Northern Gateway Regional Division No.10 Listing of Events 2006 2007 2008 2009 2010 Total Building Events Maintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)** Code Repair Install vacuum breakers on non freeze hose bibbs $ 1,070.00 $ - $ - $ - $ - $ 1,070.00 C3030.07 Interior Ceiling Painting** Code Repair Repair ceiling in mechanical room. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00 E2010.03.01 Blinds** Failure Replacement Remove and replace vertical blinds. $ - $ 2,140.00 $ - $ - $ - $ 2,140.00 D2010.02 Urinals** - 1959 Phase Failure Replacement Replace 4 urinals. $ - $ 4,280.00 $ - $ - $ - $ 4,280.00 D2010.03 Lavatories** - 1959 Phase Failure Replacement Replace 8 lavatories. $ - $ 8,560.00 $ - $ - $ - $ 8,560.00 D3040.01.01 Air Handling Units: Air Distribution** - 1959 Phase Failure Replacement Replace gas fired section with hot water or glycol coil. $ - $ - $ 10,700.00 $ - $ - $ 10,700.00 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** Failure Replacement Replace three original panelboards. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00 C3020.07 Resilient Flooring** Failure Replacement Replace the floor finish. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00 D3020.02.01 Heating Boilers and Accessories: H.W.** Failure Replacement Replace heating system to feed entire school. $ - $ 128,400.00 $ - $ - $ - $ 128,400.00 C3020.08 Carpet Flooring** Failure Replacement Repair/Replace music room carpet. $ 4,280.00 $ - $ - $ - $ - $ 4,280.00 B2010.01.11 Joint Sealers (caulking): Ext. Wall** Preventative Maintenance Caulk around doors and frames. $ - $ 2,675.00 $ - $ - $ - $ 2,675.00 B1010.01 Floor Structural Frame*(Building Frame) Repair Install bridging. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00 B2020.03 Glazed Curtain Wall** Repair Repair aluminum frame. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00 A2020 Basement Walls (& Crawl Space)* Repair Repair basement walls and install a sump. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00 B1010.02 Structural Interior and Exterior Walls* Repair Repair damaged walls. $ 107,000.00 $ - $ - $ - $ - $ 107,000.00 C2010 Stair Construction* Repair Repair wood stairs. $ 3,745.00 $ - $ - $ - $ - $ 3,745.00 B1010.03 Floor Decks, Slabs, and Toppings* Repair Repair basement flooring. $ 14,980.00 $ - $ - $ - $ - $ 14,980.00 C3020.01 Concrete Floor Finishes* Repair Repair basement flooring. $ 5,350.00 $ - $ - $ - $ - $ 5,350.00 David Ovans Elementary School B3989A Alberta Infrastructure and Transportation Page 1 of 26

Transcript of Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ......

Page 1: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)**

Code Repair Install vacuum breakers on non freeze hose bibbs

$ 1,070.00 $ - $ - $ - $ - $ 1,070.00

C3030.07 Interior Ceiling Painting** Code Repair Repair ceiling in mechanical room. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

E2010.03.01 Blinds** Failure Replacement Remove and replace vertical blinds. $ - $ 2,140.00 $ - $ - $ - $ 2,140.00

D2010.02 Urinals** - 1959 Phase Failure Replacement Replace 4 urinals. $ - $ 4,280.00 $ - $ - $ - $ 4,280.00

D2010.03 Lavatories** - 1959 Phase Failure Replacement Replace 8 lavatories. $ - $ 8,560.00 $ - $ - $ - $ 8,560.00

D3040.01.01 Air Handling Units: Air Distribution** - 1959 Phase

Failure Replacement Replace gas fired section with hot water or glycol coil.

$ - $ - $ 10,700.00 $ - $ - $ 10,700.00

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

Failure Replacement Replace three original panelboards. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00

C3020.07 Resilient Flooring** Failure Replacement Replace the floor finish. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00

D3020.02.01 Heating Boilers and Accessories: H.W.**

Failure Replacement Replace heating system to feed entire school.

$ - $ 128,400.00 $ - $ - $ - $ 128,400.00

C3020.08 Carpet Flooring** Failure Replacement Repair/Replace music room carpet. $ 4,280.00 $ - $ - $ - $ - $ 4,280.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

Preventative Maintenance Caulk around doors and frames. $ - $ 2,675.00 $ - $ - $ - $ 2,675.00

B1010.01 Floor Structural Frame*(Building Frame)

Repair Install bridging. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00

B2020.03 Glazed Curtain Wall** Repair Repair aluminum frame. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

A2020 Basement Walls (& Crawl Space)*

Repair Repair basement walls and install a sump.

$ 6,420.00 $ - $ - $ - $ - $ 6,420.00

B1010.02 Structural Interior and Exterior Walls*

Repair Repair damaged walls. $ 107,000.00 $ - $ - $ - $ - $ 107,000.00

C2010 Stair Construction* Repair Repair wood stairs. $ 3,745.00 $ - $ - $ - $ - $ 3,745.00

B1010.03 Floor Decks, Slabs, and Toppings*

Repair Repair basement flooring. $ 14,980.00 $ - $ - $ - $ - $ 14,980.00

C3020.01 Concrete Floor Finishes* Repair Repair basement flooring. $ 5,350.00 $ - $ - $ - $ - $ 5,350.00

David Ovans Elementary School B3989A

Alberta Infrastructure and Transportation Page 1 of 26

Page 2: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A E2010.02.07 Kitchen Casework* Repair Adjust, repair, and refinish existing

cabinets. $ - $ 1,070.00 $ - $ - $ - $ 1,070.00

C1020.03 Interior Fire Doors* Repair Upgrade gym entrance doors, and install electronic hold open devices for doors in corridor.

$ 4,280.00 $ - $ - $ - $ - $ 4,280.00

Total of Maintenance Events $ 157,825.00 $ 159,965.00 $ 10,700.00 $ - $ - $ 328,490.00

Upgrading Events K4010.01 Barrier Free Route: Parking to Entrance

Barrier Free Access Upgrade Upgrade walkway to staff parking area. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00

D5020.02.03.03 Exit Signs Code Upgrade Exit sign Breezeway missing. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00

K4010.02 Barrier Free Entrances Code Upgrade Install a power assist door operator. $ - $ 10,700.00 $ - $ - $ - $ 10,700.00

C2020.08 Stair Railings and Balustrades*

Code Upgrade Install railings. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

K2030 Program Layout Energy Efficiency Upgrade Main Building Entrance - create a vestibule.

$ - $ 8,560.00 $ - $ - $ - $ 8,560.00

D3040.04.01 Fans: Exhaust** Range Indoor Air Quality Upgrade Install exhaust hood and exhaust fan above stove.

$ - $ - $ 5,350.00 $ - $ - $ 5,350.00

D3040.04.01 Fans: Exhaust** Kiln Indoor Air Quality Upgrade Install new roof top exhaust fan and fume hood for kiln.

$ - $ - $ 10,700.00 $ - $ - $ 10,700.00

D3020.03.01 Furnaces** - 1955, 1962 Phase

Indoor Air Quality Upgrade Replace furnaces with 3 air handling units $ - $ - $ 160,500.00 $ - $ - $ 160,500.00

D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade Additional receptacles in classrooms. $ - $ 5,350.00 $ - $ - $ - $ 5,350.00

E1090.07.06 Exercise (Climbing) Equipment

Operating Efficiency Upgrade Budget for removing climbing apparatus and repairing walls.

$ - $ 3,210.00 $ - $ - $ - $ 3,210.00

D2010.04 Sinks** Operating Efficiency Upgrade Install 3 custodial sinks. $ - $ - $ - $ 9,630.00 $ - $ 9,630.00

D5030.01 Detection and Fire Alarm** Operating Efficiency Upgrade The school has two different fire alarm systems.

$ - $ 26,750.00 $ - $ - $ - $ 26,750.00

E2010.03.06 Curtains and Drapes** Operating Efficiency Upgrade Upgrade clerestory window treatment. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00

C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Budget - Music room acoustic wall treatment

$ 6,420.00 $ - $ - $ - $ - $ 6,420.00

C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Gym acoustic wall treatment. $ 16,050.00 $ - $ - $ - $ - $ 16,050.00

C1030.01 Visual Display Boards** Program Functional Upgrade Remove chalkboards and install whiteboards.

