List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
917Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases
6,7,810/18/2004 04/03/2008
TIJD(Toyo‐Idro‐JGC‐DAELIM)
P.O.G.CIRAN/
AssaluyeConstruction
806
Daily, corrective, predictive and preventive maintenance of all equipments ( Mechanical , Machinery, Electrical, Instrumentation and HVAC ) of Pars Petrochemical
Company
05/05/2006 07/03/2009 Pars
Petrochemical Company
Pars Petrochemical
CompanyIran/Mahshahr Maintenance
307/2Instrumentation Work of Process unit of South Pars Gas
Field Development Phase 1210/21/2012 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
936Installation and Commissioning of Electrical and
Instrumentation Equipments in Wide Roll Sheet factory 09/22/2007 09/20/2010
Khozestan Oksin Steal Co.
Khozestan Oksin Steal Co.
IRAN/Ahvaz Construction
307/1Electrical Work of Process unit of South Pars Gas Field
Development Phase 1210/06/2012 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
812Total maintenance Contract ( Mechanical , Machinery, electrical, instrumentation , HVAC and communication )
of Amir Kabir Petrochemical Company09/21/2007 09/19/2008
Amir Kabir Petrochemical
Company
Amir Kabir Petrochemical
CompanyIran/Mahshahr Maintenance
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
808Maintenance of electrical, instrumentation and HVAC systems in Tondgooyan Petrochemical Company(phase
1)03/24/2007 08/29/2009
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
Iran/Mahshahr Maintenance
813Maintenance of
electrical,instrumentation,communication and HVAC systems in Maroon Petrochemical Company.
10/22/2007 11/20/2009Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIran/Mahshahr Maintenance
701Providing Electrical & InstrumentationTechnical
Services(Engineering,Procurement,Construction) to all plants of BIPC
10/18/1998 03/20/2008 BIPC BIPC IRAN/Mahshahr EPC
820Maintanance of electrical,instrumentation,HVAC and communication system for Tondgooyan Petroch. Co.
02/21/2012 02/19/2013Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
Iran/Mahshahr Maintenance
805Maintenance of electrical , instrumentation and HVAC of
Tondgooyan Petrochemical company10/02/2005 01/02/2007
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
Iran/Mahshahr Maintenance
809Total Maintenance services plus completion of remaining installation and commissiong works in
Borzuye Petrochemical Company07/01/2007 05/20/2008
Borzooyeh Petrochemical
Company
Borzooyeh Petrochemical
Company
Iran/Assaluye
Maintenance
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
307/3Instrumentation Work of Utility Area of South Pars Gas
Field Development Phase 1207/31/2013 03/21/2014
Joint Venture of Daelim, Sazeh (DSCT)
POGC IRAN/Kangan Construction
913Installation and Commissioning of Instrumentation and Electrical Equipments in DOROUD Oil Fields Expansion
Project in Kharg Island04/09/2003 01/19/2005
PETROFAC/TOTAL ELF
Total & ELFIRAN/
Kharg IslandConstruction
500/1Fabrication & Supply of E/I Bulk Supporting Material for
Phases 6,7,812/21/2004 03/20/2007
TIJD (Toyo‐Idro‐JGC‐DAELIM)
P.O.G.CIRAN/
AssaluyeProcurement
822Maintenance of Electrical & Instrumentation equipments of Kavian Petrochemical Company
03/12/2012 06/21/2013Kavian
Petrochemical Company
Kavian Petrochemical
Company
Iran/Assaluye
Maintenance
958Construction, Installation, Precommissioning and Commissioning of Electrical and Instrumentation
Systems in Phase 16 Platform02/19/2013 03/21/2014
Techno Energy Sepehr
Co.(TESCO)POGC
IRAN/Bandar Abbas
Construction
401Engineering , Procurement , Installation , Commissioning and Start‐up of the Refinery Feed Skid Metering System
03/12/2006 03/12/2007Tehran OilRefinery Co.
Tehran OilRefinery Co.
IRAN/Tehran
EPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
305DCS Control System for Seawater Intake System in Soth
Pars Gas Field Development Phases 22‐2410/09/2012 02/09/2013
Arya Petrosina Co.
POGCIRAN/
AssaluyeProcurement/Construction
909Installation and Precommissioning of Instrumentation
and Electrical Equipments in Olefin plant.05/07/2004 12/21/2003 ECC Co.
Amir Kabir Petroch. Co
IRAN/Mahshahr Construction
801Maintenance of instrumentation equipments in all units
of Faravaresh Petrochemical Company09/21/2002 09/11/2005 Faravaresh Co. BIPC Iran/Mahshahr Maintenance
948Installation & Precommissioning of Instrumentation an
Electerical systems in TCF ( Tange Bijar )06/25/2009 03/19/2012 N.I.S.O.C N.I.S.O.C
IRAN/ILAM/
TANGBIJARConstruction
945Installation of all Electrical and Mechanical work in
utility No.2 (kashan)01/27/2009 08/21/2010
Saipa Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Construction
912Installation of Instrumentation and Electrical
Equipments in HDPE Plant06/22/2003 07/21/2005
Mehvar Sazan Co.
Maroon Petrochemical Companyl
IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
956Installation, Pre‐commissioning and commissioning of electrical and instrumentation Equipments of propane
and Bhutan Tank08/07/2011 03/21/2013 Darya Sahel Co.
Kharg
Petrochemical. Co.
IRAN/Kharg Island
Construction
804Maintenance of electrical and instrumentation
equipments in All units of Amir Kabir Petrochemical Company
05/22/2005 05/21/2006Amir Kabir
Petrochemical Company
Amir Kabir Petrochemical
CompanyIran/Mahshahr Maintenance
937Installation & Commissioning of Electrical for Car Paint
Saloon in Zamyad (2) Project10/13/2007 12/21/2009
Saipa Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Procurement/Construction
915Installation and commissioning of Instrumentation and
Electrical Equipments in EO/EG Plant10/31/2003 02/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
599/18Engineering and Supply of DCS,ESD,F&G System for
Qom Sarajeh project03/18/2010 02/01/2011 O.T.C.C N.G.S.C.
IRAN/Qom
Procurement
733Execution of Concrete Paving for LDPE Product
Warehouse, Loading Area and North Road Modification of Future Area
10/06/2011 04/07/2012Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
802Maintenance of electrical and instrumentation
equipments in all units of Tondgooyan Petrochemical Company
05/08/2004 09/05/2005Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
Iran/Mahshahr Maintenance
405Procurement and installation of Power cables for feeder
"B" in 6KV substation of olefin cooling07/19/2011 01/18/2012
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/MahshahrProcurement/Construction
816Total maintenance Contract ( Mechanical , Machinery, electrical, instrumentation , HVAC and communication )
of Bistoon Petrochemical Company04/23/2008 04/22/2009
Bistoon Petrochemical
company
Bistoon Petrochemical
company
Iran/Kermanshah
Maintenance
705Re‐Instrumentation & control system upgrade(from
Pneumatic to Fieldbus/Dcs system)02/08/2004 04/22/2008 BIPC BIPC IRAN/Mahshahr Engineering
907Installation and Commissioning of Instrumentation and
Electrical Equipments in PTA1 Plant09/21/2001 03/21/2003 ECC Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
803Maintenance of electrical and instrumentation equipments in All units of Marun Petrochemical
Company08/06/2004 10/07/2005
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIran/Mahshahr Maintenance
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
954Installation of Electrical and Instrumentation
Equipments in Unit 121 of South Pars phases 15 and 1611/26/2010 01/20/2012
MAPNA BOILER Engineering & manufacturing
Sepanier Oil & Gas
Engineering Company
IRAN/Assaluye
Construction
599/19Procurement Engineering and Procurement of field
instruments of SARAJEH Gas Injection Project02/25/2010 07/11/2010 O.T.C.C N.G.S.C.
IRAN/Qom
Procurement
909/1Commissioning of Instrumentation and Electrical
Equipments in Olefin plant.03/24/2003 05/20/2005
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Commissioning
708Repairing and Calibration of Instrumentation and
Electrical Equipment11/05/2004 02/05/2007
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr EPC
942Revamping & renovation Of Instrumentation & Control
System in Sarcheshmeh Copper Coplex01/22/2008 03/21/2010
Tam Iran .Khodro Co
NICI COIRAN/Kerman
Engineering/Construction
723INSTRUMENT ENGINEERING CONSULTING OF OL PLANT
EXPANSION AND CONTROL SYSTEM REVAMPING12/16/2008 09/20/2011 BIPC BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
807Maintenance of control and automation system ,
instrumentation equipments , workshops , laboratories and communication system in Esfahan steel Company
05/09/2006 08/06/2008Esfahan Steel
CompanyEsfahan Steel Company
Iran/Esfahan
Maintenance
403Electrical and Instrumentation Reconstruction of
damaged areas in HD Plant of Bandar Imam Petrochemical Co.
09/21/2010 03/21/2011 BIPC BIPC IRAN/Mahshahr EPC
916Installation & Commissioning of Instrmentation &
Control System in PP‐Plant11/05/2004 04/22/2007
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
402 reshadat Platform test separation unit revamping 11/22/2009 01/20/2011 I.O.O.C I.O.O.CIRAN/Lavan
EPC
706Reparing and Calibration of Instrumentation & Electrical
Equipment09/20/2004 09/21/2006
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
379PLC Control System renovation for 10 Oil Pumping
Station in I.O.P.T.C09/01/2008 06/20/2011
I.O.P.T.C.Tehran Districted
I.O.P.T.CIRAN/Tehran
EPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
302Procurment & Integration of PLC control system the total control system for 2MTPY Iron Ore Concentrate
Plant in Sirjan Iranian Steel Co. (Sisco)01/15/2012 04/16/2012
Tehran Fakor Sanat CO.
Sirjan Iranian Steel CO.
IRAN/Sirjan
Procurement/Manufacturing
707Providing Electrical & InstrumentationTechnical
Services(Engineering,Procurement,Construction) to various parts/plants of BIPC under an open Contract.
10/04/2004 10/05/2006 BIPC BIPC IRAN/Mahshahr EPC
301Procurment & Integration of PLC control system the total control system for 2MTPY Iron Ore Concentrate
Plant in Zarand Iranian Steel Co. (Zisco)01/15/2012 04/16/2012
Tehran Fakor Sanat CO.
Zarand Iranian Steel CO.
IRAN/Tehran
Procurement/Manufacturing
708/1CONSTRUCTION OF INSTRUMENT DEVICES IN PP PLANT
OF MAROON COMPLEX08/21/2004
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
381
Engineering, Designing,Integration, Installation and commissioning of PLC control system for Material
Handeling unit of Razi Petrochemical CO.01/10/2009 01/05/2010
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr EPC
599/16Procurement Engineering and Procurement of field
instruments of HD plant in Bandar Imam Petrochemical company
10/24/2009 02/05/2010 BIPC BIPC IRAN/Mahshahr Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
908Installation of Instrumentation and Electrical
Equipments in New car Painting saloon.09/21/2001 02/20/2002 Saipa Co. Saipa Co.
IRAN/Tehran
Commissioning
955Pre‐Commissioning and commissioning of Boilers in Unit
121 of Phases 15 & 16 of South Pars07/22/2011 03/20/2012
MAPNA BOILER Engineering & manufacturing
Sepanier Oil & Gas
Engineering Company
IRAN/Assaluye
Commissioning
723/2 Consulting Services Electrical & Instrument Project HD 12/16/2008 09/20/2011 Basparan Co. BIPC IRAN/Mahshahr Engineering
818Annual Contract for Servicing, Calibration and
Maintenance of Process On‐line Analyzer 02/24/2010 02/22/2013
Arabian Control Systems
Company L.L.C
Oman Refineries and Petrochemical Companies
Oman Maintenance
718Sepahan Oil Company detail / Procurement /
Precommissioning /Construction /Engineering for Re‐Instrumentation from pnewmatic to Fcs/Dcs Project
11/10/2007 08/20/2008Sepahan Oil Refinery
Sepahan Oil Refinery
IRAN/Isfahan
Engineering/Construction
599/21Financial and credit services for Procurement of
Electrical Motor Drives04/21/2010 09/19/2012
Maad Automation Co.
NICI CO IRAN/Kerman Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
814 Maintenance of HVAC systems in SPGC,Phases 6,7,8 04/05/2008 11/30/2009TIJD(Toyo‐Idro‐JGC‐DAELIM)
Petropars Company
Iran/Assaluye
Maintenance
599/28Procurement of Lighting Cables for South Pars refinery
phases 15 & 1604/20/2012 04/26/2012
Arya Shahab oil Co.
POGC IRAN/Assaluye Procurement
312 Execution of Electrical Heat Tracing System 09/21/2013 01/22/2014
Joint Venture of Daelim,
Sazeh, Kayson (DSK)
POGC IRAN/Kangan Construction
924Construction , Termination & Loop Checking of Instrument & Control system in Gas Refinery
09/05/2006 03/20/2007Ahwaz Rad mechanic co.
Parsian refinery
IRAN/Lamerd
Construction
390Cabling and installation of instruments and electrical
equipment for 2MTPY Iron Ore Concentrate Plant in Gol Gohar iron Ore Co.
07/31/2010 09/20/2011Tehran Fakor Sanat CO.
Gol‐E‐Gohar Iron Ore Co.
IRAN/Tehran
Construction
705/3Re‐Instrumentation &control system upgrade(from
Pneumatic to Fieldbus/Dcs system)02/08/2004 04/22/2008 Basparan Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
949Installation & Precommissioning of Control system in
MCR Area (SARP/SUB/C‐045 )04/14/2010 04/14/2011
Consortium of SAZEH,SEL and
ODCC
Shazand Arak Refinery
IRAN/Arak Construction
950Electrification to equipments of concentration factory in
sarcheshme cooper03/30/2010 10/20/2011
Moshiran Company
NICI COIRAN/Kerman
Construction
385Design, Engineering and Integration of
SCADA/Telemetry Control system for Shiraz water and wastewater company (Mianrood region)
12/22/2009 09/20/2011Water and Wastewater Fars Province
Water and Wastewater Fars Province
IRAN/Shiraz
EPC
309Complementary Equipment Procurement, Construction, Programming and Commissioning of Control System for
Propane Butane Storage Facility06/09/2013 12/08/2013
Kharg Petrochemical
Co.
