Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari Concepts Paige Kane & Robert Gergen Pfizer Global Supply April 2, 2013

Transcript of Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... ·...

Page 1: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Linking KM Activities with Strategy and Project

Prioritization Using Hoshin Kanari Concepts

Paige Kane & Robert Gergen

Pfizer Global Supply

April 2, 2013

Page 2: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Agenda

Who we are – Pfizer Global Supply (PGS)

Hoshin Overview

Linkage of how hoshin relates to PGS KM &Project Prioritization

About the X-Matrix and how it works

Simplified & abbreviated KM X-Matrix Workshop

2

Page 3: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

3

Products and Formulations

• 600+ MPGs

• 35,000+ SKUs

• 3,000+ formulations

• 40+ technologies/platforms

• 92 internal manuf. sites

• 188 logistics centers

• 400+ supply partners

• 30,000+ colleagues

• Site and Logistics network

• Operational/Supply/

Technical support

• Product co-development,

launch, and process

optimization

• External partnerships

Key Activities

Our Network

>175 Markets

>50 Languages

PGS covers all aspects of

Pfizer product supply

Page 4: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

4

PGS Operations An aggregation of 25+ companies!

(1985)

(2000) Agouron Gene/Networks

Hickson Int’l

Plc Institute Farmaco

Biologico Pagni

Plaistow

+ + + +

American

Home

Products

A.H

Robbins

+

(1989)

American

Cyanamid

+

(1987–88)

+

(1992)

+

(1994)

Animal divisions of:

Kabi Pharmacia

Pharmacia

AB

Upjohn Company

Sugen (1999)

(1990) (1995)

Kelco Chemicals (1994)

+

(1993)

+ +

+

+ Kabi Vitrum

(1990) (1997) (1998) (1999)

+

(2009)

(2003)

– SmithKline Beecham Animal Health (1995)

– Restivo Italiana (1994 – through Roerig)

– Koshin Medical KK (1992)

– CSL Ltd Animal Health Unit (2004)

– Vicuron Pharmaceuticals Ltd (2005)

– Idun Pharma (2005) — Apoptech

(1994)

– Synbiotics (2010)

– King Pharmaceuticals (2011)

Page 5: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Pfizer Global Supply (PGS)

Our Continuing Journey to High Performance

2010 2011 2014 Etc.

BSC measures our

progress on the

journey toward our

balanced goals

4

PGS Vision to be a

high performing

network

1

NPP is a framework

to reach our vision

2

2012 2015 2013

Recognition Program

rewards our

progress

5

We must deliver near

term cost savings 6

PGS

transformation

3

Page 6: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Hoshin Overview

Page 7: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Strategic Alignment to Drive Value Delivery

7

+ Individual teams locally

aligned to purpose and delivery

- Effort expended in loosely

aligned way results in lower overall value delivery

Common view of key business priorities and understanding of related activities; effort is multiplied by the alignment to a common purpose and overall value delivery

Current State

Future State

“Management is doing things right; leadership is doing the right things”

Peter F. Drucker

Page 8: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

The Hoshin Cycle

Step 1 Establish 3-5 year

objectives

Step 2 Define the Critical Business Issues

Step 3 Define Business

Fundamentals and Metrics

Step 4 Develop Annual Hoshin Plans and

Metrics

Step 5 Develop Local Plans

and Periodically Review

Step 6 Incorporate into

Daily Management Process

Continuous Review

Periodic Review

Steps 4 – 6 “strategy

deployment”

Steps 1 – 3 “strategy

development”

X-Matrix used at this stage

Page 9: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Site

Prioritize

Perform Program

Operating

Unit

catch ball

results status

Information Flow w/ Hoshin

Executive

Team

Business

Unit

results,

alignment,

replication

Prioritize

Perform Program

external

benchmarking

network

intelligence

Center

Prioritize

Perform Program

Page 10: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Hoshin – X-matrices

Site Metrics/BSC

Program

Tracking

Strategy deployment in action– A site example

Page 11: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

How is Hoshin applicable to KM Strategy?

Provides a means to link strategic imperatives with activities, metrics & intended results

Harnesses a process that is known and used elsewhere in the division

Creates ability to visualize and communicate how KM projects will benefit the business and how priorities are established

11

Focused on the x-matrix tool as an enabler to

identify key KM Strategy work

Page 12: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

About the X-Matrix

Page 13: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Complexity of Hoshin Process as Evident in the

Use of X-Matrix

0 0

0 0

0 0 0 0

0 0

0 0 0 0 0 0 0 0

0 0

Targ

et

Actu

al

Actual Target 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0

0

0

0

0

= Metrics or Results

on-track

=

Metrics or Results

behind and need

action

= strong correlation 3

Sign-off by Cost Steering Team = important correlation 2

r = weak correlation 1

‡ = Project Sponsor l = Project Leader

Pro

jec

t

Me

tric

s

Str

ate

gie

s

Projects

Results

Resource

s

Correlations

Vision

Correlations

Correlations

Correlations Accountability

Each x-matrix typically represents 100’s of logical links

supporting prioritization decisions

Page 14: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – Anatomy of the X Matrix

Results

Define expected outcomes (e.g. financial, reduction in investigations and BSC targets).

Res

ults

Page 15: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – Anatomy of the X Matrix

STRATEGIES

Define the Critical Few Site Strategies using...

Current Strategy Declaration from the Op Unit

Current Site Vision/Strategy

Current Programs and Associated Resources

The BSC metrics including those you identified as most critical to impact

STRATEGIES

Page 16: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – Anatomy of the X Matrix

Define the Projects that will support the achievement of the Strategies

Projects will later be prioritized based on their correlation to the strategies.

