LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February...

43
LIST OF EXISTING MBM CROSSING SYSTEM™ INSTALLATIONS UPDATED DECEMBER 15, 2014 1) ST. JOHNS RIVER POWER PARK Jacksonville, Florida Three each 40’ MBM Crossings Installed December 1990 RWS Job No. 90-122 2) FLORIDA CENTRAL RAILROAD Lake Jem, Florida Shirley Shores Drive, off C.R. 448 One each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S. Highway 27 One each 60’ MBM Crossing was installed on North lane, One each 40’ Omni full depth rubber was installed on South lane. (Cross Reference MBM List Crossing 22) Installed April 1994 Rubber Epflex Interface Installed September 2004 RWS Job No. 94-216 4) AVATAR PROPERTIES (POINCIANA TOWNSHIP) Poinciana, Florida U.S. Highway 17/92 One each 40’ MBM Crossing Installed January 1995 RWS Job No. 94-201 5) CAMP BLANDING TITAN STORAGE BUILDING Camp Blanding, Florida Railroad track approach to Titan Storage Building One each 100’ MBM Crossing Installed January 1996 RWS Job No. 94-196

Transcript of LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February...

Page 1: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

LIST OF EXISTING MBM CROSSING SYSTEM™ INSTALLATIONS

UPDATED DECEMBER 15, 2014

1) ST. JOHNS RIVER POWER PARK

Jacksonville, Florida

Three each 40’ MBM Crossings

Installed December 1990

RWS Job No. 90-122

2) FLORIDA CENTRAL RAILROAD

Lake Jem, Florida

Shirley Shores Drive, off C.R. 448

One each 40’ MBM Crossing

Installed February 1994

RWS Job No. 94-083

3) SOUTH CENTRAL FLORIDA EXPRESS

Clewiston, Florida

U.S. Highway 27

One each 60’ MBM Crossing was installed on North lane,

One each 40’ Omni full depth rubber was installed on South lane.

(Cross Reference MBM List Crossing 22)

Installed April 1994

Rubber Epflex Interface

Installed September 2004

RWS Job No. 94-216

4) AVATAR PROPERTIES (POINCIANA TOWNSHIP)

Poinciana, Florida

U.S. Highway 17/92

One each 40’ MBM Crossing

Installed January 1995

RWS Job No. 94-201

5) CAMP BLANDING TITAN STORAGE BUILDING

Camp Blanding, Florida

Railroad track approach to Titan Storage Building

One each 100’ MBM Crossing

Installed January 1996

RWS Job No. 94-196

Page 2: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

6) SOUTH CENTRAL FLORIDA EXPRESS

S.R. 70 South of Lake Placid, West of U.S. Highway 27

One each 40’ MBM Crossing

Installed March 1996

RWS Job No. 95-128

Rubber Epflex Interface

Installed October 2002

RWS Job No. 03-007

7) CITY OF LAKELAND, FLORIDA REMOVED AND REPLACE ASPHALT

Lakeland, Florida Installed July 2009

S.R. 33-A at McIntosh Power Plant RWS Job No. 08-069

One each 60’ MBM Crossing

Installed June 1996

RWS Job No. 96-049

8) FLORIDA NORTHERN RAILROAD REMOVED ASPHALT AND REPLACED

Ocala, Florida WITH RUBBER EPFLEX INTERFACE

C.R. 326 Installed February 2010

One each 100’ MBM Crossing RWS Job No. 04-109

Installed August 1996

RWS Job No. 96-026

9) FLORIDA CENTRAL RAILROAD

Ocoee, Florida

Bowness Road

One each 40’ MBM Crossing

Installed December 1996

RWS Job No. 97-036

10) FLORIDA CENTRAL RAILROAD REMOVED ASPHALT AND REPLACED

Orlando, Florida WITH RUBBER EPFLEX INTERFACE

John Young Parkway (North of Silver Star Road) Installed March 2010

Two each 40’ MBM Crossings RWS Job No. 04-109

Installed February 1997

RWS Job 97-029

11) FLORIDA CENTRAL RAILROAD REMOVED ASPHALT AND REPLACED

Orlando, Florida WITH RUBBER EPFLEX INTERFACE

U.S. Highway 441 @ Silver Star Road Installed March 2010

One each 100’ MBM Crossing installed in 12 curve RWS Job No. 04-109

Installed April 1997

RWS Job No. 97-037

Page 3: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

12) FLORIDA NORTHERN RAILROAD

Ocala, Florida

C.R. 329

One each 40’ MBM Crossing

Installed September 1997

RWS Job No. 97-158

13) TARMAC AMERICA, INC.

Medley, Florida

Pennsuco Quarry,

One each 160’ MBM Crossing (60’ Tangent, 100’ 12 curve)

Installed December 1997

RWS Job No. 97-105

14) SOUTH CENTRAL FLORIDA EXPRESS

South Bay, Florida

U.S. Highway 27

One each 120’ MBM Crossing

Installed October 1998

Rubber Epflex Interface

Installed July 2002

RWS Job No. 98-120

15) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Narcoossee Road

One each 120’ MBM Crossing

Installed February 1999

RWS Job No. 93-143

16) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Spur Road

One each 20’ MBM Crossing

Installed March 1999

RWS Job No. 98-151

17) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Old Wetherbee Road

One each 40’ MBM Crossing

Installed April 1999

RWS Job No. 98-151

Page 4: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

18) FLORIDA CENTRAL RAILROAD REMOVED ASPHALT AND REPLACED

Orlando, Florida WITH RUBBER EPFLEX INTERFACE

U.S. Highway 441 @ Sears Branch Installed March 2010

One each 100’ MBM Crossing RWS Job No. 04-109

Installed April 1999

RWS Job No. 98-129

19) FLORIDA CENTRAL RAILROAD

Orlando, Florida

S.R. 50

One each 80’ MBM Crossing

Installed March & April 1999

RWS Job No. 99-063

20) FLORIDA CENTRAL RAILROAD

Apopka, Florida

13TH

Street & Tilden

One each 100’ MBM Crossing

Installed June 1999

RWS Job No. 98-069

21) FLORIDA MIDLAND RAILROAD

Eagle Lake, Florida

S.R. 540

One each 140’ MBM Crossing

Installed September 1999

RWS Job No. 98-088

22) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida

U.S. Highway 27 - South Lanes

One each 40’ MBM Crossing

(Cross reference MBM List Crossing 3)