Kharg Petrochemical
Co.
IRAN/Kharg Island
Engineering/Procurement/Manufacturing
730Electrical and Instrument detail engineering of Ethylene
plant in Gachsaran Petrochemical Complex12/07/2010 08/18/2014
AALI NAM INDUSTRY GROUP
ENGINEERING
GachsaranPetroch. Co.
IRAN/Gachsaran
Engineering
943 Loop test of olefin plant (BIPC) 01/12/2009 04/22/2009 BIPC BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
824Future Area Electrification for Arya Sasol Polymer
Company11/21/2012 11/20/2013 ASPC CO. ASPC CO. IRAN/Assaluye
Procurement/Construction
919Installation and Commissioning of Fire Alarm and
Fighting System08/25/2005 11/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
817Supply ,installation Commissioning, Calibration ,
Repair& Maintenance of Analyzers in Isfahan Refinery Co.
05/18/2009 08/15/2010Isfahan
Refinery Co.Isfahan
Refinery Co.Iran/Isfahan
Maintenance
705/2Re‐Instrumentation &control system upgrade(from
Pneumatic to Fieldbus/Dcs system)02/08/2004 08/22/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
707/2Cable ladder /tray Installation for OL‐plant expantion &
revamping project07/26/2005 01/26/2006 BIPC BIPC IRAN/Mahshahr Construction
705/1Re‐Instrumentation &control system upgrade(from
Pneumatic to Fieldbus/Dcs system)02/08/2004 08/22/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/124Construction of Instrumentation and Electrical
Equipment of PTA‐1 Project04/11/2003 10/05/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Engineering
901Revamping the Instrumentation and Renovation of
Control System to DCS in Sulphuric Acid, Gas Purification and Sulphur Plants
03/17/1997 01/20/1998Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshahr Construction
701/105Engineering and Procurement Services for Upgrading the existing Control System of OL plant to FCS / DCS
12/31/2002 09/19/2008 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro
curement
739 Fire Alarm System Detail Engineering Services 06/21/2012 04/22/2013 N.I.S.O.C N.I.S.O.CIRAN/Ahvaz
Engineering
386PLC control system Integration and commissioning for 2MTPY Iron Ore Concentrate Plant in Gole‐Gohar Iron
ore Co.01/05/2010 07/06/2010
Tehran Fakor Sanat CO.
Gol Gohar Iron Stone Co.
IRAN/Tehran
EPC
743Cable Pulling, Procurement & Installation of Cable Tray
/ Ladder from AIS PowerPlant to Sub‐Station 5
08/13/2013 09/27/2013Sahel
consultant Co.
Damavand Petrochemical
ComplexIRAN/Assaluye Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
953/3Installation and commisining of instrument and fire
alarm system for 32'' line of 15 & 16 phases04/18/2013 07/21/2013
Sanat Gostar Kish
P.O.G.C IRAN/Assaluye Construction
391/1Engineering, Designing, Installation and commissioning of PLC control system and monitoring for water block of
Fajr 2 petrochemical company (EC Contract)08/22/2010 10/19/2012 Zolal Iran Co.
Fajr Petroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
723/1INSTRUMENT ENGINEERING CONSULTING OF OL PLANT
EXPANSION AND CONTROL SYSTEM REVAMPING12/16/2008 01/22/2010 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
952Installation of communication system in Pars
petrochemical port08/22/2010 10/20/2013
Pars Petroch. Seaport
N.I.P.CIRAN/
AssaluyeConstruction
735 3‐Phase Civil Project 11/22/2011 05/21/2012Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Construction
906Installation and Precommissioning of Instrumentation
and Electrical Equipments in AMMONIA Plant (Revamping project)
06/22/2001 01/24/2001Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
738E&I Engineering , Procurement , Construction &
Commissioning for Absorbtion Chillers of CA/VC Units04/10/2012 12/11/2013 BIPC BIPC IRAN/Mahshahr EPC
905Installation and Commissioning of Instrumentation and
Electrical Equipments in Urea/ammonia Plant08/31/2000 12/23/2000 Shakhes Co.
Razi Petroch. Co.
IRAN/Mahshahr Construction
599/27Procurement of Earthing material for South Pars
refinery phases 15 & 1604/11/2012 04/26/2012
Arya Shahab oil Co.
POGC IRAN/Assaluye Procurement
599/22Procurement Engineering and Procurement of Orifice flow elements, restriction orifices and high pressure
venturi of SARAJEH Gas Injection Project05/01/2010 08/24/2010 O.T.C.C N.G.S.C.
IRAN/Qom
Procurement
953/2Installation and commisining of instrument and fire
alarm system for 32" line of 6,7 & 8 phases03/05/2013 05/20/2013
Sanat Gostar Kish
P.O.G.C IRAN/Assaluye Construction
711/9DETAIL & PROCUREMENT ENGINEERING OF INLINE
FLOW METERS OF MASS & ENERGY BALANCE IN KIMIA COMPANY
11/18/2006 07/20/2008 Kimia Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
393PLC control system Integration and commissioning for 2MTPY Iron Ore Concentrate Plant in Zarand Iranian
Steel Co. (Zisco)11/24/2010 07/21/2011
Tehran Fakor Sanat CO.
Zarand Iranian Steel CO.
IRAN/Tehran
Engineering/Procurement/Manufacturing
941Procurment and Cable Laying for Power Transformers between fajr and Maroon Petrochemical Complex
10/31/2007 03/21/2009Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
722Basic and detail engineering of see water intake project
for gas condensate refinery10/06/2008 09/20/2010
Iran Marine industrial Co.(Sadra)
Persian Gold Star Oil Co.
IRAN/Bandar Abbas
Engineering
599/23Procurement Engineering and Procurement of field
instruments of Golgohar POLYCOM project08/03/2010 12/04/2010
Fakor Sanat Tehran
Co.
Gol Gohar Iron Ore Co.
IRAN/Tehran
Procurement
394PLC control system Integration and commissioning for
Purge Gas Recovery plant in Razi Pet. Co.04/19/2011 08/17/2011
AALI NAM INDUSTRY GROUP
ENGINEERING
Razi Petroch. Co.
IRAN/MahshahrEngineering/Procurement/Manufacturing
706/9INSTALLATION OF FIRE ALARM SYSTEM FOR KHOUZESTAN PETROCHEMICAL COMPLEX
10/21/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
810Design, Engineering, Procurement, Construction & Commissioning of Electrical & Intstrumentation
equipments in Tang Bijar07/02/2007 04/08/2008 N.I.S.O.C I.C.O.F.C
Iran/Ilam/
Tange‐BijarEPC
201Training of New Operational Perssonel ( Specialized
Course for Electrical & Instrumentation Group)09/21/2006 02/20/2008
South Pars Gas Refinery
South Pars Gas Refinery
IRAN/Mahshahr & Assaluye
Training
720Detail / Procurement Engineering for Gachsaran
Petrochemical Complex , OL Plant ( Instrumentation / Electrical )
02/21/2008 03/20/2009
AALI NAM INDUSTRY GROUP
ENGINEERING
GachsaranPetroch. Co.
IRAN/Gachsaran
Engineering
737Instrument Engineering Consulting for sarab Aliumina
project04/06/2012 12/05/2012
Sahand research Co.
Sahand research Co.
IRAN/Tabriz Engineering
929Installation , Commissioning & Start‐up of
Instrumentation & Control System in Gas Refinery (Tabnac)
01/26/2007 08/21/2007 Payandan co.Parsian refinery
IRAN/Lamerd
Construction
951Performing Piping and bridging gasoline tanks to pump house in Saipa automobile manufacturing site in Kashan
06/19/2010 01/20/2011 Saipa Co. Saipa Co.IRAN/Kashan
Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/31Procurement of Protection system‐surveillance camera
(CCTV)08/06/2012 05/09/2013
Petrochemical Kala
BIPC (Basparan Co.
)IRAN/Mahshahr
Procurement/Construction
728/206 Field Engineering Services 04/12/2011 05/21/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering
392PLC control system Integration and commissioning for 2MTPY Iron Ore Concentrate Plant in Sirjan Iranian Steel
Co. (Sisco)10/16/2010 07/21/2011 FST CO.
Sirjan Iranian Steel CO.
IRAN/Tehran
Engineering/Procurement/Manufacturing
701/175Procurement Services for the upgrade project Control
System07/06/2007 09/19/2008 Basparan Co. BIPC IRAN/Mahshahr Engineering
700/248ENGINEERING CONSULTING SERVICES TO KAZEROON
PETROCHEMICAL COMPLEX02/21/2010 06/21/2011
farsan control Co.
Kazeroon Petrochemical
Co.IRAN/Kazeroon Engineering
819 Analyzer Maintenance Services for Aromatic Oman L.L.C 10/11/2010 04/08/2012Arabian Control
Systems Company L.L.C
Aromatic Oman L.L.C (
AOL )Oman Maintenance
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
202Specific Instrumentation Training course for South Pars
Gas Engineers Phases 9 & 1001/26/2009 05/25/2008 Petro pars co. Petro pars co.
IRAN/Shiraz
Training
363Design & Production of ACPD/PTC
Model No. 729 Electronic Card (60 Sets)09/30/2004 09/30/2005 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
910Engineering, Procurement Services,Installation and
procommissioning of Electrification of New units in 3rd ammonia plant.
04/25/2003 05/14/2004 P.I.D.E.M. Co.Razi
Petroch. Co.IRAN/Mahshahr Construction
599/5 Procurement & Supply of Piping Valves 08/24/2008 11/20/2009Tehran
Refinery Co.Tehran
Refinery Co.IRAN/Tehran
Procurement
383Engineering , Procurement, Installation and
commissioning of Electrical Distribution Panles for SINA Chemical Industry
10/04/2009 05/21/2010Sina
Petroch. Co.Sina
Petroch. Co.IRAN/Shiraz
EPC
701/63Procurement, Installation and Commissioning of Instrumentation and Electricalworks of Jetty No.2
09/18/2001 04/07/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
368Design & Production of ACPD/PTC
model No. 998‐3 Electronic Card (60 Sets)06/25/2005 03/12/2007 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
712Providing Consulting Services of Electerical and Instrumentation To Faravaresh Petrochemical Co.
01/22/2006 01/20/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
914Engineering , Procurement and Execution of
Electrification of Sea Water Pumps10/30/2004 03/16/2005 P.I.D.E.M. Co.
Razi Petroch. Co.
IRAN/Mahshahr Construction
395PLC control system Integration and commissioning for
incinerator unit of Fajr Pet. Co.08/19/2011 10/19/2011 KSS
Fajr Petroch. Co.
IRAN/MahshahrEngineering/Procurement/Manufacturing
203Special Training for manufacturing,
procurement,installation &Commissioning, Electrical ,Control & Instrument of NIOPDC
10/04/2008 05/26/2009 N.I.O.P.D.C N.I.O.P.D.CIRAN/Shiraz
Training
918Engineering, Procurement, Installation and
Commissioning of Analysers06/25/2005 11/11/2005
Isfahan Refinery Co.
Isfahan Refinery Co.
IRAN/Isfahan
Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
706/5CALIBRATION & LOOP CHECK OF INSTRUMENTS IN
KHOUZESTAN PETROCHEMICAL COMPLEX11/06/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Construction
706/10ELECTRICAL/ INSTRUMENT CONSTRUCTION &
PRECOMMISSIONING ACTIVITIES OF KHOUZESTAN PETROCHEMICAL COMPLEX
10/21/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Construction
701/160 Maintenance Supervision Services 01/22/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
736development of Utility Services to new administrative
office04/06/2012 04/10/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Procurement/Construction
504 Interface Management 10/27/2009 07/21/2010 Imensazan Co
Sepanier Oil & Gas
Engineering Company
IRAN/Tehran
Engineering
721 Light End Hydrotreatment Project 03/02/2008 07/30/2008 Bou Ali Sina Petrochemical
Co.
Bou Ali Sina Petrochemical
Co.
IRAN/Tehran
Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
711Providing Consulting Services of Electerical and Instrumentation To Kimia Petrochemical Co.
01/22/2006 07/22/2007 Kimia Co. BIPC IRAN/Mahshahr Engineering
599/13 Supply of Instrument and Electrical Bulk Material 06/10/2009 02/18/2011Eni Iran Tehran
branchEni Iran
Tehran branchIRAN/Tehran
Procurement
944 Installation of industrial sewage in kashan 01/21/2009 02/21/2010Saipa
Engineering Expansion Co.
Saipa Co.IRAN/Kashan
Construction
928Installation , Commissioning & Star‐up of Fuel Cord
System in 120 Gas Station12/02/2006 05/21/2007 I.T.I N.I.O.P.D.C
IRAN/Hormozgan,Booshehr,Abadan
Construction
911Procurement, Installation and Commissioning of 4th
Dryer in Air & Nitrogen Plant05/25/2003 09/04/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
723/5 DISMANTLING OF OBSOLETE PANELS OF OL PLANT 01/03/2010 03/05/2010 BIPC BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
643Calibration Services of Hydrostatic gauges of Arak
Shazand Refinery 06/25/2011 03/20/2012
Consortium of SAZEH,SEL and
ODCC
Shazand Arak Refinery
IRAN/Arak Calibration
500/2 Supply of Instrument Bulk Material 05/18/2006 06/20/2006Karoon
Petrochemical Complex
Karoon Petrochemical
ComplexIRAN/Mahshahr Procurement
330PDesign, manufacturing and commissioning of process
data recording computer system ( 400 channel )
01/26/2000 10/26/2001 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
599/37Supplying of Cartridge Suction for Bid Boland Gas
Refinery Co.01/22/2014 03/07/2014
Bid Boland Gas Refinery Co.
