhead or underground, whichever is morecommon in the area where the warehouse is located and requires works that involvethe crossing of a 10-meter road (such as by excavation or overhead lines) but are allcarried out on public land. There is no crossing of other owners’ private propertybecause the warehouse has access to a road.- Does not require work to install the internal wiring of the warehouse. This hasalready been completed up to and including the customer’s service panel orswitchboard and the meter base.

The monthly consumption:

- It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and thatthere are no electricity cuts (assumed for simplicity reasons) and the monthly energyconsumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh.- If multiple electricity suppliers exist, the warehouse is served by the cheapestsupplier.- Tariffs effective in January of the current year are used for calculation of the price ofelectricity for the warehouse. Although January has 31 days, for calculationpurposes only 30 days are used.

LithuaniaDoing Business 2019

Page 15

Page 16: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Getting Electricity - Lithuania

Figure – Getting Electricity in Lithuania and comparator economies – Ranking and Score

DB 2019 Getting Electricity Score

0 100

90.58: Norway (Rank: 19)

90.22: Denmark (Rank: 21)

88.98: Finland (Rank: 25)

88.43: Lithuania (Rank: 26)

85.47: Regional Average (OECD high income)

82.24: Latvia (Rank: 53)

Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores arethe simple average of the scores for all the component indicators except the price of electricity.

Standardized Connection

Price of electricity (US cents per kWh) 8.3

Name of utility AB ESO

City Covered Vilnius

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Procedures (number) 4 4.5 3 (25 Economies)

Time (days) 85 77.2 18 (3 Economies)

Cost (% of income per capita) 38 64.2 0.0 (3 Economies)

Reliability of supply and transparency of tariff index (0-8) 8 7.5 8.0 (27 Economies)

LithuaniaDoing Business 2019

Page 16

Page 17: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Getting Electricity in Lithuania – Procedure, Time and Cost

This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.*

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men andwomen, the graph shows the time for women. For more information on methodology, see the website( ). For details on the procedures reflected here, see the summary below.

Doing Businesshttp://doingbusiness.org/en/methodology

Procedures (number)1 2 * 3 4

0

10

20

30

40

50

60

70

80Ti

me

(day

s)

0

5

10

15

20

25

30

35

40

Cost

(% o

f inc

ome

per c

apita

)

Time (days) Cost (% of income per capita)

Figure – Getting Electricity in Lithuania and comparator economies – Measure of Quality

Lithuania Denmark Finland Latvia Norway OECD high income

0

1

2

3

4

5

6

7

8

Inde

x sc

ore

87

87

87.5

LithuaniaDoing Business 2019

Page 17

Page 18: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Getting Electricity in Lithuania – Procedure, Time and Cost

Takes place simultaneously with previous procedure.

No. Procedures Time to Complete Associated Costs

1 Submit application to AB ESO and receive estimate as well as technicalconditions

: AB ESOAgencyThe customer submits an application for a connection to the utility. The utilityissues technical conditions and estimate of costs.

7 calendar days EUR 0

2 Sign connection service agreement with AB ESO and await completion ofexternal works

: AB ESOAgencyCustomer signs the agreement either via online e-services portal www.manogile.It or in Customer service center. After the customer pays the estimate to AB ESOvia e-services portal www.manogile.lt or by bank transfer, the following steps arecarried out by the Utility:- preparation of the design of the external electricity network;- assignment of the work order to the annual contractor. In most of the cases,annual contractors are selected once a year by the public tender and no additionprocurements are carried out after the customer signs The New ConnectionService Agreement;- construction work for the electricity network of AB ESO. All the necessarymaterial is provided by the Utility and Customer does not need to buy anymaterial for the construction of external electricity network.

75 calendar days EUR 5,436.2

3 Obtain internal wiring inspection and certificate from State EnergyInspection

: State Energy InspectionAgencyAn internal inspection can be done in parallel with AB ESO works (the externalconnection works). The customer must apply to the State Energy Inspection, aDivision of the Ministry of Economy, and request a Certificate of Completion. Thecustomer can request the internal inspection already when the ConstructionPermit is obtained. The internal wiring is the responsibility of the customer andsomeone from the customer's party is requested to be present during theinspection. The State Inspection examines the constructed warehouse and itsdocumentation and signs the certificate “Completion of Works”.

7 calendar days EUR 0

4 Sign supply contract with AB ESO, receive meter installation and electricityturn-on

: AB ESOAgencyThe electricity supply agreement can be signed online on the utility website,where the customer can choose the preferred tariff plan, and make payment. Themeter is installed after the utility receives the Certificate from the State EnergyInspection, which indicates that the internal wiring is successfully completed andthat the utility works up to the meter are completed as well. The meter is installedby AB ESO and by the same department that is doing the connection works.There is also an inspection done of the utility’s external connection work by theState Energy Inspection. The utility independently requests the State EnergyInspection to inspect the utility work (external inspection). This is the soleresponsibility of the utility and the customer does not have to be present.

3 calendar days EUR 0

LithuaniaDoing Business 2019

Page 18

Page 19: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Getting Electricity in Lithuania – Measure of Quality

Note:

If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariffindex.

If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index.

If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index.

Answer

Reliability of supply and transparency of tariff index (0-8) 8

Total duration and frequency of outages per customer a year (0-3) 3

System average interruption duration index (SAIDI) 0.4

System average interruption frequency index (SAIFI) 0.2

What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI 3.0

Mechanisms for monitoring outages (0-1) 1

Does the distribution utility use automated tools to monitor outages? Yes

Mechanisms for restoring service (0-1) 1

Does the distribution utility use automated tools to restore service? Yes

Regulatory monitoring (0-1) 1

Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability ofsupply?

Yes

Financial deterrents aimed at limiting outages (0-1) 1

Does the utility either pay compensation to customers or face fines by the regulator (or both) if outagesexceed a certain cap?

Yes

Communication of tariffs and tariff changes (0-1) 1

Are effective tariffs available online? Yes

Link to the website, if available online https://www.e-tar.lt/portal/lt/legalAct/61a5a940e70c11e7acd7ea182930b17f

Are customers notified of a change in tariff ahead of the billing cycle? Yes

LithuaniaDoing Business 2019

Page 19

Page 20: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Registering Property

This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants topurchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the landadministration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparencyof information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection forthe project was completed in May 2018. .See the methodology for more information

What the indicators measure

Procedures to legally transfer title onimmovable property (number)

Preregistration procedures (for example,checking for liens, notarizing sales agreement,paying property transfer taxes)

Registration procedures in the economy's largestbusiness city.

Postregistration procedures (for example, fillingtitle with municipality)

Time required to complete each procedure(calendar days)

Does not include time spent gatheringinformation

Each procedure starts on a separate day -though procedures that can be fully completedonline are an exception to this rule

Procedure is considered completed once finaldocument is received

No prior contact with officials•Cost required to complete each procedure (% ofproperty value)

Official costs only (such as administrative fees,duties and taxes).

Value Added Tax, Capital Gains Tax and illicitpayments are excluded

Quality of land administration index (0-30)

Reliability of infrastructure index (0-8)•Transparency of information index (0–6)•Geographic coverage index (0–8)•Land dispute resolution index (0–8)•Equal access to property rights index (-2–0)•

Case study assumptions

To make the data comparable across economies, several assumptions about theparties to the transaction, the property and the procedures are used.

The parties (buyer and seller):

- Are limited liability companies (or the legal equivalent).- Are located in the periurban area of the economy’s largest business city. For 11economies the data are also collected for the second largest business city.- Are 100% domestically and privately owned.- Have 50 employees each, all of whom are nationals.- Perform general commercial activities.

The property (fully owned by the seller):

- Has a value of 50 times income per capita, which equals the sale price.- Is fully owned by the seller.- Has no mortgages attached and has been under the same ownership for the past10 years.- Is registered in the land registry or cadastre, or both, and is free of title disputes.- Is located in a periurban commercial zone, and no rezoning is required.- Consists of land and a building. The land area is 557.4 square meters (6,000square feet). A two-story warehouse of 929 square meters (10,000 square feet) islocated on the land. The warehouse is 10 years old, is in good condition, has noheating system and complies with all safety standards, building codes and legalrequirements. The property, consisting of land and building, will be transferred in itsentirety.- Will not be subject to renovations or additional construction following the purchase.- Has no trees, natural water sources, natural reserves or historical monuments ofany kind.- Will not be used for special purposes, and no special permits, such as forresidential use, industrial plants, waste storage or certain types of agriculturalactivities, are required.- Has no occupants, and no other party holds a legal interest in it.

LithuaniaDoing Business 2019

Page 20

Page 21: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Registering Property - Lithuania

Figure – Registering Property in Lithuania and comparator economies – Ranking and Score

DB 2019 Registering Property Score

0 100

92.96: Lithuania (Rank: 3)

89.88: Denmark (Rank: 11)

87.26: Norway (Rank: 13)

81.45: Latvia (Rank: 25)

80.73: Finland (Rank: 28)

77.17: Regional Average (OECD high income)

Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. Thesescores are the simple average of the scores for each of the component indicators.

Figure – Registering Property in Lithuania – Procedure, Time and Cost

This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.*

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men andwomen, the graph shows the time for women. For more information on methodology, see the website( ). For details on the procedures reflected here, see the summary below.

Doing Businesshttp://doingbusiness.org/en/methodology

Procedures (number)1 2 3

0

0.5

1

1.5

2

2.5

3

3.5

Tim

e (d

ays)

0

0.1

0.2

0.3

0.4

0.5

Cost

(% o

f pro

pert

y va

lue)

Time (days) Cost (% of property value)

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Procedures (number) 3 4.7 1 (4 Economies)

Time (days) 3.5 20.1 1 (New Zealand)

Cost (% of property value) 0.8 4.2 0.0 (Saudi Arabia)

Quality of the land administration index (0-30) 28.5 23.0 None in 2017/18

LithuaniaDoing Business 2019

Page 21

Page 22: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Registering Property in Lithuania and comparator economies – Measure of Quality

Lithuania Denmark Finland Latvia Norway OECD high income

0

5

10

15

20

25

30

Inde

x sc

ore

28.5

24.526.5

21.5 20.023.0

Details – Registering Property in Lithuania – Procedure, Time and Cost

No. Procedures Time to Complete Associated Costs

1 Notary orders the verification and clarification of the property data: Information system of the Real Estate AgencyAgency

Resolution No. 527 of the Government of the Republic of Lithuania as of May 4,2011 On the amendment of Resolution No. 1129 of the Government of theRepublic of Lithuania of July 12, 2002 On the approval of the Real EstateCadastre regulations stipulates that a notary public, at the initial stage ofpreparing an immovable property transaction, is required to order verification andrevision of cadastral and registration data of an immovable item that arenecessary for the execution of the immovable property contract.