$ 4,280.00 $ - $ - $ - $ - $ 4,280.00

Alberta Infrastructure and Transportation Page 2 of 26

Page 3: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

Study Roof study $ 5,350.00 $ - $ - $ - $ - $ 5,350.00

Total of Upgrading Events $ 33,170.00 $ 70,620.00 $ 176,550.00 $ 9,630.00 $ - $ 289,970.00 Total of Building Events $ 190,995.00 $ 230,585.00 $ 187,250.00 $ 9,630.00 $ - $ 618,460.00

Site Events G2020.06.03 Parking Lot Signs* Operating Efficiency Upgrade Install parking lot signs. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00

G2040.02 Fences and Gates** Repair Repair soil condition and align chain link fencing.

$ 2,140.00 $ - $ - $ - $ - $ 2,140.00

G2050.04 Lawns and Greens* Repair Grade, top dress and seed the play area. $ 3,424.00 $ - $ - $ - $ - $ 3,424.00

G2010.02.01 Aggregate Roadway (Gravel)**

Repair Repair roadway. $ 10,700.00 $ - $ - $ - $ - $ 10,700.00

Total of Site Events $ 18,404.00 $ - $ - $ - $ - $ 18,404.00

Alberta Infrastructure and Transportation Page 3 of 26

Page 4: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1030.06 Handrails* Code Repair Fasten handrail properly in order to

sustain normal usage requirements. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

B1010.07 Exterior Stairs* Code Repair Install handrail at exit stairwell near 1984 music room.

$ 500.00 $ - $ - $ - $ - $ 500.00

E2010.02.99 Other Casework* Lifecycle Replacement Display cases and washrooms require modernization due to delamination and years of use.

$ 37,000.00 $ - $ - $ - $ - $ 37,000.00

D3020.02.01 Heating Boilers and Accessories: H.W.*

Lifecycle Replacement Only one heating boiler for the 1969 addition area. No backup.

$ 25,000.00 $ - $ - $ - $ - $ 25,000.00

C2020.06 Carpet Stair Finishes* Lifecycle Replacement Remove and replace existing carpet on stairs.

$ 600.00 $ - $ - $ - $ - $ 600.00

C3020.08 Carpet Flooring* Lifecycle Replacement Remove and replace existing carpet. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00

C2020.05 Resilient Stair Finishes* Lifecycle Replacement Remove and replace stair finishes in 1969west and 1979 stairwells

$ - $ 6,000.00 $ - $ - $ - $ 6,000.00

C3020.02 Tile Floor Finishes* Lifecycle Replacement Remove and replace vinyl asbestos tile flooring in many areas. Replace with resilient sheet flooring.

$ - $ 41,000.00 $ - $ - $ - $ 41,000.00

C3010.11 Interior Wall Painting* Lifecycle Replacement Repaint concrete block, gypsum board, and "Desco" coating on walls throughout school.

$ - $ 44,700.00 $ - $ - $ - $ 44,700.00

E2010.03.06 Curtains and Drapes* Lifecycle Replacement Replace curtains in the 1969 classrooms with new drapes or blinds

$ 4,000.00 $ - $ - $ - $ - $ 4,000.00

E2020 Moveable Furnishings* Lifecycle Replacement Replace desks, tables, and chairs as required.

$ 25,000.00 $ - $ - $ - $ - $ 25,000.00

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Lifecycle Replacement Replace existing ceiling tiles with new acoustic ceiling tiles

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

E2010.02.05 Educational Facility Casework*

Lifecycle Replacement Replace millwork and countertops in 1959, 1963, 1966, and 1969 areas as required.

$ 67,000.00 $ - $ - $ - $ - $ 67,000.00

C3020.07 Resilient Flooring* Lifecycle Replacement Replace sheet linoleum and vinyl flooring throughout school.

$ 400,000.00 $ - $ - $ - $ - $ 400,000.00

C1030.02 Fabricated Compartments(Toilets/Showers)*

Lifecycle Replacement Replace toiltet partitions in the 1963, 1969(upper level) and 1979 changeroom sections

$ 4,500.00 $ - $ - $ - $ - $ 4,500.00

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Preventative Maintenance Patch and repaint plaster trim and soffits $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Preventative Maintenance Remove and replace caulking around windows and doors throughout.

$ 18,000.00 $ - $ - $ - $ - $ 18,000.00

Hillside Jr. / Sr. High School B4196A

Alberta Infrastructure and Transportation Page 4 of 26

Page 5: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A C3020.01 Concrete Floor Finishes (Paint)*

Preventative Maintenance Repaint and reseal Industrial Arts floor $ 15,000.00 $ - $ - $ - $ - $ 15,000.00

B3010.07 Sheet Metal Roofing* Preventative Maintenance Repaint metal roof $ - $ 10,000.00 $ - $ - $ - $ 10,000.00

B2010.01.06.03 Metal Siding* Preventative Maintenance Repaint metal siding $ - $ 10,000.00 $ - $ - $ - $ 10,000.00

C3010.12 Wall Coverings* Preventative Maintenance Repaint vinyl wallcovering in 1963 staff lounge and 1969 "Mova-wall" systems

$ 4,600.00 $ - $ - $ - $ - $ 4,600.00

B3010.08.02 Metal Gutters and Downspouts*

Repair Extend existing roof drains to control water drainage and/or collection

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1030.08 Interior Identifying Devices* Repair Install room name plates where required $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

B1010.07 Exterior Stairs* Repair Mudjacking and repair of existing stoops $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

D5020.01 Electrical Branch Wiring* Repair Poorly supported conduit in crawlspace $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

E2010.02.08 Laboratory Casework* Repair Relaminate countertops in science rooms. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

C3010.06 Tile Wall Finishes* Repair Remove and replace ceramic tiles in 1979washroom and shower areas

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

C2020.05 Resilient Stair Finishes* Repair Remove existing finishes and replace withresilient flooring.

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C3010.14 Other Wall Finishes* Repair Remove existing Gypsum board and replace with cement board.

$ 3,500.00 $ - $ - $ - $ - $ 3,500.00

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

Repair Repair concrete block walls damaged due to water drainage problems.

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1020.01 Interior Swinging Doors* Repair Replace interior doors and hardware. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

B2010.01.06.04 Wood Siding* Repair Replace plywood between windows and reseal

$ 3,500.00 $ - $ - $ - $ - $ 3,500.00

D2030.01 Waste and Vent Piping* Repair Sanitary service is blocked by tree root growth.

$ 12,000.00 $ - $ - $ - $ - $ 12,000.00

D3050.03 Humidifiers* Repair Several humidifiers are not operational throughout the school

$ - $ 15,000.00 $ - $ - $ - $ 15,000.00

D2030.02 Waste Piping Specialties* Repair Water is seeping into the underslab ducting system.

$ 30,000.00 $ - $ - $ - $ - $ 30,000.00

Total of Maintenance Events $ 769,700.00 $ 131,700.00 $ - $ - $ - $ 901,400.00

Upgrading Events

Alberta Infrastructure and Transportation Page 5 of 26

Page 6: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A K4010.03 Barrier Free Interior Circulation

Barrier Free Access Upgrade Add handicap lift at 1979 stairwell. $ 36,000.00 $ - $ - $ - $ - $ 36,000.00

K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install new handicap door actuators and related electrical requirements at south and east main entrances.

$ 5,000.00 $ - $ - $ - $ - $ 5,000.00

B2030.01.02 Steel-Framed Storefronts* Code Upgrade Replace hardware on exit vestibule doors with code compliaint hardware.

$ 1,500.00 $ - $ - $ - $ - $ 1,500.00

D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install one exhaust system for washroomsonly, and one exhaust system for weight room only.

$ - $ 3,000.00 $ - $ - $ - $ 3,000.00

D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install new exhaust fan in change room. $ - $ - $ - $ 4,500.00 $ - $ 4,500.00

D3050.01.01 Computer Room Air Conditioning Units*

Operating Efficiency Upgrade Replace existing cooling system with a cooling only roof-top unit.

$ - $ - $ - $ 8,000.00 $ - $ 8,000.00

Total of Upgrading Events $ 42,500.00 $ 3,000.00 $ - $ 12,500.00 $ - $ 58,000.00 Total of Building Events $ 812,200.00 $ 134,700.00 $ - $ 12,500.00 $ - $ 959,400.00

Site Events G3010.03 Site Fire Protection Water Distribution*

Code Upgrade Fire hydrant is not within 45m of the building Siamese connection.