Bid Boland Gas Refinery
Co.Omidiyeh Procurement
701/61Engineering and Procurement Services for the
Flowmeters09/05/2001 04/23/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
933Installation and commisioning of Cathodic Protection
System in Oxydental Refinery (Oman)01/01/2007 06/16/2008 RITS Co. OXY Co. OMAN Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/38Engineering and procurement Services for the U.M.S.
Project01/21/2001 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
728/308Permanent Electrical Power Supply for PACK LINE
Equipment06/05/2011 09/28/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
701/220 As_builting the P & IDs 02/16/2005 02/10/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
928/1The Commisioning, Maintanance, Defect Removal and
the Periodical Audit Services of Fuel Cord System04/20/2007 07/18/2007 I.T.I N.I.O.P.D.C
IRAN/Hormozgan,Booshehr,Abadan
Construction
726 Design & manufacturing of Filling Panel of HD unit 04/13/2010 08/11/2010 ISC Company BIPC IRAN/Mahshahr Procurement
648Calibration Services for Maroon Petrochemical Co.
during the overhaul period05/06/2014 06/20/2014
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
603 Calibration Services for Instrumentation Devices 05/22/2005 05/23/2010Navid zarshimi industrial co.
Navid zarshimi industrial co.
IRAN/Mahshahr Calibration
701/241Revamping , Renovation and Commissioning of the
Instrumentation06/27/2005 04/02/2006 Kimia Co. BIPC IRAN/Mahshahr Construction
704Detail Engineering To Control System and F&G of NFL
Refinery05/02/2002 07/19/2003
Engineering International Co. (Eritec)
Engineering International Co. (Eritec)
IRAN/Mahshahr Engineering
706/8DETAIL ENGINEERING FOR KHOUZESTAN
PETROCHEMICAL COMPLEX07/12/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Engineering
712/4INSTRUMENT SITE SUPERVISION FOR OL PLANT
(EXPANSION PROJECT)08/22/2006 09/19/2008 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
926 Construction & Commissioning of 4th Nitrugen Tank 10/05/2006 09/04/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/34Supplying of spare part and required software of Silvani
fire truck06/06/2013 09/06/2013
Pazargad Nonindustrial Operations Co.
Pazargad Nonindustrial Operations Co.
IRAN/Assaluye
Procurement
940Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar
Imam Petrochemical Complex11/22/2007 05/21/2008 Kharazmi Co. BIPC IRAN/Mahshahr Construction
305PDesign & Integration of DMTI indicator system Model
No. A300 (2 Sets)01/14/1996 04/15/1996 Faravaresh Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/119Commissioning & loop checking of control system of
PTA‐1 project02/20/2003 04/07/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Commissioning
364Design & Integration of Calibration Bench Model No. CB‐
504 (10 Sets)10/02/2004 10/03/2005
Technical & Vocational
Education Fars Office
Technical & Vocational
Education Fars Office
IRAN/Shiraz
Design & Manufacturing
741Engineering and Technical Services for Damavand
Petrochemical Complex according to Owner requestes10/19/2012 01/19/2013
Damavand Petrochemical
Complex
Damavand Petrochemical
ComplexIRAN/Assaluye Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
502 Risk Management 06/06/2009 07/21/2010 Imensazan Co
Sepanier Oil & Gas
Engineering Company
IRAN/Tehran
Engineering
715Consulting Services in Physical Servey of
Instrumentation Equipment in site12/03/2006 01/20/2007
Tam Iran .Khodro Co
NICI COIRAN/Kerman
Engineering
811Collection of technical data of Kharg onshore and
offshore instrumentation equipments11/01/2007 04/22/2008 I.O.O.C I.O.O.C
Iran/Kharg Island
Maintenance
701/53Engineering and Procurement Services for the
Flowmeters08/05/2001 04/23/2007 Basparan Co. BIPC IRAN/Mahshahr
Engineering/Procurement
939Procurement, Construction & Commissioning of
Instrumentation Equipments of Tank FB‐ 201 in AR plant (Bandar Imam Petrochemical Complex)
11/10/2007 05/12/2008 Faravaresh Co. BIPC IRAN/MahshahrProcurement/Construction
821 Service Contract for Plant Outage in Barakah power plant 01/01/2012 07/12/2012Arabian Control
Systems Company L.L.C
Nomac ( National
operation and maintenance company )
Oman Maintenance
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
345PDesign & Integration of ACPD/PTC Model No. 998‐3
Electronic Card (30 Set)08/21/2001 08/21/2002 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
377Repair of 4 types of Electronic modules for CA plant in
BIPC12/09/2007 05/12/2009 Kimia Co. BIPC IRAN/Mahshahr Maintenance
728/301 Design, Supply of socket outlets on towers 12/27/2010 11/14/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/187Procurement, Installation and Commissioning of
Instrumentation of Phase 1 of the OL Expansion Project09/07/2004 12/06/2006 BIPC BIPC IRAN/Mahshahr Construction
731Instrumentation Engineering Services for Incinerator of
Fajr Petrochemical Co.01/09/2011 09/19/2012 KSS
Fajr Petroch. Co.
IRAN/Shiraz
Engineering/Procurement
503 Cost Management 08/25/2009 07/21/2010 Imensazan Co
Sepanier Oil & Gas
Engineering Company
IRAN/Tehran
Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/302 Designing of Electrical System for Workshop Building 12/22/2010 08/27/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering
938Procurement, Construction & Commissioning of
Instrumentation Equipments of Tank FB‐ 901 in AR plant (Bandar Imam Petrochemical Complex)
11/03/2007 09/19/2008 Faravaresh Co. BIPC IRAN/MahshahrProcurement/Construction
599/32Procurement ,Construction & commissioning Services
of Surveillance Camera for BD/SR Unit12/03/2012 06/03/2013 Basparan Co. BIPC IRAN/Mahshahr
Procurement/Construction
599/2 Procurement Services for Instrumentation (Relay) 05/16/2008 11/10/2008KAroon
OIL AND GASN.I.S.O.C
IRAN/Ahvaz
Procurement
706/1ENG./ CONSTRUCTION & COMMISSIONING SERVICES
FOR SINCRONIZING OF THE DIESEL GENERATOR WITH POWER NETWORK
09/25/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
605 Calibration Services for Instrumentation Devices 04/27/2004 04/28/2006Fajr
Petroch. Co.Fajr
Petroch. Co.IRAN/Mahshahr Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/23Engineering and Procurement Services for the Fire
Alarm System02/10/2000 02/10/2002
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/MahshahrEngineering/Pro
curement
728/325installation of waterproof electrical Socket across the
Pipe way from area 1 to area 807/28/2012 11/20/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
389PLC control system Integration and commissioning for
Chadormalu Tailing Recovery Plant06/02/2010 02/10/2011 FST CO.
Chadormalu Mining &
Industrial CO.IRAN/Chadormalu
Engineering/Procurement/Manufacturing
365Design & Integration of calibration bench Model No.CB‐503, CB‐504 , CB‐505 (9 Sets) ( Pneumatic & Analyzer )
09/03/2004 02/02/2006Mesbah Energi
Co.Mesbah
Energi Co.IRAN/Shiraz
Design & Manufacturing
396/2Design, procurement and commissioning of an operator work station computer for reshadat platform PLC system
12/04/2013 02/03/2014 EPC
501 Desing & Manufacturing of Electerical & Control Panel 09/23/2007 11/10/2007N.I.S.O.C
( Aghajary Oil & Gas) Co.
N.I.S.O.C IRAN/Omidiyeh Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/179Revamping and Renovation of Instrumentation for
area's 900D,200B,250 A/B/C07/23/2004 02/01/2005 Kimia Co. BIPC IRAN/Mahshahr Construction
701/22 Installation and Commissioning of the CA/VC Analysers 02/09/2000 08/08/2000 Kimia Co. BIPC IRAN/Mahshahr Construction
314P Design & Integration of SAM Alarm Cards (711 Sets) 05/14/1997 08/13/1997 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
378Design & Implementation and Commissioning of HMI
& PLC logic for PET Pilot plant01/22/2008 01/04/2009
Pajohesh & Ffanavari
Petrochemical Co.
Pajohesh & Ffanavari
Petrochemical Co.
IRAN/Mahshahr EPC
605/2Repair , maintenance and calibration services for Safety
Valves09/21/2006 04/28/2007
Fajr Petroch. Co.
Fajr Petroch. Co.
IRAN/Mahshahr Calibration
709/1 04/27/2005 04/28/2006 IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/26Procurement of Cable Ladder for South Pars refinery
phases 15 & 1603/15/2012 03/20/2012
Arya Shahab oil Co.
POGC IRAN/Assaluye Procurement
903Installation and Commissioning of Instrumentation and
Electrical Equipments in Sulphunasion Unit09/21/1999 11/08/1999 Nasb Gostar Co. Paksan Co.
IRAN/Tehran
Construction
701/178Engineering Services for Equipment Installation of
Perchlorine Production Unit instrumentation.07/12/2004 09/11/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Engineering
616Procurement and commissioning of Calib. Temp. Ovens
for 9th. Olefin Plant09/14/2007 10/31/2007 Technip Technip
IRAN/Assaluye
Calibration
701/107Engineering , Construction and Commissioning of
Neutralization Pond03/04/2003 07/13/2003 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
707/27 INSTALLATION OF CATALYST PUMPS IN LD PLANT 03/15/2006 04/28/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/8Installation of SAMPLE POINT for Lab with frame
construct and installation03/08/2006 03/29/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
344PDesign & Integration of ACPD/PTC 729 Electronic Card
(15 Sets)09/14/2001 10/10/2002 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/142Engineering and Procurement Services for Spare Parts of
Electrical, Instrument & Analysers 06/30/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/MahshahrEngineering/Pro
curement
380Engeeniring, Design, Software Development, installation
and commissioning of HMI for PSA plant in BARCO11/14/2008 08/15/2009
Bandar abbas Refinery Co.
Bandar abbas Refinery Co.
IRAN/Bandar Abbas
EPC
396/1 02/20/2013 05/22/2013Engineering/Co
nstruction
701/51Engineering and Procurement Services for the
Flowmeters07/18/2001 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/29Procurement of Lighting Distribution Panels for South
Pars refinery phases 15 & 1605/21/2012 06/17/2012
Arya Shahab oil Co.
POGCIRAN/
AssaluyeProcurement
706/7INSTALLATION OF CABLE TRAY COVERS IN KHOUZESTAN
PETROCHEMICAL COMPLEX02/02/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Construction
728/304
1‐ Sandwich panel office building in corner of PE‐warehouse building for SGS and chain people. 2‐ Drawing for power supply for Roll‐up Doors. 3‐
Additional load on LV1 & LV2 panel due to additional of 322 fans in product warehouse
12/30/2010 03/18/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/207Engineering, Procurement Services and Installation of
Closed Circuit Cameras11/09/2004 04/18/2005 Ab Niroo Co. BIPC IRAN/Mahshahr EPC
606 Calibration Services for Instrumentation Devices 02/21/2006 04/23/2007Saze
engineering consulting co.
Saze endineering consulting co.
IRAN/Mahshahr Calibration
307PDesign & Integration of Computerized DMTI (temperature indicator) (TI‐Desk) (2 Sets)
10/10/1996 05/13/1997 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
621Calibration Services for Instrumentation/Elecrtical
Measurement Equipment of Fanavaran Petrochemical Co.
12/17/2007 12/17/2010 Fanavaran Co. Fanavaran Co. IRAN/Mahshahr Calibration
599/10 Supply of spare part for GE (General Electric) System 02/10/2009 03/19/2009 Mashahir Co. Mashahir Co.IRAN/Tehran
Procurement
701/213Installation and Commissioning of Instrumentation and
Electrical Equipment of Centrol Loading Terminal01/06/2005 06/07/2005 Faravaresh Co. BIPC IRAN/Mahshahr Commissioning
599/1 Supply of Instrumentation 07/04/2007 05/17/2008 P.I.D.E.M. Co.Razi
Petrochemical Complex
IRAN/Mahshahr Procurement
342PDesign & Integration of ACPD/PTC 1002 Electronic Card
(45 Sets)09/27/2001 12/28/2001 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/43 Engineering and Procurement Services for the Analysers 04/26/2001 09/30/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/177Engineering and Installation of Instrumentation and
Electrical Equipment of Ethylene Tank07/10/2004 08/16/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
319PDesign & Integration of Computerized Process recorder
Model CPR‐100 (1 Sets)10/03/1998 10/13/1999 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
384 Repair of electronic cards for CA Plant in BIPC (100 sets) 12/22/2009 03/21/2010 Kimia Co. BIPC IRAN/Mahshahr Maintenance
313PDesign & Integration of ACPD/PTC729 Electronic Card
(15 Sets)02/19/1997 02/15/1999 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
947Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar
Imam Petrochemical Complex02/02/2009 06/27/2009 Kharazmi Co. BIPC IRAN/Mahshahr Construction
404Procurement and installation of level gauge and Level
Switch for Waste Oil Tank in PX Plant01/11/2011 07/21/2011 BIPC BIPC IRAN/Mahshahr EPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
316P Design & Integration of Control & Interlock Panels 06/01/1998 08/31/1998 Dena Tire Co. Dena Tire Co.IRAN/Shiraz
Design & Manufacturing
707/17COMMUNICATION OF IMPORTANT SIGNALS OF LOAD
SHEDING SYSTEM IND UT PLANT03/27/2006 12/25/2006 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
701/131Design of Earthing System for the Computer Network of
BIPC Office Buildings03/11/2004 03/07/2005 Kharazmi Co.
BIPC( Kharazmi Co.