The Information System of Public E-Services for Immovable PropertyTransactions shall generate a notice on the future transaction and submit it to theRegistrar of Real Estate. Having received the notice, the Registrar of Real Estateshall verify and, if necessary, revise the cadastral and registration data of theimmovable item that are necessary for the execution of the immovable propertytransaction (or, in certain cases, refuse to revise the data due to specificreasons) and make a relevant note of the data revision with the Real EstateRegister. The note shall be valid for 30 calendar days after the data revision.Data of the Real Estate Cadastre and Register required for the execution of theimmovable property transaction must be verified and the notes of data revision orrefusal to revise them must be made latest in 8 working hours or, in certain casessubject to the status of cadastral and registration data of the immovable item heldby the Real Estate Register, latest in 3 working days from the receipt of notice ofpending transaction from the Information System of Public E-Services forImmovable Property Transactions.

Less than one day,online

EUR 3.62

LithuaniaDoing Business 2019

Page 22

Page 23: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

2 Notarization of the sale-purchase agreement: Notary PublicAgency

Pursuant to the Resolution No. 1129 of the Government of the Republic ofLithuania from July 12, 2002 "On the approval of the Real Property RegisterRegulations", Civil Code, Law on Land and Law on Companies of the Republic ofLithuania with later amendments thereof, a contract of purchase and sale of animmovable item must be made in a notarial form. Failure to comply with therequirements of the form shall render the contract invalid. The contract ofpurchase and sale of an immovable item may be used against third parties andhave legal implications for them only in case it is registered with the publicregister in the statutory Procedure (procedure 3). The title (right of ownership) tothe immovable item shall devolve to the buyer from the moment of transfer of theitem. The transfer and acceptance of the immovable item shall be documented ina statement of transfer and acceptance signed by the seller and the buyer or inanother document specified in the contract of purchase and sale. Likewise, theprovisions regarding the transfer and acceptance of the immovable item may beinserted in the contract of purchase and sale. In such a case, the item and thetitle thereto shall transfer to the buyer at the moment of signing the contract.

The Directive 2010/31/EU of European Parliament and Council of 19 May 2010on the energy performance of buildings was enforced in Lithuania. Respectiveamendments to the Republic of Lithuania Law on Construction as from 9 January2013 came into force. The energy efficiency certification is mandatory in case ofsale of the property. The seller of a building being sold must provide the buyerwith a valid energy efficiency certificate of a building or part thereof, save as incases established by the Law on Construction (e.g., the energy efficiencycertification shall not be mandatory for non-residential buildings of low energyconsumption used for industrial, warehousing and agricultural managementpurposes).

The list of documents to be submitted to notaries include:• Articles of association of private limited liability companies;• Power-of-Attorney issued by the CEO of a private limited liability company, ifanother authorized person, instead of the CEO, is acting on behalf of thecompany;• Personal ID of the representatives of the parties to the contract• Resolution of the board of a private limited liability company (if this body hasbeen formed) in cases when the book value of the immovable property to be soldexceeds 1/20 of the authorized capital of the company or any other valueestablished in the articles of association of the company. Where no board isformed in the company, such resolution shall be passed by the CEO of thecompany.

• Where so is specified in the articles of association of a private limited liabilitycompany, approval of the aforementioned resolutions of the board or CEO (if theboard is not formed) by the general meeting of shareholders;• Land plot plan;• Documentary proof of seller's title to immovable items (legal basis for theacquisition of the immovable item, for example, a contract of exchange, acontract of purchase and sale, etc., on which basis the title to the immovable itemhas been registered);• Energy Performance Certificate (an original document or a copy) shall besubmitted to a notary. In case if the energy consumption of the building is low/thebuilding is not heated, the provision of the energy certificate is not required;• Other documents, if requested subject to factual circumstances.

1 day EUR 3,220.64;(Notary fees: 0.45%of property price, butnot less than € 28.96and not exceeding €5,792.40 (€ 14,481, ifmore than one objectis transferred)

In addition, EUR 3.62is a fee payable tothe Center ofRegisters forverification andrevision of cadastraland registration dataof an immovable itemas well as for themaking of datarevision notes (by theCenter of Registers))

LithuaniaDoing Business 2019

Page 23

Page 24: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Takes place simultaneously with previous procedure.

3 Register the transfer of title to the property in the Real Estate Register: Notary Public / State Enterprise Center of RegistersAgency

Due to revisions of Law on Real Property Register of the Republic of Lithuaniaand Regulations of the Real Property Register mentioned previously, one-stop-shop principle was fully implemented in the immovable property transfer process,i.e. a buyer and a seller only visit the notary public office in order to conclude theproperty transfer and to register the ownership rights. After notarizing (with digitalsignature) the prepared agreement, the notary orders the registration of newownership rights online in the Centre of Registers immediately. However, theownership transfer will be reflected in the system of the Register no later than 1working day.

Due to introduction of euro in Lithuania on 1 January 2015, registration feesremained the same, only ranges of average market value for calculation ofregistration fees of buildings and land plots were adjusted. Therefore, thecorrections are given below:

Average market value of building - registration fee:Up to EUR 14,500 = EUR 37.65From EUR 14,501 to EUR 232,000 = EUR 37.65 + 0.05% difference betweenbuilding's average market value and EUR 14,500From EUR 232,001 to EUR 870,000 = EUR 146,26 + 0.055% difference betweenbuilding's average market value and EUR 232,000More than EUR 870,000 = EUR 496,70 + 0,05% difference between building'saverage market value and 870,000, but not more than EUR 1448,10 (the ultimatecap fee for registration

Average market value of land plot - registration fee:Up to EUR 2,900 = EUR 23.17From EUR 2,901 to EUR 29,000 = EUR 23.17 + 0.3% of the difference betweenland plot's average market value and EUR 2,900From EUR 29,001 to EUR 290,000 = EUR 101.37 + 0.3% of the differencebetween land plot's average market value and EUR 29,000More than EUR 290,000 = EUR 883.34 + 0.2% of the difference between landplot's average market value and EUR 290,000, but not more than EUR 1448.10(the ultimate cap fee for registration)

Legal basis: Law Amending Articles 17, 23, 26 and Invalidating Article 25 of theLaw on Real Property Register No I-1539 of the Republic of Lithuania as of 23June 2015 No XII-1833; Resolution No 1194 of the Government of the Republicof Lithuania as of 18 November 2015 on Amendment to Resolution No 379 of theGovernment of the Republic of Lithuania as of 23 April 2014 on Approval of theReal Property Register Regulations

2 days EUR 2,469.03; (10business days(regular Procedure),but can be done in 3business days bypaying a 30% mark-up on the price (fast-track Procedure)in 2 business dayswith a 50% mark-up(fast-trackProcedure), and in 1business day with a100% mark-up (fast-track Procedure))

LithuaniaDoing Business 2019

Page 24

Page 25: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Registering Property in Lithuania – Measure of Quality

Answer Score

Reliability of infrastructure index (0-8) 8.0

What is the institution in charge of immovable property registration? The StateEnterprise Centreof Registers

In what format are the majority of title or deed records kept in the largest business city—in apaper format or in a computerized format (scanned or fully digital)?

Computer/Fullydigital

2.0

Is there an electronic database for checking for encumbrances (liens, mortgages, restrictionsand the like)?

Yes 1.0

Institution in charge of the plans showing legal boundaries in the largest business city: The StateEnterprise Centreof Registers

In what format are the majority of maps of land plots kept in the largest business city—in apaper format or in a computerized format (scanned or fully digital)?

Computer/Fullydigital

2.0

Is there an electronic database for recording boundaries, checking plans and providingcadastral information (geographic information system)?

Yes 1.0

Is the information recorded by the immovable property registration agency and the cadastralor mapping agency kept in a single database, in different but linked databases or in separatedatabases?

Single database 1.0

Do the immovable property registration agency and cadastral or mapping agency use thesame identification number for properties?

Yes 1.0

Transparency of information index (0–6) 4.5

Who is able to obtain information on land ownership at the agency in charge of immovableproperty registration in the largest business city?

Anyone whopays the officialfee

1.0

Is the list of documents that are required to complete any type of property transaction madepublicly available–and if so, how?

Yes, online 0.5

Link for online access: http://info.registrucentras.lt/

Is the applicable fee schedule for any property transaction at the agency in charge ofimmovable property registration in the largest business city made publicly available–and ifso, how?

Yes, online 0.5

Link for online access: http://www.registrucentras.lt/p/85

Does the agency in charge of immovable property registration commit to delivering a legallybinding document that proves property ownership within a specific time frame–and if so, howdoes it communicate the service standard?

Yes, online 0.5

Link for online access: http://www.registrucentras.lt/p/86

Is there a specific and separate mechanism for filing complaints about a problem thatoccurred at the agency in charge of immovable property registration?

No 0.0

Contact information:

Are there publicly available official statistics tracking the number of transactions at theimmovable property registration agency?

Yes 0.5

Number of property transfers in the largest business city in 2017: 40260 propertytransfers

Who is able to consult maps of land plots in the largest business city? Anyone whopays the officialfee

0.5

Is the applicable fee schedule for accessing maps of land plots made publicly available—and if so, how?

Yes, online 0.5

LithuaniaDoing Business 2019

Page 25

Page 26: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Link for online access: http://www.registrucentras.lt/p/773

Does the cadastral or mapping agency commit to delivering an updated map within aspecific time frame—and if so, how does it communicate the service standard?