Installed October 1999

Rubber Epflex Interface

Installed September 2004

RWS Job No. 99-158

23) FLORIDA NORTHERN RAILROAD

Ocala, Florida

Magnolia Avenue

One each 60’ MBM Crossing

Installed January 2000

RWS Job No. 99-119

Page 5: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

24) FLORIDA CENTRAL RAILROAD EXTEND CROSSING

Tavares, Florida 20 L.F. to the North

U.S. Highway 441 at Mount Homer Road Installed March 2005

One each 180’ MBM Crossing RWS Job No. 05-069

Installed January 2000 REMOVED ASPHALT AND REPLACED

RWS Job No. 99-160 WITH RUBBER EPFLEX INTERFACE

Installed February 2010

RWS Job No. 04-109

25) LAKELAND REGIONAL INDUSTRIAL PARK

Lakeland, Florida

U.S. Highway 92

One each 60’ MBM Crossing installed in 12 curve

Installed July 2000

RWS Job No. 99-122

26) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.R. 35 / Baseline Road

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed September 2000

RWS Job No. 00-095

27) FLORIDA CENTRAL RAILROAD

Orlando, Florida

S.R. 423 / Lee Road

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed October 2000

RWS Job No. 00-078

28) TAMPA ELECTRIC COMPANY RELOCATED ONE 60' MBM CROSING

Big Bend Station IN PEMBROKE ROAD

Wyandotte Road and Pembroke Road Re-using all existing materials

Apollo Beach, Florida October 2009

Four each 60’ MBM Crossings Cross-Reference Crossing No. 131

Installed in 12 curve

with Rubber Epflex Interface

Installed October and November 2000

RWS Job No. 00-175

29) SOUTH CENTRAL FLORIDA EXPRESS

Port Mayaca, Florida

S.R. 76

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed November 2000

RWS Job No. 00-036

Page 6: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

30) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Boy Scout Boulevard

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed February 2001

RWS Job No. 00-130

31) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

Old DeSoto City Road

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed March 2001

RWS Job No. 01-036

32) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

S.R. 700 (U.S. Highway 98)

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed April 2001

RWS Job No. 00-009

33) SOUTH CENTRAL FLORIDA EXPRESS

Belle Glade, Florida

S.R. 15

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed April 2001

RWS Job No. 00-039

34) FLORIDA CENTRAL RAILROAD

Tavares, Florida

Alfred Street (Old U.S. Highway 441)

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed May 2001

RWS Job No. 01-081

35) FLORIDA MIDLAND RAILROAD

Winter Haven, Florida

Lake Shipp Drive (S.R. 655)

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed July 2001

RWS Job No. 01-065

Page 7: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

36) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Moss Park Road

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed July 2001

RWS Job No. 93-143

37) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Boggy Creek Road

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed August 2001

RWS Job No. 93-143

38) SOUTH CENTRAL FLORIDA EXPRESS

South of Palmdale, Florida

U.S. Highway 27

Two each 40’ MBM Crossings

with Rubber Epflex Interface

Installed August 2001

RWS Job No. 01-006

39) FLORIDA MIDLAND RAILROAD

Lake Wales, Florida

S.R. 60

One each 120’ MBM Crossing on East Lanes

One each 100’ MBM Crossing on West Lanes

with Rubber Epflex Interface

Installed September 2001

RWS Job No. 01-129

40) SOUTH CENTRAL FLORIDA EXPRESS

South of Palmdale, Florida

S.R. 29

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed November 2001

RWS Job No. 01-097

41) CARGILL FERTILIZER, INC.

Bartow, Florida

Ridgewood Facility

Two each 31’ MBM Crossings

Installed January 2002

RWS Job No. 01-164

Page 8: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

42) FLORIDA CENTRAL RAILROAD

South of Apopka, Florida

Hiawassee Road

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed February 2002

RWS Job No. 00-008

43) FLORIDA CENTRAL RAILROAD

Ocoee, Florida

S.R. 439 (McKey Street)

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed June 2002

RWS Job No. 02-076

44) FLORIDA CENTRAL RAILROAD

Ocoee, Florida

Taylor Street

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed June 2002

RWS Job No. 02-076

45) FLORIDA MIDLAND RAILROAD

South of Lake Wales, Florida

C.R. 17-B

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed July 2002

RWS Job No. 02-001

46) SOUTH CENTRAL FLORIDA EXPRESS

Pahokee, Florida

S.R. 15

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed July 2002

RWS Job No. 01-105

47) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.R. 464 / S.E. 17th Street

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed July 2002

RWS Job No. 02-045

Page 9: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

48) FLORIDA CENTRAL RAILROAD

Orlando, Florida

S.R. 416 Silver Star Road

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed September 2002

RWS Job No. 01-160

49) SOUTH CENTRAL FLORIDA EXPRESS EXISTING CROSSING RAISED

Lake Placid, Florida To meet New Track Elevation after

South Bear Point (Oakley Development) rail replacement project. No new

One each 40' MBM Crossing crossing components required.

with Rubber Epflex Interface January 2008

Installed September 2002 RWS Job No. 06-106

RWS Job No. 01-122

50) SOUTH CENTRAL FLORIDA EXPRESS

Moore Haven, Florida

S.R. 78 East

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed October 2002

RWS Job No. 02-162

51) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Wewahootee Road at Private Gun Range

One each 20' MBM Crossing

Installed October 2002

RWS Job No. 93-143

52) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Penny Ranch (Orange County Gun Range)

One each 40' MBM Crossing

Installed October 2002

RWS Job No. 93-143

53) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Wewahootee Road

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed October 2002

RWS Job No. 93-143

Page 10: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

54) CSX TRANSPORTATION, INC.