Each project will be chartered.

P

RO

JE

CT

S

Page 17: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – Anatomy of the X Matrix

Define the project metrics that will measure the success of the projects.

Effective measures:

Reflect customer expectations in quality, cost, delivery and innovation. They should be strongly aligned to BSC.

Help to prevent problems by alerting us to conditions that contribute to problems.

Help on elimination of waste and reducing variability.

They are indicators of improvement in financial results.

Measurements examples:

OEE, Yield, customer satisfaction,

Lead Time, etc. METRICS

Page 18: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – Anatomy of the X Matrix

. Sponsors, Team Leaders and Team Members needed for project

execution

Use this space to analyze the relationships between the accountable parties listed below to the improvement initiatives or projects listed to the left.

Using symbols , record the level of accountability by entering the relevant symbols in the cells marking the intersection of team member columns and initiative rows.

Accountability

Page 19: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Developing and Documenting the Site

Annual Plan – X Matrix Overview

Interrelationships between quadrants are defined to help prioritize projects.

If there isn’t a strong correlation between projects and strategies, project viability should be discussed.

3 = High

Correlation

2 = Medium

Correlation

1 = Low

Correlation

Page 20: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

X-Matrix mini

workshop exercise

Page 21: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Mini KM x-Matrix workshop:

Work in the groups at your tables

11x17 populated x-matrix matrix

Word “information sheet”

Correlate the West and North (~15 mins)

Show how the prioritization works (~10 mins)

Discussion Identifying resources (~5 mins)

21

Page 22: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

The West- Strategies

Some typical examples of KM Strategies:

Identify, implement and rationalize core tools for collaboration and search

Identify and distinguish critical knowledge to the business

Accessibility of Subject Matter Experts

Promote a culture of sharing and collaboration across the business

22

Typically these ideas

are generated during

the strategy

development

process and are

entered directly to

the x-matrix, for this

exercise, we have

helped you!

Page 23: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

The North- The projects

Some typical examples of KM activities Develop master plan framework for knowledge management program

Roll out ELS (Expertise location) pilot

CoP Program Management Improvement/Enhancement

Lean Six Sigma database Replication Module Project

Leverage R&D's lessons learned process and system

Expand search scope and capability (taxonomy)

Continuous improvement of SharePoint collaboration sites

Improve linking of Global Technology Teams and CoPs

Expand use of database tool to XYZ products

Implement Process Classifications for our division

Develop video sharing application for the learning organization

Codification of best network processes

Address recognition and incentives for knowledge sharing

Enable sharing and increase visibility of regulatory filings

23

Typically in this

exercise, the owner

of project will give a

brief overview of

each project so all

parties understand

the intent and scope

of each prior to

correlation exercise

Page 24: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Documenting the Annual Plan

Prioritizing Projects on the X-Matrix

When you are considering the correlation, you also need to consider the risk (complexity, resource, etc.)

Prioritize the projects with strongest correlation to the strategies

Once a value ranking has been established, need to consider the risk to prioritize what moves forward now

Choose projects with the highest proportion of value to risk

Page 25: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Documenting the Annual Plan

Prioritizing Projects on the X-Matrix

VALUE

RISK

Be Selective

Remove from

Project List

Some quick wins, but

be careful due to

lower value

Page 26: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

26

Correlate the West & North

Analyze & discuss prioritization

Page 27: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

What did Pfizer get by using the x-matrix?

A robust discussion about what projects are out the in business (in the flow) and those that are supported by the KM group (above the flow)

Inclusion of dialogue and decisions around what are the most valuable projects to pursue

A mechanism to link projects to

Maturity & success of the KM program

The overall business results

Sr. Leaders understating that KM was using a “standard” methodology for prioritization and linking strategies to work

27

Page 28: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Thank you!

If you choose to utilize Hoshin or the x-matrix, we would love to hear your experience and specifically what was important for you to put in the “East”

28

Paige Kane – Director Knowledge Management

[email protected]

Rob Gergen Director Financial Planning & Analysis

[email protected]

Page 29: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Backup slides – workshop

materials

29

Page 30: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

The East- The measure

Areas of opportunity/improvement as classified by the APQC KM Maturity Model

Financial analysis or documentation of benefits is conducted to show value of KM investments

KM group’s focus expands from initial areas, e.g., lines of business, functions, business units, disciplines to other areas in the organization

Formal cross-functional steering or advisory committee(s) for KM is chartered and operational

A change management strategy is in place to support the KM strategy and knowledge flow approaches

Information on KM approaches and methods is available to all employees

A formal KM communication plan is in place and executed to raise awareness of KM as a method to improve business results

Standardized knowledge flow processes are used across multiple instances or situations

Standard methods are used to capture and retain valuable individual knowledge

Knowledge maps for each initial KM focus areas identify content and knowledge needs/gaps

KM tools and applications are standardized and integrated into overall IT strategy

30

Page 31: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Some examples of “The South”- Results

Use of Balanced Score Card metrics could be an example

% in stock

% right first time, etc

31

Page 32: Linking KM Activities with Strategy and Project Prioritization Using Hoshin Kanari ... KM... · 2019-08-30 · Linking KM Activities with Strategy and Project Prioritization Using

Facilitation Agenda

Who we are – Pfizer (Paige 5 Min)

Overview of the Hoshin and x-matrix process (Rob 20 min)

Mini KM x-Matrix workshop (30 mins total)

Work in the groups at your tables

- Give 11x17 blank matrix & the word sheet with all the data

Correlate the West and North 10 mins

Correlate the North and East 10 mins

Identify Resources 5 mins

Show how the prioritization works (less than 5)

Hand out the completed 11x17 x-matrix in color

32