Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

21
light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent

description

3 National LambdaRail light the future N L R National LambdaRail Update Phase I Layer 1 Deployment

Transcript of Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

Page 1: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

light the futureN L R

National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah

Dave Jent

Page 2: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

2National LambdaRail

light the futureN L RNational LambdaRail Update

Layer 1 Phase 1 updateLayer 1 Phase II Design Layer1 Phase II Deployment ScheduleLayer 2 designLayer 3 designPreliminary Pricing informationOperations support

Page 3: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

3National LambdaRail

light the futureN L RNational LambdaRail Update

Phase I Layer 1 Deployment

WDC

JAC

Level3 fiberOther fiber

STA

CHIKANPITOGD

BOI

CLE

ATL

POR

RAL

DENSVL

SEA

8

8

8

8

8 8

8

8

8

8

88

8

8

88

88

8

8

8

8

8

44

LAX 8

8

Cisco 15808 terminalCisco 15808 OADMCisco 15454 terminalCisco 15454 OADM

8

4

4

8

Page 4: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

4National LambdaRail

light the futureN L R

CRS-1

6509

1580815808

15500

1550015500

EastWest

Metro and Regional Optical Networks

NLR demarc

DWDM

1GE10GE or OC192

National LambdaRail Update

Phase I PoP Layout

Page 5: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

5National LambdaRail

light the futureN L RNational LambdaRail Update

Phase II Layer I Deployment

DAL

SYR

TUL

PENELP

KAN

PHO

BAT

ALB

HOU

WDC

OGDCLE

NYC

SAA

DEN

4

4JAC

44

4

44

4

4

4

4

4

4

4

4

44

4

44

44

4

44

4 4

SLC4

4

Level3 fiberWilTel fiber

LAX4

4

RAT4

Cisco 15808 terminalCisco 15808 OADMCisco 15454 terminalCisco 15454 OADM

8

4

4

8

Page 6: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

6National LambdaRail

light the futureN L RNational LambdaRail Update

Phase II PoP Layout

CRS-1

6509

1545415454

15500

1550015500

EastWest

Metro and Regional Optical Networks

NLR demarc

DWDM

1GE10GE or OC192

Page 7: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

7National LambdaRail

light the futureN L RNational LambdaRail Update

Complete NLR Layer I Network

DAL

SYR

TUL

PENELP

PHO

BAT

ALB

HOU

WDC

OGDCLE

NYC

SAA

4

4JAC

44

4

44

4

4

4

4

4

4

4

4

44

4

44

44

4

44

4 4

SLC4

4

Level3 fiberWilTel fiber

LAX4

4

RAT4

Cisco 15808 terminalCisco 15808 OADMCisco 15454 terminalCisco 15454 OADM

8

4

4

8

STA

CHIKAN PIT

BOI

CLE

ATL

POR

RAL

DENSVL

SEA

8

8

8

8

8 8

8

8

8

8

88

8

8

88

88

8

8

8

8

8

44

LAX 8

8

Page 8: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

8National LambdaRail

light the futureN L RNational LambdaRail Update

Phase 2 installation optical hardware

• Houston-El Paso– Projected Completion Date: 7/6/2005

• KC-Houston– Projected Completion Date: 6/27/2005

• El Paso-LA– Projected Completion Date: 8/16/2005

• Houston-Baton Rouge– Projected Completion Date: 7/13/2005

• Ogden-SLC– Projected Completion Date: 8/18/2005

Page 9: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

9National LambdaRail

light the futureN L RNational LambdaRail Update

Phase 2 installation optical hardware

• El Paso-Denver– Projected Completion Date: 8/30/2005

• DC-NYC– Projected Completion Date: 7/22/2005

• NYC-Cleveland– Projected Completion Date: 8/3/2005

• Jacksonville-Baton Rouge– Projected Completion Date: 9/14/2005

Page 10: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

10National LambdaRail

light the futureN L RNational LambdaRail Update

Layer 2 Network Design

HOU

TUL

ELP

KAN

PHO

BAT

LAX ALB

PIT

WDC

CLE

ATL

RAL

CHI NYCDEN

SVL

SEA

JAC

10GE wave

Cisco 6509 switch

Page 11: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

11National LambdaRail

light the futureN L R

NLR L2 Hardware Cisco Catalyst 6509-NEBs-A

Chassis Height: 36.65 in. 93.09cm

Chassis Width: 17.20 in. 43.68cm

Chassis Depth: 20.32 in. 51.61cm

Weight:

270 lb fully loaded

DC Power: 2 -2500 WDC power supplies

Page 12: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

12National LambdaRail

light the futureN L RNLR Layer 2 Goals

• Facilitate point to point or point to multipoint Ethernet transport at rates at or above 1Gbps.