Yes, online 0.5

Link for online access: http://www.registrucentras.lt/p/773

Is there a specific and separate mechanism for filing complaints about a problem thatoccurred at the cadastral or mapping agency?

No 0.0

Contact information:

Geographic coverage index (0–8) 8.0

Are all privately held land plots in the economy formally registered at the immovable propertyregistry?

Yes 2.0

Are all privately held land plots in the largest business city formally registered at theimmovable property registry?

Yes 2.0

Are all privately held land plots in the economy mapped? Yes 2.0

Are all privately held land plots in the largest business city mapped? Yes 2.0

Land dispute resolution index (0–8) 8.0

Does the law require that all property sale transactions be registered at the immovableproperty registry to make them opposable to third parties?

Yes 1.5

Is the system of immovable property registration subject to a state or private guarantee? Yes 0.5

Is there a specific compensation mechanism to cover for losses incurred by parties whoengaged in good faith in a property transaction based on erroneous information certified bythe immovable property registry?

Yes 0.5

Does the legal system require a control of legality of the documents necessary for a propertytransaction (e.g., checking the compliance of contracts with requirements of the law)?

Yes 0.5

If yes, who is responsible for checking the legality of the documents? Notary;

Does the legal system require verification of the identity of the parties to a propertytransaction?

Yes 0.5

If yes, who is responsible for verifying the identity of the parties? Notary;

Is there a national database to verify the accuracy of identity documents? Yes 1.0

For a standard land dispute between two local businesses over tenure rights of a propertyworth 50 times gross national income (GNI) per capita and located in the largest businesscity, what court would be in charge of the case in the first instance?

Vilnius CountyCourt (Vilniausapygardosteismas)

How long does it take on average to obtain a decision from the first-instance court for such acase (without appeal)?

Less than a year 3.0

Are there any statistics on the number of land disputes in the first instance? Yes 0.5

Number of land disputes in the largest business city in 2017: In 2017, therewere 485disputes in theland lease heardin Lithuania (infirst instancecourts)

Equal access to property rights index (-2–0) 0.0

Do unmarried men and unmarried women have equal ownership rights to property? Yes

Do married men and married women have equal ownership rights to property? Yes 0.0

LithuaniaDoing Business 2019

Page 26

Page 27: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Getting Credit

This topic explores two sets of issues—the strength of credit reporting systems and the effectiveness of collateral and bankruptcy laws infacilitating lending. The most recent round of data collection for the project was completed in May 2018.

.See the methodology for more

information

What the indicators measure

Strength of legal rights index (0–12)

Rights of borrowers and lenders throughcollateral laws (0-10)

Protection of secured creditors’ rights throughbankruptcy laws (0-2)

Depth of credit information index (0–8)

Scope and accessibility of credit informationdistributed by credit bureaus and credit registries(0-8)

Credit bureau coverage (% of adults)

Number of individuals and firms listed in largestcredit bureau as a percentage of adult population

Credit registry coverage (% of adults)

Number of individuals and firms listed in creditregistry as a percentage of adult population

Case study assumptions

assesses the sharing of credit information and the legal rights ofborrowers and lenders with respect to secured transactions through 2 sets ofindicators. The depth of credit information index measures rules and practicesaffecting the coverage, scope and accessibility of credit information availablethrough a credit registry or a credit bureau. The strength of legal rights indexmeasures the degree to which collateral and bankruptcy laws protect the rights ofborrowers and lenders and thus facilitate lending. For each economy it is firstdetermined whether a unitary secured transactions system exists. Then two casescenarios, case A and case B, are used to determine how a nonpossessory securityinterest is created, publicized and enforced according to the law. Special emphasisis given to how the collateral registry operates (if registration of security interests ispossible). The case scenarios involve a secured borrower, company ABC, and asecured lender, BizBank.

Doing Business

In some economies the legal framework for secured transactions will allow only caseA or case B (not both) to apply. Both cases examine the same set of legal provisionsrelating to the use of movable collateral.

Several assumptions about the secured borrower (ABC) and lender (BizBank)are used:

- ABC is a domestic limited liability company (or its legal equivalent).- ABC has up to 50 employees.- ABC has its headquarters and only base of operations in the economy’s largestbusiness city. For 11 economies the data are also collected for the second largestbusiness city.- Both ABC and BizBank are 100% domestically owned.

The case scenarios also involve assumptions. In case A, as collateral for the loan,ABC grants BizBank a nonpossessory security interest in one category of movableassets, for example, its machinery or its inventory. ABC wants to keep bothpossession and ownership of the collateral. In economies where the law does notallow nonpossessory security interests in movable property, ABC and BizBank use afiduciary transfer-of-title arrangement (or a similar substitute for nonpossessorysecurity interests).

In case B, ABC grants BizBank a business charge, enterprise charge, floatingcharge or any charge that gives BizBank a security interest over ABC’s combinedmovable assets (or as much of ABC’s movable assets as possible). ABC keepsownership and possession of the assets.

LithuaniaDoing Business 2019

Page 27

Page 28: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Getting Credit - Lithuania

Figure – Getting Credit in Lithuania and comparator economies – Ranking and Score

DB 2019 Getting Credit Score

0 100

85.00: Latvia (Rank: 12)

70.00: Denmark (Rank: 44)

70.00: Lithuania (Rank: 44)

65.00: Finland (Rank: 60)

64.12: Regional Average (OECD high income)

55.00: Norway (Rank: 85)

Note: The ranking of economies on the ease of getting credit is determined by sorting their scores for getting credit. These scores are thesum of the scores for the strength of legal rights index and the depth of credit information index.

Figure – Legal Rights in Lithuania and comparator economies

Lithuania Denmark Finland Latvia Norway OECD high income

0

1

2

3

4

5

6

7

8

Inde

x Sc

ore

6

87

9

5

6.1

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Strength of legal rights index (0-12) 6 6.1 12 (5 Economies)

Depth of credit information index (0-8) 8 6.7 8 (42 Economies)

Credit registry coverage (% of adults) 51.6 21.8 100.0 (4 Economies)

Credit bureau coverage (% of adults) 96.8 65.3 100.0 (25 Economies)

LithuaniaDoing Business 2019

Page 28

Page 29: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Legal Rights in Lithuania

Strength of legal rights index (0-12) 6

Does an integrated or unified legal framework for secured transactions that extends to the creation, publicity andenforcement of functional equivalents to security interests in movable assets exist in the economy?

No

Does the law allow businesses to grant a non possessory security right in a single category of movable assets, withoutrequiring a specific description of collateral?

No

Does the law allow businesses to grant a non possessory security right in substantially all of its assets, without requiring aspecific description of collateral?

Yes

May a security right extend to future or after-acquired assets, and does it extend automatically to the products, proceeds andreplacements of the original assets?

Yes

Is a general description of debts and obligations permitted in collateral agreements; can all types of debts and obligations besecured between parties; and can the collateral agreement include a maximum amount for which the assets areencumbered?

No

Is a collateral registry in operation for both incorporated and non-incorporated entities, that is unified geographically and byasset type, with an electronic database indexed by debtor's name?

Yes

Does a notice-based collateral registry exist in which all functional equivalents can be registered? No

Does a modern collateral registry exist in which registrations, amendments, cancellations and searches can be performedonline by any interested third party?

No

Are secured creditors paid first (i.e. before tax claims and employee claims) when a debtor defaults outside an insolvencyprocedure?

Yes

Are secured creditors paid first (i.e. before tax claims and employee claims) when a business is liquidated? Yes

Are secured creditors subject to an automatic stay on enforcement when a debtor enters a court-supervised reorganizationprocedure? Does the law protect secured creditors’ rights by providing clear grounds for relief from the stay and sets a timelimit for it?

No

Does the law allow parties to agree on out of court enforcement at the time a security interest is created? Does the law allowthe secured creditor to sell the collateral through public auction or private tender, as well as, for the secured creditor to keepthe asset in satisfaction of the debt?

Yes

Figure – Credit Information in Lithuania and comparator economies

Lithuania Denmark Finland Latvia Norway OECD high income

0

1

2

3

4

5

6

7

8

Inde

x Sc

ore

8

6 6

8

66.7

LithuaniaDoing Business 2019

Page 29

Page 30: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Credit Information in Lithuania

Note: An economy receives a score of 1 if there is a "yes" to either bureau or registry. If the credit bureau or registry is not operational orcovers less than 5% of the adult population, the total score on the depth of credit information index is 0.

Depth of credit information index (0-8) Creditbureau

Creditregistry

Score

Are data on both firms and individuals distributed? Yes Yes 1

Are both positive and negative credit data distributed? Yes No 1

Are data from retailers or utility companies - in addition to data from banks andfinancial institutions - distributed?

Yes No 1

Are at least 2 years of historical data distributed? (Credit bureaus and registriesthat distribute more than 10 years of negative data or erase data on defaults assoon as they are repaid obtain a score of 0 for this component.)

Yes Yes 1

Are data on loan amounts below 1% of income per capita distributed? Yes Yes 1

By law, do borrowers have the right to access their data in the credit bureau orcredit registry?

Yes Yes 1

Can banks and financial institutions access borrowers’ credit information online(for example, through an online platform, a system-to-system connection orboth)?

Yes Yes 1

Are bureau or registry credit scores offered as a value-added service to helpbanks and financial institutions assess the creditworthiness of borrowers?

