LIGHTWEIGHT THERMAL INSULATINGSCREED

SUPERLIGHT AGGREGATES FOR THE MANUFACTURE OF LIGHTWEIGHT THERMAL INSULATING MORTARS

Supe

r lig

ht aggregates

Fuel

savings

Saves time

Saves money

Page 2: LIGHTWEIGHT THERMAL INSULATING SCREED - GTi … · lightweight thermal insulating screed superlight aggregates for the manufacture of ... classic insulated floor screed vs politerm

POLITERM BLUThe complete range of superlight and high thermal insulating aggregates based on pre-coated virgin EPS beads with controlled density. Each bead is coated at production stage with EIA additive. This enables perfect mixing with the water and cement producing an homogenous distribution of beads preventing beads surfacing or bonding together.

MAXIMUMSPEED ANDEASE

WHy chooSE PoLITERM BLUTHERMAL EFFICIENCy

> Low thermal conductivity λ.> Ideal for use beneath underfloor heating UFH.

SPEED OF INSTALLATION

> A single layer instead of the multiple layer build up of traditional insulated concrete slabs.

> 1 m3 can be mixed, pumped and placed in under 5 minutes.

EASy TO PLACE

> Lightweight. Fast and easy to place, spread level and finish.

REDUCED MATERIAL WASTAGE

> Mix, pump and place on site. Make just enough material to suit requirements. No waste concrete to be disposed of. No large wasted insulation board off cuts left around site.

RAPID CURING

> Cures at the rate of 1 cm. thickness per day.> 10 times as fast as traditional screeds allowing

trafficking and finishes to be applied much earlier.

LIGHTWEIGHT

> With design mix densities between 215 and 365 kg/m3 it is ideal for use in intertenancy floor slabs, balconies and flat roofs. Can be laid to falls.

CE MARKING

> From January 1st 2014.

COMPLIANT WITH BS EN 16025-1:2013

> Thermal and/or sound insulating products in building construction. Bound EPS ballasting. Requirements for factory premixed EPS dry plaster (British Standard).

little energy for production and transport,

a lot of energy saved, thanks to its thermal

performances!

PRODUCT WITH LOWenvironmental impact

CEMENT CONTENT Kg/m3

THERMAL CONDUC-TIVITy λ

D W/mK COEFFICIENT

SCREED THICKNESSES mm.

40 50 60 70 80 90 100 150 200200 0,065 R value

m2k/W=

(thickness/λ)

0,61 0,77 0,92 1,08 1,23 1,38 1,54 2,31 3,08

250 0,067 0,60 0,75 0,90 1,04 1,19 1,34 1,49 2,24 2,99

300 0,080 0,50 0,63 0,75 0,88 1,00 1,13 1,25 1,88 2,50

350 0,103 0,39 0,49 0,58 0,68 0,78 0,87 0,97 1,46 1,94

TECHNICAL DATA:

CEMENT CONTENT Kg/m3 (Technical features absolute) 200 250 300 350

Density after 28 days Kg/m3 215 ca. 265 ca. 315 ca. 365 ca.

Thermal conductivity λD W/mK 0,065 0,067 0,080 0,103

Compressive strenght N/mm2 0,69 0,83 1,61 1,69

Shrinkage (NBN) mm/m 0,427 n.d. 0,352 0,270

Fire reactivity class A2 UNI EN 13501-1

Smoke production class s1 UNI EN 13501-1

Osservation of drops or inḀamed particles d0 UNI EN 13501-1

COMPARATIVE FLOOR THICKNESSES FOR 0.25 W/m2K U VALUE

0.2 0.3 0.4 0.5 0.6 0.7

180

160

140

120

100

80

60

40

20

0

Floor P/A ratio

Tota

l floo

r thi

ckne

ss m

m.

Politerm

EPS + 65 mm. screed

PUR + 65 mm. screed

The immediate advantages of the Politerm Blue screed are: Sub base preparation. The base needs to be perfectly

flat in conventional build ups to ensure there are no voids beneath the rigid insulation boards.

Politerm Blu screed is poured directly onto the dpm and takes up any unevenness.

Insulation boards need to be measured and cut to size ensuring minimal gaps between boards. The off cuts contribute to project wastage and costs.

The exact amount of Politerm Blu screed required is pumped directly onto the dpm.

A slip sheet is required over the insulation boards to prevent the screed or concrete mix getting around and between the insulation boards.

Not required using Politerm Blu. A movement joint is required around the slab

perimeter to allow for expansion and contraction. Shrinkage/expansion is minimal in a Politerm Blu

screed. The conventional screed above (65mm thick) will take

65 days to cure. The Politerm Blu screed will cure in just 14 days.

COMPARATIVE BUILD UPcLASSIc INSULATED FLooR ScREED VS POLITERM BLU SCREED

65 mm. screed10-15 mm. expansion jointSlip sheet

DPM

75 mm. EPS

140 mm. Politerm Blu

The next diagram shows the EPS insulation required to achieve a U Value of 0.25 W/m2K for a ground bearing floor slab with a P/A ratio of 0.4 and the alternative Politerm Blu screed. Both solutions are 140 mm. thick.

Lower P/A ratios as typified in terraced houses and semi detached require lesser thicknesses of Politerm Blu screeds compared with conventional screeds.

Page 3: LIGHTWEIGHT THERMAL INSULATING SCREED - GTi … · lightweight thermal insulating screed superlight aggregates for the manufacture of ... classic insulated floor screed vs politerm

Internal and external.

POLITERM® BLUMAIN APPLICATIONS FIELDS

SINGLE-LAyER SCREEDS (on the floor and/or basement) direct application of:

· Ceramic, stoneware, clinker and pre-polished marble floor coverings and laying of floating parquets.

· Parquets, after applying a thin-bed compound.

· Flexible flooring after application of thin-bed smoothing compound.

And also:· Gradient formation for terraces.

8

ROOFING

· Pitched roofs.· Flat roofs with or without

gradient formation.· Vaulted roofs.· Corrugated sheet iron.· Asbestos cement fibres

(encapsulation).· Also with direct application of waterproofing membrane.

10

11

2

2

9

INTERMEDIATE LAyER / FILLING(on floors and/or basement):

· System levelling.· Under sand + cement screeds.· Under self-levelling screeds.· Under floor radiating heating (also with direct laying of the coils).· Vaulted floor levelling.· Under industrial flooring.· Under driveable asphalt mantles.· In-between wall thermally insulating layer.

BUILDING ELEMENTS· Blocks.· Pre-casted walls.

1

2

3

2

4

5

6

7

1

2

6

98 3

7

11

10

5

4

PRODUCTS WITH LOW environmental impactSPEND LESS ... AND ALSO PROTECTTHE ENVIRONMENT!

The screeds preparated with the products

POLITERM BLU are perfectly sta-ble. Therefore they are the ideal

laying surface for any type of sound insulation, garanting their technical performances

along the time.

GT House Sandbank Business Park, Dunoon, Argyll PA23 8PBTel: +44 (0)1369 702070 Email: [email protected] · www.gti-direct.com