)IRAN/Mahshahr Engineering
632Calibration Services of Instrumentation Equipment for
Paydar Project11/29/2009 01/20/2010 OEID Co. OEID Co. IRAN/Shoosh Calibration
701/185Engineering Services for the Instrumentation of the
Central Loading Terminal09/07/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/121Construction Supervision Services for Cable modification
Project of BIPC.04/10/2003 08/08/2003 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/22Electrical and instrumentation work associated with
TRAICING و ANALYZER unit 05/03/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
372 Design & integration of Stablizer Package Local Panel 12/18/2006 03/18/2007Tehran Keyhan
Ide co.BIPC IRAN/Mahshahr
Engineering/Procurement
647Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Navid Zar Chemi Co.
04/23/2013 04/24/2014Navid zarshimi industrial co.
Navid zarshimi industrial co.
IRAN/Mahshahr Calibration
701/249Instalation and Commissioning of Instrumentation of
Condition Monitoring of the Compressors07/20/2005 12/16/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
310PDesign & Integration of ACPD/PTC 998‐3 Electronic Card
(1 Set)02/18/1997 05/21/1997 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
382Commissioning of ESD System for NOORABAD GAS
COMPRESSOR STATION 04/13/2009 07/21/2009 NIGC NIGC IRAN/Noorabad Commissioning
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
815Offshore and Onshore Instrumention data collection
and equipment Tagging in Kharg Island04/05/2008 06/02/2008 I.O.O.C I.O.O.C
Iran/Kharg Island
Maintenance
707/6INSTALLATION OF INLINE FLOW METERS IN SR PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
725Engineering and manufacturing of HD plant flaker control panel in Bandar Imam petrochemical factory
04/13/2010 04/23/2010
International Services
Corporation ( ISC )
BIPC IRAN/Mahshahr Procurement
701/120Installation of Instrumentation and Electrical Equipment
of PTA‐1 Project02/20/2003 05/21/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
701/111Installation and Testing the Electrical Devices of Diesel
Gen. House and Main Workshop01/23/2003 01/23/2004
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
703Detailed design and supply of electricity to the new unit
of Razi petrochemical complex10/17/2001 10/17/2002
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/71Engineering, Installation and Commissioning of the
Tanks Management System10/19/2001 03/07/2002 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/12Engineering, Procurement and Construction of LYNX‐
1000 Heptane Drying Unit05/14/1999 10/18/1999 Basparan Co. BIPC IRAN/Mahshahr EPC
611/1Repair , Maintenance and Calibration Services for
Maroon Petrochemical Co.05/30/2007 05/22/2010
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Calibration
728/305 Modification of PE WAREHOUSE Internal Lighting System 04/26/2011 08/14/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
706/12DETAIL ENGINEERING FOR PACKAGE'S INTERLOCKS IN
KHOUZESTAN PETROCHEMICAL COMPLEX04/28/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
317PDesign & Integration of Signal Isolator Model SI‐1018 (3
Sets)05/27/1998 08/27/1998 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/57 Installation of Qquipments in New Laboratory 08/07/2001 12/08/2001 Kimia Co. BIPC IRAN/Mahshahr Construction
646Calibration Services for Instrumentation/Elecrtical
Measurement Equipment of Rojin Sanat Co. 02/21/2012 06/21/2012 Rozhin Co. Rozhin Co. Calibration
331P Design & Integration of P/I Transducer (78 Sets) 01/30/2000 01/05/2002 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
931Instrumentation Cable Laying in Parsian ‐ 2 Gas Refinery
(lamerd)04/28/2007 05/24/2007 Payandan co.
Parsian refinery
IRAN/Lamerd
Construction
615Repair and Calibration of Instrumentation and Electrical
Equipment for Khoozestan Petrochemical Co.08/17/2007 08/17/2007
KhoozestanPetrochemical
Co.
KhoozestanPetroch. Co.
IRAN/Mahshahr Calibration
640Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Navid Zar Chemi Co.
04/24/2011 04/23/2013Navid zarshimi industrial co.
Navid zarshimi industrial co.
IRAN/Mahshahr Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
746Preparation of Scope of work for designing and
engineering phasesof DCS project
05/20/2014 08/17/2014Tabriz Oil Refinery Company
Tabriz Oil Refinery Company
Iran/Tabriz Engineering
706/13RELAY TESTING OF 850 LV FEEDERS IN SUBSTATIONS OF
KHOUZESTAN PETROCHEMICAL COMPLEX11/11/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Calibration
701/26 Monthly Maintenance of the Fire Fighting Vehicles 03/16/2000 03/11/2001 BIPC BIPC IRAN/Mahshahr Construction
334PDesign & manufacturing of ACPD/PTC
998‐3 Electronic Card (15 Sets)09/24/2000 04/27/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
728/217Transmission signals from PLC at gas station to DCS
system at offsite control room11/13/2012 01/19/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
701/171Engineering and Procurement Services for Condition
Monitoring of Reciprocating Compressors05/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
711/5 ELECTRICAL SUPERVISION OF LAND FILL PROJECT 10/05/2006 03/07/2007 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/156 Rehabilitation of Instrumentation of Section 400 12/10/2003 01/11/2005 Basparan Co. BIPC IRAN/Mahshahr Construction
701/186Engineering Services for the Electrical Equipment of the
Central Loading Terminal08/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
932Installation and commisioning of Fire Alarm System in Karoon Petrochemical Company (Bandar Imam Free
Zone )06/06/2007 12/21/2007
Karoon Petroch. Co.
Karoon Petroch. Co.
IRAN/Mahshahr Construction
734Installation and Commissioning of Gas Detection System
, LDPE Plant10/10/2011 11/25/2011
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Construction
613Calibration Services for Instrumentation/Elecrtical
Measurement Equipment of Ramin Power Generation 11/22/2007 03/18/2008 K.E.P.D.C K.E.P.D.C
IRAN/Ahvaz
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
320P Production Spare Parts for TI‐DESK 02/18/1999 02/17/2001 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
727 UT‐600 Neutralization pound control system 06/05/2010 08/05/2010 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
707/3ACPD electrial cords troubleshooting( Anode control protection Device )
11/20/2005 03/22/2006 Kimia Co. BIPC IRAN/Mahshahr Maintenance
904Installation and Commissioning of Instrumentation and Electrical Equipments in Automobile car Painting Saloon
07/17/2000 10/10/2001 Saipa Co. Saipa Co.IRAN/Tehran
Construction
701/66Engineering and Procurement Services for New
Exchangers of Saline Water System09/24/2001 04/02/2002 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
701/16Engineering, Procurement and Construction of Silica
Analyser08/03/1999 Ab Niroo Co. BIPC IRAN/Mahshahr EPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/17 Supply of Solonoid Valve 02/20/2010 08/21/2010 P.K.CMobin
Petriochemical Co
IRAN/Mahshahr Procurement
707/7 CABLE LAYING OF NEW COOLING TOWER OF NF PLANT 04/07/2006 06/05/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/122 Installation and Commissioning of Fire Alarm System 03/17/2003 05/13/2003Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Engineering
610MOV Rehabilitation & Calibration
For NIOPDC06/09/2007 08/06/2007 N.I.O.P.D.C N.I.O.P.D.C IRAN/Arak Calibration
306PDesign & Integration Calibration Bench Model CB‐501
(10 Set)08/24/1996 12/24/1996 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
708/33Electrical and instrument work according to announced work such as Cabling,Gland & Termination,… related to
TANKAGE AREA و PROCESS AREA of EO/EG unit05/03/2006 10/05/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
922Power Feeder Installation & Cable Laying for Explosion‐
Proof Air Condition System in Olefin Plant07/19/2006 08/13/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/73Procurement Services, Overhauling and Commissioning the Electrical Equipment of Mahshar Export Storage
Tanks01/12/2002 05/05/2002 Faravaresh Co. BIPC IRAN/Mahshahr Maintenance
701/188Engineering, Installation and Commissioning of New
Control Loops of Ethylene Tank09/10/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
359Design & Integration of Liebert System Control Card (10
Sets)08/24/2003 08/23/2004 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
706/3CABLING/ TERMINATION OF UNIT 50 OF KHOUZESTAN
PETROCHEMICAL COMPLEX10/15/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Construction
604 Calibration Services for Instrumentation Devices 05/22/2004 08/22/2004Maroon
Petrochemical Company
Maroon Petrochemical
Company
IRAN/Ahvaz
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
628Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Co.
08/22/2009 11/20/2009 NIGC NIGCIRAN/Shiraz
Calibration
311PDesign & Integration of ACPD/PTC 998‐3 Electronic Card
(15 Set)12/22/1996 04/25/1997 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
728/306 Upgrading of Relay Protection Units 04/26/2011 02/01/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering/Pro
curement
924/1 Installation and cabling of 20/11 KV transformer 10/22/2006 11/20/2006 N.I.S.O.CParsian refinery
IRAN/Lamerd Construction
946Installation, test and precommisioning of Lood Sheding
system in Bandar Imam01/05/2009 03/21/2010 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
701/164Engineering Services for Optimization of Area Lighting
System of the Complex03/07/2004 Kharazmi Co.
BIPC( Kharazm Co. )
IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/108Engineering, Installation and Commissioning of the
Modified Parts of the LV Panels01/23/2003 05/13/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
328PDesign & Integration of RPM‐Monitoring System (11
Sets)02/13/2000 06/12/2000 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
304 Design & Integration of Calibration Banch (3 set) 06/17/2012 09/17/2012Laleh
Petrochemical CO.
Laleh Petrochemical
CO.Iran/Mahshahr
Design & Manufacturing
701/157Repaire and Installation of the Instrument & Electrical
Equipment of Jetty NO.112/28/2003 06/05/2004 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/103Installation and Commissioning of Instrumentation of
NOXEL Project01/04/2003 03/16/2004 Basparan Co. BIPC IRAN/Mahshahr Construction
599/8Desing , Manufacturing & Supply of Electrical Panel
Electerical Panel11/18/2008 01/29/2009
Fajr Petrochemical
Complex
Fajr Petrochemical
ComplexIRAN/Mahshahr Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/37Engineering and Procurement Services for the Instrumentation of NOXOL Injection PACKAGE
01/01/2001 05/14/2001 Basparan Co. BIPC IRAN/MahshahrEngineering/Pro
curement
354 Production of Spare parts for RPM‐Monitoring System 04/25/2003 07/23/2003 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
706/14INSTALLATION OF PACKAGE'S INTERCONNECTION IN
KHOUZESTAN PETROCHEMICAL COMPLEX12/05/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/MahshahrEngineering/Co
nstruction
708/28Electrical and instrumentation work associated with ANALYZER , TRACING and P‐2020A, B‐2014,B Pumps
Push button in EO/EG units05/19/2006 08/03/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/37F&G work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE AREA و PROCESS
AREA of EO/EG unit07/22/2006 10/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
728/205Transfering the Bearing data of C‐501&502 from PLC to
DCS06/25/2011 08/27/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/109Installation and Commerssioning of Electrical Facilities
of BAGGING Building01/23/2003 05/13/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
329PDesign & Integration of Mercury Flow Amplifier (35 Sets)
& 1 Set of Simulator01/11/2000 03/16/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
710Repairing and Calibration of Instrumentation and
Electrical Equipment11/16/2005 09/13/2007
Karoon Petroch. Co.
Karoon Petroch. Co.
IRAN/Mahshahr Engineering
701/33Engineering and Installation of Fire Alarm System for
Dehydration Unit of Masjedsoleymaan11/21/2000 07/01/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Engineering
607Pressure Safety‐Relief Valves Rehabilitation &
Calibration services09/10/2006 09/10/2007
Fajr Petroch. Co.
Fajr Petroch. Co.
IRAN/Mahshahr Calibration
724Engineering and defining of important signals for Load
Shadding system12/22/2009 04/23/2010 BIPC BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/213 Speed protection system for C‐401A/B 05/29/2012 05/25/2013 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering/Pro
curement
599/11 Maintenance of Nuovo pignone Electronic cards 08/25/2009 11/07/2009 NIGC NIGCIRAN/Shiraz
Maintenance
707/29INSTALLATION CM RELATED ACCESSORIES OF LD PLANT
COMPRESSORS01/01/2006 02/01/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
701/29Engineering and Procurement Services for 12 Nos.
Flowmeters & Counters07/12/2000 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
388Design & Integration of two calibration Bench, Model
No. CB‐503,50401/29/2010 04/30/2010 I.O.O.C I.O.O.C
IRAN/Shiraz
Design & Manufacturing
701/69Engineering and Procurement Services for replacement
of (HOKUSHIN) Magnetic Flowmeters10/18/2001 Kimia Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/208 Modification in analog input channels (C‐501/502) 09/04/2011 10/20/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering
707/14INSTALLATION OF INLINE FLOW METERS IN LD PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
920Installation & Commissioning of Ex‐Proof Electrical
Equipments in the Catalyst Warehouse02/03/2006 04/26/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
341P Design & Integration of Flow Computer (6 Sets) 06/17/2001 06/17/2003 Kimia Co. BIPC IRAN/MahshahrDesign &
Manufacturing
728/303 Relocating of Diesel Generator's Batteries 04/26/2011 10/13/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/214Engineering, Installation and Commissioning of New
electrical Actuators of the Furnaces12/19/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
629Calibration/Maintenance Services for
Instrumentation/Elecrtical Measurement Equipment of Khoozestan Petrochemical Co.