Lakeland, Florida

U.S. Highway 92 @ Kraft Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed November 2002

RWS Job No. 02-143

55) CSX TRANSPORTATION, INC.

Lakeland, Florida

S.R. 659 (Combee Road)

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed December 2002

RWS Job No. 02-024

56) FLORIDA CENTRAL RAILROAD

Ocoee, Florida

S.R. 438 Ocoee at Silver Star Road

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed January 2003

RWS Job No. 02-032

57) FLORIDA CENTRAL RAILROAD

Orlando, Florida

S.R. 438 West Princeton / Smith Street

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed March 2003

RWS Job No. 02-139

58) FLORIDA CENTRAL RAILROAD

Apopka, Florida

C.R. 435 (Park Avenue)

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed April 2003

RWS Job No. 02-133

Page 11: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

59) U.S. AGRI-CHEMICALS CORPORATION

Bartow, Florida

Plant Main Entrance Crossing

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed May 2003

RWS Job No. 03-084

60) FLORIDA CENTRAL RAILROAD

Plymouth, Florida

C.R. 437 (Orange Avenue)

Two each 40’ MBM Crossings

with Rubber Epflex Interface

Installed May 2003

RWS Job No. 02-132

61) U.S. SUGAR CORPORATION

East of Belle Glade, Florida

S.R. 80 (Hooker Highway)

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed October 2003

RWS Job No. 03-001

62) CSX TRANSPORTATION, INC. CROSSING REPLACED

(HDR ENGINEERING, INC.) November 2006

Bradley Junction, Florida Acid water deteriorated concrete,

S.R. 37 allowing rail movement within

One each 40' MBM Crossing the crossing.

with Rubber Epflex Interface

Installed December 2003

RWS Job No. 03-037

63) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Sheeler Road

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed February 2004

RWS Job No. 03-132

Page 12: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

64) FLORIDA CENTRAL RAILROAD

Zellwood, Florida

Jones Avenue

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed February 2004

RWS Job No. 03-133

65) SOUTH CENTRAL FLORIDA EXPRESS

Belle Glade, Florida

S.R. 715 and S.W. 16th Street

One each 80’ MBM Crossing

with Rubber Epflex Interface

(Cross Reference MBM List Crossing 106)

Installed July 2004

RWS Job No. 04-100

66) SOUTH CENTRAL FLORIDA EXPRESS

Martin County, Florida

S.R. 710 / Warfield Highway

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed July 2004

RWS Job No. 04-099

67) FLORIDA MIDLAND RAILROAD

Polk County, Florida

S.R. 555 (U.S. Highway 17) @ Bartow Airbase

One each 120’ MBM Crossing

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed October 2004

RWS Job No. 03-098

68) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.R. 492 (N.W. 10th Street)

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed December 2004

RWS Job No. 04-130

Page 13: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

69) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.R. 492 (N.E. 10th Street)

One each 100’ MBM Crossing installed in 9° curve

with Rubber Epflex Interface

Installed December 2004

RWS Job No. 04-131

70) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Mercy Drive

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed January 2005

RWS Job No. 04-122

71) CSX TRANSPORTATION, INC.

Tampa, Florida

Port Sutton Road

One each 40’ MBM Crossing in Tangent Track

with Rubber Epflex Interface

One each 60’ MBM Crossing installed in 12° curve

with Rubber Epflex Interface

One each 100’ MBM Crossing installed in 9° curve

with Rubber Epflex Interface

Installed February 2005

RWS Job No. 03-119

72) FLORIDA CENTRAL RAILROAD

Tavares, Florida

U.S. Highway 441 at Mount Homer Road

Extend North lanes

One each 20’ MBM Crossing

with Rubber Epflex Interface

Installed March 2005

RWS Job No. 05-069

(Cross Reference MBM List Crossing 24)

73) CSX TRANSPORTATION, INC.

Orlando, Florida

S.R. 526 (Robinson Street)

One each 100’ MBM Crossing

Installed in 11° 30’ curve

with Rubber Epflex Interface

Installed April 2005

RWS Job No. 03-091

Page 14: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

74) CSX TRANSPORTATION, INC.

Bartow, Florida

S.R. 60 (MOSAIC Ridgewood Crossing)

Two each 40’ MBM Crossings

(East-bound and West-bound lanes)

with Rubber Epflex Interface

Installed April 2005

RWS Job No. 04-089

75) MOSAIC PHOSPHATES COMPANY

South Pierce, Florida

C.R. 630 (1.5 miles east of Old Hwy. 37)

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed May 2005

RWS Job No. 03-085

76) FLORIDA POWER & LIGHT COMPANY

Parrish, Florida

U.S. Highway 301

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed May 2005

RWS Job No. 04-013

77) SOUTH CENTRAL FLORIDA EXPRESS

Clewiston, Florida

Sanora Avenue (C.R. 832)

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed June 2005

RWS Job No. 05-024

78) U.S. SUGAR CORPORATION EXTEND CROSSING

Pahokee, Florida 20 L.F. installed in 9° curve

S.R. 15 - Mill Road at Bryant Mill Installed July 2012

One each 80’ MBM Crossing RWS Job No. 11-076

with Rubber Epflex Interface

Installed September 2005

RWS Job No. 05-096

Page 15: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

79) SOUTH CENTRAL FLORIDA EXPRESS EXTEND CROSSING

Pahokee, Florida 20 L.F.

S.R. 15 (F.D.O.T. No. 272282-T) Installed July 2012

One each 100’ MBM Crossing RWS Job No. 11-075

with Rubber Epflex Interface

Installed September 2005

RWS Job No. 05-105

80) SOUTH CENTRAL FLORIDA EXPRESS

Palm Beach County

Highway 441 (S.R. 15) / Connors Highway

One each 300’ MBM Crossing

with Rubber Epflex Interface

Installed September 2005

RWS Job No. 05-115

81) MOSAIC PHOSPHATES COMPANY

Apollo Beach, Florida

U.S. Highway 41 North Lane

One each 40’ MBM Crossing

with Rubber Epflex Interface

Installed October 2005

RWS Job No. 03-085

82) CSX TRANSPORTATION, INC.