$ - $ - $ - $ - $ 20,000.00 $ 20,000.00

G2040.02 Fences and Gates* Lifecycle Replacement Replace chain link fence around tennis court

$ - $ 8,000.00 $ - $ - $ - $ 8,000.00

G2010.02.01 Aggregate Roadway (Gravel)*

Repair Grade and provide additional gravel $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

G2050.04 Lawns and Grasses* Repair Grade north side of site to ensure proper water drainage away from building. Remove dirt pile left from gas line repair.

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

G3030.01 Storm Water Collection* Repair Move and anchor splashpads against building to ensure adequate drainage.

$ 6,000.00 $ - $ - $ - $ - $ 6,000.00

G2010.02.02 Flexible Pavement Roadway (Asphalt)*

Repair Remove and replace asphalt in NW corner.

$ 15,000.00 $ - $ - $ - $ - $ 15,000.00

G2020.04 Rigid Parking Lot Pavement (Concrete)*

Repair Remove and replace concrete on west side parking lot with asphalt

$ 440,000.00 $ - $ - $ - $ - $ 440,000.00

G2030.04 Rigid Pedestrian Pavement (Concrete)*

Repair Remove and replace sidewalks and concrete pads.

$ 47,500.00 $ - $ - $ - $ - $ 47,500.00

Total of Site Events $ 528,500.00 $ 13,000.00 $ - $ - $ 20,000.00 $ 561,500.00

Alberta Infrastructure and Transportation Page 6 of 26

Page 7: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 Total

C1020.03 Interior Fire Doors* Code Repair Install doors in corridors $ 12,000 $ - $ - $ - $ - $ 12,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Repair ceiling assemblies $ 3,000 $ - $ - $ - $ - $ 3,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Repair fire stop wall penetrations $ 5,000 $ - $ - $ - $ - $ 5,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Storage room next to Computer Lab # 47 needs to be brought up to code

$ 1,500 $ - $ - $ - $ - $ 1,500

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Storage space within the cafeteria needs to be brought up to code

$ 12,500 $ - $ - $ - $ - $ 12,500

C3020.07 Resilient Flooring* Failure Replacement Install new floor finishes in 1960, 1964 and 1966 classrooms

$ - $ 54,000 $ - $ - $ - $ 54,000

C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new flooring in the Administration area

$ 8,000 $ - $ - $ - $ - $ 8,000

C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new Kitchen flooring $ 3,000 $ - $ - $ - $ - $ 3,000

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*

Failure Replacement Replace BUR roof 1966 & 1973 Section $ 350,000 $ - $ - $ - $ - $ 350,000

C3020.08 Carpet Flooring* Failure Replacement Replace carpet in Library. $ 7,000 $ - $ - $ - $ - $ 7,000

E2010.02.05 Educational Facility Casework* CTS

Failure Replacement Replace casework in CTS space $ 2,000 $ - $ - $ - $ - $ 2,000

D5020.02 Interior Lighting Failure Replacement Replace damaged lenses in corridors. $ - $ 3,000 $ - $ - $ - $ 3,000

C3020.08 Carpet Flooring* Failure Replacement Replace Music Room flooring. $ 9,000 $ - $ - $ - $ - $ 9,000

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*

Failure Replacement Replace Six Panelboards. $ - $ 24,000 $ - $ - $ - $ 24,000

C1010.03 Interior Operable Folding Panel Partitions*

Repair 1973 Gym - Replace operable partition's sound seals

$ 5,000 $ - $ - $ - $ - $ 5,000

C1010.05 Interior Windows* Repair Install Glazing in CTS $ 1,000 $ - $ - $ - $ - $ 1,000

B3010.09 Roof Specialities and Accessories

Repair Paint rooftop accessories, install new access ladders, and ice guards.

$ 6,000 $ - $ - $ - $ - $ 6,000

B2010.01.13 Paints (& Stains): Exterior Wall*

Repair Repaint exterior concrete block $ 10,000 $ - $ - $ - $ - $ 10,000

Onoway Junior / Senior High School B3845ABuilding EventsMaintenance Events

Alberta Infrastructure and Transportation Page 7 of 26

Page 8: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A C3020.01 Concrete Floor Finishes (Paint)*

Repair Repair and repaint concrete floors in CTS area.

$ 20,000 $ - $ - $ - $ - $ 20,000

C1010.01 Interior Fixed Partitions* Repair Repair damaged interior walls. $ 6,000 $ - $ - $ - $ - $ 6,000

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Repair Repair damaged stucco and parging $ 8,000 $ - $ - $ - $ - $ 8,000

B1020.04 Canopies* Repair Repair Entrance Canopy $ 3,000 $ - $ - $ - $ - $ 3,000

F1010.02.04 Portable and Mobile Buildings* - Beauty Culture

Repair Repair steps and install new door weatherstripping. Repair interior wall.

$ 1,500 $ - $ - $ - $ - $ 1,500

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Repair Replace / upgrade sealant $ 1,000 $ - $ - $ - $ - $ 1,000

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Repair Replace ceiling tiles in Classrooms and Corridors

$ 20,000 $ - $ - $ - $ - $ 20,000

B2030.01.02 Steel-Framed Storefronts* Repair Replace exterior door hardware $ 5,500 $ - $ - $ - $ - $ 5,500

C1020.01 Interior Swinging Doors* Repair Replace interior doors, frames and hardware

$ 18,500 $ - $ - $ - $ - $ 18,500

B3010.08.02 Metal Gutters and Downspouts*

Repair Replace rainwater leaders and install splash pads

$ 1,500 $ - $ - $ - $ - $ 1,500

C1010.06 Interior Glazed Partitions and Storefronts*

Repair Replace sound seals around glazed partitions in the Library

$ 1,500 $ - $ - $ - $ - $ 1,500

D3010.02 Gas Supply Systems* Repair Scrape and repaint roof gas piping. $ 4,000 $ - $ - $ - $ - $ 4,000

Total of Maintenance Events 525,500$ 81,000$ -$ -$ -$ 606,500$

K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install 2 power assist door operators. $ 12,000 $ - $ - $ - $ - $ 12,000

K4010.03 Barrier Free Interior Circulation

Barrier Free Access Upgrade Install a barrier free ramp in the music room.

$ 7,000 $ - $ - $ - $ - $ 7,000

D4030.01 Fire Extinguisher, Cabinets and Accessories*

Code Upgrade Install new fire extinguishers. $ 3,000 $ - $ - $ - $ - $ 3,000

B1010.07 Exterior Stairs* Code Upgrade Install stairs at 1992 structure. $ 5,000 $ - $ - $ - $ - $ 5,000

D2010.04 Sinks* - 1960, 1973 Phase Code Upgrade Install vacuum breakers on lab sinks. $ 2,000 $ - $ - $ - $ - $ 2,000

Upgrading Events

Alberta Infrastructure and Transportation Page 8 of 26

Page 9: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A B1010.09 Assembly Construction - Fire Rating

Code Upgrade Upgrade 2003 storage structure $ 30,000 $ - $ - $ - $ - $ 30,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Upgrade Upgrade Storage room in 1992 structure $ 11,500 $ - $ - $ - $ - $ 11,500

D2020.02.06 Domestic Water Heaters* - 1960 Phase

Energy Efficiency Upgrade Replace domestic water heater. $ - $ 3,000 $ - $ - $ - $ 3,000

B2020.01.01.02 Aluminum Windows (Glass & Frame)*

Energy Efficiency Upgrade Upgrade windows 1966 and 1973 structures

$ 50,000 $ - $ - $ - $ - $ 50,000

D3040.04.01 Fans: Exhaust* - 1966 Phase

Indoor Air Quality Upgrade Improve exhaust for Home economics. $ - $ 9,500 $ - $ - $ - $ 9,500

D3050.01.01 Computer Room Air Conditioning Units*

Indoor Air Quality Upgrade Install air conditioner. $ - $ 25,000 $ - $ - $ - $ 25,000

D3020.03.01 Furnaces* - 1981 Phase Indoor Air Quality Upgrade Replace furnaces with new AHUs. $ - $ 60,000 $ - $ - $ - $ 60,000

D5030.02.04 Video Surveillance* Operating Efficiency Upgrade

Add surveillance camera. $ - $ 10,000 $ - $ - $ - $ 10,000

D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade

Classrooms need additional receptacles. $ - $ - $ 18,000 $ - $ - $ 18,000

D2010.04 Sinks* - 1966 Phase Operating Efficiency Upgrade

Install 3 art sinks. $ - $ 9,000 $ - $ - $ - $ 9,000

D5010.03 Main Electrical Switchboards (Main Distribution)*

Operating Efficiency Upgrade

Upgrade splitter panelboard. $ - $ - $ 15,000 $ - $ - $ 15,000

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in boy's gym

$ 24,000 $ - $ - $ - $ - $ 24,000

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in girls gym.