11/22/2009 11/22/2011KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Calibration
701/52Engineering and Procurement Services for the
Flowmeters08/05/2001 Kharazmi Co. BIPC IRAN/Mahshahr Engineering
728/312 Heat Decreasing of the Chilled Water Panel 09/03/2011 01/05/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
701/47Commissioning & Start up the Instrumentation and
Electrical Equipment of Urea Unit05/22/2001 06/22/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Commissioning
337PDesign & Integration of P/I Transducer & Flow Computer
(5 Sets Each)04/24/2001 04/26/2003 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
701/116Engineering and Procurement Services for the Electrical
Maintenance workshop01/22/2003 12/02/2003 Kharazmi Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/204Changing The Mech. Switches Of C‐501/502 Stp1‐Mp1
(Psl‐ 51410/51402) To Transmitters01/01/2011 08/29/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
902 Installation of Tank Gauging System in Common Facilities 05/11/1999 09/12/1997 BIPC BIPC IRAN/Mahshahr Construction
701/201Engineering Services for the Lighting System
modification09/20/2004 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/48Cabling the New Route to COOLING TOWER in NEW
Urea Unit07/18/2001 08/05/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Construction
707/26INSTALLATION OF INLINE FLOW METERS OF MASS &
ENERGY BALANCE IN KIMIA COMPANY06/26/2006 10/26/2006 Kimia Co. BIPC IRAN/Mahshahr Construction
617 Applied Calibration Training Services 10/27/2007 12/03/2007 K.E.P.D.C K.E.P.D.CIRAN/Ahvaz
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/174Engineering and Procurement Services for the
Transformer Oil Analyser06/23/2004 10/04/2004 Basparan Co. BIPC IRAN/Mahshahr Engineering
701/245 Design and Engineering of the Paging System 07/20/2005 05/21/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
343P Design & Integration of Mercury Flow Amplifier (25Sets) 09/27/2001 09/27/2002 Kimia Co. BIPC IRAN/MahshahrDesign &
Manufacturing
701/147Repair and Maintenance Services for the CPR‐300
Package10/22/2003 11/12/2004 Kimia Co. BIPC IRAN/Mahshahr Engineering
641Calibration Services for Instrumentation/Elecrtical
Measurement Equipment of Fan Niroo Co. 06/18/2011 08/17/2011
Fan Niroo Company
Fan Niroo Company
IRAN/Assaluye
Calibration
923Installation & Commissioning of Turbine Compressor
Vibration System.06/11/2006 07/01/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/233 Installation and Commissioning of 7 Nos. Flowmeters 05/12/2005 04/26/2006 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
701/28Engineering, Procurement and Installation of 11 Nos.
Oxygen Analysers06/21/2000 12/01/2000 Faravaresh Co. BIPC IRAN/Mahshahr EPC
701/151Engineering and Procurement Services for Vibration
Monitoring System of GB‐301 A‐D11/29/2003 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
701/32Engineering and Installation of Catalyst Firing Remote
Control for the DEAC Tanks01/04/2001 Basparan Co. BIPC IRAN/Mahshahr Construction
335PDesign & Integration of Calibration Bench Model No.CB‐
502 (3 Sets)10/01/2000 05/04/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
708/10STEAM TRACE TUBING OF EO/EG PLANT OF MAROON
COMPLEX05/03/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
323PDesign & Integration of P/I Transducer
(25 Sets)02/18/1999 02/15/2000 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
701/91 Detail Technical Surveying of Instrumentation 09/21/2002 04/02/2003 Kimia Co. BIPC IRAN/Mahshahr Engineering
711/2DETAIL & PROCUREMENT ENGINEERING OF
INSTRUMENT DEVICES FOR METHANOL TANK IN MTBE PLANT
08/15/2006 10/15/2006 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/27 Engineering & Procurement Services for H2S Detector. 05/31/2000 12/01/2000Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshahr
Engineering/Procurement
371Engineering, Designing,Integration, Installation and
commissioning of PLC control system for fire extinguishing systems, station No 1,2
11/14/2006 06/14/2007Shiraz
petroch. Co.Shiraz
Petroch. Co.IRAN/Shiraz
EPC
599/24 Procurement of Earthing Copper pieces 01/15/2012 01/23/2012Arya Shahab oil
Co.POGC
IRAN/Assaluye
Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/17Engineering and Procurement Services for Propane
Recovery Unit09/10/1999 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
711/3DETAIL & PROCUREMENT ENGINEERING OF CENTRAL
MONITORING SYSTEM FOR MASS & ENERGY BALANCE IN KIMIA COMPANY
08/15/2006 07/20/2008 Kimia Co. BIPC IRAN/Mahshahr Engineering
712/3 DETAIL ENGINEERING OF POWER CABLE FOR LPG PLANT 09/28/2006 10/15/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
325PDesign & Integration of Temperature Monitoring System
Model No. DMTS‐32 (1 Set )09/24/1999 11/26/1999
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/MahshahrDesign &
Manufacturing
701/93 Installation and Commissioning of 8 Nos. Flowmeters 10/11/2002 04/20/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
713Providing Consulting Services of Electerical and
Instrumentation To Ab Niroo Petrochemical Co.
01/22/2006 01/21/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/146Engineering , Procurement Services and Construction Supervision Services for the Condition Manitoring
System of Compressors08/19/2003 Basparan Co. BIPC IRAN/Mahshahr EPC
338PDesign & Integration of ACPD/PTC Electronic Card
Model No.1002 (15 Sets)04/24/2001 07/24/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
362Design & Integration of Calibration Bench Model No.CB‐
505 (1 Set Each)
05/04/2004 08/01/2004Fajr
Petroch. Co.Fajr
Petroch. Co.IRAN/Mahshahr
Design & Manufacturing
701/200 Consulting services for the Jetty Electrification Project 10/25/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/251Engineering Services for Checking the Design of Lighting
and Small Power System of Engineering Offices01/14/2006 05/17/2006 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/167 Installation and Commissioning of 6 Nos. Electric Pumps 04/09/2004 07/03/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
712/2FEASIBILITY STUDY OF NEW BUILDING OF PX PLANT IN
BANDAR IMAM PETROCHEMICAL COMPLEX09/16/2006 09/21/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
728/307 Modification of Site Telephone stations 06/06/2011 09/27/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeEngineering/Pro
curement
701/113Installation and Testing the Electrical Devices of Analyser, Weighbridge (S&N) Buildings and HOSE
STATIONS 1 &201/23/2003 04/17/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
728/105Installation of main input power cables for offsite data
center08/07/2013 10/20/2013 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
728/313Paging system modification for Compressor Area, LDPE‐
plant09/10/2011 01/11/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
EPC
701/206Engineering, Procurement, Installation and
Commissioning of Instrumentation of Loading Arm of the Jetty No.1
11/06/2004 02/28/2006 Faravaresh Co. BIPC IRAN/Mahshahr EPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/49Engineering Services for the Modification of Control
Loops07/17/2001 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/223 Installation of Instrumentation and Electrical Works of
New Motors .03/15/2005 Basparan Co. BIPC IRAN/Mahshahr
Engineering/Construction
728/321 Procurement & Installation of Eexd. Air Conditioner 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement/Construction
701/159Engineering & Installation of Equipment on LV/MV
Panels in the NF Plant01/06/2004 04/02/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/46Procurement, Installation and Commissioning of
Ultrasonic Flowmeters of Benzen and Propane Lines05/21/2001 10/05/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/50Engineering and Procurement Services for the Control
Loop Instruments of CHILLING POND07/18/2001 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/221 Installation of Local Control Units for the New Pumps 02/24/2005 05/26/2005 Basparan Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
701/126Electrical Engineering Services for PASKARANEH JETTY of
petrochemical Special Economic Zone04/24/2003 06/06/2003 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/114Installation and Testing the Electrical Devices of
LABORATORY Building01/23/2003 04/04/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Engineering
355 Production of Spare Parts for CPR‐300 05/17/2003 08/14/2003 Ab Niroo Co. BIPC IRAN/MahshahrDesign &
Manufacturing
712/7INSTRUMENT ENG. & PROCUREMENT OF 6" PROPYLENE
LINE FROM OL TO REJAL PLANT10/19/2006 04/21/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
711/10 Work on diesel generator 04/19/2007 05/20/2007 Kimia Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
500/3 Supply of Vibration Probes 07/02/2006 10/01/2006 TABRIZ GAS Co. TABRIZ GAS Co. IRAN/Tabriz Procurement
633Calibration Services for Standard/Reference Instrument
Equipment of Aghajari Oil & Gas Co.12/22/2009 01/20/2010 NISOC Oil Co. NISOC Oil Co.
IRAN/Aghajari
Calibration
728/202 Engineering & procurement of flow transmitters for
Dilution Steam12/19/2010 03/16/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering/Procurement
303P Design & Integration of Control Panel (2 Sets) 09/26/1995 11/27/1995 ECC Co.Abadan Refinery
IRAN/AbadanDesign &
Manufacturing
637Calibration Training Services Pressure and Temperature
Instruments08/22/2010 09/20/2010
owjenasr Technical & engineering
pars petrochemical
co.
IRAN/Shiraz
Calibration
644Calibration Services of Metering Stations for Gas
Transferring Co.09/21/2011 10/22/2011 N.I.G.C N.I.G.C IRAN/Mahshahr Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
353 Production of Spare Parts for CPR‐300 03/12/2003 06/18/2003 Kimia Co. BIPC IRAN/MahshahrDesign &
Manufacturing
701/133Engineering and Procurement Services for Vibration
Monitoring of Compressors in NF/AR Plants06/09/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
638Calibration Services for
Instrumentation/Elecrtical/Reference Measurement Equipment of Firmco
01/22/2011 03/07/2011 FIRMCO COAmir Kabir Petroch. Co
IRAN/Mahshahr Calibration
706/2DATA SHEET PREPARATION FOR INSTRUMENT DEVICES
OF CHILLERS IN KHOUZESTAN PETROCHEMICAL COMPLEX
10/06/2004KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Engineering
701/190Engineering, Installation and Commissioning of Level
Indicators on the IW Tanks09/10/2004 01/01/2007 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/208Installation and Commissioning of Level Control
Instrumentation of Propylene Exchangers10/14/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/231 Lighting System engineering. 05/20/2005 06/18/2005 Kimia Co. BIPC IRAN/Mahshahr Engineering
619Fire Fighting System Completion of Ethane Retrieval
Plant 10/22/2007 01/20/2008
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Calibration
701/165Engineering and Procurement Services for the Electrification of the Field Air Compressors
03/14/2004 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro
curement
599/36 Purchasing of Spare battery for Simtronics LTU 600 12/10/2013 03/19/2014 N.G.S.C. N.G.S.C. Procurement
712/1ENG. & PROCUREMENT OF WASTE OIL VESSEL'S
INSTRUMENT FOR AR PLANT10/14/2006 12/09/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
728/214 Installation of manual call points in storage area 06/05/2012 08/05/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/103checking and construction new septic system for admin
& restaurant bldg.04/11/2012 05/20/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
326P Production of Spare parts for CPR‐100 07/07/1999 09/14/1999 BIPC BIPC IRAN/MahshahrDesign &
Manufacturing
701/224Engineering, Procurement and Commissioning of
Loading System of EDC Line04/18/2005 04/07/2006 Kimia Co. BIPC IRAN/Mahshahr EPC
315PDesign & Integration of Calibration Bench Model No.
CB‐501 (4 Sets)03/01/1998 06/09/1998 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
701/39Procurement, Installation and Commissioning the
Electrical Equipment of LATEX Project03/14/2001 07/06/2001 Basparan Co. BIPC IRAN/Mahshahr Construction
701/101Construction Supervision Services for the Electrical
Works of Ethylane Tank12/08/2002 04/19/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/112Installation and Testing the Electrical Devices of Hot OIL,
TICKET, CONTROL and AUX. Rooms.01/23/2003 05/05/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
701/204 Installation of Flowmeter on the Treated Waste Line to
Sea10/26/2004 03/28/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/218 Installation & Commissioning oftachometers. 02/06/2005 04/28/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/70 Installation and Commissioning of 5 Nos. Flowmeters. 10/19/2001 01/31/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction
627Calibration Services of Instrumentation and Laboratory
Equipment for Amir Kabir Petroch. Co.07/04/2009 08/03/2009
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Calibration
728/320 Replacement of W‐402 with New Dosage Pump 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeEPC
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
626Calibration Services for Measurement Equipment of Fars
Electrical Distribution Co.05/18/2009 06/08/2009
Fars Distribution
Elec. Company
Fars Distribution Elec. Company
IRAN/Shiraz
Calibration
701/77Procurement Services and Installation of Electrical Facilities of the Rest Room of SEA WATER Area.
03/03/2002 05/18/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
708/16TERMINATION & TEST OF FIRE ALARM SYSTEM FOR
POLYPEXT & CATA PLANT04/23/2006 05/22/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/194Engineering, Procurement and Installationof the Flow
Control Loops of the LATEX Project09/23/2004 01/25/2007 Basparan Co. BIPC IRAN/Mahshahr EPC
701/193 Electrification of Portable Air Compressors 08/14/2004 04/16/2005 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
701/197Relocating and Commissioning of the CONTROL ROOM
Computers10/03/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/191Engineering, Installation and Commissioning of Alarm
System on MS Line.09/10/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
710/3DETAIL ENGINEERING OF INSTRUMENT DEVICES FOR
CHILLERS OF UNIT 70307/29/2007 09/18/2007
Karoon Petroch. Co.
Karoon Petroch. Co.