Tampa, Florida

U.S. Highway 41 (S.R. 45) / Rockport

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed November 2005

RWS Job No. 04-088

83) CONRAD YELVINGTON DISTRIBUTORS, INC.

Tampa, Florida

Rockport Lead and 50th Street

One each 20’ MBM Crossing

with Rubber Epflex Interface

Installed November 2005

RWS Job No. 04-088

Page 16: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

84) FLORIDA CENTRAL RAILROAD EXTEND CROSSING

Winter Garden, Florida 40 L.F. to the North

S.R. 438 / Plant Street 20 L.F. to the South

One each 40’ MBM Crossing Installed January 2010

with Rubber Epflex Interface RWS Job No. 08-086

Installed December 2005

RWS Job No. 05-109

85) FLORIDA NORTHERN RAILROAD

Ocala, Florida

Martin Luther King, Jr. Avenue

(N.W. 16th Avenue)

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed January 2006

RWS Job No. 05-100

86) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.R. 40 / Silver Springs Boulevard

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed January 2006

RWS Job No. 06-004

87) ORLANDO UTILITIES COMMISSION

Orlando, Florida

John Wycliffe Boulevard

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed March 2006

RWS Job No. 05-098

88) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Central Avenue / CR 437 A

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed June 2006

RWS Job No. 06-051

Page 17: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

89) CSX TRANSPORTATION, INC.

Fort Green, Florida

S. R. 62

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed June 2006

RWS Job No. 06-036

90) JACKSONVILLE ELECTRIC AUTHORITY

Jacksonville, Florida

St. Johns River Power Park

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed July 2006

RWS Job No. 03-159

91) HERNANDO COUNTY

BOARD OF COUNTY COMMISSIONERS

Brooksville, Florida

U. S. Highway 41

One each 140' MBM Crossing

with Rubber Epflex Interface

Installed September 2006

RWS Job No. 06-043

92) HERNANDO COUNTY

BOARD OF COUNTY COMMISSIONERS

Brooksville, Florida

Hernando County Airport

Runway Drive

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed September 2006

RWS Job No. 06-043

93) FLORIDA CENTRAL RAILROAD

Lake Jem, Florida

C. R. 448-A

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed September 2006

RWS Job No. 06-124

Page 18: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

94) THE RYLAND GROUP, INC.

RYLAND HOMES

Parrish, Florida

Copperstone Development off Erie Road

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed October 2006

RWS Job No. 06-089

95) SOUTH CENTRAL FLORIDA EXPRESS, INC.

Lake Placid, Florida

Roy Pendarvis Roadway (Lake June Drive)

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed November 2006

RWS Job No. 04-076

96) FLORIDA NORTHERN RAILROAD

Ocala, Florida

N.W. 27Th

Avenue

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed November 2006

RWS Job No. 07-005

97) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Lake Doe Boulevard

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed November 2006

RWS Job No. 07-032

98) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Vulcan Road

One each 40' MBM Crossing

Installed December 2006

RWS Job No. 06-122

Page 19: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

99) MOSAIC PHOSPHATES COMPANY

Mulberry, Florida

New Wales Facility

Wheel Washer Track No. 51

One each 40' MBM Crossing

Installed January 2007

RWS Job No. 03-085

100) FLORIDA CENTRAL RAILROAD

Apopka, Florida

C.R. 435 (Apopka – Vineland Road)

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed February 2007

RWS Job No. 06-062

101) ORLANDO UTILITIES COMMISSION

Orlando, Florida

Stanton Energy Center Plant

Warehouse Road Crossing

One each 40' MBM Crossing

Installed April 2007

RWS Job No. 05-098

102) FLORIDA NORTHERN RAILROAD

WEST COAST SUBDIVISION

Newberry, Florida

S.R. 26

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed May 2007

RWS Job No. 07-090

103) FLORIDA NORTHERN RAILROAD

Crystal River, Florida

U.S. Highway 19

One each 40' MBM Crossing (South Lanes)

One each 60' MBM Crossing (North Lanes)

with Rubber Epflex Interface

Installed June 2007

RWS Job No. 06-121

Page 20: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

104) FLORIDA NORTHERN RAILROAD

Crystal River, Florida

C.R. 495 (At Red Level)

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed July 2007

RWS Job No. 06-123

105) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

Commerce Avenue

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed July 2007

RWS Job No. 07-034

106) SOUTH CENTRAL FLORIDA EXPRESS

Belle Glade, Florida

S.R. 715 and S.W. 16th Street

One each 20' MBM Crossing (Extend Existing Crossing)

with Rubber Epflex Interface

(Cross Reference MBM List Crossing 65)

Installed August 2007

RWS Job No. 07-064

107) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

Kenilworth Boulevard

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed August 2007

RWS Job No. 07-034

108) AN RAILWAY, LLC

Port St. Joe, Florida

S.R. 71

One each 60' MBM Crossing

With Rubber Epflex Interface

Installed September 2007

RWS Job No. 07-092

Page 21: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

109) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Carder Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed September 2007

RWS Job No. 07-082

110) FLORIDA CENTRAL RAILROAD

Zellwood, Florida

Laughlin Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed September 2007

RWS Job No. 07-080

111) MORRISON HOMES, INC.