$ 18,000 $ - $ - $ - $ - $ 18,000

E1020.03 Theater and Stage Equipment*

Program Functional Upgrade Stage drapery $ 10,000 $ - $ - $ - $ - $ 10,000

K40 Current Code Issues Study Study - Code review $ 15,000 $ - $ - $ - $ - $ 15,000

Total of Upgrading Events 187,500$ 116,500$ 33,000$ -$ -$ 337,000$ Total of Building Events $ 713,000 $ 197,500 $ 33,000 $ - $ - $ 943,500

G2010.02.02 Flexible Pavement Roadway (Asphalt)*

Failure Replacement Repair access roadway $ 70,000 $ - $ - $ - $ - $ 70,000

G4020.01 Area Lighting* Operating Efficiency Upgrade

Add exterior lighting if surveillance camera's added.

$ - $ 3,000 $ - $ - $ - $ 3,000

Site Events

Alberta Infrastructure and Transportation Page 9 of 26

Page 10: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A G2020.02.01 Aggregate Parking Lots (Gravel)*

Operating Efficiency Upgrade

Upgrade Student parking areas $ 55,000 $ - $ - $ - $ - $ 55,000

G2020.06.02 Parking Bumpers* Program Functional Upgrade Install 30 wheel stops $ 3,000 $ - $ - $ - $ - $ 3,000

G2040.08 Flagpoles* Repair Refinish flagpole. $ 500 $ - $ - $ - $ - $ 500

G2050.04 Lawns and Grasses* Repair Repair lawns and grasses $ 15,000 $ - $ - $ - $ - $ 15,000

G2020.02.02 Flexible Paving Parking Lots(Asphalt)*

Repair Repair staff and visitor parking. $ 5,000 $ - $ - $ - $ - $ 5,000

G2030.06 Exterior Steps and Ramps* Repair Replace portable's exterior steps and landings.

$ 8,000 $ - $ - $ - $ - $ 8,000

Total of Site Events 156,500$ 3,000$ -$ -$ -$ 159,500$

Alberta Infrastructure and Transportation Page 10 of 26

Page 11: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1010.07 Interior Partition Firestopping* Code Repair Budget for upgrade to fire separations. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

C2020.05 Resilient Stair Finishes* Code Repair Construct a ramp access to the gym. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

D3040.01.04 Ducts: Air Distribution* Code Repair Install fire dampers. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00

D2020.01.03 Piping Specialties (Backflow Preventors)*

Code Repair Install vacuum breakers. $ - $ 1,000.00 $ - $ - $ - $ 1,000.00

D3040.03.01 Hot Water Distribution Systems*

Code Repair Revise mechanical room layout. $ 15,000.00 $ - $ - $ - $ - $ 15,000.00

B1020.06 Roof Construction Fireproofing*

Code Repair Upgrade walls and roof structure assemblies in upper corridor ceiling spaces.

$ 15,000.00 $ - $ - $ - $ - $ 15,000.00

D5020.02.02.02 Interior Fluorescent Fixtures*

Failure Replacement Relamp gym fixtures. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*

Failure Replacement Replace four original panelboards. $ - $ 16,000.00 $ - $ - $ - $ 16,000.00

C1030.10 Lockers* Lifecycle Replacement Install new lockers in the 1959 section. Install appropriate storage for student's apparel within the 1965 section.

$ 18,000.00 $ - $ - $ - $ - $ 18,000.00

C1020.01 Interior Swinging Doors* Lifecycle Replacement Upgrade doors and frames for 1954 and 1959, and 1965 structures.

$ 17,000.00 $ - $ - $ - $ - $ 17,000.00

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*

Lifecycle Replacement Upgrade roofing, consider achieving a higher RSI value.

$ - $ - $ - $ 115,000.00 $ - $ 115,000.00

B2010.01.13 Paints (& Stains): Exterior Wall*

Preventative Maintenance Paint exterior masonry walls. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00

C3020.11 Floor Painting Preventative Maintenance Paint furnace room floor. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

Preventative Maintenance Repair exterior masonry walls. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

B3010.08.02 Metal Gutters and Downspouts*

Repair Install new rainwater leaders. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Repair Level t-bar ceiling. $ 4,500.00 $ - $ - $ - $ - $ 4,500.00

C3010.02 Wall Paneling* Repair Re-finish wall paneling. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

C3030.04 12x12 Stapled Acoustic Ceiling Finishes*

Repair Repair and/or refinish ceiling tiles. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

Rich Valley School B3522A

Alberta Infrastructure and Transportation Page 11 of 26

Page 12: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalRich Valley School B3522A B2010.01.09 Expansion Control: ExteriorWall Skin*

Repair Repair exterior masonry / control joints. $ 1,200.00 $ - $ - $ - $ - $ 1,200.00

A1030 Slab on Grade* Repair Repair floor irregularities. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1030.12 Storage Shelving* Repair Repair storage shelving. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

E2010.02.05 Educational Facility Casework*

Repair Upgrade classroom casework. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Repair Upgrade gym exterior wall finish. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

Total of Maintenance Events $ 158,700.00 $ 27,000.00 $ - $ 115,000.00 $ - $ 300,700.00

Upgrading Events D5010.03 Main Electrical Switchboards (Main Distribution)*

Code Upgrade Clearances do not meet Canadian Electrical Code (CEC).

$ - $ - $ - $ - $ - $ -

K4010.02 Barrier Free Entrances Code Upgrade Upgrade main entrance to barrier free standards.

$ 6,500.00 $ - $ - $ - $ - $ 6,500.00

D5020.02.02.02 Interior Fluorescent Fixtures*

Energy Efficiency Upgrade Upgrade 80 fixtures T12 to T8. $ - $ 20,000.00 $ - $ - $ - $ 20,000.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Energy Efficiency Upgrade Upgrade exterior caulking. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3010.11 Interior Wall Painting* Operating Efficiency Upgrade Budget for painting walls - 5 year cycle. $ - $ - $ 10,000.00 $ - $ - $ 10,000.00

D2010.04 Sinks* Operating Efficiency Upgrade Replace two custodial sinks. $ - $ 6,000.00 $ - $ - $ - $ 6,000.00

D5030.04.02 Paging/Intercom Systems* Operating Efficiency Upgrade Sound system wiring run exposed on gym wall.

$ - $ 1,000.00 $ - $ - $ - $ 1,000.00

C1020.03 Interior Fire Doors* Operating Efficiency Upgrade Upgrade double doors within the 1965 corridor.

$ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Budget to install acoustic wall treatments. $ 7,000.00 $ - $ - $ - $ - $ 7,000.00

C3020.08 Carpet Flooring* Program Functional Upgrade The carpet in the music/science room is worn.

$ 6,000.00 $ - $ - $ - $ - $ 6,000.00

E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade music program casework. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade science program casework $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

C1030.01 Visual Display Boards* Program Functional Upgrade Upgrade visual display boards in 1959 section.

$ 2,000.00 $ - $ - $ - $ - $ 2,000.00

Total of Upgrading Events $ 30,500.00 $ 27,000.00 $ 10,000.00 $ - $ - $ 67,500.00

Alberta Infrastructure and Transportation Page 12 of 26

Page 13: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalRich Valley School B3522ATotal of Building Events $ 189,200.00 $ 54,000.00 $ 10,000.00 $ 115,000.00 $ - $ 368,200.00

Site Events G2020.06.03 Parking Lot Signs* Code Repair Upgrade site and building signage. $ 4,200.00 $ - $ - $ - $ - $ 4,200.00

G2050.04 Lawns and Grasses* Preventative Maintenance Budget for re-grading and seeding grounds.