IRAN/Mahshahr Engineering
701/3Engineering and Procument Services for the Compressors Vibrtion Monitoring System
12/13/1998 12/12/2000 Kharazmi Co. BIPC IRAN/MahshahrEngineering/Pro
curement
708/4 Fire alarm cabling for HD unitMaroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/123Installation and Commissioning of Rotameters, Volume
Tank, and Diesel Generator Electrification03/17/2003 06/19/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
706/4DETAIL/ SITE ENGINEERING FOR F&G SYSTEM OF WAREHOUSE IN KHOUZESTAN PETROCHEMICAL
COMPLEX11/04/2004
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/184Installation and Commissioning of Flowmeter on the
Water In‐take Line to the Complex07/03/2004 11/17/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
711/4Installation and setup K402A/B و P‐201E/F to installed
diesel generator in site09/26/2006 12/01/2006 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Construction
387Design & Integration of one calibration Bench, Model
No. CB‐504(1 Set )
12/22/2009 03/21/2010Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Shiraz
Design & Manufacturing
713/2 INSTRUMENT DETAIL ENGINEERING OF 4TH NITROGEN
VESSEL12/22/2006 01/20/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
707/11INSTALLATION OF INLINE FLOW METERS IN HD PLANT
OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
701/76Procurement Services and Construction of 2 Nos. Lift
Electrical works.03/03/2002 05/12/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/20 Engineering and Procurement for Flowmeters 09/11/1999 05/19/2000 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro
curement
301PDesign & Integration of Calibrator System Model No. PC‐
501 (15 Sets)07/21/1995 10/20/1995 Faravaresh Co. BIPC IRAN/Mahshahr
Design & Manufacturing
312PDesign & Integration of 128 Channel DMTI Indicator
System (2 Sets)02/18/1997 05/20/1997 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
701/195Engineering, Istallationn and Commissioning of the CRA‐
609Analyser of Industrial Water Unit09/13/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/78Commissioningof Control System of Neuralization Pool
of the Water Treatment Unit03/12/2002 04/27/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Commissioning
701/58Engineering & Installation of the Instrumentation of
New Tower C‐70108/11/2001 12/18/2001 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/153Engineering, Procurement Services and Installation of 4
Nos. Level Transmitters in CA Plant11/30/2003 Kimia Co. BIPC IRAN/Mahshahr EPC
708/14CABLE LAYING BETWEEN PROCESS & TANKAGE AREA
FOR EO/EG PLANT OF MAROON COMPLEX05/03/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/135Installation and Testing of Instrument Devices of Modified (Pneumatic to Electronic) Control Loops
06/21/2003 05/17/2005 Kimia Co. BIPC IRAN/Mahshahr Construction
352Design & Integration of Operator Station
(2 Sets)08/29/2002 01/08/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Design & Manufacturing
599/35Supplying Required Material For Bid Boland Gas
Refinery Co.07/13/2013 08/23/2013
Bid Boland Gas Refinery Co.
Bid Boland Gas Refinery
Co.Omidiyeh Procurement
701/136Installation and Testing the Instrumentation of CHILLING
POND06/21/2003 10/19/2003 Kimia Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/102Construction Supervision Services for the Instrument
Works of Ethylane Tank12/08/2002 03/30/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/217Cabling and Termination of Compressor Governer
System01/23/2005 04/15/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/65Engineering Services for Process Control of Saline Water
System09/24/2001 12/25/2001 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/25Troubleshooting and Repairing the ACCELERATION UNIT
of Fire Fighting Vehicle03/16/2000 08/17/2000 BIPC BIPC IRAN/Mahshahr Construction
708/38Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE
AREA و PROCESS AREA of EO/EG unit10/01/2006 11/01/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
710/1TECHNICAL EVALUATION OF DIFF. PROPOSALS FOR
LIGHTING ACCESSORIES 10/13/2005 10/29/2005
Karoon Petroch. Co.
Karoon Petroch. Co.
IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
921Cabling, Termination and Commissioning the Electrical
Governer of GT‐1501 Compressor in NF Plant01/18/2006 02/02/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
374 Design & Integration of one calibration Bench 05/17/2007 07/15/2007Aeen Talash Tabrize.Co
Aeen Talash Tabrize.Co
IRAN/TabrizDesign &
Manufacturing
707/10INSTALLATION OF INLINE FLOW METERS IN BD PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
624Calibration Services for Instrumentation/Elecrtical
Measurement Equipment of National Gas Co.09/20/2008 10/21/2008 N.I.G.C N.I.G.C
IRAN/Omidiyeh ( Miyan koh )
Calibration
701/250Engineering and Procurement Services for Control Valve
on the Input Line to GB‐910 C/D compressor09/05/2005 12/11/2005 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
367Design & Integration of Calibration Bench Model No.
CB‐505 (1 Set )P.K.C P.K.C
IRAN/Shiraz
Design & Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
623Calibration Services of Instrumentation and Laboratory
Equipment for Amir Kabir Petroch. Co.06/21/2008 07/21/2008
Amir Kabir Petroch. Co
Amir Kabir Petroch. Co
IRAN/Mahshahr Calibration
706/11CALIBRATION & COMMISSIONING OF ANALYZERS IN
KHOUZESTAN PETROCHEMICAL COMPLEX04/21/2005
KhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Calibration
701/115Installation and Testing the Electrical Devices of
WAREHOUSE & SUB‐STATION02/10/2003 04/02/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
701/232ENGINEERING of electrical facilities of
LAND FILL area.05/20/2005 06/13/2005 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/8Engineering and Procurement Services for the H2S
DETECTOR05/08/1999 10/16/1999 Kharazmi Co. BIPC IRAN/Mahshahr
Engineering/Procurement
321PDesign & Integration of SAM Alarm Cards
(36 Sets)02/18/1999 02/09/2000 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
366Design & Integration of Calibration Bench Model No.CB‐
503 (1 Set)P.K.C P.K.C
IRAN/Shiraz
Design & Manufacturing
701/4Engineering and Procurement Services for the Oxygen
Analysers01/05/1999 01/06/2001 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
708/29 Commisioning assistance in EO/EG unit 04/29/2006 07/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/237Engineering for Relocation & Installation of Fire
Extingnishers05/24/2004 08/13/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
707/28ELECTRICAL/ INSTRUMENT INSTALLATION SERVICES OF
LD PLANT CATALYST PUMPS02/05/2006 03/07/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
701/14 Design and Engineering for the Utilities metering system. 07/06/1999 07/25/1999 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
707/15 COMMUNICATION OF ALARMS BETWEEN OL & UT PLANT 04/13/2006 05/22/2006 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
701/90Relocating and Commissioning the Instrument Air Piping
of Purging System of Cell‐Room Panels.09/13/2002 04/15/2003 Kimia Co. BIPC IRAN/Mahshahr Construction
701/130Engineering, Procurement Services, Installation and Commissioning of Automatic Fire Fighting System
12/16/2003 Basparan Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
701/192Engineering, Installaton and Commissioning of Alarm
System for the Feul and Steam Pumps08/10/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
620Rent of Temperature Calibration Ovens for Thermocouples Testing of Poly ‐Etilen Unit
12/09/2007 12/19/2007 ASPC CO. ASPC CO. IRAN/Mahshahr Calibration
728/317 Fire alarm system execution for asset integrity building 01/10/2012 03/11/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/166Construction and commissioning the Connection of Fire
Fighting water Line to Cooling Tower Package04/07/2004 04/27/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
369Design & Integration of one calibration Bench , Model
No. CB‐504 (1 Set)09/05/2005 11/15/2005
Parsian Gas Refinery
Parsian Gas Refinery
IRAN/LamerdDesign &
Manufacturing
622Calibration Services for Measurement Equipment of Fars
Electrical Distribution Co.03/11/2008 05/10/2008
Fars Distribution
Elec. Company
Fars Distribution Elec. Company
IRAN/Shiraz
Calibration
728/216Transmition fire and gas alarms signals from Flare
substation to offsite control room07/21/2012 10/09/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Construction
701/236Installation and Commissioning of 4 Nos. Flowmeters on
the HCL Line of Section 60005/25/2005 08/05/2005 Kimia Co. BIPC IRAN/Mahshahr Construction
701/176Engineering and ProcUnit Rateement Services for 12
Nos. ON‐OFF Valves06/21/2004 Basparan Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/7Engineering and Procurement Services for the ORP and
PH METER05/08/1999 05/11/2000 Kharazmi Co. BIPC IRAN/Mahshahr
Engineering/Procurement
309PDesign & Integration of 16 Channel RTD‐DMTI Indicator
System (2 Sets)11/12/1996 04/17/1997 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
701/180Installation and Commissioning of one totalizer on the
Fire Fighting Water Line .06/16/2004 05/14/2006 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
340PDesign & Integration of Solenoid‐Valve Packs for Fire‐
Fighting Vehicles02/07/2001 03/01/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
322PDesign & Integration of Calibration Bench Model No. CB‐
501 (2 Sets)
02/21/1999 05/30/1999Kharg
Petrochemical. Co.
Kharg
Petrochemical. Co.
IRAN/Kharg Island
Design & Manufacturing
701/1Preparation of Technical Drawings and Documents for
Construction of CPR‐10010/18/1998 12/19/1998 Basparan Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/35
Electrical and instrument work according to announced work such as Cabling,Device installation,Gland &
Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
07/22/2006 09/05/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/183Installation and Commissioning of Totalizer on the HCL
Line07/03/2004 10/04/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
707/13INSTALLATION OF INLINE FLOW METERS IN PP PLANT OF
BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
306Preparation of Tender package for Khavaran facilities
No.4 PMS System08/30/2012 09/27/2012
National Iranian Gas Company
National Iranian Gas Company
IRAN/Khavaran Engineering
701/222Installation and Commissioning of TOTAL HYDRO
CARBON Analyser of Nitrogen Unit03/02/2005 05/07/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
599/25 Desing & Manufacturing of Electerical & Control Panel 02/23/2012 04/25/2012Fajr
Petroch. Co.Fajr
Petroch. Co.IRAN/Mahshahr Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
707/9AUTOMATIC CONTROL OF NITROGEN VENT IN ABNIROO
CO.03/15/2006 12/14/2006 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/240Installation and Commissioning of the Flowmeter of
Buthane Line to CF Unit06/15/2005 07/11/2005 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
599/3 Supply of Electrical Equipment 03/11/2008 06/30/2008 TABRIZ GAS Co. TABRIZ GAS Co. IRAN/Tabriz Procurement
708/6 Termination and test of Fire alarm 01/15/2007 02/05/2007Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
318PDesign & Integration of Calibration Bench Model No.
CB‐501 (2 Sets)10/02/1998 12/17/1998
Razi & KhargPetrochemical.
Co.
Razi & KhargPetrochemical.
Co.IRAN/Mahshahr
Design & Manufacturing
701/215 Engineering and Procurement Services for the STEP Under Progress STEP Under Progress Transformer of
power Generation Unit01/04/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/6Engineering and Procurement Services for the Hydrogen
Analysers05/08/1999 05/02/2000 Kharazmi Co. BIPC IRAN/Mahshahr Engineering
701/67Installation and Commissioning of 4 Nos. TOTALIZERS, ISOLATORS and Flowmeters in the Control Room Panels
10/01/2001 04/13/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
701/118Installation and Testing of Electrical Devices for the
Mahshahr Export Storge Tanks02/09/2003 05/12/2006 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
728/215 transferring of 6 JB and 1 PT in the pipeline path 07/10/2012 08/09/2012 ASPC CO. ASPC CO.IRAN/
AssaluyeConstruction
708/36
Electrical and instrument work according to announced work such as Cabling,Device installation,Gland &
Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
07/22/2006 10/20/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
639Calibration Services for Instrumentation Equipment of
Gas Trnsferring Co. 04/12/2011 05/26/2011 NIGC NIGC
IRAN/Shiraz
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/94basic design of Condition Monitoring for the
Compressors in LD plant.10/07/2002 12/08/2002 Basparan Co. BIPC IRAN/Mahshahr Engineering
728/201Engineering & Procurement of Magnetic type level
gauges for E‐403 & E‐404 at C2 cracker plant12/21/2010 10/18/2011 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering/Procurement
708/40Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE
AREA و PROCESS AREA of EO/EG unit11/07/2006 12/08/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
711/8ELECTRICAL / INSTRUMENT DETAIL ENGINEERING OF
NEW ABSORPTION CHILLER OF VC PLANT12/06/2006 03/05/2007 Kimia Co. BIPC IRAN/Mahshahr Engineering
370Design and implementaion of Thinkpac Control &
Monitoring software09/29/2006 12/17/2006 Ventus S.A Ventus S.A Belgium EPC
701/100Engineering, Installation and Commissioning of Electrical works for New Rooms of Warehouse Mechanization
System11/23/2002 01/29/2003 Basparan Co. BIPC IRAN/Mahshahr
Engineering/Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/9The cabling and its associated works for feeding pumps
A,B‐2020,A,B P‐2014
05/03/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/34F&G work according to announced work such as
Cabling,Gland & Termination,… related to TANKAGE AREA و PROCESS AREA of EO/EG unit
06/22/2006 09/05/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
373Design & Production of electronic cards for trip amplifier and temperature converter of DCS
03/30/2007 08/22/2007Bandar abbas Refinery Co.
Bandar abbas Refinery Co.
IRAN/Bandar Abbas
Design & Manufacturing
701/140Installation of Vaccum Breaker and Safety Valve on the
Condensate Storage Tanks07/02/2003 10/10/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/182Installation and Commissioning of Alarms of NF1 & 2
Units07/15/2004 10/01/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/13 Preparation of Detail Engineering drawings for CPR‐300 07/06/1999 10/05/1999 Kimia Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
614Calibration Services for Elecrtical Measurement
Equipment 08/17/2007 12/17/2007 K.E.P.D.C K.E.P.D.C
IRAN/Khozestan
Calibration
712/6DETAIL ENGINEERING OF INSTRUMENT INSTALLATION
OF JET MIXING PLANT10/07/2006 11/08/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/81 Modification and Commissioning of CPR‐300 System 07/09/2002 10/03/2002 Kimia Co. BIPC IRAN/Mahshahr Commissioning
635Calibration Services for Instrumentation Equipment of
Exir Sanat Co. 05/22/2010 08/22/2010 Exirsanat Co. Exirsanat Co.
IRAN/Tehran
Calibration
708/21Installation of the analyzers: AE/AT‐21002‐20701‐77001‐
20901 of EOEG unit05/02/2001 06/24/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/110Refurbishing and Testing the damaged Instrument &
Electrical Panels01/23/2003 04/04/2003
Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/68Installation and Commissioning of Instrumentation and
Electrical works of New Turbo Pump OL‐GA‐7013010/11/2001 09/30/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
636Calibration Services for Standard/Reference Instrument
Equipment of Gachsaran Oil & Gas Co.06/22/2010 07/21/2010
Gachsaran gas & oil co.
(NIOC)
Gachsaran gas & oil co.
