Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)**
Code Repair Install vacuum breakers on non freeze hose bibbs
$ 1,070.00 $ - $ - $ - $ - $ 1,070.00
C3030.07 Interior Ceiling Painting** Code Repair Repair ceiling in mechanical room. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
E2010.03.01 Blinds** Failure Replacement Remove and replace vertical blinds. $ - $ 2,140.00 $ - $ - $ - $ 2,140.00
D2010.02 Urinals** - 1959 Phase Failure Replacement Replace 4 urinals. $ - $ 4,280.00 $ - $ - $ - $ 4,280.00
D2010.03 Lavatories** - 1959 Phase Failure Replacement Replace 8 lavatories. $ - $ 8,560.00 $ - $ - $ - $ 8,560.00
D3040.01.01 Air Handling Units: Air Distribution** - 1959 Phase
Failure Replacement Replace gas fired section with hot water or glycol coil.
$ - $ - $ 10,700.00 $ - $ - $ 10,700.00
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
Failure Replacement Replace three original panelboards. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00
C3020.07 Resilient Flooring** Failure Replacement Replace the floor finish. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00
D3020.02.01 Heating Boilers and Accessories: H.W.**
Failure Replacement Replace heating system to feed entire school.
$ - $ 128,400.00 $ - $ - $ - $ 128,400.00
C3020.08 Carpet Flooring** Failure Replacement Repair/Replace music room carpet. $ 4,280.00 $ - $ - $ - $ - $ 4,280.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
Preventative Maintenance Caulk around doors and frames. $ - $ 2,675.00 $ - $ - $ - $ 2,675.00
B1010.01 Floor Structural Frame*(Building Frame)
Repair Install bridging. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00
B2020.03 Glazed Curtain Wall** Repair Repair aluminum frame. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
A2020 Basement Walls (& Crawl Space)*
Repair Repair basement walls and install a sump.
$ 6,420.00 $ - $ - $ - $ - $ 6,420.00
B1010.02 Structural Interior and Exterior Walls*
Repair Repair damaged walls. $ 107,000.00 $ - $ - $ - $ - $ 107,000.00
C2010 Stair Construction* Repair Repair wood stairs. $ 3,745.00 $ - $ - $ - $ - $ 3,745.00
B1010.03 Floor Decks, Slabs, and Toppings*
Repair Repair basement flooring. $ 14,980.00 $ - $ - $ - $ - $ 14,980.00
C3020.01 Concrete Floor Finishes* Repair Repair basement flooring. $ 5,350.00 $ - $ - $ - $ - $ 5,350.00
David Ovans Elementary School B3989A
Alberta Infrastructure and Transportation Page 1 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A E2010.02.07 Kitchen Casework* Repair Adjust, repair, and refinish existing
cabinets. $ - $ 1,070.00 $ - $ - $ - $ 1,070.00
C1020.03 Interior Fire Doors* Repair Upgrade gym entrance doors, and install electronic hold open devices for doors in corridor.
$ 4,280.00 $ - $ - $ - $ - $ 4,280.00
Total of Maintenance Events $ 157,825.00 $ 159,965.00 $ 10,700.00 $ - $ - $ 328,490.00
Upgrading Events K4010.01 Barrier Free Route: Parking to Entrance
Barrier Free Access Upgrade Upgrade walkway to staff parking area. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00
D5020.02.03.03 Exit Signs Code Upgrade Exit sign Breezeway missing. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00
K4010.02 Barrier Free Entrances Code Upgrade Install a power assist door operator. $ - $ 10,700.00 $ - $ - $ - $ 10,700.00
C2020.08 Stair Railings and Balustrades*
Code Upgrade Install railings. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
K2030 Program Layout Energy Efficiency Upgrade Main Building Entrance - create a vestibule.
$ - $ 8,560.00 $ - $ - $ - $ 8,560.00
D3040.04.01 Fans: Exhaust** Range Indoor Air Quality Upgrade Install exhaust hood and exhaust fan above stove.
$ - $ - $ 5,350.00 $ - $ - $ 5,350.00
D3040.04.01 Fans: Exhaust** Kiln Indoor Air Quality Upgrade Install new roof top exhaust fan and fume hood for kiln.
$ - $ - $ 10,700.00 $ - $ - $ 10,700.00
D3020.03.01 Furnaces** - 1955, 1962 Phase
Indoor Air Quality Upgrade Replace furnaces with 3 air handling units $ - $ - $ 160,500.00 $ - $ - $ 160,500.00
D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade Additional receptacles in classrooms. $ - $ 5,350.00 $ - $ - $ - $ 5,350.00
E1090.07.06 Exercise (Climbing) Equipment
Operating Efficiency Upgrade Budget for removing climbing apparatus and repairing walls.
$ - $ 3,210.00 $ - $ - $ - $ 3,210.00
D2010.04 Sinks** Operating Efficiency Upgrade Install 3 custodial sinks. $ - $ - $ - $ 9,630.00 $ - $ 9,630.00
D5030.01 Detection and Fire Alarm** Operating Efficiency Upgrade The school has two different fire alarm systems.
$ - $ 26,750.00 $ - $ - $ - $ 26,750.00
E2010.03.06 Curtains and Drapes** Operating Efficiency Upgrade Upgrade clerestory window treatment. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00
C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Budget - Music room acoustic wall treatment
$ 6,420.00 $ - $ - $ - $ - $ 6,420.00
C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Gym acoustic wall treatment. $ 16,050.00 $ - $ - $ - $ - $ 16,050.00
C1030.01 Visual Display Boards** Program Functional Upgrade Remove chalkboards and install whiteboards.
$ 4,280.00 $ - $ - $ - $ - $ 4,280.00
Alberta Infrastructure and Transportation Page 2 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
Study Roof study $ 5,350.00 $ - $ - $ - $ - $ 5,350.00
Total of Upgrading Events $ 33,170.00 $ 70,620.00 $ 176,550.00 $ 9,630.00 $ - $ 289,970.00 Total of Building Events $ 190,995.00 $ 230,585.00 $ 187,250.00 $ 9,630.00 $ - $ 618,460.00
Site Events G2020.06.03 Parking Lot Signs* Operating Efficiency Upgrade Install parking lot signs. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00
G2040.02 Fences and Gates** Repair Repair soil condition and align chain link fencing.
$ 2,140.00 $ - $ - $ - $ - $ 2,140.00
G2050.04 Lawns and Greens* Repair Grade, top dress and seed the play area. $ 3,424.00 $ - $ - $ - $ - $ 3,424.00
G2010.02.01 Aggregate Roadway (Gravel)**
Repair Repair roadway. $ 10,700.00 $ - $ - $ - $ - $ 10,700.00
Total of Site Events $ 18,404.00 $ - $ - $ - $ - $ 18,404.00
Alberta Infrastructure and Transportation Page 3 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1030.06 Handrails* Code Repair Fasten handrail properly in order to
sustain normal usage requirements. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
B1010.07 Exterior Stairs* Code Repair Install handrail at exit stairwell near 1984 music room.
$ 500.00 $ - $ - $ - $ - $ 500.00
E2010.02.99 Other Casework* Lifecycle Replacement Display cases and washrooms require modernization due to delamination and years of use.
$ 37,000.00 $ - $ - $ - $ - $ 37,000.00
D3020.02.01 Heating Boilers and Accessories: H.W.*
Lifecycle Replacement Only one heating boiler for the 1969 addition area. No backup.
$ 25,000.00 $ - $ - $ - $ - $ 25,000.00
C2020.06 Carpet Stair Finishes* Lifecycle Replacement Remove and replace existing carpet on stairs.
$ 600.00 $ - $ - $ - $ - $ 600.00
C3020.08 Carpet Flooring* Lifecycle Replacement Remove and replace existing carpet. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00
C2020.05 Resilient Stair Finishes* Lifecycle Replacement Remove and replace stair finishes in 1969west and 1979 stairwells
$ - $ 6,000.00 $ - $ - $ - $ 6,000.00
C3020.02 Tile Floor Finishes* Lifecycle Replacement Remove and replace vinyl asbestos tile flooring in many areas. Replace with resilient sheet flooring.