$ 10,000.00 $ - $ - $ - $ - $ 10,000.00

G2040.08 Flagpoles* Preventative Maintenance Refinish Flagpole. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

G2020.06.02 Parking Bumpers* Program Functional Upgrade Install concrete wheel stops. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00

G2040.02 Fences and Gates* Repair Budget - repair chain link fencing. $ - $ - $ - $ 2,000.00 $ - $ 2,000.00

G2040.02 Fences and Gates* Repair Budget for repairs to chain link fencing. $ - $ 2,000.00 $ - $ - $ - $ 2,000.00

G2010.02.01 Aggregate Roadway (Gravel)*

Repair Upgrade roadway and parking areas. $ 60,000.00 $ - $ - $ - $ - $ 60,000.00

G2030.04 Rigid Pedestrian Pavement (Concrete)*

Repair Upgrade walkways. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

G2030.06 Exterior Steps and Ramps* Repair Upgrade wood stair and landing. $ - $ - $ 2,000.00 $ - $ - $ 2,000.00

Total of Site Events $ 82,200.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ - $ 88,200.00

Alberta Infrastructure and Transportation Page 13 of 26

Page 14: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)**

Code Repair Install vacuum breakers on non freeze hose bibbs

$ 1,070.00 $ - $ - $ - $ - $ 1,070.00

C3030.07 Interior Ceiling Painting** Code Repair Repair ceiling in mechanical room. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

E2010.03.01 Blinds** Failure Replacement Remove and replace vertical blinds. $ - $ 2,140.00 $ - $ - $ - $ 2,140.00

D2010.02 Urinals** - 1959 Phase Failure Replacement Replace 4 urinals. $ - $ 4,280.00 $ - $ - $ - $ 4,280.00

D2010.03 Lavatories** - 1959 Phase Failure Replacement Replace 8 lavatories. $ - $ 8,560.00 $ - $ - $ - $ 8,560.00

D3040.01.01 Air Handling Units: Air Distribution** - 1959 Phase

Failure Replacement Replace gas fired section with hot water or glycol coil.

$ - $ - $ 10,700.00 $ - $ - $ 10,700.00

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

Failure Replacement Replace three original panelboards. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00

C3020.07 Resilient Flooring** Failure Replacement Replace the floor finish. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00

D3020.02.01 Heating Boilers and Accessories: H.W.**

Failure Replacement Replace heating system to feed entire school.

$ - $ 128,400.00 $ - $ - $ - $ 128,400.00

C3020.08 Carpet Flooring** Failure Replacement Repair/Replace music room carpet. $ 4,280.00 $ - $ - $ - $ - $ 4,280.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

Preventative Maintenance Caulk around doors and frames. $ - $ 2,675.00 $ - $ - $ - $ 2,675.00

B1010.01 Floor Structural Frame*(Building Frame)

Repair Install bridging. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00

B2020.03 Glazed Curtain Wall** Repair Repair aluminum frame. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

A2020 Basement Walls (& Crawl Space)*

Repair Repair basement walls and install a sump.

$ 6,420.00 $ - $ - $ - $ - $ 6,420.00

B1010.02 Structural Interior and Exterior Walls*

Repair Repair damaged walls. $ 107,000.00 $ - $ - $ - $ - $ 107,000.00

C2010 Stair Construction* Repair Repair wood stairs. $ 3,745.00 $ - $ - $ - $ - $ 3,745.00

B1010.03 Floor Decks, Slabs, and Toppings*

Repair Repair basement flooring. $ 14,980.00 $ - $ - $ - $ - $ 14,980.00

C3020.01 Concrete Floor Finishes* Repair Repair basement flooring. $ 5,350.00 $ - $ - $ - $ - $ 5,350.00

David Ovans Elementary School B3989A

Alberta Infrastructure and Transportation Page 14 of 26

Page 15: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A E2010.02.07 Kitchen Casework* Repair Adjust, repair, and refinish existing

cabinets. $ - $ 1,070.00 $ - $ - $ - $ 1,070.00

C1020.03 Interior Fire Doors* Repair Repair gym entrance doors, and install electronic hold open devices for doors in corridor.

$ 4,280.00 $ - $ - $ - $ - $ 4,280.00

Total of Maintenance Events $ 157,825.00 $ 159,965.00 $ 10,700.00 $ - $ - $ 328,490.00

Upgrading Events K4010.01 Barrier Free Route: Parking to Entrance

Barrier Free Access Upgrade Upgrade walkway to staff parking area. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00

D5020.02.03.03 Exit Signs Code Upgrade Exit sign Breezeway missing. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00

K4010.02 Barrier Free Entrances Code Upgrade Install a power assist door operator. $ - $ 10,700.00 $ - $ - $ - $ 10,700.00

C2020.08 Stair Railings and Balustrades*

Code Upgrade Install railings. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00

K2030 Program Layout Energy Efficiency Upgrade Main Building Entrance - create a vestibule.

$ - $ 8,560.00 $ - $ - $ - $ 8,560.00

D3040.04.01 Fans: Exhaust** Range Indoor Air Quality Upgrade Install exhaust hood and exhaust fan above stove.

$ - $ - $ 5,350.00 $ - $ - $ 5,350.00

D3040.04.01 Fans: Exhaust** Kiln Indoor Air Quality Upgrade Install new roof top exhaust fan and fume hood for kiln.

$ - $ - $ 10,700.00 $ - $ - $ 10,700.00

D3020.03.01 Furnaces** - 1955, 1962 Phase

Indoor Air Quality Upgrade Replace furnaces with 3 air handling units $ - $ - $ 160,500.00 $ - $ - $ 160,500.00

D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade Additional receptacles in classrooms. $ - $ 5,350.00 $ - $ - $ - $ 5,350.00

E1090.07.06 Exercise (Climbing) Equipment

Operating Efficiency Upgrade Budget for removing climbing apparatus and repairing walls.

$ - $ 3,210.00 $ - $ - $ - $ 3,210.00

D2010.04 Sinks** Operating Efficiency Upgrade Install 3 custodial sinks. $ - $ - $ - $ 9,630.00 $ - $ 9,630.00

D5030.01 Detection and Fire Alarm** Operating Efficiency Upgrade The school has two different fire alarm systems.

$ - $ 26,750.00 $ - $ - $ - $ 26,750.00

E2010.03.06 Curtains and Drapes** Operating Efficiency Upgrade Upgrade clerestory window treatment. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00

C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Budget - Music room acoustic wall treatment

$ 6,420.00 $ - $ - $ - $ - $ 6,420.00

C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Gym acoustic wall treatment. $ 16,050.00 $ - $ - $ - $ - $ 16,050.00

C1030.01 Visual Display Boards** Program Functional Upgrade Remove chalkboards and install whiteboards.

$ 4,280.00 $ - $ - $ - $ - $ 4,280.00

Alberta Infrastructure and Transportation Page 15 of 26

Page 16: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

Study Roof study $ 5,350.00 $ - $ - $ - $ - $ 5,350.00

Total of Upgrading Events $ 33,170.00 $ 70,620.00 $ 176,550.00 $ 9,630.00 $ - $ 289,970.00 Total of Building Events $ 190,995.00 $ 230,585.00 $ 187,250.00 $ 9,630.00 $ - $ 618,460.00

Site Events G2020.06.03 Parking Lot Signs* Operating Efficiency Upgrade Install parking lot signs. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00

G2040.02 Fences and Gates** Repair Repair soil condition and align chain link fencing.

$ 2,140.00 $ - $ - $ - $ - $ 2,140.00

G2050.04 Lawns and Greens* Repair Grade, top dress and seed the play area. $ 3,424.00 $ - $ - $ - $ - $ 3,424.00

G2010.02.01 Aggregate Roadway (Gravel)**

Repair Repair roadway. $ 10,700.00 $ - $ - $ - $ - $ 10,700.00

Total of Site Events $ 18,404.00 $ - $ - $ - $ - $ 18,404.00

Alberta Infrastructure and Transportation Page 16 of 26

Page 17: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1030.06 Handrails* Code Repair Fasten handrail properly in order to

sustain normal usage requirements. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

B1010.07 Exterior Stairs* Code Repair Install handrail at exit stairwell near 1984 music room.

$ 500.00 $ - $ - $ - $ - $ 500.00

E2010.02.99 Other Casework* Lifecycle Replacement Display cases and washrooms require modernization due to delamination and years of use.