Florida Power & Light Company

Jacklyn Oaks Development

Parrish, Florida

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed October 2007

RWS Job No. 06-041

112) TRADEMARK METALS RECYCLING, LLC

Lockhart, Florida

One each 40' MBM Crossing

Installed October 2007

RWS Job No. 07-102

113) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Fairview Grande Condos Entrance

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed December 2007

RWS Job No. 08-021

114) THE BAY LINE RAILROAD, LLC

Panama City, Florida

S.R. 231 / Harrison Avenue

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed January 2008

RWS Job No. 07-147

Page 22: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

115) COCA COLA ENTERPRISES

Orlando, Florida

Inside Mercy Drive Facility

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed March 2008

RWS Job No. 07-138

116) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

South Highlands Avenue

One each 340' MBM Crossing

Installed in a 4° curve

with Rubber Epflex Interface

Installed March 2008

RWS Job No. 07-034

117) SOUTH CENTRAL FLORIDA EXPRESS

Sebring, Florida

North Highlands Avenue

One each 340' MBM Crossing

with Rubber Epflex Interface

Installed July 2008

RWS Job No. 07-034

118) CSX TRANSPORTATION, INC.

Bartow, Florida

State Road 60

Two each 380' MBM Crossings

with Rubber Epflex Interface

Installed August 2008

RWS Job No. 08-080

119) CSX TRANSPORTATION, INC.

Tampa, Florida

Tampa Port Authority

McCloskey Boulevard

Two each 60' MBM Crossings

with Rubber Epflex Interface

Installed January 2009

RWS Job No. 08-028

Page 23: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

120) CSX TRANSPORTATION, INC.

Tampa, Florida

Tampa Port Authority

Guy N Verger Boulevard

One each 120' MBM Crossing installed in 12° curve

with Rubber Epflex Interface

Installed January 2009

RWS Job No. 08-029

121) FLORIDA NORTHERN RAILROAD

Citrus County, Florida

West Dunklin Avenue

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed February 2009

RWS Job No. 09-029

122) FLORIDA CENTRAL RAILROAD

Modello Park, Orange County, Florida

All American Boulevard

Two each 60' MBM Crossings in Tangent Track

One each 60' MBM Crossing installed in 12° curve

with Rubber Epflex Interface

Installed February 2009

RWS Job No. 08-017

123) CSX TRANSPORTATION, INC.

Tampa, Florida

U.S. Highway 41 (50th Street)

Two each 120' MBM Crossings

with Rubber Epflex Interface

Installed February 2009

RWS Job No. 07-050

124) CSX TRANSPORTATION, INC.

Quincy, Florida

S.R. 10 @ U.S. 90 (Jefferson Street)

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed March 2009

RWS Job No. 08-051

Page 24: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

125) CSX TRANSPORTATION, INC.

Tampa, Florida

S.R. 60 – Adamo Drive

One each 120' MBM Crossing installed in 14.5° curve

with Rubber Epflex Interface

Installed March 2009

RWS Job No. 08-102

126) SOUTH CENTRAL FLORIDA EXPRESS EXTEND CROSSING

Belle Glade, Florida 20 L.F.

S.R. 812 – Hooker Highway Installed July 2012

One each 80' MBM Crossing RWS Job No. 11-035

with Rubber Epflex Interface

Installed April 2009

RWS Job No. 08-101

127) SUGAR CANE GROWERS

COOPERATIVE OF FLORIDA

Belle Glade, Florida

West Sugarhouse Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed May 2009

RWS Job No. 09-047

128) FLORIDA NORTHERN RAILROAD

Archer, Florida

S.R. 24 – Archer Road

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed June 2009

RWS Job No. 09-030

129) THE BAY LINE RAILROAD, LLC

Panama City, Florida

U.S. Highway 98

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed September 2009

RWS Job No. 08-138

Page 25: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

130) SOUTH CENTRAL FLORIDA EXPRESS

Pahokee, Florida

Larrimore Road

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed September 2009

RWS Job No. 09-094

131) TAMPA ELECTRIC COMPANY

Apollo Beach, Florida

Big Bend Station

Pembroke Road

One each 80' MBM Crossing installed in 10° curve

with Rubber Epflex Interface

Installed October 2009

RWS Job No. 09-021

132) AN RAILWAY , LLC

Port St. Joe, Florida

State Road 71

Two each 80' MBM Crossing

with Rubber Epflex Interface

Installed October 2009

RWS Job No. 09-088

133) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.E. 31st Street

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed December 2009

RWS Job No. 08-085

134) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Clarcona-Ocoee Road

One each 160' MBM Crossing

with Rubber Epflex Interface

Installed December 2009

RWS Job No. 06-045

Page 26: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

135) FLORIDA MIDLAND RAILROAD

Bartow, Florida

Spirit Lake Road

One each 60' MBM Crossing

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed January 2010

RWS Job No. 09-127

136) AN RAILWAY, LLC

Hosford, Florida

S.R. 20

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed February 2010

RWS Job No. 10-031

137) AN RAILWAY, LLC

Greensboro, Florida

S.R. 12

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed February 2010

RWS Job No. 10-032

138) FLORIDA NORTHERN RAILROAD

Ocala, Florida

S.E. 36th Avenue

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed April 2010

RWS Job No. 08-128

139) THE BAY LINE RAILROAD, LLC

Panama City, Florida

S.R. 389 (East Avenue)

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed June 2010

RWS Job No. 10-066

Page 27: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

140) THE BAY LINE RAILROAD, LLC

Panama City, Florida

Business U.S. Highway 98

One each 160' MBM Crossing

with Rubber Epflex Interface

Installed June 2010

RWS Job No. 10-065

141) FLORIDA CENTRAL RAILROAD

Lake Jem, Florida

C.R. 448

One each 200' MBM Crossing

with Rubber Epflex Interface

Installed June 2010

RWS Job No. 09-126

142) FLORIDA NORTHERN RAILROAD

Williston, Florida

S.R. 500 / U.S. Highway 27

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed July 2010

RWS Job No. 09-105

143) CSX TRANSPORTATION, INC.

Jacksonville, Florida

S.R. 105 – Heckscher Drive

One each 140' MBM Crossing

with Rubber Epflex Interface

Installed August 2010

RWS Job No. 09-072

144) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Lakeville Road

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed September 2010

RWS Job No. 09-122

145) CSX TRANSPORTATION, INC.