(NIOC)
IRAN/Gachsaran
Calibration
361Design & Integration of Operator Station device
(1 Set)12/27/2003 03/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/125Procurement and Construction of Kiosk for Tower
Monitoring of Jetty No.204/11/2003 07/10/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
599/15 Desing & Manufacturing of Electerical & Control Panel 09/27/2009 11/07/2009Fajr
Petrochemical Complex
Fajr Petrochemical
ComplexIRAN/Mahshahr Procurement
701/88 Installation and Commissioning the Mass Flowmeters 08/24/2002 10/24/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
707/12INSTALLATION OF INLINE FLOW METERS IN PVC PLANT
OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
701/75Engineering and Procurement Services for New
Utilization of Tank T252X02/21/2004 Kimia Co. BIPC IRAN/Mahshahr
Engineering/Procurement
711/6FEASIBILITY STUDY OF ELECTRICAL CONSUMERS IN LIME
STONE AREA OF VC PLANT10/09/2006 12/01/2006 Kimia Co. BIPC IRAN/Mahshahr Engineering
701/89Installation and Commissioning for 2 Nos. Conductivity
Meters08/24/2002 03/26/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/44Engineering, Procurement Services and Installation of %6 Caustic Injection Package for QW and PW Lines
05/14/2001 05/07/2003 Faravaresh Co. BIPC IRAN/Mahshahr EPC
630Calibration Services for Standard/Reference Instrument
Equipment of Gachsaran Oil & Gas Co.11/23/2009 12/23/2009
Gachsaran gas & oil co.
(NIOC)
Gachsaran gas & oil co.
(NIOC)
IRAN/Gachsaran
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
707/20ELECTRICAL/ INSTRUMENT ENGINEERING SERVICES OF
LD1,2 CATALYST PUMPS04/11/2006 05/14/2006 Basparan Co. BIPC IRAN/Mahshahr Engineering
701/170Engineering and Procurement Services for Vibration
Switches of Cooling Tower Fans05/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
701/229Engineering and Procurement Servicesfor High Pressure
Alarm of the New Compressor04/27/2005 05/08/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/62Commpletion of Installation of Area Lighting of Granual
Urea Unit08/05/2001 10/28/2001
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Construction
701/150Engineering and Procurement Services for Flowmeters
of Flare Lines11/18/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
609Calibration Services for Standard/Reference Instrument
Equipment02/01/2007 02/11/2007
Gachsaran gas & oil co.
(NIOC)
Gachsaran gas & oil co.
(NIOC)
IRAN/Shiraz
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/34 Installation of AL Analyser 12/21/2000 04/27/2001 Basparan Co. BIPC IRAN/Mahshahr Construction
706/6CALIBRATION OF INSTRUMENTS IN KHOUZESTAN
PETROCHEMICAL COMPLEXKhozestanPetroch. Co.
KhozestanPetroch. Co.
IRAN/Mahshahr Calibration
707/22PROCUREMENT ENGINEERING SERVICES FOR F&G
SYSTEM OF OL PLANT04/28/2006 05/26/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
728/209TRANSFERRING OF FAULT SIGNAL (COMMON ALARM)
FOR FIRE AND GAS SYSTEM TO DCS12/18/2011 02/17/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering/Procurement
711/7DETAIL ENGINEERING OF ELECTRICAL PANELS FOR CPVC
& KIMIA WORKSHOPS IN KIMIA COMPANY10/09/2006 10/31/2006 Kimia Co. BIPC IRAN/Mahshahr Engineering
339PDesign & Integration of ON‐OFF Controller Device
(4 Sets )02/22/2001 05/24/2001 BIPC BIPC IRAN/Mahshahr
Design & Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/216Engineering, Procurement Services and Installation of Pressure Transmitter on the Sodium Hypochlorite Line
01/12/2005 Kharazmi Co. BIPC IRAN/MahshahrEngineering/Pro
curement
701/227Engineering and Procurement Services for Electrical System and Air Conditioning Facilities of Central
Electrical Workshop04/27/2005 Faravaresh Co. BIPC IRAN/Mahshahr EPC
701/163Engineering, Procurement and Installation of Pumps
Ammeters in the Control Room02/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr EPC
707/23INSTALLATION OF TEMPERATURE CONTROL DEVICES IN
EDC PLANT05/19/2006 06/16/2006 Kimia Co. BIPC IRAN/Mahshahr Construction
701/10 Troubleshooting and Repairing the DCS Electronic Cards 04/02/1999 04/01/2000 Kharazmi Co. BIPC IRAN/Mahshahr Engineering
701/230Execution of Instrument Air Piping for the Fans of
Section 400.05/10/2005 05/11/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/225Installation and Commissionig of Multi Temp. Indicators
of Floating Roof Tanks04/26/2005 05/07/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
708/45Sunshade preparation and installation for
instrumentation device10/29/2006 11/29/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/168Engineering and Procurement Services for H2s Analyser
of Area 20004/21/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
707/31
ENGINEERING SERVICES FOR ELECTRICAL AS‐BUILT DRAWINGS & FEASIBILITY STUDY OF SUPPLY
ELECTRICAL POWER FOR EXPLOSION PROOF COOLERS IN OL PLANT
08/12/2006 09/10/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/149 Design of Electrification route to Restaurant Building 11/16/2003 04/19/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/242 Installation and Commissioning of DR‐103 Density Meter 07/11/2005 08/10/2005 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/210Engineering and Procurement Services of FRQ‐004 and
ERCQ‐401A Counters12/05/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
927 Installation & Commissioning of CCTV System 12/22/2006 03/21/2007 Basparan Co. BIPC IRAN/Mahshahr Construction
642Calibration Services for Standard/Reference Instrument
Equipment of Gachsaran Oil & Gas Co.07/22/2011 08/28/2011
Gachsaran gas & oil co.
(NIOC)
Gachsaran gas & oil co.
(NIOC)
IRAN/Gachsaran
Calibration
701/18 Engineering and Procurement Services for Flowmeters 05/10/1999 Kimia Co. BIPC IRAN/MahshahrEngineering/Pro
curement
701/143Installation and Commissioning of Instrumentation and
Electrical Equipment of EDC Unit08/04/2003 11/04/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/158 Consulting services for Modifications in FARAVARESH Co. 02/10/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/141Repair and Installation of the Instrumentation and Electrical Equipment of Jetty No.1(Modification)
08/04/2003 10/04/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/97 Installation and Commissioning of the AR‐201 Analyser 11/05/2002 05/08/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
327PDesign & Integration of Calibrator System Model No. PC‐
501 (3 Sets)
06/19/1999 09/19/1999Kharg
Petrochemical. Co.
Kharg
Petrochemical. Co.
IRAN/Kharg Island
Design & Manufacturing
713/1PROCUREMENT SERVICES FOR P/I CONVERTERS &
TOTALIZERS12/08/2006 03/24/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/243Installation and Commissioning of Instruments of Filters
of Train 206/29/2005 07/06/2006 Basparan Co. BIPC IRAN/Mahshahr
Engineering/Construction
707/30ENGINEERING SERVICES FOR SUPPLY ELECTRICAL
POWER OF EXPLOSION PROOF COOLERS IN NF PLANT05/23/2006 06/23/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
925 Cable Laying & Termination for Air Conditioning systems 10/29/2006 11/18/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
634Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Co.
01/22/2010 02/20/2010 NIGC NIGCIRAN/Shiraz
Calibration
707/16ENGINEERING SERVICES FOR LIGHTING, F&G,
TELEPHONE & PAGGING SYSTEM OF MAINTENANCE WAREHOUSE OF FARAVARESH CO.
04/20/2006 04/24/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
708/20Installation, Cabling, Gland and termination of F&G
system of EOEG unit04/28/2006 06/23/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
599/20 Supply of Flow Computer 03/11/2010 06/09/2010Petrochemical
KalaBIPC
(KIMIA Co. )IRAN/Mahshahr Procurement
701/85Installation and Commissioning of Counters for Utility
Measuring System08/02/2002 09/17/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/39F&G work such as Cabling,Device installation,Gland & Termination,… related to TANKAGE AREA و PROCESS
AREA of EO/EG unit10/14/2006 11/14/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/212Engineering & Procurement Services for the Installation
of Alarm System (Low) for the Levels of RECTIFIER TOWERS
12/05/2004 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro
curement
701/211Engineering & Procurement Services for the Installation
of PDIA on the FA‐429A &B Beds12/05/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
701/127Engineering, Installation and, Commissioning of the
Lighting System in BD/SR Plant04/29/2003 07/27/2003 Basparan Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/138Engineering and Procurement Services for the Electrification Project of Welding Workshop
07/13/2003 09/12/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro
curement
625Calibration Services for Standard/Reference Instrument
Equipment of Gachsaran Oil & Gas Co.11/07/2008 12/07/2008
Gachsaran gas & oil co.
(NIOC)N.I.S.O.C
IRAN/Gachsaran
Calibration
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
360Design & Integration of Liebert System Temperature /
Humidity Transmitter electronic card (10 Sets )12/15/2003 08/13/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/219Engineering Services for the Lighting System
Modification of Chemical Stores02/17/2005
BIPC ( Faravaresh
Co. )
BIPC( Faravaresh
Co. )IRAN/Mahshahr Engineering
701/104Engineering and Procurement Services for the
Modification works of FP‐103 Tank12/29/2002 12/30/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
701/235Installation and Commissioning of one GAMA RAY LEVEL
Detector05/20/2005 05/21/2006 Kimia Co. BIPC IRAN/Mahshahr Construction
701/137Engineering, Installation and Testing of the Pumps
Control Circuits06/24/2003 09/23/2003 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/99Engineering and Procurement Services for N2 Blankets
of Caustic Storage Tank11/26/2002 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/209Engineering and Procurement Services of two Nos. PCV
for the GT‐12A & B Valves12/05/2004 12/06/2006 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Procurement
712/8EARTH FAULT RELAY INSTALLATION FOR MTBE'S FEEDER
IN CF PLANT12/05/2006 02/11/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
618Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Station
11/28/2007 12/05/2007 NIGC NIGCIRAN/Shiraz
Calibration
701/5As_Builting the Instrumentation Drawings and
Documents02/10/1999 01/10/2000 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
719Detail / Procurement Engineering for instrumentation of
Ethylene Loading Line No.102/21/2008 11/08/2008 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
599/33 Hook Up material supplying for Fajr Petrochemical Co. 10/26/2012 12/30/2012Fajr
Petroch. Co.Fajr
Petroch. Co.IRAN/Mahshahr Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/4 Procurement & Supply of Vibration Sensor 08/01/2008 08/01/2008 NIOEC NIOECIRAN/Bandar
AbbasProcurement
701/96 Installation and Commissioning of the TIC of Soil Tank 10/18/2002 Basparan Co. BIPC IRAN/Mahshahr Construction
707/4Installation and Commissioning of Thermostats and
Alarm System in the Panles of Packing Unit11/20/2005 01/20/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
701/162 Construction Supervision Services in Instrument & Electrical Devisions for Central Loading Terminal
01/28/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/154Engineering , Procurement Services and Installation of
BELT SCALER01/30/2004 Kimia Co. BIPC IRAN/Mahshahr EPC
708/48Cabling from fire alarm panel to jb‐1‐b‐4000i inside of
control roomin loading Area for Gas Detector
01/15/2007 02/15/2007Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/82Installation and Commissioning 2 Nos. Ultrasonic
Flowmeters on the Ethylane Line07/15/2002 07/13/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
631 Rent of Loop Check equipment for Abadan Oil Refinery 11/29/2009 12/06/2009 Taraz star Co. Taraz star Co.IRAN/Abadan
Calibration
708/7TEE CONNECTOR installationn for Hook up typs L01 and
plug installation03/16/2006 04/07/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/13INSTALLATION OF F&G SYSTEM IN CONTROL/ AUXILIARY
ROOM & UPS ROOM OF MAROON COMPLEX03/16/2006 04/17/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
347P Production of Spare Parts for TI‐DESK 07/24/2001 07/24/2002 Faravaresh Co. BIPC IRAN/MahshahrDesign &
Manufacturing
701/64Troubleshooting of Electronic Cards of RTD Converter
for DCS system (7 sets)09/23/2001 12/24/2001 Basparan Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/24Engineering and Procurement Services for the Spare
Parts of Fire fighting Vehicles03/16/2000 02/14/2001 BIPC BIPC IRAN/Mahshahr
Engineering/Procurement
708/44Cabling from F&G PANEL to HVAC & from HVAC PANEL
to HVAC Compressor in HDPE unit11/05/2006 12/06/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/199Engineering, Installation and Commissioning of 3 NOS Thermometers on the Liquid Nitrogen Line to FB Tanks
10/10/2004 10/11/2006 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Co
nstruction
930 Installation and Commisioning of Quicksilver Storage
Weightening System in CA Plant11/15/2006 03/09/2007 Kimia Co. BIPC IRAN/Mahshahr Commissioning
701/98Installation and Commissioning of the Ex‐Proof
Equipment of AL Analyser house.10/15/2002 11/04/2002 Basparan Co. BIPC IRAN/Mahshahr Construction
711/1PROCUREMENT ENGINEERING OF LCD MONITORS FOR
MTBE PLANT08/15/2006 10/15/2006 Kimia Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
707/34GENERATION OF INSTRUMENT WIRING DIAGRAM AND
AS‐BUILT OF EXISTING DOCUMENT 07/22/2006 08/22/2006 Basparan Co. BIPC IRAN/Mahshahr Engineering
701/56 Installation and Commissioning of the OXYGEN Analyser 08/07/2001 10/25/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction
599/14 Desing & Manufacturing of Electerical & Control Panel 09/07/2009 10/20/2009Fajr
Petrochemical Complex
Fajr Petrochemical
ComplexIRAN/Mahshahr Procurement
701/205Installation of Pressure Gauge on Waste Water Line and
Contruction of Shelfer for the Control Valves09/20/2004 05/12/2005 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
732Preparing the executive documents for new LT & PT in
CF Plant05/31/2011 07/01/2011 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/189 Installaton and Commissioningof two actuator. 09/10/2004 08/27/2004 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/9Engineering and Procurement Services for the
Gaschromatograph Spare Parts05/08/1999 05/07/2000 Kharazmi Co. BIPC IRAN/Mahshahr
Engineering/Procurement
707/35ENGINEERING SERVICES FOR SUPPLY ELECTRICAL
POWER OF WELDING WORKSHOP FANS IN CF PLANT05/24/2006 06/20/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/181Installation and Commissioning of HIGH and LOW
Alarms in Control Loop PRC‐70106/16/2004 09/16/2004 Ab Niroo Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/54Engineering and Installation of NF‐FQ‐101 Accessories in
the Metering Station08/07/2001 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/134 Electrification and Testing of the Vaccum‐Pump Motor 06/14/2003 07/15/2003 Basparan Co. BIPC IRAN/Mahshahr Construction
701/234 Installation and Commissioning of 2 Intercom Sations 05/19/2005 05/20/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/117Procurement and Installation of one CLAMP‐ON
Flowmeter on the 24" Salt Line.02/10/2003 03/18/2003 Kimia Co. BIPC IRAN/Mahshahr Construction
304PDesign & Integration of Calibration bench Model No. CB‐
501 (1 Set)
04/07/1996 07/06/1996 F.I.R.M Co. F.I.R.M Co. IRAN/MahshahrDesign &
Manufacturing
701/84Engineering and Installation of Interlock System for LPG
Transfer Unit07/27/2002 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
708/41Cabling for EBC‐20‐MCC‐HVAC from C.R to S.STAK AREA
&Sunshade installation for GAS DETECTOR of EO/EG unit
11/04/2006 12/02/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/198Installation and Commissionoing of the GAMA RAY
LEVEL INDICATOR.10/17/2004 10/18/2006 Basparan Co. BIPC IRAN/Mahshahr Construction
708/43Device,Gland,Tube,…installation number FT‐99002‐
FT99001,PT‐99002 & PT‐9900110/29/2006 11/18/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/32Electrical and instrument work according to announced work such as Cabling,Hook Up,Gland & Termination…
07/02/2006 07/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/79Installation and Commissioning the Ultrasonic
Flowmeter on the Flare Line05/17/2002 08/19/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/239Installation and Commissioning of the Flowmeter of
Buthane Line to CF Unit06/09/2005 07/24/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction
599/30 Supply of Pressure Switch 05/21/2012 05/23/2012Tondgooyan Petroch. Co.