Yes No 1

Total Score ("yes" to either public bureau or private registry) 8

Coverage Credit bureau Credit registry

Number of individuals 1,640,346 931,281

Number of firms 170,180 34,862

Total 1,810,526 966,143

Percentage of adult population 96.8 51.6

LithuaniaDoing Business 2019

Page 30

Page 31: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Protecting Minority Investors

This topic measures the strength of minority shareholder protections against misuse of corporate assets by directors for their personal gainas well as shareholder rights, governance safeguards and corporate transparency requirements that reduce the risk of abuse. The mostrecent round of data collection for the project was completed in May 2018. .See the methodology for more information

What the indicators measure

: Review andapproval requirements for related-partytransactions; Disclosure requirements for related-party transactions

• Extent of disclosure index (0–10)

: Abilityof minority shareholders to sue and holdinterested directors liable for prejudicial related-party transactions; Available legal remedies(damages, disgorgement of profits, fines,imprisonment, rescission of the transaction)

• Extent of director liability index (0–10)

:Access to internal corporate documents;Evidence obtainable during trial and allocation oflegal expenses

• Ease of shareholder suits index (0–10)

: Simple average of the extent ofdisclosure, extent of director liability and ease ofshareholder indices

• Extent of conflict of interest regulation index(0–10)

:Shareholders’ rights and role in major corporatedecisions

• Extent of shareholder rights index (0-10)

:Governance safeguards protecting shareholdersfrom undue board control and entrenchment

• Extent of ownership and control index (0-10)

:Corporate transparency on ownership stakes,compensation, audits and financial prospects

• Extent of corporate transparency index (0-10)

: Simple average of the extent of shareholdersrights, extent of ownership and control and extentof corporate transparency indices

• Extent of shareholder governance index (0–10)

: Simple average of the extent of conflict ofinterest regulation and extent of shareholdergovernance indices

• Strength of minority investor protection index(0–10)

Case study assumptions

To make the data comparable across economies, a case study uses severalassumptions about the business and the transaction.

- Is a publicly traded corporation listed on the economy’s most important stockexchange. If there are fewer than ten listed companies or if there is no stockexchange in the economy, it is assumed that Buyer is a large private company withmultiple shareholders.- Has a board of directors and a chief executive officer (CEO) who may legally act onbehalf of Buyer where permitted, even if this is not specifically required by law.- Has a supervisory board in economies with a two-tier board system on which Mr.James appointed 60% of the shareholder-elected members.- Has not adopted bylaws or articles of association that go beyond the minimumrequirements. Does not follow codes, principles, recommendations or guidelines thatare not mandatory.- Is a manufacturing company with its own distribution network.

The business (Buyer):

- Mr. James owns 60% of Buyer, sits on Buyer’s board of directors and elected twodirectors to Buyer’s five-member board.- Mr. James also owns 90% of Seller, a company that operates a chain of retailhardware stores. Seller recently closed a large number of its stores.- Mr. James proposes that Buyer purchase Seller’s unused fleet of trucks to expandBuyer’s distribution of its food products, a proposal to which Buyer agrees. The priceis equal to 10% of Buyer’s assets and is higher than the market value.- The proposed transaction is part of the company’s principal activity and is notoutside the authority of the company.- Buyer enters into the transaction. All required approvals are obtained, and allrequired disclosures made—that is, the transaction was not entered into fraudulently.- The transaction causes damages to Buyer. Shareholders sue Mr. James and theexecutives and directors that approved the transaction.

The transaction involves the following details:

LithuaniaDoing Business 2019

Page 31

Page 32: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Protecting Minority Investors - Lithuania

Figure – Protecting Minority Investors in Lithuania and comparator economies – Ranking and Score

DB 2019 Protecting Minority Investors Score

0 100

75.00: Norway (Rank: 15)

66.67: Denmark (Rank: 38)

66.67: Lithuania (Rank: 38)

64.21: Regional Average (OECD high income)

63.33: Latvia (Rank: 51)

58.33: Finland (Rank: 72)

Note: The ranking of economies on the strength of minority investor protections is determined by sorting their scores for protecting minorityinvestors. These scores are the simple average of the scores for the extent of conflict of interest regulation index and the extent ofshareholder governance index.

Figure – Protecting Minority Investors in Lithuania and comparator economies – Measure of Quality

Lithuania

Denmark

Finland

Latvia

Norway

OECD high income

0 5 10 15 20 25 30 35 40 45 50Sub-Indicator Score

10 4 7 6 6 7

9 5 7 5 6 8

9 4 6 2 6 8

8 4 5 5 7 9

10 5 7 8 7 8

7.4 5.5 6.5 5.2 6.3 7.4

Extent of corporate transparency index (0-10) Extent of director liability index (0-10) Extent of disclosure index (0-10)Extent of ownership and control index (0-10) Extent of shareholder rights index (0-10) Ease of shareholder suits index (0-10)

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Extent of disclosure index (0-10) 7.0 6.5 10 (13 Economies)

Extent of director liability index (0-10) 4.0 5.3 10 (Cambodia)

Ease of shareholder suits index (0-10) 7.0 7.3 10 (Djibouti)

Extent of shareholder rights index (0-10) 6.0 6.4 10 (Kazakhstan)

Extent of ownership and control index (0-10) 6.0 5.4 None in 2017/18

Extent of corporate transparency index (0-10) 10.0 7.6 10 (6 Economies)

LithuaniaDoing Business 2019

Page 32

Page 33: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Protecting Minority Investors in Lithuania – Measure of Quality

Answer Score

Extent of conflict of interest regulation index (0-10) 6

Extent of disclosure index (0-10) 7.0

Whose decision is sufficient to approve the Buyer-Seller transaction? (0-3) Shareholders orboard of directorsincludinginterested parties

1.0

Must an external body review the terms of the transaction before it takes place? (0-1) No 0.0

Must Mr. James disclose his conflict of interest to the board of directors? (0-2) Full disclosure ofall material facts

2.0

Must Buyer disclose the transaction in periodic filings (e.g. annual reports)? (0-2) Disclosure on thetransaction andon the conflict ofinterest

2.0

Must Buyer immediately disclose the transaction to the public? (0-2) Disclosure on thetransaction andon the conflict ofinterest

2.0

Extent of director liability index (0-10) 4.0

Can shareholders representing 10% of Buyer's share capital sue for the damage thetransaction caused to Buyer? (0-1)

Yes 1.0

Can shareholders hold Mr. James liable for the damage the transaction caused to Buyer? (0-2)

Liable if negligent 1.0

Can shareholders hold the other directors liable for the damage the transaction caused toBuyer (0-2)

Liable if negligent 1.0

Must Mr. James pay damages for the harm caused to Buyer upon a successful claim byshareholders? (0-1)

Yes 1.0

Must Mr. James repay profits made from the transaction upon a successful claim byshareholders? (0-1)

No 0.0

Is Mr. James disqualified upon a successful claim by shareholders? (0-1) No 0.0

Can a court void the transaction upon a successful claim by shareholders? (0-2) Only in case offraud or bad faith

0.0

Ease of shareholder suits index (0-10) 7.0

Before suing, can shareholders representing 10% of Buyer's share capital inspect thetransaction documents? (0-1)

No 0.0

Can the plaintiff obtain any documents from the defendant and witnesses at trial? (0-3) Any relevantdocument

3.0

Can the plaintiff request categories of documents from the defendant without identifyingspecific ones? (0-1)

No 0.0

Can the plaintiff directly question the defendant and witnesses at trial? (0-2) Yes 2.0

Is the level of proof required for civil suits lower than that of criminal cases? (0-1) Yes 1.0

Can shareholder plaintiffs recover their legal expenses from the company? (0-2) Yes if successful 1.0

Extent of shareholder governance index (0-10) 7.3

Extent of shareholder rights index (0-10) 6.0

Does the sale of 51% of Buyer's assets require shareholder approval? No 0.0

Can shareholders representing 10% of Buyer's share capital call for a meeting ofshareholders?

Yes 1.0

Must Buyer obtain its shareholders’ approval every time it issues new shares? Yes 1.0

LithuaniaDoing Business 2019

Page 33

Page 34: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Do shareholders automatically receive preemption rights every time Buyer issues newshares?

Yes 1.0

Must shareholders approve the election and dismissal of the external auditor? Yes 1.0

Are changes to the rights of a class of shares only possible if the holders of the affectedshares approve?

No 0.0

Assuming that Buyer is a limited company, does the sale of 51% of its assets requiremember approval?

No 0.0

Assuming that Buyer is a limited company, can members representing 10% call for ameeting of members?

Yes 1.0

Assuming that Buyer is a limited company, must all or almost all members consent to add anew member?

No 0.0

Assuming that Buyer is a limited company, must a member first offer to sell their interest tothe existing members before they can sell to non-members?

Yes 1.0

Extent of ownership and control index (0-10) 6.0

Is it forbidden to appoint the same individual as CEO and chairperson of the board ofdirectors?

No 0.0

Must the board of directors include independent and nonexecutive board members? No 0.0

Can shareholders remove members of the board of directors without cause before the endof their term?

Yes 1.0

Must the board of directors include a separate audit committee exclusively comprising boardmembers?

No 0.0

Must a potential acquirer make a tender offer to all shareholders upon acquiring 50% ofBuyer?

Yes 1.0

Must Buyer pay declared dividends within a maximum period set by law? Yes 1.0

Is a subsidiary prohibited from acquiring shares issued by its parent company? Yes 1.0

Assuming that Buyer is a limited company, must Buyer have a mechanism to resolvedisagreements among members?

Yes 1.0

Assuming that Buyer is a limited company, must a potential acquirer make a tender offer toall shareholders upon acquiring 50% of Buyer?

No 0.0

Assuming that Buyer is a limited company, must Buyer distribute profits within a maximumperiod set by law?

Yes 1.0

Extent of corporate transparency index (0-10) 10.0

Must Buyer disclose direct and indirect beneficial ownership stakes representing 5%? Yes 1.0

Must Buyer disclose information about board members’ primary employment anddirectorships in other companies?

Yes 1.0

Must Buyer disclose the compensation of individual managers? Yes 1.0

Must a detailed notice of general meeting be sent 21 days before the meeting? Yes 1.0

Can shareholders representing 5% of Buyer’s share capital put items on the general meetingagenda?

Yes 1.0

Must Buyer's annual financial statements be audited by an external auditor? Yes 1.0

Must Buyer disclose its audit reports to the public? Yes 1.0

Assuming that Buyer is a limited company, must members meet at least once a year? Yes 1.0

Assuming that Buyer is a limited company, can members representing 5% put items on themeeting agenda?

Yes 1.0

Assuming that Buyer is a limited company, must Buyer's annual financial statements beaudited by an external auditor?

Yes 1.0

LithuaniaDoing Business 2019

Page 34

Page 35: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Paying Taxes

This topic records the taxes and mandatory contributions that a medium-size company must pay or withhold in a given year, as well as theadministrative burden of paying taxes and contributions and complying with postfiling procedures (VAT refund and tax audit). The most recentround of data collection for the project was completed in May 2018 covering for the Paying Taxes indicator calendar year 2017 (January 1,2017 – December 31, 2017). See the methodology for more information.