Green Cove Springs, Florida

U.S. Highway 17 – S.R. 15

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed October 2010

RWS Job No. 09-025

Page 28: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

146) MANATEE COUNTY PUBLIC WORKS

Palmetto, Florida

29th Street East

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed October 2010

RWS Job No. 08-025

147) CSX TRANSPORTATION, INC.

Tampa, Florida

Hillsborough Avenue (S.R. 600)

Two each 120' MBM Crossing

with Rubber Epflex Interface

Installed October 2010

RWS Job No. 08-088

148) CSX TRANSPORTATION, INC.

Sanford, Florida

U.S. Highway 17-92 (French Avenue)

One each 100' MBM Crossing

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed November 2010

RWS Job No. 09-079

149) ALABAMA GULF COAST RAILWAY

Pensacola, Florida

U.S. Highway 90 (9 Mile Road)

One each 140' MBM Crossing

with Rubber Epflex Interface

Installed March 2011

RWS Job No. 11-005

150) CSX TRANSPORTATION, INC.

Pensacola, Florida

S.R. 196 (Bayfront Parkway / East Main Street)

Two each 80' MBM Crossing

with Rubber Epflex Interface

Installed March 2011

RWS Job No. 11-016

Page 29: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

151) CSX TRANSPORTATION, INC.

Largo, Florida

S.R. 688 (Ulmerton Road)

One each 180' MBM Crossing

with Rubber Epflex Interface

Installed March 2011

RWS Job No. 08-089

152) CSX TRANSPORTATION, INC.

Pinellas Park, Florida

S.R. 694 (Park Boulevard)

One each 160' MBM Crossing

with Rubber Epflex Interface

Installed April 2011

RWS Job No. 08-107

153) CSX TRANSPORTATION, INC.

Starke, Florida

S.R. 200 (U.S. Highway 301)

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed May 2011

RWS Job No. 10-109

154) SOUTH CENTRAL FLORIDA EXPRESS

Belle Glade, Florida

West Canal Street South

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed May 2011

RWS Job No. 10-049

155) SOUTH CENTRAL FLORIDA EXPRESS

Belle Glade, Florida

West Canal Street North

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed May 2011

RWS Job No. 10-049

156) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

Dave Rawls Boulevard (BIMT)

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed June 2011

RWS Job No. 11-040

Page 30: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

157) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

Heckscher Drive (BIMT)

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed June 2011

RWS Job No. 11-040

158) GAINESVILLE RENEWABLE ENERGY CENTER

Gainesville, Florida

Biomass Entrance Road

One each 60' MBM Crossing installed in 9° curve

with Rubber Epflex Interface

Installed July 2011

RWS Job No. 11-092

159) FLORIDA CENTRAL RAILROAD

Orlando, Florida

S.R. 434 / Carder Road

One each 220' MBM Crossing

with Rubber Epflex Interface

Installed September 2011

RWS Job No. 11-094

160) FLORIDA CENTRAL RAILROAD

Lockhart, Florida

Edgewater Drive South @ Clarcona-Ocoee Road

One each 160' MBM Crossing

with Rubber Epflex Interface

Installed October 2011

RWS Job No. 11-078

161) FLORIDA NORTHERN RAILROAD

Newberry, Florida

S.W. 30th Avenue, (100 Ft. West of Hwy. 27)

Two each 55.5' MBM Crossings (For 115 Rail)

with Rubber Epflex Interface

Installed December 2011

RWS Job No. 12-015

162) FLORIDA CENTRAL RAILROAD

Lockhart, Florida

Beggs Road

Two each 40' MBM Crossing

with Rubber Epflex Interface

Installed January 2012

RWS Job No. 11-079

Page 31: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

163) FLORIDA CENTRAL RAILROAD

Orlando, Florida

North Edgewater Drive

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed January 2012

RWS Job No. 11-081

164) FLORIDA NORTHERN RAILROAD

Williston, Florida

C.R. 316

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed January 2012

RWS Job No. 11-112

165) CSX TRANSPORTATION, INC.

Miami, Florida

S.W. 88th Street (Kendall Drive)

One each 160' MBM Crossing

with Rubber Epflex Interface

Installed February 2012

RWS Job No. 10-110

166) THE BAY LINE RAILROAD, LLC

Panama City, Florida

S.R. 22

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed March 2012

RWS Job No. 12-044

167) THE BAY LINE RAILROAD, LLC

Panama City, Florida

S.R. 389 (East Avenue)

One each 100' MBM Crossing

with Rubber Epflex Interface

Installed March 2012

RWS Job No. 12-043

168) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

Blount Island Boulevard (BIMT)

One each 80' MBM Crossing installed in a curve 15º 26 min.

with Rubber Epflex Interface

Installed March 2012

RWS Job No. 11-108

Page 32: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

169) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

William Mills Street (BIMT)

One each 100' MBM Crossing installed in 12° curve

with Rubber Epflex Interface

Installed March 2012

RWS Job No. 11-108

170) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

Dave Rawls Boulevard (BIMT)

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed April 2012

RWS Job No. 11-108

171) JACKSONVILLE PORT AUTHORITY

Jacksonville, Florida

Intermodal Drive (BIMT)

Two each 80' MBM Crossing

with Rubber Epflex Interface

Installed April 2012

RWS Job No. 11-108

172) FLORIDA CENTRAL RAILROAD

Lockhart, Florida

Mott Avenue

One each 31' MBM Crossing

with Rubber Epflex Interface

Installed July 2012

RWS Job No. 12-063

173) CSX TRANSPORTATION, INC.

Largo, Florida

Seminole Boulevard (U.S. Hwy. 19-A)

One each 260' MBM Crossing

with Rubber Epflex Interface

Installed August 2012

RWS Job No. 11-106

Page 33: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

174) MANATEE COUNTY PUBLIC WORKS DEPARTMENT

Parrish, Florida

Erie Road @ 69th Street

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed September 2012

RWS Job No. 10-057

175) CSX TRANSPORTATION, INC.