$ - $ 41,000.00 $ - $ - $ - $ 41,000.00
C3010.11 Interior Wall Painting* Lifecycle Replacement Repaint concrete block, gypsum board, and "Desco" coating on walls throughout school.
$ - $ 44,700.00 $ - $ - $ - $ 44,700.00
E2010.03.06 Curtains and Drapes* Lifecycle Replacement Replace curtains in the 1969 classrooms with new drapes or blinds
$ 4,000.00 $ - $ - $ - $ - $ 4,000.00
E2020 Moveable Furnishings* Lifecycle Replacement Replace desks, tables, and chairs as required.
$ 25,000.00 $ - $ - $ - $ - $ 25,000.00
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Lifecycle Replacement Replace existing ceiling tiles with new acoustic ceiling tiles
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
E2010.02.05 Educational Facility Casework*
Lifecycle Replacement Replace millwork and countertops in 1959, 1963, 1966, and 1969 areas as required.
$ 67,000.00 $ - $ - $ - $ - $ 67,000.00
C3020.07 Resilient Flooring* Lifecycle Replacement Replace sheet linoleum and vinyl flooring throughout school.
$ 400,000.00 $ - $ - $ - $ - $ 400,000.00
C1030.02 Fabricated Compartments(Toilets/Showers)*
Lifecycle Replacement Replace toiltet partitions in the 1963, 1969(upper level) and 1979 changeroom sections
$ 4,500.00 $ - $ - $ - $ - $ 4,500.00
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Preventative Maintenance Patch and repaint plaster trim and soffits $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Preventative Maintenance Remove and replace caulking around windows and doors throughout.
$ 18,000.00 $ - $ - $ - $ - $ 18,000.00
Hillside Jr. / Sr. High School B4196A
Alberta Infrastructure and Transportation Page 4 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A C3020.01 Concrete Floor Finishes (Paint)*
Preventative Maintenance Repaint and reseal Industrial Arts floor $ 15,000.00 $ - $ - $ - $ - $ 15,000.00
B3010.07 Sheet Metal Roofing* Preventative Maintenance Repaint metal roof $ - $ 10,000.00 $ - $ - $ - $ 10,000.00
B2010.01.06.03 Metal Siding* Preventative Maintenance Repaint metal siding $ - $ 10,000.00 $ - $ - $ - $ 10,000.00
C3010.12 Wall Coverings* Preventative Maintenance Repaint vinyl wallcovering in 1963 staff lounge and 1969 "Mova-wall" systems
$ 4,600.00 $ - $ - $ - $ - $ 4,600.00
B3010.08.02 Metal Gutters and Downspouts*
Repair Extend existing roof drains to control water drainage and/or collection
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1030.08 Interior Identifying Devices* Repair Install room name plates where required $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
B1010.07 Exterior Stairs* Repair Mudjacking and repair of existing stoops $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
D5020.01 Electrical Branch Wiring* Repair Poorly supported conduit in crawlspace $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
E2010.02.08 Laboratory Casework* Repair Relaminate countertops in science rooms. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
C3010.06 Tile Wall Finishes* Repair Remove and replace ceramic tiles in 1979washroom and shower areas
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
C2020.05 Resilient Stair Finishes* Repair Remove existing finishes and replace withresilient flooring.
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C3010.14 Other Wall Finishes* Repair Remove existing Gypsum board and replace with cement board.
$ 3,500.00 $ - $ - $ - $ - $ 3,500.00
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
Repair Repair concrete block walls damaged due to water drainage problems.
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1020.01 Interior Swinging Doors* Repair Replace interior doors and hardware. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
B2010.01.06.04 Wood Siding* Repair Replace plywood between windows and reseal
$ 3,500.00 $ - $ - $ - $ - $ 3,500.00
D2030.01 Waste and Vent Piping* Repair Sanitary service is blocked by tree root growth.
$ 12,000.00 $ - $ - $ - $ - $ 12,000.00
D3050.03 Humidifiers* Repair Several humidifiers are not operational throughout the school
$ - $ 15,000.00 $ - $ - $ - $ 15,000.00
D2030.02 Waste Piping Specialties* Repair Water is seeping into the underslab ducting system.
$ 30,000.00 $ - $ - $ - $ - $ 30,000.00
Total of Maintenance Events $ 769,700.00 $ 131,700.00 $ - $ - $ - $ 901,400.00
Upgrading Events
Alberta Infrastructure and Transportation Page 5 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A K4010.03 Barrier Free Interior Circulation
Barrier Free Access Upgrade Add handicap lift at 1979 stairwell. $ 36,000.00 $ - $ - $ - $ - $ 36,000.00
K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install new handicap door actuators and related electrical requirements at south and east main entrances.
$ 5,000.00 $ - $ - $ - $ - $ 5,000.00
B2030.01.02 Steel-Framed Storefronts* Code Upgrade Replace hardware on exit vestibule doors with code compliaint hardware.
$ 1,500.00 $ - $ - $ - $ - $ 1,500.00
D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install one exhaust system for washroomsonly, and one exhaust system for weight room only.
$ - $ 3,000.00 $ - $ - $ - $ 3,000.00
D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install new exhaust fan in change room. $ - $ - $ - $ 4,500.00 $ - $ 4,500.00
D3050.01.01 Computer Room Air Conditioning Units*
Operating Efficiency Upgrade Replace existing cooling system with a cooling only roof-top unit.
$ - $ - $ - $ 8,000.00 $ - $ 8,000.00
Total of Upgrading Events $ 42,500.00 $ 3,000.00 $ - $ 12,500.00 $ - $ 58,000.00 Total of Building Events $ 812,200.00 $ 134,700.00 $ - $ 12,500.00 $ - $ 959,400.00
Site Events G3010.03 Site Fire Protection Water Distribution*
Code Upgrade Fire hydrant is not within 45m of the building Siamese connection.
$ - $ - $ - $ - $ 20,000.00 $ 20,000.00
G2040.02 Fences and Gates* Lifecycle Replacement Replace chain link fence around tennis court
$ - $ 8,000.00 $ - $ - $ - $ 8,000.00
G2010.02.01 Aggregate Roadway (Gravel)*
Repair Grade and provide additional gravel $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
G2050.04 Lawns and Grasses* Repair Grade north side of site to ensure proper water drainage away from building. Remove dirt pile left from gas line repair.
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
G3030.01 Storm Water Collection* Repair Move and anchor splashpads against building to ensure adequate drainage.
$ 6,000.00 $ - $ - $ - $ - $ 6,000.00
G2010.02.02 Flexible Pavement Roadway (Asphalt)*
Repair Remove and replace asphalt in NW corner.
$ 15,000.00 $ - $ - $ - $ - $ 15,000.00
G2020.04 Rigid Parking Lot Pavement (Concrete)*
Repair Remove and replace concrete on west side parking lot with asphalt
$ 440,000.00 $ - $ - $ - $ - $ 440,000.00
G2030.04 Rigid Pedestrian Pavement (Concrete)*
Repair Remove and replace sidewalks and concrete pads.