What the indicators measure

Tax payments for a manufacturing company in2017 (number per year adjusted for electronicand joint filing and payment)

Total number of taxes and contributions paid orwithheld, including consumption taxes (valueadded tax, sales tax or goods and service tax)

Method and frequency of filing and payment•Time required to comply with 3 major taxes(hours per year)

Collecting information, computing tax payable•Preparing separate tax accounting books, ifrequired

Completing tax return, filing with agencies•Arranging payment or withholding•

Total tax and contribution rate (% of commercialprofits)

Profit or corporate income tax•Social contributions, labor taxes paid byemployer

Property and property transfer taxes•Dividend, capital gains, financial transactionstaxes

Waste collection, vehicle, road and other taxes•Postfiling Index

Time to comply with a VAT refund (hours)•Time to obtain a VAT refund (weeks)•Time to comply with a corporate income taxcorrection (hours)

Time to complete a corporate income taxcorrection (weeks)

Case study assumptions

Using a case scenario, records taxes and mandatory contributions amedium size company must pay in a year, and measures the administrative burdenof paying taxes, contributions and dealing with postfiling processes. Information isalso compiled on frequency of filing and payments, time taken to comply with taxlaws, time taken to comply with the requirements of postfiling processes and timewaiting.

Doing Business

To make data comparable across economies, several assumptions are used:- TaxpayerCo is a medium-size business that started operations on January 1, 2016.It produces ceramic flowerpots and sells them at retail.

Taxes andmandatory contributions are measured at all levels of government.

- In June 2017, TaxpayerCo. makes a large capital purchase: the value of themachine is 65 times income per capita of the economy. Sales are equally spread permonth (1,050 times income per capita divided by 12) and cost of goods sold areequally expensed per month (875 times income per capita divided by 12). Themachinery seller is registered for VAT and excess input VAT incurred in June will befully recovered after four consecutive months if the VAT rate is the same for inputs,sales and the machine and the tax reporting period is every month. Input VAT willexceed Output VAT in June 2017.

All taxes and contributionsrecorded are paid in the second year of operation (calendar year 2017).

The VAT refund process:

- An error in calculation of income tax liability (for example, use of incorrect taxdepreciation rates, or incorrectly treating an expense as tax deductible) leads to anincorrect income tax return and a corporate income tax underpayment. TaxpayerCo.discovered the error and voluntarily notified the tax authority. The value of theunderpaid income tax liability is 5% of the corporate income tax liabilitydue. TaxpayerCo. submits corrected information after the deadline for submitting theannual tax return, but within the tax assessment period.

The corporate income tax audit process:

LithuaniaDoing Business 2019

Page 35

Page 36: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Paying Taxes - Lithuania

Figure – Paying Taxes in Lithuania and comparator economies – Ranking and Score

DB 2019 Paying Taxes Score

0 100

91.14: Denmark (Rank: 9)

90.64: Finland (Rank: 11)

89.74: Latvia (Rank: 13)

88.66: Lithuania (Rank: 18)

84.84: Norway (Rank: 30)

83.32: Regional Average (OECD high income)

Note: The ranking of economies on the ease of paying taxes is determined by sorting their scores for paying taxes. These scores are thesimple average of the scores for each of the component indicators, with a threshold and a nonlinear transformation applied to one of thecomponent indicators, the total tax and contribution rate. The threshold is defined as the total tax and contribution rate at the 15th percentileof the overall distribution for all years included in the analysis up to and including Doing Business 2015, which is 26.1%. All economies with atotal tax and contribution rate below this threshold receive the same score as the economy at the threshold.

Figure – Paying Taxes in Lithuania and comparator economies – Measure of Quality

Lithuania Denmark Finland Latvia Norway OECD high income

0

20

40

60

80

100

Inde

x sc

ore

97.5289.06 93.09 98.11

62.65

84.41

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Payments (number per year) 10 11.2 3 (Hong Kong SAR, China)

Time (hours per year) 99 159.4 49 (Singapore)

Total tax and contribution rate (% of profit) 42.6 39.8 26.1% (32 Economies)

Postfiling index (0-100) 97.52 84.41 None in 2017/18

LithuaniaDoing Business 2019

Page 36

Page 37: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Paying Taxes in Lithuania

Tax ormandatorycontribution

Payments(number)

Notes onPayments

Time(hours)

Statutorytax rate

Tax base Total taxandcontributionrate (% ofprofit)

Notes onTTCR

Socialsecuritycontributions

1.0 online 34.0 30.98% gross salaries 35.17

Corporateincome tax

1.0 online 18.0 15% taxable profit 5.92

Real estatetax

1.0 online 1% assessedpropertyvalue

0.98

Environmental tax

1.0 online 39.77 Eur/tonin January -April 201671.13 Eur/tonin May -December2016

ton of waste 0.29

Vehicle tax 1.0 online EUR 286 +EUR 753

fixed feedepending ontype ofvehicle

0.15

Land tax 1.0 online 0.01% - 4% assessedland value

0.06

Contributionsto guaranteefund

0.0 online andjointly

0.2% gross salaries 0.00 included insocial securitycontributions

Value addedtax (VAT)

1.0 online 47.0 21% value added 0.00 not included

Fuel tax 1.0 included intofuel price

0.00 small amount

Employeepaid - Socialsecuritycontributions

0.0 jointly 9% gross salaries 0.00 withheld

Tax onpollution frommobilesources

1.0 online various rates fuelconsumption

0.00

Tax onpollution frompackaging

1.0 online various rates packaginguse

0.00 small amount

Totals 10 99 42.6

LithuaniaDoing Business 2019

Page 37

Page 38: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Paying Taxes in Lithuania – Tax by Type

Taxes by type Answer

Profit tax (% of profit) 5.9

Labor tax and contributions (% of profit) 35.2

Other taxes (% of profit) 1.5

LithuaniaDoing Business 2019

Page 38

Page 39: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Paying Taxes in Lithuania – Measure of Quality

Names of taxes have been standardized. For instance income tax, profit tax, tax on company's income are all named corporateincome tax in this table.The hours for VAT include all the VAT and sales taxes applicable.The hours for Social Security include all the hours for labor taxes and mandatory contributions in general.The postfiling index is the average of the scores on time to comply with VAT refund, time to obtain a VAT refund, time to comply with acorporate income tax correction and time to complete a corporate income tax correction.N/A = Not applicable.

Notes:

Answer Score

Postfiling index (0-100) 97.52

VAT refunds

Does VAT exist? Yes

Does a VAT refund process exist per the case study? Yes

Restrictions on VAT refund process None

Percentage of cases exposed to a VAT audit (%) 0% - 24%

Is there a mandatory carry forward period? No

Time to comply with VAT refund (hours) 2.1 95.8

Time to obtain a VAT refund (weeks) 6.2 94.27

Corporate income tax audits

Does corporate income tax exist? Yes

Percentage of cases exposed to a corporate income tax audit (%) 0% - 24%

Time to comply with a corporate income tax correction (hours) 1.5 100

Time to complete a corporate income tax correction (weeks) No tax audit percase studyscenario

100

LithuaniaDoing Business 2019

Page 39

Page 40: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Trading across Borders

records the time and cost associated with the logistical process of exporting and importing goods. measuresthe time and cost (excluding tariffs) associated with three sets of procedures—documentary compliance, border compliance and domestictransport—within the overall process of exporting or importing a shipment of goods. The most recent round of data collection for the projectwas completed in May 2018. .

Doing Business Doing Business

See the methodology for more information

What the indicators measure

Documentary compliance

Obtaining, preparing and submitting documentsduring transport, clearance, inspections and portor border handling in origin economy

Obtaining, preparing and submitting documentsrequired by destination economy and any transiteconomies

Covers all documents required by law and inpractice, including electronic submissions ofinformation

Border compliance

Customs clearance and inspections•Inspections by other agencies (if applied to morethan 20% of shipments)

Handling and inspections that take place at theeconomy’s port or border

Domestic transport

Loading or unloading of the shipment at thewarehouse or port/border

Transport between warehouse and port/border•Traffic delays and road police checks whileshipment is en route

Case study assumptions

To make the data comparable across economies, a few assumptions are madeabout the traded goods and the transactions:

Time is measured in hours, and 1 day is 24 hours (for example, 22 days arerecorded as 22×24=528 hours). If customs clearance takes 7.5 hours, the data arerecorded as is. Alternatively, suppose documents are submitted to a customs agencyat 8:00a.m., are processed overnight and can be picked up at 8:00a.m. the next day.The time for customs clearance would be recorded as 24 hours because the actualprocedure took 24 hours.

Time:

Insurance cost and informal payments for which no receipt is issued areexcluded from the costs recorded. Costs are reported in U.S. dollars. Contributorsare asked to convert local currency into U.S. dollars based on the exchange rateprevailing on the day they answer the questionnaire. Contributors are private sectorexperts in international trade logistics and are informed about exchange rates.

Cost:

- For all 190 economies covered by , it is assumed a shipment is in awarehouse in the largest business city of the exporting economy and travels to awarehouse in the largest business city of the importing economy.- It is assumed each economy imports 15 metric tons of containerized auto parts (HS8708) from its natural import partner—the economy from which it imports the largestvalue (price times quantity) of auto parts. It is assumed each economy exports theproduct of its comparative advantage (defined by the largest export value) to itsnatural export partner—the economy that is the largest purchaser of this product.Shipment value is assumed to be $50,000.- The mode of transport is the one most widely used for the chosen export or importproduct and the trading partner, as is the seaport or land border crossing.- All electronic information submissions requested by any government agency inconnection with the shipment are considered to be documents obtained, preparedand submitted during the export or import process.- A port or border is a place (seaport or land border crossing) where merchandisecan enter or leave an economy.- Relevant government agencies include customs, port authorities, road police,border guards, standardization agencies, ministries or departments of agriculture orindustry, national security agencies and any other government authorities.