$ 37,000.00 $ - $ - $ - $ - $ 37,000.00

D3020.02.01 Heating Boilers and Accessories: H.W.*

Lifecycle Replacement Only one heating boiler for the 1969 addition area. No backup.

$ 25,000.00 $ - $ - $ - $ - $ 25,000.00

C2020.06 Carpet Stair Finishes* Lifecycle Replacement Remove and replace existing carpet on stairs.

$ 600.00 $ - $ - $ - $ - $ 600.00

C3020.08 Carpet Flooring* Lifecycle Replacement Remove and replace existing carpet. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00

C2020.05 Resilient Stair Finishes* Lifecycle Replacement Remove and replace stair finishes in 1969west and 1979 stairwells

$ - $ 6,000.00 $ - $ - $ - $ 6,000.00

C3020.02 Tile Floor Finishes* Lifecycle Replacement Remove and replace vinyl asbestos tile flooring in many areas. Replace with resilient sheet flooring.

$ - $ 41,000.00 $ - $ - $ - $ 41,000.00

C3010.11 Interior Wall Painting* Lifecycle Replacement Repaint concrete block, gypsum board, and "Desco" coating on walls throughout school.

$ - $ 44,700.00 $ - $ - $ - $ 44,700.00

E2010.03.06 Curtains and Drapes* Lifecycle Replacement Replace curtains in the 1969 classrooms with new drapes or blinds

$ 4,000.00 $ - $ - $ - $ - $ 4,000.00

E2020 Moveable Furnishings* Lifecycle Replacement Replace desks, tables, and chairs as required.

$ 25,000.00 $ - $ - $ - $ - $ 25,000.00

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Lifecycle Replacement Replace existing ceiling tiles with new acoustic ceiling tiles

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

E2010.02.05 Educational Facility Casework*

Lifecycle Replacement Replace millwork and countertops in 1959, 1963, 1966, and 1969 areas as required.

$ 67,000.00 $ - $ - $ - $ - $ 67,000.00

C3020.07 Resilient Flooring* Lifecycle Replacement Replace sheet linoleum and vinyl flooring throughout school.

$ 400,000.00 $ - $ - $ - $ - $ 400,000.00

C1030.02 Fabricated Compartments(Toilets/Showers)*

Lifecycle Replacement Replace toiltet partitions in the 1963, 1969(upper level) and 1979 changeroom sections

$ 4,500.00 $ - $ - $ - $ - $ 4,500.00

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Preventative Maintenance Patch and repaint plaster trim and soffits $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Preventative Maintenance Remove and replace caulking around windows and doors throughout.

$ 18,000.00 $ - $ - $ - $ - $ 18,000.00

Hillside Jr. / Sr. High School B4196A

Alberta Infrastructure and Transportation Page 17 of 26

Page 18: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A C3020.01 Concrete Floor Finishes (Paint)*

Preventative Maintenance Repaint and reseal Industrial Arts floor $ 15,000.00 $ - $ - $ - $ - $ 15,000.00

B3010.07 Sheet Metal Roofing* Preventative Maintenance Repaint metal roof $ - $ 10,000.00 $ - $ - $ - $ 10,000.00

B2010.01.06.03 Metal Siding* Preventative Maintenance Repaint metal siding $ - $ 10,000.00 $ - $ - $ - $ 10,000.00

C3010.12 Wall Coverings* Preventative Maintenance Repaint vinyl wallcovering in 1963 staff lounge and 1969 "Mova-wall" systems

$ 4,600.00 $ - $ - $ - $ - $ 4,600.00

B3010.08.02 Metal Gutters and Downspouts*

Repair Extend existing roof drains to control water drainage and/or collection

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1030.08 Interior Identifying Devices* Repair Install room name plates where required $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

B1010.07 Exterior Stairs* Repair Mudjacking and repair of existing stoops $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

D5020.01 Electrical Branch Wiring* Repair Poorly supported conduit in crawlspace $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

E2010.02.08 Laboratory Casework* Repair Relaminate countertops in science rooms. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

C3010.06 Tile Wall Finishes* Repair Remove and replace ceramic tiles in 1979washroom and shower areas

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

C2020.05 Resilient Stair Finishes* Repair Remove existing finishes and replace withresilient flooring.

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C3010.14 Other Wall Finishes* Repair Remove existing Gypsum board and replace with cement board.

$ 3,500.00 $ - $ - $ - $ - $ 3,500.00

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

Repair Repair concrete block walls damaged due to water drainage problems.

$ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1020.01 Interior Swinging Doors* Repair Replace interior doors and hardware. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

B2010.01.06.04 Wood Siding* Repair Replace plywood between windows and reseal

$ 3,500.00 $ - $ - $ - $ - $ 3,500.00

D2030.01 Waste and Vent Piping* Repair Sanitary service is blocked by tree root growth.

$ 12,000.00 $ - $ - $ - $ - $ 12,000.00

D3050.03 Humidifiers* Repair Several humidifiers are not operational throughout the school

$ - $ 15,000.00 $ - $ - $ - $ 15,000.00

D2030.02 Waste Piping Specialties* Repair Water is seeping into the underslab ducting system.

$ 30,000.00 $ - $ - $ - $ - $ 30,000.00

Total of Maintenance Events $ 769,700.00 $ 131,700.00 $ - $ - $ - $ 901,400.00

Upgrading Events

Alberta Infrastructure and Transportation Page 18 of 26

Page 19: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A K4010.03 Barrier Free Interior Circulation

Barrier Free Access Upgrade Add handicap lift at 1979 stairwell. $ 36,000.00 $ - $ - $ - $ - $ 36,000.00

K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install new handicap door actuators and related electrical requirements at south and east main entrances.

$ 5,000.00 $ - $ - $ - $ - $ 5,000.00

B2030.01.02 Steel-Framed Storefronts* Code Upgrade Replace hardware on exit vestibule doors with code compliaint hardware.

$ 1,500.00 $ - $ - $ - $ - $ 1,500.00

D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install one exhaust system for washroomsonly, and one exhaust system for weight room only.

$ - $ 3,000.00 $ - $ - $ - $ 3,000.00

D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install new exhaust fan in change room. $ - $ - $ - $ 4,500.00 $ - $ 4,500.00

D3050.01.01 Computer Room Air Conditioning Units*

Operating Efficiency Upgrade Replace existing cooling system with a cooling only roof-top unit.

$ - $ - $ - $ 8,000.00 $ - $ 8,000.00

Total of Upgrading Events $ 42,500.00 $ 3,000.00 $ - $ 12,500.00 $ - $ 58,000.00 Total of Building Events $ 812,200.00 $ 134,700.00 $ - $ 12,500.00 $ - $ 959,400.00

Site Events G3010.03 Site Fire Protection Water Distribution*

Code Upgrade Fire hydrant is not within 45m of the building Siamese connection.

$ - $ - $ - $ - $ 20,000.00 $ 20,000.00

G2040.02 Fences and Gates* Lifecycle Replacement Replace chain link fence around tennis court

$ - $ 8,000.00 $ - $ - $ - $ 8,000.00

G2010.02.01 Aggregate Roadway (Gravel)*

Repair Grade and provide additional gravel $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

G2050.04 Lawns and Grasses* Repair Grade north side of site to ensure proper water drainage away from building. Remove dirt pile left from gas line repair.

$ 20,000.00 $ - $ - $ - $ - $ 20,000.00

G3030.01 Storm Water Collection* Repair Move and anchor splashpads against building to ensure adequate drainage.

$ 6,000.00 $ - $ - $ - $ - $ 6,000.00

G2010.02.02 Flexible Pavement Roadway (Asphalt)*

Repair Remove and replace asphalt in NW corner.

$ 15,000.00 $ - $ - $ - $ - $ 15,000.00

G2020.04 Rigid Parking Lot Pavement (Concrete)*

Repair Remove and replace concrete on west side parking lot with asphalt

$ 440,000.00 $ - $ - $ - $ - $ 440,000.00

G2030.04 Rigid Pedestrian Pavement (Concrete)*

Repair Remove and replace sidewalks and concrete pads.