$ 47,500.00 $ - $ - $ - $ - $ 47,500.00
Total of Site Events $ 528,500.00 $ 13,000.00 $ - $ - $ 20,000.00 $ 561,500.00
Alberta Infrastructure and Transportation Page 6 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 Total
C1020.03 Interior Fire Doors* Code Repair Install doors in corridors $ 12,000 $ - $ - $ - $ - $ 12,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Repair ceiling assemblies $ 3,000 $ - $ - $ - $ - $ 3,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Repair fire stop wall penetrations $ 5,000 $ - $ - $ - $ - $ 5,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Storage room next to Computer Lab # 47 needs to be brought up to code
$ 1,500 $ - $ - $ - $ - $ 1,500
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Storage space within the cafeteria needs to be brought up to code
$ 12,500 $ - $ - $ - $ - $ 12,500
C3020.07 Resilient Flooring* Failure Replacement Install new floor finishes in 1960, 1964 and 1966 classrooms
$ - $ 54,000 $ - $ - $ - $ 54,000
C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new flooring in the Administration area
$ 8,000 $ - $ - $ - $ - $ 8,000
C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new Kitchen flooring $ 3,000 $ - $ - $ - $ - $ 3,000
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*
Failure Replacement Replace BUR roof 1966 & 1973 Section $ 350,000 $ - $ - $ - $ - $ 350,000
C3020.08 Carpet Flooring* Failure Replacement Replace carpet in Library. $ 7,000 $ - $ - $ - $ - $ 7,000
E2010.02.05 Educational Facility Casework* CTS
Failure Replacement Replace casework in CTS space $ 2,000 $ - $ - $ - $ - $ 2,000
D5020.02 Interior Lighting Failure Replacement Replace damaged lenses in corridors. $ - $ 3,000 $ - $ - $ - $ 3,000
C3020.08 Carpet Flooring* Failure Replacement Replace Music Room flooring. $ 9,000 $ - $ - $ - $ - $ 9,000
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
Failure Replacement Replace Six Panelboards. $ - $ 24,000 $ - $ - $ - $ 24,000
C1010.03 Interior Operable Folding Panel Partitions*
Repair 1973 Gym - Replace operable partition's sound seals
$ 5,000 $ - $ - $ - $ - $ 5,000
C1010.05 Interior Windows* Repair Install Glazing in CTS $ 1,000 $ - $ - $ - $ - $ 1,000
B3010.09 Roof Specialities and Accessories
Repair Paint rooftop accessories, install new access ladders, and ice guards.
$ 6,000 $ - $ - $ - $ - $ 6,000
B2010.01.13 Paints (& Stains): Exterior Wall*
Repair Repaint exterior concrete block $ 10,000 $ - $ - $ - $ - $ 10,000
Onoway Junior / Senior High School B3845ABuilding EventsMaintenance Events
Alberta Infrastructure and Transportation Page 7 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A C3020.01 Concrete Floor Finishes (Paint)*
Repair Repair and repaint concrete floors in CTS area.
$ 20,000 $ - $ - $ - $ - $ 20,000
C1010.01 Interior Fixed Partitions* Repair Repair damaged interior walls. $ 6,000 $ - $ - $ - $ - $ 6,000
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Repair Repair damaged stucco and parging $ 8,000 $ - $ - $ - $ - $ 8,000
B1020.04 Canopies* Repair Repair Entrance Canopy $ 3,000 $ - $ - $ - $ - $ 3,000
F1010.02.04 Portable and Mobile Buildings* - Beauty Culture
Repair Repair steps and install new door weatherstripping. Repair interior wall.
$ 1,500 $ - $ - $ - $ - $ 1,500
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Repair Replace / upgrade sealant $ 1,000 $ - $ - $ - $ - $ 1,000
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Repair Replace ceiling tiles in Classrooms and Corridors
$ 20,000 $ - $ - $ - $ - $ 20,000
B2030.01.02 Steel-Framed Storefronts* Repair Replace exterior door hardware $ 5,500 $ - $ - $ - $ - $ 5,500
C1020.01 Interior Swinging Doors* Repair Replace interior doors, frames and hardware
$ 18,500 $ - $ - $ - $ - $ 18,500
B3010.08.02 Metal Gutters and Downspouts*
Repair Replace rainwater leaders and install splash pads
$ 1,500 $ - $ - $ - $ - $ 1,500
C1010.06 Interior Glazed Partitions and Storefronts*
Repair Replace sound seals around glazed partitions in the Library
$ 1,500 $ - $ - $ - $ - $ 1,500
D3010.02 Gas Supply Systems* Repair Scrape and repaint roof gas piping. $ 4,000 $ - $ - $ - $ - $ 4,000
Total of Maintenance Events 525,500$ 81,000$ -$ -$ -$ 606,500$
K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install 2 power assist door operators. $ 12,000 $ - $ - $ - $ - $ 12,000
K4010.03 Barrier Free Interior Circulation
Barrier Free Access Upgrade Install a barrier free ramp in the music room.
$ 7,000 $ - $ - $ - $ - $ 7,000
D4030.01 Fire Extinguisher, Cabinets and Accessories*
Code Upgrade Install new fire extinguishers. $ 3,000 $ - $ - $ - $ - $ 3,000
B1010.07 Exterior Stairs* Code Upgrade Install stairs at 1992 structure. $ 5,000 $ - $ - $ - $ - $ 5,000
D2010.04 Sinks* - 1960, 1973 Phase Code Upgrade Install vacuum breakers on lab sinks. $ 2,000 $ - $ - $ - $ - $ 2,000
Upgrading Events
Alberta Infrastructure and Transportation Page 8 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A B1010.09 Assembly Construction - Fire Rating
Code Upgrade Upgrade 2003 storage structure $ 30,000 $ - $ - $ - $ - $ 30,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Upgrade Upgrade Storage room in 1992 structure $ 11,500 $ - $ - $ - $ - $ 11,500
D2020.02.06 Domestic Water Heaters* - 1960 Phase
Energy Efficiency Upgrade Replace domestic water heater. $ - $ 3,000 $ - $ - $ - $ 3,000
B2020.01.01.02 Aluminum Windows (Glass & Frame)*
Energy Efficiency Upgrade Upgrade windows 1966 and 1973 structures
$ 50,000 $ - $ - $ - $ - $ 50,000
D3040.04.01 Fans: Exhaust* - 1966 Phase
Indoor Air Quality Upgrade Improve exhaust for Home economics. $ - $ 9,500 $ - $ - $ - $ 9,500
D3050.01.01 Computer Room Air Conditioning Units*
Indoor Air Quality Upgrade Install air conditioner. $ - $ 25,000 $ - $ - $ - $ 25,000
D3020.03.01 Furnaces* - 1981 Phase Indoor Air Quality Upgrade Replace furnaces with new AHUs. $ - $ 60,000 $ - $ - $ - $ 60,000
D5030.02.04 Video Surveillance* Operating Efficiency Upgrade
Add surveillance camera. $ - $ 10,000 $ - $ - $ - $ 10,000
D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade
Classrooms need additional receptacles. $ - $ - $ 18,000 $ - $ - $ 18,000
D2010.04 Sinks* - 1966 Phase Operating Efficiency Upgrade
Install 3 art sinks. $ - $ 9,000 $ - $ - $ - $ 9,000
D5010.03 Main Electrical Switchboards (Main Distribution)*
Operating Efficiency Upgrade
Upgrade splitter panelboard. $ - $ - $ 15,000 $ - $ - $ 15,000
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in boy's gym
$ 24,000 $ - $ - $ - $ - $ 24,000
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in girls gym.
$ 18,000 $ - $ - $ - $ - $ 18,000
E1020.03 Theater and Stage Equipment*
Program Functional Upgrade Stage drapery $ 10,000 $ - $ - $ - $ - $ 10,000
K40 Current Code Issues Study Study - Code review $ 15,000 $ - $ - $ - $ - $ 15,000
Total of Upgrading Events 187,500$ 116,500$ 33,000$ -$ -$ 337,000$ Total of Building Events $ 713,000 $ 197,500 $ 33,000 $ - $ - $ 943,500
G2010.02.02 Flexible Pavement Roadway (Asphalt)*
Failure Replacement Repair access roadway $ 70,000 $ - $ - $ - $ - $ 70,000
G4020.01 Area Lighting* Operating Efficiency Upgrade
Add exterior lighting if surveillance camera's added.
$ - $ 3,000 $ - $ - $ - $ 3,000
Site Events
Alberta Infrastructure and Transportation Page 9 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A G2020.02.01 Aggregate Parking Lots (Gravel)*
Operating Efficiency Upgrade
Upgrade Student parking areas $ 55,000 $ - $ - $ - $ - $ 55,000
G2020.06.02 Parking Bumpers* Program Functional Upgrade Install 30 wheel stops $ 3,000 $ - $ - $ - $ - $ 3,000
G2040.08 Flagpoles* Repair Refinish flagpole. $ 500 $ - $ - $ - $ - $ 500
G2050.04 Lawns and Grasses* Repair Repair lawns and grasses $ 15,000 $ - $ - $ - $ - $ 15,000
G2020.02.02 Flexible Paving Parking Lots(Asphalt)*
Repair Repair staff and visitor parking. $ 5,000 $ - $ - $ - $ - $ 5,000
G2030.06 Exterior Steps and Ramps* Repair Replace portable's exterior steps and landings.