Assumptions of the case study:Doing Business

LithuaniaDoing Business 2019

Page 40

Page 41: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Trading across Borders - Lithuania

Figure – Trading across Borders in Lithuania and comparator economies – Ranking and Score

DB 2019 Trading Across Borders Score

0 100

97.83: Lithuania (Rank: 19)

96.97: Norway (Rank: 22)

95.26: Latvia (Rank: 26)

94.21: Regional Average (OECD high income)

92.44: Finland (Rank: 34)

100.00: Denmark (Rank: 1)

Note: The ranking of economies on the ease of trading across borders is determined by sorting their scores for trading across borders. Thesescores are the simple average of the scores for the time and cost for documentary compliance and border compliance to export and import.

Figure – Trading across Borders in Lithuania – Time and Cost

Export-

BorderCompliance

Export-

DocumentaryCompliance

Import-

BorderCompliance

Import-

DocumentaryCompliance

012345678

Tim

e (h

ours

)

0

10

20

30

40

50

60

70Co

st (U

SD)

7 58

3 28

0 01

0

Time (hours) Cost (USD)

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Time to export: Border compliance (hours) 7 12.5 1 (19 Economies)

Cost to export: Border compliance (USD) 58 139.1 0 (19 Economies)

Time to export: Documentary compliance (hours) 3 2.4 1 (26 Economies)

Cost to export: Documentary compliance (USD) 28 35.2 0 (20 Economies)

Time to import: Border compliance (hours) 0 8.5 0 (25 Economies)

Cost to import: Border compliance (USD) 0 100.2 0 (28 Economies)

Time to import: Documentary compliance (hours) 1 3.4 1 (30 Economies)

Cost to import: Documentary compliance (USD) 0 24.9 0 (30 Economies)

LithuaniaDoing Business 2019

Page 41

Page 42: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Trading across Borders in Lithuania

Characteristics Export Import

Product HS 87 : Vehicles other than railway ortramway rolling-stock, and parts andaccessories thereof

HS 8708: Parts and accessories of motorvehicles

Trade partner Russian Federation Germany

Border Medininkai border crossing Poland-Lithuania border crossing

Distance (km) 35 160

Domestic transport time (hours) 1 4

Domestic transport cost (USD) 73 290

Details – Trading across Borders in Lithuania – Components of Border Compliance

Time to Complete (hours) Associated Costs (USD)

Export: Clearance and inspections requiredby customs authorities

3.0 58.0

Export: Clearance and inspections requiredby agencies other than customs

0.0 0.0

Export: Port or border handling 4.3 0.0

Import: Clearance and inspections requiredby customs authorities

0.0 0.0

Import: Clearance and inspections requiredby agencies other than customs

0.0 0.0

Import: Port or border handling 0.0 0.0

LithuaniaDoing Business 2019

Page 42

Page 43: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Trading across Borders in Lithuania – Trade Documents

Export Import

CMR waybill CMR waybill

Certificate of origin Commercial invoice

Certificate of conformity Packing list

Customs Export Declaration Intrastat

Commercial invoice

Packing list

LithuaniaDoing Business 2019

Page 43

Page 44: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Enforcing Contracts

.

The enforcing contracts indicator measures the time and cost for resolving a commercial dispute through a local first-instance court, and thequality of judicial processes index, evaluating whether each economy has adopted a series of good practices that promote quality andefficiency in the court system. The most recent round of data collection was completed in May 2018. See the methodology for moreinformation

What the indicators measure

Time required to enforce a contract through thecourts (calendar days)

Time to file and serve the case•Time for trial and to obtain the judgment•Time to enforce the judgment•

Cost required to enforce a contract through thecourts (% of claim)

Attorney fees•Court fees•Enforcement fees•

Quality of judicial processes index (0-18)

Court structure and proceedings (-1-5)•Case management (0-6)•Court automation (0-4)•Alternative dispute resolution (0-3)•

Case study assumptions

The dispute in the case study involves the breach of a sales contract between 2domestic businesses. The case study assumes that the court hears an expert on thequality of the goods in dispute. This distinguishes the case from simple debtenforcement.

To make the data comparable across economies, uses severalassumptions about the case:- The dispute concerns a lawful transaction between two businesses (Seller andBuyer), both located in the economy’s largest business city. For 11 economies thedata are also collected for the second largest business city.- The buyer orders custom-made goods, then fails to pay alleging that the goods arenot of adequate quality.- The value of the dispute is 200% of the income per capita or the equivalent in localcurrency of USD 5,000, whichever is greater.- The seller sues the buyer before the court with jurisdiction over commercial casesworth 200% of income per capita or $5,000.- The seller requests the pretrial attachment of the defendant’s movable assets tosecure the claim.- The dispute on the quality of the goods requires an expert opinion.- The judge decides in favor of the seller; there is no appeal.- The seller enforces the judgment through a public sale of the buyer’s movableassets.

Doing Business

LithuaniaDoing Business 2019

Page 44

Page 45: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Enforcing Contracts - Lithuania

Figure – Enforcing Contracts in Lithuania and comparator economies – Ranking and Score

DB 2019 Enforcing Contracts Score

0 100

81.27: Norway (Rank: 3)

78.80: Lithuania (Rank: 7)

73.92: Denmark (Rank: 14)

71.66: Latvia (Rank: 20)

67.65: Regional Average (OECD high income)

66.40: Finland (Rank: 46)

Note: The ranking of economies on the ease of enforcing contracts is determined by sorting their scores for enforcing contracts. Thesescores are the simple average of the scores for each of the component indicators.

Figure – Enforcing Contracts in Lithuania – Time and Cost

Denmark Finland Latvia Lithuania Norway OECDhigh

income

0

100

200

300

400

500

600

700

Tim

e (d

ays)

0

5

10

15

20

25

30

Cost

(% o

f cla

im v

alue

)485

23.3485

16.2469

23.1

370

23.6

400

9.9

582.421.2

Time (days) Cost (% of claim value)

Standardized Case

Claim value EUR 25,892

Court name Vilnius District Court

City Covered Vilnius

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Time (days) 370 582.4 None in 2017/18

Cost (% of claim value) 23.6 21.2 None in 2017/18

Quality of judicial processes index (0-18) 15.0 11.5 None in 2017/18

LithuaniaDoing Business 2019

Page 45

Page 46: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Enforcing Contracts in Lithuania and comparator economies – Measure of Quality

Lithuania

Denmark

Finland

Latvia

Norway

OECD high income

0 2 4 6 8 10 12 14 16Sub-Indicator Score

3 4.5 4 3.5

2.5 4.5 3.5 3.5

2.5 2 2.5 1.5

3 4.5 2 3

2.5 4 4 3.5

2.5 3.1 2.3 3.6

Alternative dispute resolution (0-3) Case management (0-6) Court automation (0-4) Court structure and proceedings (-1-5)

Details – Enforcing Contracts in Lithuania

Indicator

Time (days) 370

Filing and service 40

Trial and judgment 240

Enforcement of judgment 90

Cost (% of claim value) 23.6

Attorney fees 8.6

Court fees 6

Enforcement fees 9

Quality of judicial processes index (0-18) 15.0

Court structure and proceedings (-1-5) 3.5

Case management (0-6) 4.5

Court automation (0-4) 4.0

Alternative dispute resolution (0-3) 3.0

LithuaniaDoing Business 2019

Page 46

Page 47: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Enforcing Contracts in Lithuania – Measure of Quality

Answer Score

Quality of judicial processes index (0-18) 15.0

Court structure and proceedings (-1-5) 3.5

1. Is there a court or division of a court dedicated solely to hearing commercial cases? No 0.0

2. Small claims court 1.5

2.a. Is there a small claims court or a fast-track procedure for small claims? Yes

2.b. If yes, is self-representation allowed? Yes

3. Is pretrial attachment available? Yes 1.0

4. Are new cases assigned randomly to judges? Yes, automatic 1.0

5. Does a woman's testimony carry the same evidentiary weight in court as a man's? Yes 0.0

Case management (0-6) 4.5

1. Time standards 0.0

1.a. Are there laws setting overall time standards for key court events in a civilcase?

Yes

1.b. If yes, are the time standards set for at least three court events? No

1.c. Are these time standards respected in more than 50% of cases? Yes

2. Adjournments 0.5

2.a. Does the law regulate the maximum number of adjournments that can begranted?

No

2.b. Are adjournments limited to unforeseen and exceptional circumstances? Yes

2.c. If rules on adjournments exist, are they respected in more than 50% of cases? Yes

3. Can two of the following four reports be generated about the competent court: (i) time todisposition report; (ii) clearance rate report; (iii) age of pending cases report; and (iv) singlecase progress report?

Yes 1.0

4. Is a pretrial conference among the case management techniques used before thecompetent court?

Yes 1.0

5. Are there any electronic case management tools in place within the competent court foruse by judges?

Yes 1.0

6. Are there any electronic case management tools in place within the competent court foruse by lawyers?

Yes 1.0

Court automation (0-4) 4.0

1. Can the initial complaint be filed electronically through a dedicated platform within thecompetent court?

yes 1.0

2. Is it possible to carry out service of process electronically for claims filed before thecompetent court?

Yes 1.0

3. Can court fees be paid electronically within the competent court? Yes 1.0

4. Publication of judgments 1.0

4.a Are judgments rendered in commercial cases at all levels made available to thegeneral public through publication in official gazettes, in newspapers or on theinternet or court website?

Yes

4.b. Are judgments rendered in commercial cases at the appellate and supremecourt level made available to the general public through publication in officialgazettes, in newspapers or on the internet or court website?

Yes

Alternative dispute resolution (0-3) 3.0

1. Arbitration 1.5

LithuaniaDoing Business 2019

Page 47

Page 48: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

1.a. Is domestic commercial arbitration governed by a consolidated law orconsolidated chapter or section of the applicable code of civil procedureencompassing substantially all its aspects?

Yes

1.b. Are there any commercial disputes—aside from those that deal with publicorder or public policy—that cannot be submitted to arbitration?

No

1.c. Are valid arbitration clauses or agreements usually enforced by the courts? Yes

2. Mediation/Conciliation 1.5

2.a. Is voluntary mediation or conciliation available? Yes

2.b. Are mediation, conciliation or both governed by a consolidated law orconsolidated chapter or section of the applicable code of civil procedureencompassing substantially all their aspects?