Tondgooyan Petroch. Co.
IRAN/Mahshahr Procurement
376Design and production of Electronic Cards for battery
Charger12/11/2007 02/09/2008 I.O.P.T.C I.O.P.T.C
IRAN/Shiraz
Design & Manufacturing
701/59Installation and Commissioning of One PH METER in
Unit 30008/22/2001 10/20/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/12 Desing & Manufacturing of Electerical & Control Panel 05/04/2009 06/02/2009Fajr
Petrochemical Complex
Fajr Petrochemical
ComplexIRAN/Mahshahr Procurement
701/238Installation of Commissioning two Nos. Totalizers for
FRQ‐004 & FRQ‐401A Loops05/31/2005 05/31/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction
708/5 Hand switch installation 01/15/2007 02/05/2007Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/244Engineering, Electrification and Commissioning of Power
Feed to 110V Distribution Panel of the Analysers08/09/2005 10/14/2005 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/148 Installation of Alarm System on HD Control Panel. 09/28/2003 10/19/2003 Basparan Co. BIPC IRAN/Mahshahr Construction
701/128Installation and Testing of Cables & Control Room
Equipment for New Ultrasonic Flowmeter of OL Plant Flare Line
05/06/2003 06/03/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/87Relocating and Commissioning the Electrification of
Main Office Airconditioning Package(Electrical works)
08/20/2002 09/05/2002 Kimia Co. BIPC IRAN/Mahshahr Construction
701/95 Revamping in Main Office Building 10/29/2002 11/29/2002 Kimia Co. BIPC IRAN/Mahshahr Construction
708/26FT‐50305 magnetic Installation and setup an additional
PT for map05/29/2006 05/23/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
608Calibration Services for Elecrtical Measurement
Equipment 01/20/2007 01/28/2007
Fars Distribution
Elec. Company
Fars Distribution Elec. Company
IRAN/Shiraz
Calibration
701/36Engineering and Procurement Services for the Safety Valve and V.B. of Condensate and Pure Water Tanks
01/31/2001 04/17/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro
curement
701/41Installation & Commissioning of the Instrumentation of
LATEX Project03/14/2001 06/28/2001 Basparan Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/42 Installation and Commissioning of the Mass Flowmeters 03/14/2001 06/13/2001 Basparan Co. BIPC IRAN/Mahshahr Construction
701/83 Engineering and Procurement Services for the
Instrumentation of Steam Injection to Tower DA‐10407/13/2002 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
712/9INSTRUMENT ENGINEERING SERVICES FOR OL PLANT
FLARE01/09/2007 05/12/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/40Installation and Commissioning of Two OXYGEN
Analysers03/13/2001 06/12/2001 Kimia Co. BIPC IRAN/Mahshahr Construction
333P Production of Spare Parts for DMTS‐32 06/24/2000 09/22/2000Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshahr
Design & Manufacturing
701/92 Installation and Commissioning for 5 Nos. KWH Meters 09/22/2002 09/22/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/155 Installation of Flowmeter on Cooling Water Line 11/30/2003 04/08/2004 Kimia Co. BIPC IRAN/Mahshahr Construction
701/35Engineering and Procurement Services for the H2S
FLARING PACKAGE12/30/2000 12/14/2002 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
707/19PROCUREMENT ENGINEERING SERVICES FOR 3
CONTROL VALVES & 4 BYPASS VALVES05/10/2006 06/07/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
708/25Cable and Conduit Performing of PT‐00550 / FQI‐3060
related to HD unit05/19/2006 06/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/11 INSTALLATION OF DETECTORS & ALARMS 04/27/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/15GENERAL CONSTRUCTION SERVICES FOR CABLE/ GLAND
& TERMINATION05/03/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
599/6 Design and Procurement of Mounting Support 09/03/2008 10/03/2008TAVAN TADBIR FANAVAR CO.
BIPC IRAN/Mahshahr Procurement
701/74Troubleshooting the Electronic Cards of Switching Unit
device of RS‐24 unit01/06/2002 03/18/2002 BIPC BIPC IRAN/Mahshahr Construction
701/248Installation and Testing of Circuit Breakersof Power
feeders of the Analysers08/29/2005 09/17/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction
300P Design & Integration of Calibrator system model No. PC‐
501 (2 Sets)
09/25/1995 11/26/1995 F.I.R.M Co. F.I.R.M Co.IRAN/Shiraz
Design & Manufacturing
611/2Functional Test of fire alarm and Instrumentation Systems in PP plant of Maroon Petrochemical Co.
08/05/2007 08/12/2007Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
375Design and production of Electronic Cards for MOV
integral Module08/18/2007 11/17/2007
Bandar abbas Refinery Co.
Bandar abbas Refinery Co.
IRAN/Bandar Abbas
Design & Manufacturing
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/17ERECTION & CONSTRUCTION OF SAMPLE CONNECTION
FOR HDPE PLANT04/14/2006 05/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/30Installation of Gland and Termination for F&G system
and PVC installation of EO/EG unit05/25/2006 07/21/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
599/9 Supply of electronical equipment 01/06/2009 03/19/2009 Keyhan Ide co. Keyhan Ide co.IRAN/Tehran
Procurement
302PDesign & Integration of Calibrator System Model No. PC‐
501 (2 Sets)10/06/1995 12/07/1995 ECC Co. E.C.C.
IRAN/Shiraz
Design & Manufacturing
701/226Engineering , Installation and Commissioning of Alarm
for Loop TRC‐30104/27/2005 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Construction
701/228Engineering and Procurement Services for Control Valve
on the Input Line to GB‐910 C/D Compressor04/27/2005 05/26/2005 Faravaresh Co. BIPC IRAN/Mahshahr
Engineering/Procurement
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/247Checking the Requisition Documents of Safety Valves of
the New Pumps08/27/2005 09/26/2005 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
708/31Changing the PT‐00601 Cable route from FJBIF‐0424 to
FJBIF‐044907/08/2006 08/06/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
728/309 Solve the Problem on Switch gear 6 Kv Olefin Plant 10/17/2010 11/09/2010 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement
308PDesign & Integration of Flame Detector Electronic Card
(10 Sets)10/04/1996 12/05/1996 F.I.R.M Co.
Shiraz Petroch. Co.
IRAN/MahshahrDesign &
Manufacturing
701/19Engineering and Procurement for AMONIA DETECTOR
Spare Parts11/10/1999 04/11/2000 Kharazmi Co. BIPC IRAN/Mahshahr
Engineering/Procurement
707/8GENERATION OF PANEL DIGRAMS FOR MONITORING
SYSTEM OF NF PLANT COMPRESSORS04/18/2006 05/19/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/246Checking the Operation of the Flowmeter of Nitrogen
Lines of all Units08/27/2005 09/26/2005 Ab Niroo Co. BIPC IRAN/Mahshahr Commissioning
710/2 TECHNICAL INSPECTION OF LIGHTING ACCESSORIES 12/11/2005 12/31/2005Karoon
Petroch. Co.Karoon
Petroch. Co.IRAN/Mahshahr Engineering
701/161Consulting services for Instrumentation & Electrical
modifications. 01/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
701/60Installation of Gas Detectors, Cabling, Termination and
Commissioning the System08/10/2001 09/10/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction
701/72Engineering and Installation of Digital Pressure and
Temprature Indicators of Meter Prover Panel12/15/2001 02/27/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction
708/12COMMISSIONING ASSISTANCE OF F&G SYSTEM FOR
EO/EG PLANT OF MAROON COMPLEX04/16/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Commissioning
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
708/18 Moving X‐HSH‐50315 according to the request 05/04/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
599/7Desing , Manufacturing & Supply of Electrical / Control
Panel Electerical Panel
08/01/2008 09/01/2008Fajr
Petrochemical Complex
Fajr Petrochemical
ComplexIRAN/Mahshahr Procurement
358Design & Integration of SAM Alarm Cards
(6 Sets)09/14/2003 01/14/2004 Faravaresh Co. BIPC IRAN/Mahshahr
Design & Manufacturing
708/42 Cabling for HVAC system of analizer room (No.2) 10/29/2006 11/01/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/152Installation and Commissioning of two PDI Meters on
the Chillers I/O Lines11/30/2003 03/17/2004 Kimia Co. BIPC IRAN/Mahshahr Construction
714 Inspecting Wiring and Cabling Documents 10/22/2006 11/25/2006Parsian Gas Refinery
Parsian Gas Refinery
IRAN/Lamerd
Engineering
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
357Production of Spare Parts for
CPR‐30009/13/2003 01/13/2004 Kimia Co. BIPC IRAN/Mahshahr
Design & Manufacturing
701/11 Repairing the Electronic cards of VCM Analyser 04/02/1999 04/08/2000 Kharazmi Co.BIPC
( Kharazmi Co. )
IRAN/Mahshahr Engineering
708/19 Changing the cable and conduit roth of TV‐30109 05/02/2006 05/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/30 Troubleshooting and Repairing of SW POWER SUPPLY 10/08/2000 11/08/2000Razi
Petroch. Co.Razi
Petroch. Co.IRAN/Mahshahr Engineering
701/144 Installation of two TOTALIZER on DM Water panels. 08/11/2003 09/11/2003 Kimia Co. BIPC IRAN/Mahshahr Construction
701/132Troubleshooting and Repair of Electronic Cards of PLC in
PVC Plant07/29/2003 Basparan Co. BIPC IRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/31Troubleshouting and Repiring of SWITCHING POWEWR
SUPPLY11/06/2000 12/07/2000
Razi Petroch. Co.
Razi Petroch. Co.
IRAN/Mahshahr Engineering
708/24 Insallation of HAND SWITCH related to XVY‐10203 of HD
unit05/21/2006 06/20/2006
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
701/139 Installation and Testing the TOTALIZER & P/I for FQ‐203 . 07/25/2003 07/27/2003 Kimia Co. BIPC IRAN/Mahshahr Construction
701/203 Construction of Fresh Air Ducting for the Containers 11/07/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Construction
708/49process related to F&G system such as
Gland,Termination,… for Pro. Area and Tk. Area01/15/2007 02/05/2007
Maroon Petrochemical
Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/23 Control room Cabling from FACP01 to FACP02 in HD unit 05/21/2006 06/21/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
701/129consulting services for Control System of Cooling Tower
Fans05/20/2003 05/20/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering
348P Production of Spare Parts for TI‐DESK 04/20/2002 08/18/2002 Faravaresh Co. BIPC IRAN/MahshahrDesign &
Manufacturing
701/21Troubleshooting and Repairing the Electronic Cards of
the Amplifier Unit (3 Sets)10/25/1999 04/09/2000 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering
701/55Procurement and Installation of the Electric Actuator of
Reflav Valve08/07/2001 08/07/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction
708/47 Gas Detector,Gland and...installation in gas station 01/22/2007 02/06/2007Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
708/46Installation of JB,Gland,Termination,Tray and Ladder in
electrical zonearea 7 & 8
11/15/2006 11/20/2006Maroon
Petrochemical Company
Maroon Petrochemical
CompanyIRAN/Mahshahr Construction
List of Completed Projects
Project No.
Project description Start Date Finish Date Client Main Client Location Project Type
728/310 Purchase of one MCCB 01/12/2011 01/18/2011 ASPC CO. ASPC CO.IRAN/
AssaluyeProcurement
702 Engineering
728/324Design of electrification system for open yard shelter of
spare parts warehouses06/09/2012 10/09/2012 ASPC CO. ASPC CO.
IRAN/Assaluye
Engineering
934Installation and commisioning of Instrumentation
Equipments in RAK Lube Oil Refinery (UAE)06/19/2007 09/20/2007 RITS Co.
RAK Lube Oil Co.
UAE Construction