$ 8,000 $ - $ - $ - $ - $ 8,000
Total of Site Events 156,500$ 3,000$ -$ -$ -$ 159,500$
Alberta Infrastructure and Transportation Page 10 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1010.07 Interior Partition Firestopping* Code Repair Budget for upgrade to fire separations. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
C2020.05 Resilient Stair Finishes* Code Repair Construct a ramp access to the gym. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
D3040.01.04 Ducts: Air Distribution* Code Repair Install fire dampers. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00
D2020.01.03 Piping Specialties (Backflow Preventors)*
Code Repair Install vacuum breakers. $ - $ 1,000.00 $ - $ - $ - $ 1,000.00
D3040.03.01 Hot Water Distribution Systems*
Code Repair Revise mechanical room layout. $ 15,000.00 $ - $ - $ - $ - $ 15,000.00
B1020.06 Roof Construction Fireproofing*
Code Repair Upgrade walls and roof structure assemblies in upper corridor ceiling spaces.
$ 15,000.00 $ - $ - $ - $ - $ 15,000.00
D5020.02.02.02 Interior Fluorescent Fixtures*
Failure Replacement Relamp gym fixtures. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
Failure Replacement Replace four original panelboards. $ - $ 16,000.00 $ - $ - $ - $ 16,000.00
C1030.10 Lockers* Lifecycle Replacement Install new lockers in the 1959 section. Install appropriate storage for student's apparel within the 1965 section.
$ 18,000.00 $ - $ - $ - $ - $ 18,000.00
C1020.01 Interior Swinging Doors* Lifecycle Replacement Upgrade doors and frames for 1954 and 1959, and 1965 structures.
$ 17,000.00 $ - $ - $ - $ - $ 17,000.00
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*
Lifecycle Replacement Upgrade roofing, consider achieving a higher RSI value.
$ - $ - $ - $ 115,000.00 $ - $ 115,000.00
B2010.01.13 Paints (& Stains): Exterior Wall*
Preventative Maintenance Paint exterior masonry walls. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00
C3020.11 Floor Painting Preventative Maintenance Paint furnace room floor. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
Preventative Maintenance Repair exterior masonry walls. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
B3010.08.02 Metal Gutters and Downspouts*
Repair Install new rainwater leaders. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Repair Level t-bar ceiling. $ 4,500.00 $ - $ - $ - $ - $ 4,500.00
C3010.02 Wall Paneling* Repair Re-finish wall paneling. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
C3030.04 12x12 Stapled Acoustic Ceiling Finishes*
Repair Repair and/or refinish ceiling tiles. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
Rich Valley School B3522A
Alberta Infrastructure and Transportation Page 11 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalRich Valley School B3522A B2010.01.09 Expansion Control: ExteriorWall Skin*
Repair Repair exterior masonry / control joints. $ 1,200.00 $ - $ - $ - $ - $ 1,200.00
A1030 Slab on Grade* Repair Repair floor irregularities. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1030.12 Storage Shelving* Repair Repair storage shelving. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
E2010.02.05 Educational Facility Casework*
Repair Upgrade classroom casework. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Repair Upgrade gym exterior wall finish. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
Total of Maintenance Events $ 158,700.00 $ 27,000.00 $ - $ 115,000.00 $ - $ 300,700.00
Upgrading Events D5010.03 Main Electrical Switchboards (Main Distribution)*
Code Upgrade Clearances do not meet Canadian Electrical Code (CEC).
$ - $ - $ - $ - $ - $ -
K4010.02 Barrier Free Entrances Code Upgrade Upgrade main entrance to barrier free standards.
$ 6,500.00 $ - $ - $ - $ - $ 6,500.00
D5020.02.02.02 Interior Fluorescent Fixtures*
Energy Efficiency Upgrade Upgrade 80 fixtures T12 to T8. $ - $ 20,000.00 $ - $ - $ - $ 20,000.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Energy Efficiency Upgrade Upgrade exterior caulking. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3010.11 Interior Wall Painting* Operating Efficiency Upgrade Budget for painting walls - 5 year cycle. $ - $ - $ 10,000.00 $ - $ - $ 10,000.00
D2010.04 Sinks* Operating Efficiency Upgrade Replace two custodial sinks. $ - $ 6,000.00 $ - $ - $ - $ 6,000.00
D5030.04.02 Paging/Intercom Systems* Operating Efficiency Upgrade Sound system wiring run exposed on gym wall.
$ - $ 1,000.00 $ - $ - $ - $ 1,000.00
C1020.03 Interior Fire Doors* Operating Efficiency Upgrade Upgrade double doors within the 1965 corridor.
$ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Budget to install acoustic wall treatments. $ 7,000.00 $ - $ - $ - $ - $ 7,000.00
C3020.08 Carpet Flooring* Program Functional Upgrade The carpet in the music/science room is worn.
$ 6,000.00 $ - $ - $ - $ - $ 6,000.00
E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade music program casework. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade science program casework $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
C1030.01 Visual Display Boards* Program Functional Upgrade Upgrade visual display boards in 1959 section.
$ 2,000.00 $ - $ - $ - $ - $ 2,000.00
Total of Upgrading Events $ 30,500.00 $ 27,000.00 $ 10,000.00 $ - $ - $ 67,500.00
Alberta Infrastructure and Transportation Page 12 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalRich Valley School B3522ATotal of Building Events $ 189,200.00 $ 54,000.00 $ 10,000.00 $ 115,000.00 $ - $ 368,200.00
Site Events G2020.06.03 Parking Lot Signs* Code Repair Upgrade site and building signage. $ 4,200.00 $ - $ - $ - $ - $ 4,200.00
G2050.04 Lawns and Grasses* Preventative Maintenance Budget for re-grading and seeding grounds.
$ 10,000.00 $ - $ - $ - $ - $ 10,000.00
G2040.08 Flagpoles* Preventative Maintenance Refinish Flagpole. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
G2020.06.02 Parking Bumpers* Program Functional Upgrade Install concrete wheel stops. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00
G2040.02 Fences and Gates* Repair Budget - repair chain link fencing. $ - $ - $ - $ 2,000.00 $ - $ 2,000.00
G2040.02 Fences and Gates* Repair Budget for repairs to chain link fencing. $ - $ 2,000.00 $ - $ - $ - $ 2,000.00
G2010.02.01 Aggregate Roadway (Gravel)*
Repair Upgrade roadway and parking areas. $ 60,000.00 $ - $ - $ - $ - $ 60,000.00
G2030.04 Rigid Pedestrian Pavement (Concrete)*
Repair Upgrade walkways. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
G2030.06 Exterior Steps and Ramps* Repair Upgrade wood stair and landing. $ - $ - $ 2,000.00 $ - $ - $ 2,000.00
Total of Site Events $ 82,200.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ - $ 88,200.00
Alberta Infrastructure and Transportation Page 13 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)**
Code Repair Install vacuum breakers on non freeze hose bibbs
$ 1,070.00 $ - $ - $ - $ - $ 1,070.00
C3030.07 Interior Ceiling Painting** Code Repair Repair ceiling in mechanical room. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
E2010.03.01 Blinds** Failure Replacement Remove and replace vertical blinds. $ - $ 2,140.00 $ - $ - $ - $ 2,140.00
D2010.02 Urinals** - 1959 Phase Failure Replacement Replace 4 urinals. $ - $ 4,280.00 $ - $ - $ - $ 4,280.00
D2010.03 Lavatories** - 1959 Phase Failure Replacement Replace 8 lavatories. $ - $ 8,560.00 $ - $ - $ - $ 8,560.00
D3040.01.01 Air Handling Units: Air Distribution** - 1959 Phase
Failure Replacement Replace gas fired section with hot water or glycol coil.