Yes

2.c. Are there financial incentives for parties to attempt mediation or conciliation(i.e., if mediation or conciliation is successful, a refund of court filing fees, incometax credits or the like)?

Yes

LithuaniaDoing Business 2019

Page 48

Page 49: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Resolving Insolvency

studies the time, cost and outcome of insolvency proceedings involving domestic legal entities. These variables are used tocalculate the recovery rate, which is recorded as cents on the dollar recovered by secured creditors through reorganization, liquidation ordebt enforcement (foreclosure or receivership) proceedings. To determine the present value of the amount recovered by creditors,

uses the lending rates from the International Monetary Fund, supplemented with data from central banks and the EconomistIntelligence Unit. The most recent round of data collection was completed in May 2018. .

Doing Business

DoingBusiness

See the methodology for more information

What the indicators measure

Time required to recover debt (years)

Measured in calendar years•Appeals and requests for extension are included•

Cost required to recover debt (% of debtor’sestate)

Measured as percentage of estate value•Court fees•Fees of insolvency administrators•Lawyers’ fees•Assessors’ and auctioneers’ fees•Other related fees•

Outcome

Whether business continues operating as a goingconcern or business assets are sold piecemeal

Recovery rate for creditors

Measures the cents on the dollar recovered bysecured creditors

Outcome for the business (survival or not)determines the maximum value that can berecovered

Official costs of the insolvency proceedings arededucted

Depreciation of furniture is taken into account•Present value of debt recovered•

Strength of insolvency framework index (0- 16)

Sum of the scores of four component indices:•Commencement of proceedings index (0-3)•Management of debtor’s assets index (0-6)•Reorganization proceedings index (0-3)•Creditor participation index (0-4)•

Case study assumptions

To make the data on the time, cost and outcome comparable across economies,several assumptions about the business and the case are used:

- A hotel located in the largest city (or cities) has 201 employees and 50 suppliers.The hotel experiences financial difficulties.- The value of the hotel is 100% of the income per capita or the equivalent in localcurrency of USD 200,000, whichever is greater.- The hotel has a loan from a domestic bank, secured by a mortgage over the hotel’sreal estate. The hotel cannot pay back the loan, but makes enough money tooperate otherwise.

In addition, evaluates the quality of legal framework applicable tojudicial liquidation and reorganization proceedings and the extent to which bestinsolvency practices have been implemented in each economy covered.

Doing Business

LithuaniaDoing Business 2019

Page 49

Page 50: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Resolving Insolvency - Lithuania

Figure – Resolving Insolvency in Lithuania and comparator economies – Ranking and Score

DB 2019 Resolving Insolvency Score

0 100

92.81: Finland (Rank: 2)

85.44: Norway (Rank: 5)

85.13: Denmark (Rank: 6)

75.21: Regional Average (OECD high income)

59.60: Latvia (Rank: 54)

46.87: Lithuania (Rank: 85)

Note: The ranking of economies on the ease of resolving insolvency is determined by sorting their scores for resolving insolvency. Thesescores are the simple average of the scores for the recovery rate and the strength of insolvency framework index.

Figure – Resolving Insolvency in Lithuania – Time and Cost

Denmark Finland Latvia Lithuania Norway OECDhigh

income

0

0.5

1

1.5

2

2.5

Tim

e (y

ears

)

0

2

4

6

8

10

12

14

16

Cost

(% o

f est

ate)

1.0

4.00.9

3.5

1.5 10.0

2.3 15.0

0.9

1.0

1.79.3

Time (years) Cost (% of estate)

Indicator Lithuania OECD highincome

Best RegulatoryPerformance

Recovery rate (cents on the dollar) 40.6 70.5 None in 2017/18

Time (years) 2.3 1.7 0.4 (Ireland)

Cost (% of estate) 15.0 9.3 1.0 (Norway)

Outcome (0 as piecemeal sale and 1 as going concern) 0 .. ..

Strength of insolvency framework index (0-16) 8.0 11.9 None in 2017/18

LithuaniaDoing Business 2019

Page 50

Page 51: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Figure – Resolving Insolvency in Lithuania and comparator economies – Measure of Quality

Note: Even if the economy’s legal framework includes provisions related to insolvency proceedings (liquidation or reorganization), theeconomy receives 0 points for the strength of insolvency framework index, if time, cost and outcome indicators are recorded as “no practice.”

Lithuania

Denmark

Finland

Latvia

Norway

OECD high income

0 2 4 6 8 10 12 14 16Sub-Indicator Score

4 2.5 1 0.5

6 3 2 1

6 3 3 2.5

5 2.5 2 2.5

5 2.5 3 1

5.3 2.8 2.2 1.9

Management of debtor's assets index (0-6) Commencement of proceedings index (0-3) Creditor participation index (0-4)Reorganization proceedings index (0-3)

Figure – Resolving Insolvency in Lithuania and comparator economies – Recovery Rate

Lithuania Denmark Finland Latvia Norway OECD high income

0

20

40

60

80

100

Reco

very

rate

(cen

ts o

n th

e do

llar)

40.6

88.5 88.3

41.1

92.0

70.5

LithuaniaDoing Business 2019

Page 51

Page 52: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Resolving Insolvency in Lithuania

Indicator Answer Score

Proceeding liquidation (afteran attempt atreorganization)

Mirage management is interested in saving the business. Additionally, if the management doesnot initiates reorganization, BizBank will start recovery procedure and this will lead the company toliquidation. However, reorganization is likely to fail, because BizBank will be interested in gettingpaid as soon as possible and will not approve the reorganization plan. If reorganization plan is notapproved, the court will terminate reorganization proceedings and initiate liquidation.

Outcome piecemeal sale Upon declaring the enterprise bankrupt and adopting a resolution to put the enterprise intoliquidation by reason of bankruptcy, the court shall confirm the amount of revised claims of eachcreditor, the procedure of liquidation, other orders and instructions necessary for carrying out theliquidation procedure. In this stage pledged assets – the real estate - shall be sold at an auction.

Time (in years) 2.3 Mirage management will file a petition for commencement of reorganization proceedings and senda notice of it to the creditors and to the Authority of Audit, Accounting, Property valuation andInsolvency Management under the Ministry of Finance of the Republic of Lithuania. The court willdecide whether to initiate reorganization proceedings within 1 month of receiving the petition.Decision of the court to initiate reorganization proceedings stays all other enforcement actionsagainst the debtor. An administrator will be appointed and creditors must submit their claims withinspecified period (usually 30 to 45 days). The claims must be approved by the court in order for thecreditors to vote on the reorganization plan. A creditors' meeting will be held 30 days after thecreditors' claims are approved, creditors will elect a creditors' committee. Mirage managementmust submit a reorganization plan within 6 months of the date when the decision on the openingof reorganization proceedings is made. Creditors representing at least 2/3 of the aggregateamount of certified claims must vote in favor of the plan, in order for it to be approved. If thecreditors fail to approve the plan, reorganization proceedings will be terminated. Afterreorganization proceedings are terminated, there is no automatic conversion of proceedings intoliquidation. However, BizBank will be able to petition the court to open liquidation proceedings.The court will issue a liquidation order and liquidation proceedings will commence. A bankruptcyadministrator will be appointed, who must sell the assets to satisfy the creditors' claims.Immovable property must be sold at a public auction. Movable property and immovables not soldat an auction will be sold in accordance with the decision of the creditors. Claims of securedcreditors have priority over all other claims, including employment and tax claims, and will be paidfirst from the proceedings of the sale.

Cost (% ofestate)

15.0 Major expenses will include remuneration of the insolvency administrator (around 8%), attorneys'fees (up to 5%), and fees of accountants and other professionals (up to 2%).

Recovery rate(cents on thedollar)

40.6

LithuaniaDoing Business 2019

Page 52

Page 53: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Details – Resolving Insolvency in Lithuania – Measure of Quality

Even if the economy’s legal framework includes provisions related to insolvency proceedings (liquidation or reorganization), theeconomy receives 0 points for the strength of insolvency framework index, if time, cost and outcome indicators are recorded as “no practice.”Note:

Answer Score

Strength of insolvency framework index (0-16) 8.0

Commencement of proceedings index (0-3) 2.5

What procedures are available to a DEBTOR when commencing insolvency proceedings? (a) Debtor mayfile for bothliquidation andreorganization

1.0

Does the insolvency framework allow a CREDITOR to file for insolvency of the debtor? (b) Yes, but acreditor may filefor liquidationonly

0.5

What basis for commencement of the insolvency proceedings is allowed under theinsolvency framework?

(c) Both (a) and(b) options areavailable, butonly one of themneeds to becomplied with

1.0

Management of debtor's assets index (0-6) 4.0

Does the insolvency framework allow the continuation of contracts supplying essential goodsand services to the debtor?

Yes 1.0

Does the insolvency framework allow the rejection by the debtor of overly burdensomecontracts?

Yes 1.0

Does the insolvency framework allow avoidance of preferential transactions? Yes 1.0

Does the insolvency framework allow avoidance of undervalued transactions? Yes 1.0

Does the insolvency framework provide for the possibility of the debtor obtaining credit aftercommencement of insolvency proceedings?

No 0.0

Does the insolvency framework assign priority to post-commencement credit? (c) No priority isassigned to post-commencementcreditors

0.0

Reorganization proceedings index (0-3) 0.5

Which creditors vote on the proposed reorganization plan? (a) All creditors 0.5

Does the insolvency framework require that dissenting creditors in reorganization receive atleast as much as what they would obtain in a liquidation?

No 0.0

Are the creditors divided into classes for the purposes of voting on the reorganization plan,does each class vote separately and are creditors in the same class treated equally?

No 0.0

Creditor participation index (0-4) 1.0

Does the insolvency framework require approval by the creditors for selection orappointment of the insolvency representative?

No 0.0

Does the insolvency framework require approval by the creditors for sale of substantialassets of the debtor?

No 0.0

Does the insolvency framework provide that a creditor has the right to request informationfrom the insolvency representative?