Pinellas Park, Florida

S.R. 693 – 66th Street

One each 175.5' MBM Crossing

with Rubber Epflex Interface

Installed September 2012

RWS Job No. 12-091

176) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Hazelhurst Avenue

Two each 31' MBM Crossings

with Rubber Epflex Interface

Installed October 2012

RWS Job No. 12-065

177) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Shader Road

Two each 31' MBM Crossings

with Rubber Epflex Interface

Installed October 2012

RWS Job No. 12-066

178) FLORIDA CENTRAL RAILROAD

Lockhart, Florida

Magnolia Homes Road

One each 40' MBM Crossing

for 115RE Rail in 4º Curve

with Rubber Epflex Interface

Installed November 2012

RWS Job No. 12-064

Page 34: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

179) TAMPA ELECTRIC COMPANY

Apollo Beach, Florida

U.S. Highway 41 South Lane

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed December 2012

RWS Job No. 11-103

180) SOUTH CENTRAL FLORIDA EXPRESS

Clewiston, Florida

Flaghole Road

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed February 2013

RWS Job No. 13-008

181) CSX TRANSPORTATION, INC.

Clearwater, Florida

Belleair Road

One each 46.5' MBM Crossing

with Rubber Epflex Interface

Installed February 2013

RWS Job No. 12-017

182) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Lakeville Road

One each 51' MBM Crossing

with Rubber Epflex Interface

Installed February 2013

RWS Job No. 12-119

183) CSX TRANSPORTATION, INC.

Largo, Florida

Wyatt Street

One each 46.5' MBM Crossing

with Rubber Epflex Interface

Installed March 2013

RWS Job No. 12-016

184) CSX TRANSPORTATION, INC.

Taft, Florida

S.R. 482 – Sand Lake Road

One each 60' and One each 55.5' MBM Crossing

with Rubber Epflex Interface

Installed March 2013

RWS Job No. 12-080

Page 35: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

185) CSX TRANSPORTATION, INC.

Miami, Florida

U.S. Highway 90 – 8th Street – Tamiami Trail

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed April 2013

RWS Job No. 10-112

186) GEORGIA & FLORIDA RAILWAY, LLC

Perry, Florida

U.S. Highway 27 – S.R. 20

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed April 2013

RWS Job No. 12-072

187) FLORIDA CENTRAL RAILROAD

Fairvilla (Modella Park), Florida

Silver Star Road

Two each 86.5' MBM Crossing

with Rubber Epflex Interface

Installed April 2013

RWS Job No. 12-118

188) FLORIDA CENTRAL RAILROAD

Lockhart, Florida

Rose Avenue

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed May 2013

RWS Job No. 12-153

189) CSX TRANSPORTATION, INC.

Jacksonville, Florida

U.S. 90 (Beaver Street) @ Jim Wright Road

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed June 2013

RWS Job No. 11-019

190) CSX TRANSPORTATION, INC.

Bradenton, Florida

S.R. 64 – EB (6th Avenue)

One each 60’ MBM Crossing

with Rubber Epflex Interface

Installed June 2013

RWS Job No. 12-090

Page 36: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

191) AN RAILWAY, LLC

Lowry, Florida

S.R. 65

One each 51' MBM Crossing

with Rubber Epflex Interface

Installed June 2013

RWS Job No. 13-058

192) CSX TRANSPORTATION, INC.

Tampa, Florida

S.R. 60 (Adamo Drive)

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed July 2013

RWS Job No. 12-137

193) CSX TRANSPORTATION, INC.

Tampa, Florida

REK Entrance (Tampa Port Authority)

One each 86.5’ MBM Crossing

with Rubber Epflex Interface

Installed July 2013

RWS Job No. 13-010

194) GIBBS & REGISTER, INC.

Palmetto, Florida

S.R. 45 (U.S. Highway 41)

Southbound Lanes

One each 55.5’ MBM Crossing

with Rubber Epflex Interface

Installed August 2013

RWS Job No. 13-022

195) CSX TRANSPORTATION, INC.

Tampa, Florida

S.R. 599 (50th Street)

One each 115.5’ MBM Crossing

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed August 2013

RWS Job No. 12-138

Page 37: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

196) GIBBS & REGISTER, INC.

Palmetto, Florida

S.R. 45 (U.S. Highway 41)

Northbound Lanes

One each 55.5’ MBM Crossing

with Rubber Epflex Interface

Installed August 2013

RWS Job No. 13-022

197) CSX TRANSPORTATION, INC.

Miami, Florida

N.E. 6th Avenue – 185

th Street

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed September 2013

RWS Job No. 10-114

198) CSX TRANSPORTATION, INC.

Land-O- Lakes, Florida

S.R. 597 (Dale Mabry Highway)

Southbound Lanes

One each 251’ MBM Crossing

with Rubber Epflex Interface

Installed October 2013

RWS Job No. 12-140

199) CSX TRANSPORTATION, INC.

Land-O- Lakes, Florida

S.R. 597 (Dale Mabry Highway)

Northbound Lanes

One each 131’ MBM Crossing

with Rubber Epflex Interface

Installed October 2013

RWS Job No. 12-140

200) FLORIDA CENTRAL RAILROAD

Apopka, Florida

Hermit Smith Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed November 2013

RWS Job No. 12-151

Page 38: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

201) FLORIDA NORTHERN RAILROAD

Ocala, Florida

N.W. 35th Street

One each 120' MBM Crossing

with Rubber Epflex Interface

Installed November 2013

RWS Job No. 12-040

202) DUKE ENERGY FLORIDA, INC.

Crystal River, Florida

Old Tallahassee Road

One each 100' MBM Crossing

for 132RE Rail in 14.5º Curve

with Rubber Epflex Interface

Installed November 2013

RWS Job No. 13-038

203) CHESAPEAKE & ALBEMARLE RAILROAD

Elizabeth City, North Carolina

U.S. Highway 17 (Hughes Boulevard)

One each 140' MBM Crossing

with Rubber Epflex Interface

Installed December 2013

RWS Job No. 13-039

204) TAMPA PORT AUTHORITY

(Seavy & Associates, Inc.)