$ - $ - $ 10,700.00 $ - $ - $ 10,700.00
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
Failure Replacement Replace three original panelboards. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00
C3020.07 Resilient Flooring** Failure Replacement Replace the floor finish. $ 6,420.00 $ - $ - $ - $ - $ 6,420.00
D3020.02.01 Heating Boilers and Accessories: H.W.**
Failure Replacement Replace heating system to feed entire school.
$ - $ 128,400.00 $ - $ - $ - $ 128,400.00
C3020.08 Carpet Flooring** Failure Replacement Repair/Replace music room carpet. $ 4,280.00 $ - $ - $ - $ - $ 4,280.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
Preventative Maintenance Caulk around doors and frames. $ - $ 2,675.00 $ - $ - $ - $ 2,675.00
B1010.01 Floor Structural Frame*(Building Frame)
Repair Install bridging. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00
B2020.03 Glazed Curtain Wall** Repair Repair aluminum frame. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
A2020 Basement Walls (& Crawl Space)*
Repair Repair basement walls and install a sump.
$ 6,420.00 $ - $ - $ - $ - $ 6,420.00
B1010.02 Structural Interior and Exterior Walls*
Repair Repair damaged walls. $ 107,000.00 $ - $ - $ - $ - $ 107,000.00
C2010 Stair Construction* Repair Repair wood stairs. $ 3,745.00 $ - $ - $ - $ - $ 3,745.00
B1010.03 Floor Decks, Slabs, and Toppings*
Repair Repair basement flooring. $ 14,980.00 $ - $ - $ - $ - $ 14,980.00
C3020.01 Concrete Floor Finishes* Repair Repair basement flooring. $ 5,350.00 $ - $ - $ - $ - $ 5,350.00
David Ovans Elementary School B3989A
Alberta Infrastructure and Transportation Page 14 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A E2010.02.07 Kitchen Casework* Repair Adjust, repair, and refinish existing
cabinets. $ - $ 1,070.00 $ - $ - $ - $ 1,070.00
C1020.03 Interior Fire Doors* Repair Repair gym entrance doors, and install electronic hold open devices for doors in corridor.
$ 4,280.00 $ - $ - $ - $ - $ 4,280.00
Total of Maintenance Events $ 157,825.00 $ 159,965.00 $ 10,700.00 $ - $ - $ 328,490.00
Upgrading Events K4010.01 Barrier Free Route: Parking to Entrance
Barrier Free Access Upgrade Upgrade walkway to staff parking area. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00
D5020.02.03.03 Exit Signs Code Upgrade Exit sign Breezeway missing. $ - $ 1,605.00 $ - $ - $ - $ 1,605.00
K4010.02 Barrier Free Entrances Code Upgrade Install a power assist door operator. $ - $ 10,700.00 $ - $ - $ - $ 10,700.00
C2020.08 Stair Railings and Balustrades*
Code Upgrade Install railings. $ 1,070.00 $ - $ - $ - $ - $ 1,070.00
K2030 Program Layout Energy Efficiency Upgrade Main Building Entrance - create a vestibule.
$ - $ 8,560.00 $ - $ - $ - $ 8,560.00
D3040.04.01 Fans: Exhaust** Range Indoor Air Quality Upgrade Install exhaust hood and exhaust fan above stove.
$ - $ - $ 5,350.00 $ - $ - $ 5,350.00
D3040.04.01 Fans: Exhaust** Kiln Indoor Air Quality Upgrade Install new roof top exhaust fan and fume hood for kiln.
$ - $ - $ 10,700.00 $ - $ - $ 10,700.00
D3020.03.01 Furnaces** - 1955, 1962 Phase
Indoor Air Quality Upgrade Replace furnaces with 3 air handling units $ - $ - $ 160,500.00 $ - $ - $ 160,500.00
D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade Additional receptacles in classrooms. $ - $ 5,350.00 $ - $ - $ - $ 5,350.00
E1090.07.06 Exercise (Climbing) Equipment
Operating Efficiency Upgrade Budget for removing climbing apparatus and repairing walls.
$ - $ 3,210.00 $ - $ - $ - $ 3,210.00
D2010.04 Sinks** Operating Efficiency Upgrade Install 3 custodial sinks. $ - $ - $ - $ 9,630.00 $ - $ 9,630.00
D5030.01 Detection and Fire Alarm** Operating Efficiency Upgrade The school has two different fire alarm systems.
$ - $ 26,750.00 $ - $ - $ - $ 26,750.00
E2010.03.06 Curtains and Drapes** Operating Efficiency Upgrade Upgrade clerestory window treatment. $ - $ 12,840.00 $ - $ - $ - $ 12,840.00
C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Budget - Music room acoustic wall treatment
$ 6,420.00 $ - $ - $ - $ - $ 6,420.00
C3010.09 Acoustical Wall Treatment** Program Functional Upgrade Gym acoustic wall treatment. $ 16,050.00 $ - $ - $ - $ - $ 16,050.00
C1030.01 Visual Display Boards** Program Functional Upgrade Remove chalkboards and install whiteboards.
$ 4,280.00 $ - $ - $ - $ - $ 4,280.00
Alberta Infrastructure and Transportation Page 15 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalDavid Ovans Elementary School B3989A B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
Study Roof study $ 5,350.00 $ - $ - $ - $ - $ 5,350.00
Total of Upgrading Events $ 33,170.00 $ 70,620.00 $ 176,550.00 $ 9,630.00 $ - $ 289,970.00 Total of Building Events $ 190,995.00 $ 230,585.00 $ 187,250.00 $ 9,630.00 $ - $ 618,460.00
Site Events G2020.06.03 Parking Lot Signs* Operating Efficiency Upgrade Install parking lot signs. $ 2,140.00 $ - $ - $ - $ - $ 2,140.00
G2040.02 Fences and Gates** Repair Repair soil condition and align chain link fencing.
$ 2,140.00 $ - $ - $ - $ - $ 2,140.00
G2050.04 Lawns and Greens* Repair Grade, top dress and seed the play area. $ 3,424.00 $ - $ - $ - $ - $ 3,424.00
G2010.02.01 Aggregate Roadway (Gravel)**
Repair Repair roadway. $ 10,700.00 $ - $ - $ - $ - $ 10,700.00
Total of Site Events $ 18,404.00 $ - $ - $ - $ - $ 18,404.00
Alberta Infrastructure and Transportation Page 16 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1030.06 Handrails* Code Repair Fasten handrail properly in order to
sustain normal usage requirements. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
B1010.07 Exterior Stairs* Code Repair Install handrail at exit stairwell near 1984 music room.
$ 500.00 $ - $ - $ - $ - $ 500.00
E2010.02.99 Other Casework* Lifecycle Replacement Display cases and washrooms require modernization due to delamination and years of use.
$ 37,000.00 $ - $ - $ - $ - $ 37,000.00
D3020.02.01 Heating Boilers and Accessories: H.W.*
Lifecycle Replacement Only one heating boiler for the 1969 addition area. No backup.
$ 25,000.00 $ - $ - $ - $ - $ 25,000.00
C2020.06 Carpet Stair Finishes* Lifecycle Replacement Remove and replace existing carpet on stairs.
$ 600.00 $ - $ - $ - $ - $ 600.00
C3020.08 Carpet Flooring* Lifecycle Replacement Remove and replace existing carpet. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00
C2020.05 Resilient Stair Finishes* Lifecycle Replacement Remove and replace stair finishes in 1969west and 1979 stairwells
$ - $ 6,000.00 $ - $ - $ - $ 6,000.00
C3020.02 Tile Floor Finishes* Lifecycle Replacement Remove and replace vinyl asbestos tile flooring in many areas. Replace with resilient sheet flooring.
$ - $ 41,000.00 $ - $ - $ - $ 41,000.00
C3010.11 Interior Wall Painting* Lifecycle Replacement Repaint concrete block, gypsum board, and "Desco" coating on walls throughout school.
$ - $ 44,700.00 $ - $ - $ - $ 44,700.00
E2010.03.06 Curtains and Drapes* Lifecycle Replacement Replace curtains in the 1969 classrooms with new drapes or blinds
$ 4,000.00 $ - $ - $ - $ - $ 4,000.00
E2020 Moveable Furnishings* Lifecycle Replacement Replace desks, tables, and chairs as required.