$ 47,500.00 $ - $ - $ - $ - $ 47,500.00

Total of Site Events $ 528,500.00 $ 13,000.00 $ - $ - $ 20,000.00 $ 561,500.00

Alberta Infrastructure and Transportation Page 19 of 26

Page 20: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 Total

C1020.03 Interior Fire Doors* Code Repair Install doors in corridors $ 12,000 $ - $ - $ - $ - $ 12,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Repair ceiling assemblies $ 3,000 $ - $ - $ - $ - $ 3,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Repair fire stop wall penetrations $ 5,000 $ - $ - $ - $ - $ 5,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Storage room next to Computer Lab # 47 needs to be brought up to code

$ 1,500 $ - $ - $ - $ - $ 1,500

C1010.07 Interior Partition and Ceilings Firestopping*

Code Repair Storage space within the cafeteria needs to be brought up to code

$ 12,500 $ - $ - $ - $ - $ 12,500

C3020.07 Resilient Flooring* Failure Replacement Install new floor finishes in 1960, 1964 and 1966 classrooms

$ - $ 54,000 $ - $ - $ - $ 54,000

C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new flooring in the Administration area

$ 8,000 $ - $ - $ - $ - $ 8,000

C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new Kitchen flooring $ 3,000 $ - $ - $ - $ - $ 3,000

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*

Failure Replacement Replace BUR roof 1966 & 1973 Section $ 350,000 $ - $ - $ - $ - $ 350,000

C3020.08 Carpet Flooring* Failure Replacement Replace carpet in Library. $ 7,000 $ - $ - $ - $ - $ 7,000

E2010.02.05 Educational Facility Casework* CTS

Failure Replacement Replace casework in CTS space $ 2,000 $ - $ - $ - $ - $ 2,000

D5020.02 Interior Lighting Failure Replacement Replace damaged lenses in corridors. $ - $ 3,000 $ - $ - $ - $ 3,000

C3020.08 Carpet Flooring* Failure Replacement Replace Music Room flooring. $ 9,000 $ - $ - $ - $ - $ 9,000

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*

Failure Replacement Replace Six Panelboards. $ - $ 24,000 $ - $ - $ - $ 24,000

C1010.03 Interior Operable Folding Panel Partitions*

Repair 1973 Gym - Replace operable partition's sound seals

$ 5,000 $ - $ - $ - $ - $ 5,000

C1010.05 Interior Windows* Repair Install Glazing in CTS $ 1,000 $ - $ - $ - $ - $ 1,000

B3010.09 Roof Specialities and Accessories

Repair Paint rooftop accessories, install new access ladders, and ice guards.

$ 6,000 $ - $ - $ - $ - $ 6,000

B2010.01.13 Paints (& Stains): Exterior Wall*

Repair Repaint exterior concrete block $ 10,000 $ - $ - $ - $ - $ 10,000

Onoway Junior / Senior High School B3845ABuilding EventsMaintenance Events

Alberta Infrastructure and Transportation Page 20 of 26

Page 21: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A C3020.01 Concrete Floor Finishes (Paint)*

Repair Repair and repaint concrete floors in CTS area.

$ 20,000 $ - $ - $ - $ - $ 20,000

C1010.01 Interior Fixed Partitions* Repair Repair damaged interior walls. $ 6,000 $ - $ - $ - $ - $ 6,000

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Repair Repair damaged stucco and parging $ 8,000 $ - $ - $ - $ - $ 8,000

B1020.04 Canopies* Repair Repair Entrance Canopy $ 3,000 $ - $ - $ - $ - $ 3,000

F1010.02.04 Portable and Mobile Buildings* - Beauty Culture

Repair Repair steps and install new door weatherstripping. Repair interior wall.

$ 1,500 $ - $ - $ - $ - $ 1,500

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Repair Replace / upgrade sealant $ 1,000 $ - $ - $ - $ - $ 1,000

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Repair Replace ceiling tiles in Classrooms and Corridors

$ 20,000 $ - $ - $ - $ - $ 20,000

B2030.01.02 Steel-Framed Storefronts* Repair Replace exterior door hardware $ 5,500 $ - $ - $ - $ - $ 5,500

C1020.01 Interior Swinging Doors* Repair Replace interior doors, frames and hardware

$ 18,500 $ - $ - $ - $ - $ 18,500

B3010.08.02 Metal Gutters and Downspouts*

Repair Replace rainwater leaders and install splash pads

$ 1,500 $ - $ - $ - $ - $ 1,500

C1010.06 Interior Glazed Partitions and Storefronts*

Repair Replace sound seals around glazed partitions in the Library

$ 1,500 $ - $ - $ - $ - $ 1,500

D3010.02 Gas Supply Systems* Repair Scrape and repaint roof gas piping. $ 4,000 $ - $ - $ - $ - $ 4,000

Total of Maintenance Events 525,500$ 81,000$ -$ -$ -$ 606,500$

K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install 2 power assist door operators. $ 12,000 $ - $ - $ - $ - $ 12,000

K4010.03 Barrier Free Interior Circulation

Barrier Free Access Upgrade Install a barrier free ramp in the music room.

$ 7,000 $ - $ - $ - $ - $ 7,000

D4030.01 Fire Extinguisher, Cabinets and Accessories*

Code Upgrade Install new fire extinguishers. $ 3,000 $ - $ - $ - $ - $ 3,000

B1010.07 Exterior Stairs* Code Upgrade Install stairs at 1992 structure. $ 5,000 $ - $ - $ - $ - $ 5,000

D2010.04 Sinks* - 1960, 1973 Phase Code Upgrade Install vacuum breakers on lab sinks. $ 2,000 $ - $ - $ - $ - $ 2,000

Upgrading Events

Alberta Infrastructure and Transportation Page 21 of 26

Page 22: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A B1010.09 Assembly Construction - Fire Rating

Code Upgrade Upgrade 2003 storage structure $ 30,000 $ - $ - $ - $ - $ 30,000

C1010.07 Interior Partition and Ceilings Firestopping*

Code Upgrade Upgrade Storage room in 1992 structure $ 11,500 $ - $ - $ - $ - $ 11,500

D2020.02.06 Domestic Water Heaters* - 1960 Phase

Energy Efficiency Upgrade Replace domestic water heater. $ - $ 3,000 $ - $ - $ - $ 3,000

B2020.01.01.02 Aluminum Windows (Glass & Frame)*

Energy Efficiency Upgrade Upgrade windows 1966 and 1973 structures

$ 50,000 $ - $ - $ - $ - $ 50,000

D3040.04.01 Fans: Exhaust* - 1966 Phase

Indoor Air Quality Upgrade Improve exhaust for Home economics. $ - $ 9,500 $ - $ - $ - $ 9,500

D3050.01.01 Computer Room Air Conditioning Units*

Indoor Air Quality Upgrade Install air conditioner. $ - $ 25,000 $ - $ - $ - $ 25,000

D3020.03.01 Furnaces* - 1981 Phase Indoor Air Quality Upgrade Replace furnaces with new AHUs. $ - $ 60,000 $ - $ - $ - $ 60,000

D5030.02.04 Video Surveillance* Operating Efficiency Upgrade

Add surveillance camera. $ - $ 10,000 $ - $ - $ - $ 10,000

D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade

Classrooms need additional receptacles. $ - $ - $ 18,000 $ - $ - $ 18,000

D2010.04 Sinks* - 1966 Phase Operating Efficiency Upgrade

Install 3 art sinks. $ - $ 9,000 $ - $ - $ - $ 9,000

D5010.03 Main Electrical Switchboards (Main Distribution)*

Operating Efficiency Upgrade

Upgrade splitter panelboard. $ - $ - $ 15,000 $ - $ - $ 15,000

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in boy's gym

$ 24,000 $ - $ - $ - $ - $ 24,000

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in girls gym.

$ 18,000 $ - $ - $ - $ - $ 18,000

E1020.03 Theater and Stage Equipment*

Program Functional Upgrade Stage drapery $ 10,000 $ - $ - $ - $ - $ 10,000

K40 Current Code Issues Study Study - Code review $ 15,000 $ - $ - $ - $ - $ 15,000

Total of Upgrading Events 187,500$ 116,500$ 33,000$ -$ -$ 337,000$ Total of Building Events $ 713,000 $ 197,500 $ 33,000 $ - $ - $ 943,500

G2010.02.02 Flexible Pavement Roadway (Asphalt)*

Failure Replacement Repair access roadway $ 70,000 $ - $ - $ - $ - $ 70,000

G4020.01 Area Lighting* Operating Efficiency Upgrade

Add exterior lighting if surveillance camera's added.