Tampa, Florida

Maritime Boulevard

One each 60' MBM Crossing

with Rubber Epflex Interface

Installed December 2013

RWS Job No. 13-113

205) FLORIDA NORTHERN RAILROAD

Newberry, Florida

N.W. 1st

Avenue

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed December 2013

RWS Job No. 13-086

Page 39: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

206) FLORIDA NORTHERN RAILROAD

Newberry, Florida

N.W. 6th

Avenue

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed December 2013

RWS Job No. 13-088

207) FLORIDA NORTHERN RAILROAD

Newberry, Florida

N.W. 252nd

Street

One each 46.5' MBM Crossing

with Rubber Epflex Interface

Installed December 2013

RWS Job No. 13-087

208) FLORIDA NORTHERN RAILROAD

Newberry, Florida

S.W. 15th

Avenue

Two each 46.5' MBM Crossing

with Rubber Epflex Interface

Installed January 2014

RWS Job No. 13-073

209) FLORIDA CENTRAL RAILROAD

Zellwood, Florida

West Ponkan Road

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed February 2014

RWS Job No. 13-092

210) FLORIDA CENTRAL RAILROAD

Orlando, Florida

Country Club Drive

One each 51' MBM Crossing

with Rubber Epflex Interface

Installed February 2014

RWS Job No. 13-118

211) AN RAILWAY, LLC

Apalachicola, Florida

Bluff Road

One each 80' MBM Crossing

with Rubber Epflex Interface

Installed February 2014

RWS Job No. 13-057

Page 40: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

212) FLORIDA CENTRAL RAILROAD

Clarcona, Florida

Gilliam Road

One each 31' MBM Crossing

with Rubber Epflex Interface

Installed March 2014

RWS Job No. 13-093

213) FLORIDA CENTRAL RAILROAD

Winter Garden, Florida

Bethune Avenue

One each 40' MBM Crossing

with Rubber Epflex Interface

Installed March 2014

RWS Job No. 13-095

214) FLORIDA CENTRAL RAILROAD

Ocoee, Florida

Hackney Prairie Road

One each 55.5' MBM Crossing

with Rubber Epflex Interface

Installed March 2014

RWS Job No. 13-094

215) CSX TRANSPORTATION, INC.

Gainesville, Florida

S.R. 121 @ U.S. Highway 441

One each 80’ MBM Crossing

with Rubber Epflex Interface

Installed May 2014

RWS Job No. 14-027

216) GEORGIA-PACIFIC

Palatka, Florida

U.S. Highway 17

One each 140’ MBM Crossing

with Rubber Epflex Interface

Installed May 2014

RWS Job No. 13-114

217) CSX TRANSPORTATION, INC.

Hawthorne, Florida

U.S. Highway 301

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed June 2014

RWS Job No. 13-100

Page 41: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

218) AN RAILWAY, LLC

Apalachicola, Florida

S.R. 65 (North)

One each 51' MBM Crossing

with Rubber Epflex Interface

Installed July 2014

RWS Job No. 14-061

219) CSX TRANSPORTATION, INC.

Yulee, Florida

S.R. 200 (Highway A1A)

One each 120’ MBM Crossing

with Rubber Epflex Interface

Installed July 2014

RWS Job No. 11-037

220) CSX TRANSPORTATION, INC.

Jacksonville, Florida

S.R. 105 (Heckscher Drive)

One each 80’ MBM Crossing installed in 4º curve

with Rubber Epflex Interface

Installed August 2014

RWS Job No. 12-092

221) CSX TRANSPORTATION, INC.

Largo, Florida

S.R. 686 (West Bay Drive)

One each 100’ MBM Crossing

with Rubber Epflex Interface

Installed August 2014

RWS Job No. 13-009

222) THE BAY LINE RAILROAD, LLC

Panama City, Florida

Highway 77 (Martin Luther King, Jr. Boulevard))

One each 160’ MBM Crossing

with Rubber Epflex Interface

Installed September 2014

RWS Job No. 14-057

223) CSX TRANSPORTATION, INC.

Mulberry, Florida

S.R. 60 @ Phosphate Boulevard

One each 131’ MBM Crossing

with Rubber Epflex Interface

Installed September 2014

RWS Job No. 13-048

Page 42: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

224) CSX TRANSPORTATION, INC.

San Antonio, Florida

U.S. Highway 41- S.R. 45 (Fivay Junction)

One each 102’ MBM Crossing

with Rubber Epflex Interface

Installed October 2014

RWS Job No. 14-025

225) CSX TRANSPORTATION, INC.

Tampa, Florida

S.R. 582 – Fowler Avenue

One each 166.5’ MBM Crossing

with Rubber Epflex Interface

Installed October 2014

RWS Job No. 14-036

226) CSX TRANSPORTATION, INC.

Mulberry, Florida

S.R. 60 @ C.R. 676 (Nichols Road)

One each 146.5’ MBM Crossing

with Rubber Epflex Interface

Installed October 2014

RWS Job No. 13-047

227) SOUTH CAROLINA CENTRAL RAILROAD COMPANY, LLC

Darlington, South Carolina

U.S. 52 – U.S. 401

One each 115.5’ MBM Crossing

with Rubber Epflex Interface

Installed November 2014

RWS Job No. 13-023

228) FLORIDA MIDLAND RAILROAD

Lake Wales, Florida

S.R. 17

One each 106.5’ MBM Crossing

with Rubber Epflex Interface

Installed November 2014

RWS Job No. 12-086

229) FLORIDA NORTHERN RAILROAD

Newberry, Florida

S.R. 45

One each 131’ MBM Crossing

with Rubber Epflex Interface

Installed December 2014

RWS Job No. 14-091

Page 43: LIST OF EXISTING MBM RAILROAD CROSSING INSTALLATIONSOne each 40’ MBM Crossing Installed February 1994 RWS Job No. 94-083 3) SOUTH CENTRAL FLORIDA EXPRESS Clewiston, Florida U.S.

230)