$ 25,000.00 $ - $ - $ - $ - $ 25,000.00
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Lifecycle Replacement Replace existing ceiling tiles with new acoustic ceiling tiles
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
E2010.02.05 Educational Facility Casework*
Lifecycle Replacement Replace millwork and countertops in 1959, 1963, 1966, and 1969 areas as required.
$ 67,000.00 $ - $ - $ - $ - $ 67,000.00
C3020.07 Resilient Flooring* Lifecycle Replacement Replace sheet linoleum and vinyl flooring throughout school.
$ 400,000.00 $ - $ - $ - $ - $ 400,000.00
C1030.02 Fabricated Compartments(Toilets/Showers)*
Lifecycle Replacement Replace toiltet partitions in the 1963, 1969(upper level) and 1979 changeroom sections
$ 4,500.00 $ - $ - $ - $ - $ 4,500.00
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Preventative Maintenance Patch and repaint plaster trim and soffits $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Preventative Maintenance Remove and replace caulking around windows and doors throughout.
$ 18,000.00 $ - $ - $ - $ - $ 18,000.00
Hillside Jr. / Sr. High School B4196A
Alberta Infrastructure and Transportation Page 17 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A C3020.01 Concrete Floor Finishes (Paint)*
Preventative Maintenance Repaint and reseal Industrial Arts floor $ 15,000.00 $ - $ - $ - $ - $ 15,000.00
B3010.07 Sheet Metal Roofing* Preventative Maintenance Repaint metal roof $ - $ 10,000.00 $ - $ - $ - $ 10,000.00
B2010.01.06.03 Metal Siding* Preventative Maintenance Repaint metal siding $ - $ 10,000.00 $ - $ - $ - $ 10,000.00
C3010.12 Wall Coverings* Preventative Maintenance Repaint vinyl wallcovering in 1963 staff lounge and 1969 "Mova-wall" systems
$ 4,600.00 $ - $ - $ - $ - $ 4,600.00
B3010.08.02 Metal Gutters and Downspouts*
Repair Extend existing roof drains to control water drainage and/or collection
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1030.08 Interior Identifying Devices* Repair Install room name plates where required $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
B1010.07 Exterior Stairs* Repair Mudjacking and repair of existing stoops $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
D5020.01 Electrical Branch Wiring* Repair Poorly supported conduit in crawlspace $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
E2010.02.08 Laboratory Casework* Repair Relaminate countertops in science rooms. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
C3010.06 Tile Wall Finishes* Repair Remove and replace ceramic tiles in 1979washroom and shower areas
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
C2020.05 Resilient Stair Finishes* Repair Remove existing finishes and replace withresilient flooring.
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C3010.14 Other Wall Finishes* Repair Remove existing Gypsum board and replace with cement board.
$ 3,500.00 $ - $ - $ - $ - $ 3,500.00
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
Repair Repair concrete block walls damaged due to water drainage problems.
$ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1020.01 Interior Swinging Doors* Repair Replace interior doors and hardware. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
B2010.01.06.04 Wood Siding* Repair Replace plywood between windows and reseal
$ 3,500.00 $ - $ - $ - $ - $ 3,500.00
D2030.01 Waste and Vent Piping* Repair Sanitary service is blocked by tree root growth.
$ 12,000.00 $ - $ - $ - $ - $ 12,000.00
D3050.03 Humidifiers* Repair Several humidifiers are not operational throughout the school
$ - $ 15,000.00 $ - $ - $ - $ 15,000.00
D2030.02 Waste Piping Specialties* Repair Water is seeping into the underslab ducting system.
$ 30,000.00 $ - $ - $ - $ - $ 30,000.00
Total of Maintenance Events $ 769,700.00 $ 131,700.00 $ - $ - $ - $ 901,400.00
Upgrading Events
Alberta Infrastructure and Transportation Page 18 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalHillside Jr. / Sr. High School B4196A K4010.03 Barrier Free Interior Circulation
Barrier Free Access Upgrade Add handicap lift at 1979 stairwell. $ 36,000.00 $ - $ - $ - $ - $ 36,000.00
K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install new handicap door actuators and related electrical requirements at south and east main entrances.
$ 5,000.00 $ - $ - $ - $ - $ 5,000.00
B2030.01.02 Steel-Framed Storefronts* Code Upgrade Replace hardware on exit vestibule doors with code compliaint hardware.
$ 1,500.00 $ - $ - $ - $ - $ 1,500.00
D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install one exhaust system for washroomsonly, and one exhaust system for weight room only.
$ - $ 3,000.00 $ - $ - $ - $ 3,000.00
D3040.04.01 Fans: Exhaust* Indoor Air Quality Upgrade Install new exhaust fan in change room. $ - $ - $ - $ 4,500.00 $ - $ 4,500.00
D3050.01.01 Computer Room Air Conditioning Units*
Operating Efficiency Upgrade Replace existing cooling system with a cooling only roof-top unit.
$ - $ - $ - $ 8,000.00 $ - $ 8,000.00
Total of Upgrading Events $ 42,500.00 $ 3,000.00 $ - $ 12,500.00 $ - $ 58,000.00 Total of Building Events $ 812,200.00 $ 134,700.00 $ - $ 12,500.00 $ - $ 959,400.00
Site Events G3010.03 Site Fire Protection Water Distribution*
Code Upgrade Fire hydrant is not within 45m of the building Siamese connection.
$ - $ - $ - $ - $ 20,000.00 $ 20,000.00
G2040.02 Fences and Gates* Lifecycle Replacement Replace chain link fence around tennis court
$ - $ 8,000.00 $ - $ - $ - $ 8,000.00
G2010.02.01 Aggregate Roadway (Gravel)*
Repair Grade and provide additional gravel $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
G2050.04 Lawns and Grasses* Repair Grade north side of site to ensure proper water drainage away from building. Remove dirt pile left from gas line repair.
$ 20,000.00 $ - $ - $ - $ - $ 20,000.00
G3030.01 Storm Water Collection* Repair Move and anchor splashpads against building to ensure adequate drainage.
$ 6,000.00 $ - $ - $ - $ - $ 6,000.00
G2010.02.02 Flexible Pavement Roadway (Asphalt)*
Repair Remove and replace asphalt in NW corner.
$ 15,000.00 $ - $ - $ - $ - $ 15,000.00
G2020.04 Rigid Parking Lot Pavement (Concrete)*
Repair Remove and replace concrete on west side parking lot with asphalt
$ 440,000.00 $ - $ - $ - $ - $ 440,000.00
G2030.04 Rigid Pedestrian Pavement (Concrete)*
Repair Remove and replace sidewalks and concrete pads.
$ 47,500.00 $ - $ - $ - $ - $ 47,500.00
Total of Site Events $ 528,500.00 $ 13,000.00 $ - $ - $ 20,000.00 $ 561,500.00
Alberta Infrastructure and Transportation Page 19 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 Total
C1020.03 Interior Fire Doors* Code Repair Install doors in corridors $ 12,000 $ - $ - $ - $ - $ 12,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Repair ceiling assemblies $ 3,000 $ - $ - $ - $ - $ 3,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Repair fire stop wall penetrations $ 5,000 $ - $ - $ - $ - $ 5,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Storage room next to Computer Lab # 47 needs to be brought up to code
$ 1,500 $ - $ - $ - $ - $ 1,500
C1010.07 Interior Partition and Ceilings Firestopping*
Code Repair Storage space within the cafeteria needs to be brought up to code
$ 12,500 $ - $ - $ - $ - $ 12,500
C3020.07 Resilient Flooring* Failure Replacement Install new floor finishes in 1960, 1964 and 1966 classrooms
$ - $ 54,000 $ - $ - $ - $ 54,000
C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new flooring in the Administration area
$ 8,000 $ - $ - $ - $ - $ 8,000
C3020.07.02 Resilient Sheet Flooring Failure Replacement Install new Kitchen flooring $ 3,000 $ - $ - $ - $ - $ 3,000
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*
Failure Replacement Replace BUR roof 1966 & 1973 Section $ 350,000 $ - $ - $ - $ - $ 350,000
C3020.08 Carpet Flooring* Failure Replacement Replace carpet in Library. $ 7,000 $ - $ - $ - $ - $ 7,000
E2010.02.05 Educational Facility Casework* CTS
Failure Replacement Replace casework in CTS space $ 2,000 $ - $ - $ - $ - $ 2,000
D5020.02 Interior Lighting Failure Replacement Replace damaged lenses in corridors. $ - $ 3,000 $ - $ - $ - $ 3,000
C3020.08 Carpet Flooring* Failure Replacement Replace Music Room flooring. $ 9,000 $ - $ - $ - $ - $ 9,000
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
Failure Replacement Replace Six Panelboards. $ - $ 24,000 $ - $ - $ - $ 24,000
C1010.03 Interior Operable Folding Panel Partitions*
Repair 1973 Gym - Replace operable partition's sound seals
$ 5,000 $ - $ - $ - $ - $ 5,000
C1010.05 Interior Windows* Repair Install Glazing in CTS $ 1,000 $ - $ - $ - $ - $ 1,000
B3010.09 Roof Specialities and Accessories
Repair Paint rooftop accessories, install new access ladders, and ice guards.