$ - $ 3,000 $ - $ - $ - $ 3,000

Site Events

Alberta Infrastructure and Transportation Page 22 of 26

Page 23: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A G2020.02.01 Aggregate Parking Lots (Gravel)*

Operating Efficiency Upgrade

Upgrade Student parking areas $ 55,000 $ - $ - $ - $ - $ 55,000

G2020.06.02 Parking Bumpers* Program Functional Upgrade Install 30 wheel stops $ 3,000 $ - $ - $ - $ - $ 3,000

G2040.08 Flagpoles* Repair Refinish flagpole. $ 500 $ - $ - $ - $ - $ 500

G2050.04 Lawns and Grasses* Repair Repair lawns and grasses $ 15,000 $ - $ - $ - $ - $ 15,000

G2020.02.02 Flexible Paving Parking Lots(Asphalt)*

Repair Repair staff and visitor parking. $ 5,000 $ - $ - $ - $ - $ 5,000

G2030.06 Exterior Steps and Ramps* Repair Replace portable's exterior steps and landings.

$ 8,000 $ - $ - $ - $ - $ 8,000

Total of Site Events 156,500$ 3,000$ -$ -$ -$ 159,500$

Alberta Infrastructure and Transportation Page 23 of 26

Page 24: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1010.07 Interior Partition Firestopping* Code Repair Budget for upgrade to fire separations. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

C2020.05 Resilient Stair Finishes* Code Repair Construct a ramp access to the gym. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

D3040.01.04 Ducts: Air Distribution* Code Repair Install fire dampers. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00

D2020.01.03 Piping Specialties (Backflow Preventors)*

Code Repair Install vacuum breakers. $ - $ 1,000.00 $ - $ - $ - $ 1,000.00

D3040.03.01 Hot Water Distribution Systems*

Code Repair Revise mechanical room layout. $ 15,000.00 $ - $ - $ - $ - $ 15,000.00

B1020.06 Roof Construction Fireproofing*

Code Repair Upgrade walls and roof structure assemblies in upper corridor ceiling spaces.

$ 15,000.00 $ - $ - $ - $ - $ 15,000.00

D5020.02.02.02 Interior Fluorescent Fixtures*

Failure Replacement Relamp gym fixtures. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*

Failure Replacement Replace four original panelboards. $ - $ 16,000.00 $ - $ - $ - $ 16,000.00

C1030.10 Lockers* Lifecycle Replacement Install new lockers in the 1959 section. Install appropriate storage for student's apparel within the 1965 section.

$ 18,000.00 $ - $ - $ - $ - $ 18,000.00

C1020.01 Interior Swinging Doors* Lifecycle Replacement Upgrade doors and frames for 1954 and 1959, and 1965 structures.

$ 17,000.00 $ - $ - $ - $ - $ 17,000.00

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*

Lifecycle Replacement Upgrade roofing, consider achieving a higher RSI value.

$ - $ - $ - $ 115,000.00 $ - $ 115,000.00

B2010.01.13 Paints (& Stains): Exterior Wall*

Preventative Maintenance Paint exterior masonry walls. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00

C3020.11 Floor Painting Preventative Maintenance Paint furnace room floor. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

B2010.01.02.02 Concrete Block: Ext. Wall Skin*

Preventative Maintenance Repair exterior masonry walls. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00

B3010.08.02 Metal Gutters and Downspouts*

Repair Install new rainwater leaders. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

Repair Level t-bar ceiling. $ 4,500.00 $ - $ - $ - $ - $ 4,500.00

C3010.02 Wall Paneling* Repair Re-finish wall paneling. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

C3030.04 12x12 Stapled Acoustic Ceiling Finishes*

Repair Repair and/or refinish ceiling tiles. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

Rich Valley School B3522A

Alberta Infrastructure and Transportation Page 24 of 26

Page 25: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalRich Valley School B3522A B2010.01.09 Expansion Control: ExteriorWall Skin*

Repair Repair exterior masonry / control joints. $ 1,200.00 $ - $ - $ - $ - $ 1,200.00

A1030 Slab on Grade* Repair Repair floor irregularities. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00

C1030.12 Storage Shelving* Repair Repair storage shelving. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00

E2010.02.05 Educational Facility Casework*

Repair Upgrade classroom casework. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

Repair Upgrade gym exterior wall finish. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00

Total of Maintenance Events $ 158,700.00 $ 27,000.00 $ - $ 115,000.00 $ - $ 300,700.00

Upgrading Events D5010.03 Main Electrical Switchboards (Main Distribution)*

Code Upgrade Clearances do not meet Canadian Electrical Code (CEC).

$ - $ - $ - $ - $ - $ -

K4010.02 Barrier Free Entrances Code Upgrade Upgrade main entrance to barrier free standards.

$ 6,500.00 $ - $ - $ - $ - $ 6,500.00

D5020.02.02.02 Interior Fluorescent Fixtures*

Energy Efficiency Upgrade Upgrade 80 fixtures T12 to T8. $ - $ 20,000.00 $ - $ - $ - $ 20,000.00

B2010.01.11 Joint Sealers (caulking): Ext. Wall*

Energy Efficiency Upgrade Upgrade exterior caulking. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3010.11 Interior Wall Painting* Operating Efficiency Upgrade Budget for painting walls - 5 year cycle. $ - $ - $ 10,000.00 $ - $ - $ 10,000.00

D2010.04 Sinks* Operating Efficiency Upgrade Replace two custodial sinks. $ - $ 6,000.00 $ - $ - $ - $ 6,000.00

D5030.04.02 Paging/Intercom Systems* Operating Efficiency Upgrade Sound system wiring run exposed on gym wall.

$ - $ 1,000.00 $ - $ - $ - $ 1,000.00

C1020.03 Interior Fire Doors* Operating Efficiency Upgrade Upgrade double doors within the 1965 corridor.

$ 2,000.00 $ - $ - $ - $ - $ 2,000.00

C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Budget to install acoustic wall treatments. $ 7,000.00 $ - $ - $ - $ - $ 7,000.00

C3020.08 Carpet Flooring* Program Functional Upgrade The carpet in the music/science room is worn.

$ 6,000.00 $ - $ - $ - $ - $ 6,000.00

E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade music program casework. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade science program casework $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

C1030.01 Visual Display Boards* Program Functional Upgrade Upgrade visual display boards in 1959 section.

$ 2,000.00 $ - $ - $ - $ - $ 2,000.00

Total of Upgrading Events $ 30,500.00 $ 27,000.00 $ 10,000.00 $ - $ - $ 67,500.00

Alberta Infrastructure and Transportation Page 25 of 26

Page 26: Listing of Events - infrastructure.alberta.ca · B2020.03 Glazed Curtain Wall** Repair Repair ... Ext. Wall* Preventative Maintenance Patch and repaint plaster trim ... Listing of

Northern Gateway Regional Division No.10Listing of Events

2006 2007 2008 2009 2010 TotalRich Valley School B3522ATotal of Building Events $ 189,200.00 $ 54,000.00 $ 10,000.00 $ 115,000.00 $ - $ 368,200.00

Site Events G2020.06.03 Parking Lot Signs* Code Repair Upgrade site and building signage. $ 4,200.00 $ - $ - $ - $ - $ 4,200.00

G2050.04 Lawns and Grasses* Preventative Maintenance Budget for re-grading and seeding grounds.

$ 10,000.00 $ - $ - $ - $ - $ 10,000.00

G2040.08 Flagpoles* Preventative Maintenance Refinish Flagpole. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

G2020.06.02 Parking Bumpers* Program Functional Upgrade Install concrete wheel stops. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00

G2040.02 Fences and Gates* Repair Budget - repair chain link fencing. $ - $ - $ - $ 2,000.00 $ - $ 2,000.00

G2040.02 Fences and Gates* Repair Budget for repairs to chain link fencing. $ - $ 2,000.00 $ - $ - $ - $ 2,000.00

G2010.02.01 Aggregate Roadway (Gravel)*

Repair Upgrade roadway and parking areas. $ 60,000.00 $ - $ - $ - $ - $ 60,000.00

G2030.04 Rigid Pedestrian Pavement (Concrete)*

Repair Upgrade walkways. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00

G2030.06 Exterior Steps and Ramps* Repair Upgrade wood stair and landing. $ - $ - $ 2,000.00 $ - $ - $ 2,000.00

Total of Site Events $ 82,200.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ - $ 88,200.00

Alberta Infrastructure and Transportation Page 26 of 26