• Provide detailed performance measurement and real time statistics which allow the user to fully understand the performance of the transport network.

• Provide flexible infrastructure and tools which allow users to make, or signal for, service level changes to their individual Layer 2 paths, dramatically reducing provisioning delays while making more efficient use of the network.

• Refine these services, over time, to meet the specific needs of the research community; even where those developments would differ from what a standard service provider would be willing to do.

Page 13: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

13National LambdaRail

light the futureN L RNLR L2 Initial Services

National Peering Fabric – Create a national distributed exchange point, with a single broadcast domain for all members. Initial user ports will be 1GE.

Dedicated Point to Point Ethernet – VLAN between 2 members with dedicated bandwidth from sub 1G to multiple 1G.

Best Effort Point to Multipoint – Multi-point VLAN with no dedicated bandwidth

Page 14: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

14National LambdaRail

light the futureN L RNational LambdaRail Update

Layer 3 Network Design

ALBPHO

BAT

RAL

JAC

TUL

PIT

HOU

LAX

WDC

ATL

CHI NYCDEN

SEA

Cisco CRS-1 router

10GE wave

Page 15: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

15National LambdaRail

light the futureN L R

NLR L3 Hardware Cisco CRS-1 Half-rack

Chassis Height: 38.5 in. 99.06cm, (with base cosmetics)

Chassis Width: 17.5 in. 44.45 cm

Chassis Depth: 36.6 in 93.0 cm; (40.5 in. 100.844 cm, including full cosmetics)

Weight:

• 330.8 lb (138 kg) chassis with fans, PDUs, and blanks (as shipped)• 650 lb (294.8 kg) chassis as shipped, including power shelves, and all line cards and route processors

DC Power: 7900 WDC 3 65A feeds per power supply

Clearance: 3 feet front and back required.Four-post mounting.

Page 16: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

16National LambdaRail

light the futureN L RNLR Layer 3 Goals

• Create a national infrastructure for network and application experiments, in a way that is not possible with current production commodity networks, network test-beds, or production R&E networks.

• Provide an advanced national “breakable” infrastructure to try out technologies and configurations. In addition, researchers will have the opportunity to create experiments and test them using live production traffic in a national backbone provider footprint.

• Provide a flexible layer 3 network supporting experiments for anything from requiring total control of the hardware to requiring access to active real-time production traffic.

• Support researchers with a level of communication and visibility to its users not seen before in other networks.

Page 17: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

17National LambdaRail

light the futureN L RNLR Layer 3 Services

BGP to each memberISIS core IGPIPv4 Multicast: PIM, MSDP, MBGP by default.IPv6: BGP peering by defaultSecurity: Each member will be able to black-hole

traffic to one of their hosts using special BGP community

Each member gets a 10GE connection and a VLAN backhauled over the L2 network to a second node.

Page 18: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

18National LambdaRail

light the futureN L RPreliminary pricing

•Pricing is based on a per segment cost. •The pricing model includes the number of segments as well as capacity replacement, maintenance, operations and equipment replacement costs. There are pricing models for members as well as non-members. One example: – 1gb circuit from Chicago to Washington DC would use

three L1 segments and three L2 segments. This would cost approximately $23,500 upfront and $20,940/year.

Page 19: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

19National LambdaRail

light the futureN L RNLR Operations Support

• NLR Service Desk at Indiana University– [email protected]– http://noc.nlr.net

• Layer 1 services provided by CENIC• Layer 2/3 services provided by Indiana University• Experimental Support services provided by MCNC

Page 20: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

20National LambdaRail

light the futureN L R

Thanks to:

Chris Griffin Steve Cotter Dave Reese Caren Litvanyi Jon-Paul Herron Grover Browning

Page 21: Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.

21National LambdaRail

light the futureN L RFor more information…

NLR puts the control, the power and the promise of experimental

Contact Tom West [email protected]@nlr.net

NLR: putting the control, the power and the promise of experimental network infrastructure in the hands of our nation’s scientists and researchers.

light the futureN L R