$ 6,000 $ - $ - $ - $ - $ 6,000
B2010.01.13 Paints (& Stains): Exterior Wall*
Repair Repaint exterior concrete block $ 10,000 $ - $ - $ - $ - $ 10,000
Onoway Junior / Senior High School B3845ABuilding EventsMaintenance Events
Alberta Infrastructure and Transportation Page 20 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A C3020.01 Concrete Floor Finishes (Paint)*
Repair Repair and repaint concrete floors in CTS area.
$ 20,000 $ - $ - $ - $ - $ 20,000
C1010.01 Interior Fixed Partitions* Repair Repair damaged interior walls. $ 6,000 $ - $ - $ - $ - $ 6,000
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Repair Repair damaged stucco and parging $ 8,000 $ - $ - $ - $ - $ 8,000
B1020.04 Canopies* Repair Repair Entrance Canopy $ 3,000 $ - $ - $ - $ - $ 3,000
F1010.02.04 Portable and Mobile Buildings* - Beauty Culture
Repair Repair steps and install new door weatherstripping. Repair interior wall.
$ 1,500 $ - $ - $ - $ - $ 1,500
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Repair Replace / upgrade sealant $ 1,000 $ - $ - $ - $ - $ 1,000
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Repair Replace ceiling tiles in Classrooms and Corridors
$ 20,000 $ - $ - $ - $ - $ 20,000
B2030.01.02 Steel-Framed Storefronts* Repair Replace exterior door hardware $ 5,500 $ - $ - $ - $ - $ 5,500
C1020.01 Interior Swinging Doors* Repair Replace interior doors, frames and hardware
$ 18,500 $ - $ - $ - $ - $ 18,500
B3010.08.02 Metal Gutters and Downspouts*
Repair Replace rainwater leaders and install splash pads
$ 1,500 $ - $ - $ - $ - $ 1,500
C1010.06 Interior Glazed Partitions and Storefronts*
Repair Replace sound seals around glazed partitions in the Library
$ 1,500 $ - $ - $ - $ - $ 1,500
D3010.02 Gas Supply Systems* Repair Scrape and repaint roof gas piping. $ 4,000 $ - $ - $ - $ - $ 4,000
Total of Maintenance Events 525,500$ 81,000$ -$ -$ -$ 606,500$
K4010.02 Barrier Free Entrances Barrier Free Access Upgrade Install 2 power assist door operators. $ 12,000 $ - $ - $ - $ - $ 12,000
K4010.03 Barrier Free Interior Circulation
Barrier Free Access Upgrade Install a barrier free ramp in the music room.
$ 7,000 $ - $ - $ - $ - $ 7,000
D4030.01 Fire Extinguisher, Cabinets and Accessories*
Code Upgrade Install new fire extinguishers. $ 3,000 $ - $ - $ - $ - $ 3,000
B1010.07 Exterior Stairs* Code Upgrade Install stairs at 1992 structure. $ 5,000 $ - $ - $ - $ - $ 5,000
D2010.04 Sinks* - 1960, 1973 Phase Code Upgrade Install vacuum breakers on lab sinks. $ 2,000 $ - $ - $ - $ - $ 2,000
Upgrading Events
Alberta Infrastructure and Transportation Page 21 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A B1010.09 Assembly Construction - Fire Rating
Code Upgrade Upgrade 2003 storage structure $ 30,000 $ - $ - $ - $ - $ 30,000
C1010.07 Interior Partition and Ceilings Firestopping*
Code Upgrade Upgrade Storage room in 1992 structure $ 11,500 $ - $ - $ - $ - $ 11,500
D2020.02.06 Domestic Water Heaters* - 1960 Phase
Energy Efficiency Upgrade Replace domestic water heater. $ - $ 3,000 $ - $ - $ - $ 3,000
B2020.01.01.02 Aluminum Windows (Glass & Frame)*
Energy Efficiency Upgrade Upgrade windows 1966 and 1973 structures
$ 50,000 $ - $ - $ - $ - $ 50,000
D3040.04.01 Fans: Exhaust* - 1966 Phase
Indoor Air Quality Upgrade Improve exhaust for Home economics. $ - $ 9,500 $ - $ - $ - $ 9,500
D3050.01.01 Computer Room Air Conditioning Units*
Indoor Air Quality Upgrade Install air conditioner. $ - $ 25,000 $ - $ - $ - $ 25,000
D3020.03.01 Furnaces* - 1981 Phase Indoor Air Quality Upgrade Replace furnaces with new AHUs. $ - $ 60,000 $ - $ - $ - $ 60,000
D5030.02.04 Video Surveillance* Operating Efficiency Upgrade
Add surveillance camera. $ - $ 10,000 $ - $ - $ - $ 10,000
D5020.01 Electrical Branch Wiring* Operating Efficiency Upgrade
Classrooms need additional receptacles. $ - $ - $ 18,000 $ - $ - $ 18,000
D2010.04 Sinks* - 1966 Phase Operating Efficiency Upgrade
Install 3 art sinks. $ - $ 9,000 $ - $ - $ - $ 9,000
D5010.03 Main Electrical Switchboards (Main Distribution)*
Operating Efficiency Upgrade
Upgrade splitter panelboard. $ - $ - $ 15,000 $ - $ - $ 15,000
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in boy's gym
$ 24,000 $ - $ - $ - $ - $ 24,000
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Install acoustic wall treatment in girls gym.
$ 18,000 $ - $ - $ - $ - $ 18,000
E1020.03 Theater and Stage Equipment*
Program Functional Upgrade Stage drapery $ 10,000 $ - $ - $ - $ - $ 10,000
K40 Current Code Issues Study Study - Code review $ 15,000 $ - $ - $ - $ - $ 15,000
Total of Upgrading Events 187,500$ 116,500$ 33,000$ -$ -$ 337,000$ Total of Building Events $ 713,000 $ 197,500 $ 33,000 $ - $ - $ 943,500
G2010.02.02 Flexible Pavement Roadway (Asphalt)*
Failure Replacement Repair access roadway $ 70,000 $ - $ - $ - $ - $ 70,000
G4020.01 Area Lighting* Operating Efficiency Upgrade
Add exterior lighting if surveillance camera's added.
$ - $ 3,000 $ - $ - $ - $ 3,000
Site Events
Alberta Infrastructure and Transportation Page 22 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalOnoway Junior / Senior High School B3845A G2020.02.01 Aggregate Parking Lots (Gravel)*
Operating Efficiency Upgrade
Upgrade Student parking areas $ 55,000 $ - $ - $ - $ - $ 55,000
G2020.06.02 Parking Bumpers* Program Functional Upgrade Install 30 wheel stops $ 3,000 $ - $ - $ - $ - $ 3,000
G2040.08 Flagpoles* Repair Refinish flagpole. $ 500 $ - $ - $ - $ - $ 500
G2050.04 Lawns and Grasses* Repair Repair lawns and grasses $ 15,000 $ - $ - $ - $ - $ 15,000
G2020.02.02 Flexible Paving Parking Lots(Asphalt)*
Repair Repair staff and visitor parking. $ 5,000 $ - $ - $ - $ - $ 5,000
G2030.06 Exterior Steps and Ramps* Repair Replace portable's exterior steps and landings.