No 0.0

Does the insolvency framework provide that a creditor has the right to object to decisionsaccepting or rejecting creditors' claims?

Yes 1.0

LithuaniaDoing Business 2019

Page 53

Page 54: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Labor Market Regulation

presents detailed data for the labor market regulation indicators on the website( ). The report does not present rankings of economies on these indicators or include the topic in the aggregateease of doing business score or ranking on the ease of doing business.

Doing Business Doing Businesshttp://www.doingbusiness.org

The most recent round of data collection was completed in May 2018. .See the methodology for more information

What the indicators measure

(i) whether fixed-term contracts are prohibited forpermanent tasks; (ii) maximum cumulative durationof fixed-term contracts; (iii) length of theprobationary period; (iv) minimum wage.

Hiring

(i) maximum number of working days allowed perweek; (ii) premiums for work: at night, on a weeklyrest day and overtime; (iii) whether there arerestrictions on work at night, work on a weekly restday and for overtime work; (iv) whethernonpregnant and nonnursing women can worksame night hours as men; (v) length of paid annualleave.

Working hours

(i) whether redundancy can be basis for terminatingworkers; (ii) whether employer needs to notifyand/or get approval from third party to terminate 1redundant worker and a group of 9 redundantworkers; (iii) whether law requires employer toreassign or retrain a worker before making workerredundant; (iv) whether priority rules apply forredundancies and reemployment.

Redundancy rules

(i) notice period for redundancy dismissal; (ii)severance payments due when terminating aredundant worker.

Redundancy cost

(i) whether law mandates equal remuneration forwork of equal value and nondiscrimination based ongender in hiring; (ii) whether law mandates paid orunpaid maternity leave; (iii) length of paid maternityleave; (iv) whether employees on maternity leavereceive 100% of wages; (v) availability of five fullypaid days of sick leave a year; (vi) eligibilityrequirements for unemployment protection.

Job quality

Case study assumptions

To make the data comparable across economies, several assumptions about theworker and the business are used.

- Is a cashier in a supermarket or grocery store, age 19, with one year of workexperience.- Is a full-time employee.- Is not a member of the labor union, unless membership is mandatory.

The worker:

- Is a limited liability company (or the equivalent in the economy).- Operates a supermarket or grocery store in the economy’s largest business city.For 11 economies the data are also collected for the second largest business city.- Has 60 employees.- Is subject to collective bargaining agreements if such agreements cover more than50% of the food retail sector and they apply even to firms that are not party to them.- Abides by every law and regulation but does not grant workers more benefits thanthose mandated by law, regulation or (if applicable) collective bargainingagreements.

The business:

LithuaniaDoing Business 2019

Page 54

Page 55: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Labor Market Regulation - Lithuania

Details – Labor Market Regulation in Lithuania

Answer

Hiring

Fixed-term contracts prohibited for permanent tasks? No

Maximum length of a single fixed-term contract (months) 60.0

Maximum length of fixed-term contracts, including renewals (months) 60.0

Minimum wage applicable to the worker assumed in the case study (US$/month) 424.8

Ratio of minimum wage to value added per worker 0.2

Maximum length of probationary period (months) 3.0

Working hours

Standard workday 8.0

Maximum number of working days per week 5.5

Premium for night work (% of hourly pay) 50.0

Premium for work on weekly rest day (% of hourly pay) 100.0

Premium for overtime work (% of hourly pay) 50.0

Restrictions on night work? No

Whether nonpregnant and nonnursing women can work the same night hours as men Yes

Restrictions on weekly holiday? No

Restrictions on overtime work? No

Paid annual leave for a worker with 1 year of tenure (working days) 20.0

Paid annual leave for a worker with 5 years of tenure (working days) 20.0

Paid annual leave for a worker with 10 years of tenure (working days) 23.0

Paid annual leave (average for workers with 1, 5 and 10 years of tenure, in working days) 21.0

Redundancy rules

Dismissal due to redundancy allowed by law? Yes

Third-party notification if one worker is dismissed? No

Third-party approval if one worker is dismissed? No

Third-party notification if nine workers are dismissed? No

Third-party approval if nine workers are dismissed? No

Retraining or reassignment obligation before redundancy? Yes

Priority rules for redundancies? Yes

Priority rules for reemployment? No

Redundancy cost

Notice period for redundancy dismissal for a worker with 1 year of tenure 4.3

Notice period for redundancy dismissal for a worker with 5 years of tenure 4.3

Notice period for redundancy dismissal for a worker with 10 years of tenure 4.3

Notice period for redundancy dismissal (average for workers with 1, 5 and 10 years of tenure) 4.3

Severance pay for redundancy dismissal for a worker with 1 year of tenure 8.7

LithuaniaDoing Business 2019

Page 55

Page 56: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Severance pay for redundancy dismissal for a worker with 5 years of tenure 8.7

Severance pay for redundancy dismissal for a worker with 10 years of tenure 8.7

Severance pay for redundancy dismissal (average for workers with 1, 5 and 10 years of tenure) 8.7

Job quality

Equal remuneration for work of equal value? Yes

Gender nondiscrimination in hiring? Yes

Paid or unpaid maternity leave mandated by law? Yes

Minimum length of maternity leave (calendar days)? 126.0

Receive 100% of wages on maternity leave? Yes

Five fully paid days of sick leave a year? Yes

Unemployment protection after one year of employment? No

Minimum contribution period for unemployment protection (months)? 18.0

LithuaniaDoing Business 2019

Page 56

Page 57: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

Business Reforms in Lithuania

In the past year, observed a peaking of reform activity worldwide. From June 2, 2017, to May 1, 2018, 128 economiesimplemented a record 314 regulatory reforms improving the business climate. Reforms inspired by have been implementedby economies in all regions. The following are reforms implemented since 2008.

Doing BusinessDoing Business

Doing Business

= reform making it easier to do business. = Change making it more difficult to do business.Doing Business

DB2019

Protecting Minority Investors: Lithuania strengthened minority investor protections by introducing greater requirements for the disclosureof the compensation of directors and other high-ranking officers on an individual basis.

Paying Taxes: Lithuania made paying taxes easier by merging the filing and payment of two labor contributions and issuing pre-populatedvalue added tax returns.

Trading across Borders: Lithuania made exporting easier by enhancing its automated customs data management system.

Labor Market Regulation: Lithuania changed legislation on working hours, paid annual leave, as well as notice period and severancepayments in case of redundancy.

DB2018

Dealing with Construction Permits: Lithuania made dealing with construction permits easier by reducing the time needed to obtaintechnical conditions and the building permit.

Getting Electricity: Lithuania made getting electricity easier by streamlining procedures and imposing deadlines for issuing internal wiringinspection certificates.

Protecting Minority Investors: Lithuania strengthened minority investor protections by increasing corporate transparency.

Paying Taxes: Lithuania made paying taxes easier by introducing electronic system for filing and paying VAT, CIT and social securitycontributions. On the other hand, the environmental tax was increased.

DB2017

Getting Electricity: Lithuania made getting electricity faster by introducing time limits on the utility to conduct necessary connectionprocedures and lowering the connection tariff.

DB2016

Starting a Business: Lithuania made starting a business easier by introducing online VAT registration.

Getting Electricity: The utility in Lithuania has reduced the time of the connection works by enforcing the legal time limit to perform theexternal connection works.

Protecting Minority Investors: Lithuania strengthened minority investor protections by prohibiting subsidiaries from acquiring sharesissued by their parent company.

DB2015

Starting a Business: Lithuania made starting a business easier by eliminating the need to have a company seal and speeding up the valueadded tax (VAT) registration at the State Tax Inspectorate.

Dealing with Construction Permits: Lithuania made dealing with construction permits easier by reducing the time required for processingbuilding permit applications.

Enforcing Contracts: Lithuania made enforcing contracts easier by introducing an electronic filing system for court users.

DB2014

Getting Credit: Lithuania strengthened its secured transactions system by broadening the range of movable assets that can be used ascollateral, allowing a general description in the security agreement of the assets pledged as collateral and permitting out-of-courtenforcement.

DB2013

Starting a Business: Lithuania made starting a business easier by introducing online registration for limited liability companies andeliminating the notarization requirement for incorporation documents.

Resolving Insolvency: Lithuania made resolving insolvency easier by establishing which cases against the company’s property shall betaken to the bankruptcy court, tightening the time frame for decisions on appeals, abolishing the court’s obligation to individually notifycreditors and other stakeholders about restructuring proceedings and setting new time limits for creditors to file claims.

LithuaniaDoing Business 2019

Page 57

Page 58: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

DB2012

Protecting Minority Investors: Lithuania strengthened investor protections by introducing greater requirements for corporate disclosure tothe public and in the annual report.

Resolving Insolvency: Lithuania amended its reorganization law to simplify and shorten reorganization proceedings, grant priority tosecured creditors and introduce professional requirements for insolvency administrators.

Labor Market Regulation: Lithuania allowed fixed-term contracts to be concluded for permanent tasks (until 31 July 2012).

DB2011

Starting a Business: Lithuania tightened the time limit for completing the registration of a company.

Getting Credit: Lithuania’s private credit bureau now collects and distributes positive information on borrowers.

Paying Taxes: Lithuania reduced corporate tax rates.

Trading across Borders: Lithuania reduced the time to import by introducing, in compliance with EU law, an electronic system forsubmitting customs declarations.

Resolving Insolvency: Lithuania introduced regulations relating to insolvency administrators that set out clear rules of liability forviolations of law.

DB2010

Paying Taxes: Lithuania made paying taxes more costly for companies by increasing the corporate income tax rate.

Resolving Insolvency: Lithuania made resolving insolvency easier through amendments to the Enterprise Bankruptcy Law.

DB2009

Registering Property: Lithuania made registering property easier by merging the procedure for obtaining the real estate transactioncertificate with the notarization procedure.

LithuaniaDoing Business 2019

Page 58

Page 59: Lithuania - LRV 2019(1).pdf · Lithuania Region OECD high income Income Category High income Population 2,827,721 City Covered Vilnius DB 2019 Rank 190 1 14 DB 2019 Ease of doing

LithuaniaDoing Business 2019

Page 59