$ 8,000 $ - $ - $ - $ - $ 8,000
Total of Site Events 156,500$ 3,000$ -$ -$ -$ 159,500$
Alberta Infrastructure and Transportation Page 23 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalBuilding EventsMaintenance Events C1010.07 Interior Partition Firestopping* Code Repair Budget for upgrade to fire separations. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
C2020.05 Resilient Stair Finishes* Code Repair Construct a ramp access to the gym. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
D3040.01.04 Ducts: Air Distribution* Code Repair Install fire dampers. $ 40,000.00 $ - $ - $ - $ - $ 40,000.00
D2020.01.03 Piping Specialties (Backflow Preventors)*
Code Repair Install vacuum breakers. $ - $ 1,000.00 $ - $ - $ - $ 1,000.00
D3040.03.01 Hot Water Distribution Systems*
Code Repair Revise mechanical room layout. $ 15,000.00 $ - $ - $ - $ - $ 15,000.00
B1020.06 Roof Construction Fireproofing*
Code Repair Upgrade walls and roof structure assemblies in upper corridor ceiling spaces.
$ 15,000.00 $ - $ - $ - $ - $ 15,000.00
D5020.02.02.02 Interior Fluorescent Fixtures*
Failure Replacement Relamp gym fixtures. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*
Failure Replacement Replace four original panelboards. $ - $ 16,000.00 $ - $ - $ - $ 16,000.00
C1030.10 Lockers* Lifecycle Replacement Install new lockers in the 1959 section. Install appropriate storage for student's apparel within the 1965 section.
$ 18,000.00 $ - $ - $ - $ - $ 18,000.00
C1020.01 Interior Swinging Doors* Lifecycle Replacement Upgrade doors and frames for 1954 and 1959, and 1965 structures.
$ 17,000.00 $ - $ - $ - $ - $ 17,000.00
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*
Lifecycle Replacement Upgrade roofing, consider achieving a higher RSI value.
$ - $ - $ - $ 115,000.00 $ - $ 115,000.00
B2010.01.13 Paints (& Stains): Exterior Wall*
Preventative Maintenance Paint exterior masonry walls. $ 8,000.00 $ - $ - $ - $ - $ 8,000.00
C3020.11 Floor Painting Preventative Maintenance Paint furnace room floor. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
B2010.01.02.02 Concrete Block: Ext. Wall Skin*
Preventative Maintenance Repair exterior masonry walls. $ - $ 5,000.00 $ - $ - $ - $ 5,000.00
B3010.08.02 Metal Gutters and Downspouts*
Repair Install new rainwater leaders. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*
Repair Level t-bar ceiling. $ 4,500.00 $ - $ - $ - $ - $ 4,500.00
C3010.02 Wall Paneling* Repair Re-finish wall paneling. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
C3030.04 12x12 Stapled Acoustic Ceiling Finishes*
Repair Repair and/or refinish ceiling tiles. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
Rich Valley School B3522A
Alberta Infrastructure and Transportation Page 24 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalRich Valley School B3522A B2010.01.09 Expansion Control: ExteriorWall Skin*
Repair Repair exterior masonry / control joints. $ 1,200.00 $ - $ - $ - $ - $ 1,200.00
A1030 Slab on Grade* Repair Repair floor irregularities. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00
C1030.12 Storage Shelving* Repair Repair storage shelving. $ 2,500.00 $ - $ - $ - $ - $ 2,500.00
E2010.02.05 Educational Facility Casework*
Repair Upgrade classroom casework. $ 5,000.00 $ - $ - $ - $ - $ 5,000.00
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
Repair Upgrade gym exterior wall finish. $ 10,000.00 $ - $ - $ - $ - $ 10,000.00
Total of Maintenance Events $ 158,700.00 $ 27,000.00 $ - $ 115,000.00 $ - $ 300,700.00
Upgrading Events D5010.03 Main Electrical Switchboards (Main Distribution)*
Code Upgrade Clearances do not meet Canadian Electrical Code (CEC).
$ - $ - $ - $ - $ - $ -
K4010.02 Barrier Free Entrances Code Upgrade Upgrade main entrance to barrier free standards.
$ 6,500.00 $ - $ - $ - $ - $ 6,500.00
D5020.02.02.02 Interior Fluorescent Fixtures*
Energy Efficiency Upgrade Upgrade 80 fixtures T12 to T8. $ - $ 20,000.00 $ - $ - $ - $ 20,000.00
B2010.01.11 Joint Sealers (caulking): Ext. Wall*
Energy Efficiency Upgrade Upgrade exterior caulking. $ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3010.11 Interior Wall Painting* Operating Efficiency Upgrade Budget for painting walls - 5 year cycle. $ - $ - $ 10,000.00 $ - $ - $ 10,000.00
D2010.04 Sinks* Operating Efficiency Upgrade Replace two custodial sinks. $ - $ 6,000.00 $ - $ - $ - $ 6,000.00
D5030.04.02 Paging/Intercom Systems* Operating Efficiency Upgrade Sound system wiring run exposed on gym wall.
$ - $ 1,000.00 $ - $ - $ - $ 1,000.00
C1020.03 Interior Fire Doors* Operating Efficiency Upgrade Upgrade double doors within the 1965 corridor.
$ 2,000.00 $ - $ - $ - $ - $ 2,000.00
C3010.09 Acoustical Wall Treatment* Program Functional Upgrade Budget to install acoustic wall treatments. $ 7,000.00 $ - $ - $ - $ - $ 7,000.00
C3020.08 Carpet Flooring* Program Functional Upgrade The carpet in the music/science room is worn.
$ 6,000.00 $ - $ - $ - $ - $ 6,000.00
E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade music program casework. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
E2010.02.08 Laboratory Casework* Program Functional Upgrade Upgrade science program casework $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
C1030.01 Visual Display Boards* Program Functional Upgrade Upgrade visual display boards in 1959 section.
$ 2,000.00 $ - $ - $ - $ - $ 2,000.00
Total of Upgrading Events $ 30,500.00 $ 27,000.00 $ 10,000.00 $ - $ - $ 67,500.00
Alberta Infrastructure and Transportation Page 25 of 26
Northern Gateway Regional Division No.10Listing of Events
2006 2007 2008 2009 2010 TotalRich Valley School B3522ATotal of Building Events $ 189,200.00 $ 54,000.00 $ 10,000.00 $ 115,000.00 $ - $ 368,200.00
Site Events G2020.06.03 Parking Lot Signs* Code Repair Upgrade site and building signage. $ 4,200.00 $ - $ - $ - $ - $ 4,200.00
G2050.04 Lawns and Grasses* Preventative Maintenance Budget for re-grading and seeding grounds.
$ 10,000.00 $ - $ - $ - $ - $ 10,000.00
G2040.08 Flagpoles* Preventative Maintenance Refinish Flagpole. $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
G2020.06.02 Parking Bumpers* Program Functional Upgrade Install concrete wheel stops. $ 3,000.00 $ - $ - $ - $ - $ 3,000.00
G2040.02 Fences and Gates* Repair Budget - repair chain link fencing. $ - $ - $ - $ 2,000.00 $ - $ 2,000.00
G2040.02 Fences and Gates* Repair Budget for repairs to chain link fencing. $ - $ 2,000.00 $ - $ - $ - $ 2,000.00
G2010.02.01 Aggregate Roadway (Gravel)*
Repair Upgrade roadway and parking areas. $ 60,000.00 $ - $ - $ - $ - $ 60,000.00
G2030.04 Rigid Pedestrian Pavement (Concrete)*
Repair Upgrade walkways. $ 4,000.00 $ - $ - $ - $ - $ 4,000.00
G2030.06 Exterior Steps and Ramps* Repair Upgrade wood stair and landing. $ - $ - $ 2,000.00 $ - $ - $ 2,000.00
Total of Site Events $ 82,200.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ - $ 88,200.00
Alberta Infrastructure and Transportation Page 26 of 26